![Page 1: Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal presentation 7.28.2015](https://reader030.fdocuments.us/reader030/viewer/2022032700/55d1dbaabb61eb5e328b470d/html5/thumbnails/1.jpg)
1
Groundwater Control Since 1934
Coal Ash Dewatering Solutions
![Page 2: Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal presentation 7.28.2015](https://reader030.fdocuments.us/reader030/viewer/2022032700/55d1dbaabb61eb5e328b470d/html5/thumbnails/2.jpg)
2
Groundwater Control Since 1934
WE ARE GRIFFINDewateringGriffin has provided service and equipment to the construction dewatering and groundwater pumping market since 1934 gaining the respect of Griffin’s clients by solving their groundwater problems.
Pumps & EquipmentGriffin Pump has over 80 years experience in manufacturing innovative equipment that is a direct result of field experience.
Filtration and TreatmentGriffin offers treatment systems for any application using the appropriate technologies to best treat the water on our client’s jobsite.
![Page 3: Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal presentation 7.28.2015](https://reader030.fdocuments.us/reader030/viewer/2022032700/55d1dbaabb61eb5e328b470d/html5/thumbnails/3.jpg)
3
Griffin Dewatering has the engineering capabilities, the experienced personnel and the wide range of equipment and services needed to handle complex dewatering challenges.
![Page 4: Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal presentation 7.28.2015](https://reader030.fdocuments.us/reader030/viewer/2022032700/55d1dbaabb61eb5e328b470d/html5/thumbnails/4.jpg)
4
Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal• Fly ash has low/no compressibility• Stabilization of fly ash for dry excavation results from
reduction of pore water pressure, thus increasing cohesion• Key success factors for excavation dewatering:
• Field permeability testing of fly ash in situ• Proper engineering analysis of permeability, flow conditions and
expected drawdown• High intensity of dewatering by using closely spaced wickpoints that
operate without disruption• Preventing recharge from aquifers or runoff• Effective filtration/treatment of discharged water
Ash Pond Dewatering
![Page 5: Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal presentation 7.28.2015](https://reader030.fdocuments.us/reader030/viewer/2022032700/55d1dbaabb61eb5e328b470d/html5/thumbnails/5.jpg)
5
Lowering the water content of ash pond materials by pre-drainage increases coal ash cohesion and stability.
This allows for vertical cuts to be made for large scale excavation with conventional excavation equipment.
The primary methods of ash pond dewatering are:
• Wickpoints• Deep Wells• Well Points• Eductors• Sumping
![Page 6: Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal presentation 7.28.2015](https://reader030.fdocuments.us/reader030/viewer/2022032700/55d1dbaabb61eb5e328b470d/html5/thumbnails/6.jpg)
6
Three Distinct Sources of Water
Ash Pond Dewatering
• Impounded/free water which lies on top of the ash and comes from precipitation and/or sluicing.
• Groundwater which may intrude into the bottom of the ash.
• Interstitial water which lies in the pore spaces of the ash.
Staging between the 3 pumping systems is a key factor in preventing the potential for leachate entering the groundwater.
![Page 7: Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal presentation 7.28.2015](https://reader030.fdocuments.us/reader030/viewer/2022032700/55d1dbaabb61eb5e328b470d/html5/thumbnails/7.jpg)
Ash Pond Dewatering
Three Part Solution
7
![Page 8: Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal presentation 7.28.2015](https://reader030.fdocuments.us/reader030/viewer/2022032700/55d1dbaabb61eb5e328b470d/html5/thumbnails/8.jpg)
Groundwater Control Since 1934
Kingston Fossil Plant Ash Pond, Kingston NC
Coal Combustible Residuals: Griffin’s Approach toEngineered Dewatering Solutions for Ash Pond Excavations
• Groundwater Modeling
• Engineering and Design
• Dewatering Systems
• Pumps and Equipment
• Filtration and Treatment
• Maintenance and Operation
8
![Page 9: Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal presentation 7.28.2015](https://reader030.fdocuments.us/reader030/viewer/2022032700/55d1dbaabb61eb5e328b470d/html5/thumbnails/9.jpg)
9
SEEP 2DGriffin utilizes two dimensional seepage analysis in order to calculate the flow lines, constant head lines and water table for specific projects like dam seepage and cutoff wall dewatering.
Using MODFLOW helps analyze the 3D models for the dewatering system. The cone of depression resulting from dewatering can be simulated and shown in 3D view. The flowrate required for drawdown at each jobsite can be estimated for each well location.
MODFLOW
![Page 10: Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal presentation 7.28.2015](https://reader030.fdocuments.us/reader030/viewer/2022032700/55d1dbaabb61eb5e328b470d/html5/thumbnails/10.jpg)
• Dewatering Systems Design (Permanent and Temporary)
• Aquifer Testing (Pumping Tests and Slug Tests)
• Uplift Pressure Calculation / Relief Well Design
• Recharge Well Design
• Dewatering Submittals
• Developing Dewatering Specifications Soil stratigraphy, using GMS Borehole Module, based on the available borehole data. Case study: Treatment Facility in Norfolk, VA
Engineering and Design
10
![Page 11: Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal presentation 7.28.2015](https://reader030.fdocuments.us/reader030/viewer/2022032700/55d1dbaabb61eb5e328b470d/html5/thumbnails/11.jpg)
SilterMops for free water pumping
Dewatering Systems
• Geotextile filter assembly
• Tailored to site conditions
• Suspended solids control
11
![Page 12: Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal presentation 7.28.2015](https://reader030.fdocuments.us/reader030/viewer/2022032700/55d1dbaabb61eb5e328b470d/html5/thumbnails/12.jpg)
Full Line of Dewatering and Treatment Systems
Dewatering Systems
• Deep Well Systems
• Wellpoint/Wickpoint Systems
• Eductor Systems
• Open Pumping/ Sumping
• Filtration and Treatment
12
![Page 13: Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal presentation 7.28.2015](https://reader030.fdocuments.us/reader030/viewer/2022032700/55d1dbaabb61eb5e328b470d/html5/thumbnails/13.jpg)
Wellpoints Deep Wells
Eductors Wickpoints
Dewatering Systems
13
![Page 14: Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal presentation 7.28.2015](https://reader030.fdocuments.us/reader030/viewer/2022032700/55d1dbaabb61eb5e328b470d/html5/thumbnails/14.jpg)
14
• Griffin wick drains are constructed using formed polystyrene core with a nonwoven spun bonded filter fabric.
• The core provides an uninterrupted path for water to flow.
Wickpoint System
Dewatering Systems
![Page 15: Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal presentation 7.28.2015](https://reader030.fdocuments.us/reader030/viewer/2022032700/55d1dbaabb61eb5e328b470d/html5/thumbnails/15.jpg)
15
Pumps and Equipment
![Page 16: Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal presentation 7.28.2015](https://reader030.fdocuments.us/reader030/viewer/2022032700/55d1dbaabb61eb5e328b470d/html5/thumbnails/16.jpg)
16
Filtration and Treatment
Griffin has extensive experience treating groundwater and offers field tested solutions and equipment for our client’s water treatment requirements.
Griffin offers systems to address standard groundwater issues such as:
• Total suspended solids• Nuisance mineral removal (Iron, manganese, etc.)
• Hardness
• pH
• Hydrogen sulfide
• Heavy metal removal
• Radium
• Radon
• VOC contamination
![Page 17: Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal presentation 7.28.2015](https://reader030.fdocuments.us/reader030/viewer/2022032700/55d1dbaabb61eb5e328b470d/html5/thumbnails/17.jpg)
17
Maintenance and Operation
Griffin has available specialists trained to operate, maintain, and repair a wide range of dewatering and treatment systems and equipment.
Griffin’s core dewatering business, includes construction, dewatering, systemsintegration, operation and maintenance.
![Page 18: Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal presentation 7.28.2015](https://reader030.fdocuments.us/reader030/viewer/2022032700/55d1dbaabb61eb5e328b470d/html5/thumbnails/18.jpg)
Kingston Fossil PlantAsh Recovery Project
Tennessee Valley Authority2012
Case Study
18
Griffin was contracted to lower water in ash more than 10’, creating a stable working platform and allowing a barrier wall to be constructed.
![Page 19: Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal presentation 7.28.2015](https://reader030.fdocuments.us/reader030/viewer/2022032700/55d1dbaabb61eb5e328b470d/html5/thumbnails/19.jpg)
19
![Page 20: Coal Combustible Residuals: Challenges and Solutions to Dewatering and Disposal presentation 7.28.2015](https://reader030.fdocuments.us/reader030/viewer/2022032700/55d1dbaabb61eb5e328b470d/html5/thumbnails/20.jpg)
Please visit our website for more details at:www.griffindewatering.com