CLMB315 (G-Code) - Dublin, Ohio, USAdublinohiousa.gov/dev/dev/wp-content/uploads/2017/03/17...Harper...

15

Transcript of CLMB315 (G-Code) - Dublin, Ohio, USAdublinohiousa.gov/dev/dev/wp-content/uploads/2017/03/17...Harper...

tnxTowertnxTower Job

CLMB315 Page

1 of 10

Harper Engineering, Inc. 815 Superior Ave., Suite 1514

Project 9-151-1103

Date

13:54:26 01/05/17 Cleveland, OH 44114

Phone: (216) 344-3855 FAX: (216) 344-3856

Client Verizon

Designed by

A.Hebovia

Tower Input Data There is a pole section. This tower is designed using the TIA-222-G standard. The following design criteria apply:

Tower is located in Franklin County, Ohio. Basic wind speed of 90 mph. Structure Class II. Exposure Category C. Topographic Category 1. Crest Height 0.000 ft. Nominal ice thickness of 0.750 in. Ice thickness is considered to increase with height. Ice density of 56 pcf. A wind speed of 40 mph is used in combination with ice. Deflections calculated using a wind speed of 60 mph. A non-linear (P-delta) analysis was used. Pressures are calculated at each section. Stress ratio used in pole design is 1. Local bending stresses due to climbing loads, feedline supports, and appurtenance mounts are not considered.

Tapered Pole Section Geometry Section Elevation

ft

Section Length

ft

Splice Length

ft

Number of

Sides

Top Diameter

in

Bottom Diameter

in

Wall Thickness

in

Bend Radius

in

Pole Grade

L1 140.000-95.780 44.220 4.430 18 21.000 31.460 0.188 0.750 A572-65 (65 ksi)

L2 95.780-47.600 52.610 5.790 18 30.037 42.290 0.313 1.250 A572-65 (65 ksi)

L3 47.600-1.000 52.390 18 40.317 52.500 0.375 1.500 A572-65 (65 ksi)

Tapered Pole Properties Section Tip Dia.

in Area in2

I in4

r in

C in

I/C in3

J in4

It/Q in2

w in

w/t

L1 21.324 12.386 677.826 7.388 10.668 63.538 1356.544 6.194 3.366 17.952 31.945 18.611 2299.500 11.102 15.982 143.884 4602.026 9.307 5.207 27.77

L2 31.548 29.483 3291.113 10.552 15.259 215.686 6586.557 14.744 4.737 15.157 42.942 41.636 9269.240 14.902 21.483 431.462 18550.676 20.822 6.893 22.058

L3 42.306 47.540 9581.841 14.179 20.481 467.845 19176.290 23.775 6.436 17.162 53.310 62.042 21296.775 18.504 26.670 798.529 42621.573 31.027 8.580 22.88

tnxTowertnxTower Job

CLMB315 Page

2 of 10

Harper Engineering, Inc. 815 Superior Ave., Suite 1514

Project 9-151-1103

Date

13:54:26 01/05/17 Cleveland, OH 44114

Phone: (216) 344-3855 FAX: (216) 344-3856

Client Verizon

Designed by

A.Hebovia

Tower Elevation

ft

Gusset Area

(per face)

ft2

Gusset Thickness

in

Gusset Grade Adjust. Factor Af

Adjust. Factor

Ar

Weight Mult.

Double Angle Stitch Bolt Spacing

Diagonals in

Double Angle Stitch Bolt Spacing

Horizontals in

L1 140.000-95.780

1 1 1

L2 95.780-47.600

1 1 1

L3 47.600-1.000

1 1 1

Monopole Base Plate Data

Base Plate Data Base plate is square Base plate is grouted √ Anchor bolt grade A615-75 Anchor bolt size 2.250 in Number of bolts 14 Embedment length 72.000 in f'c 3.000 ksi Grout space 2.000 in Base plate grade A572-50 Base plate thickness 2.250 in Bolt circle diameter 60.000 in Outer diameter 66.000 in Inner diameter 42.500 in Base plate type Plain Plate

Feed Line/Linear Appurtenances - Entered As Round Or Flat

Description Sector Component Type

Placement

ft

Total Number

Number Per Row

Start/End Position

Width or Diameter

in

Perimeter

in

Weight

klf 1 5/8'' Hybrid cable

(Verizon) B Surface Ar

(CaAa) 140.000 - 1.000 1 1 0.000

0.000 0.000 0.001

Feed Line/Linear Appurtenances - Entered As Area

Description Face or

Leg

Allow Shield

Component Type

Placement

ft

Total Number

CAAA

ft2/ft

Weight

klf LDF7-50A (1-5/8

FOAM) (Verizon)

B No Inside Pole 140.000 - 4.000 12 No Ice 1/2'' Ice 1'' Ice

0.000 0.000 0.000

0.001 0.001 0.001

2'' Rigid Conduit C No Inside Pole 81.000 - 11.000 1 No Ice 1/2'' Ice 1'' Ice

0.000 0.000 0.000

0.003 0.003 0.003

Feed Line/Linear Appurtenances Section Areas

tnxTowertnxTower Job

CLMB315 Page

3 of 10

Harper Engineering, Inc. 815 Superior Ave., Suite 1514

Project 9-151-1103

Date

13:54:26 01/05/17 Cleveland, OH 44114

Phone: (216) 344-3855 FAX: (216) 344-3856

Client Verizon

Designed by

A.Hebovia

Tower Section

Tower Elevation

ft

Face AR

ft2

AF

ft2

CAAA

In Face ft2

CAAA

Out Face ft2

Weight

K L1 140.000-95.780 A

B C

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.471 0.000

L2 95.780-47.600 A B C

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.514 0.094

L3 47.600-1.000 A B C

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.000 0.000

0.000 0.467 0.102

Feed Line/Linear Appurtenances Section Areas - With Ice Tower Section

Tower Elevation

ft

Face or

Leg

Ice Thickness

in

AR

ft2

AF

ft2

CAAA

In Face ft2

CAAA

Out Face ft2

Weight

K L1 140.000-95.780 A

B C

1.702 0.000 0.000 0.000

0.000 0.000 0.000

0.000 15.051 0.000

0.000 0.000 0.000

0.000 0.628 0.000

L2 95.780-47.600 A B C

1.619 0.000 0.000 0.000

0.000 0.000 0.000

0.000 16.399 0.000

0.000 0.000 0.000

0.000 0.684 0.094

L3 47.600-1.000 A B C

1.456 0.000 0.000 0.000

0.000 0.000 0.000

0.000 15.091 0.000

0.000 0.000 0.000

0.000 0.617 0.102

Shielding Factor Ka

Tower Section

Feed Line Record No.

Description Feed Line Segment Elev.

Ka No Ice

Ka Ice

L1 2 1 5/8" Hybrid cable 95.78 - 140.00 1.0000 1.0000 L2 2 1 5/8" Hybrid cable 47.60 - 95.78 1.0000 1.0000

Discrete Tower Loads

Description Face or

Leg

Offset Type

Offsets: Horz

Lateral Vert

ft ft ft

Azimuth Adjustment

°

Placement

ft

CAAA Front

ft2

CAAA Side

ft2

Weight

K

PiROD 13' Low Profile Platform Top (Monopole)

(Verizon)

C None 0.000 140.000 No Ice 1/2'' Ice 1'' Ice

15.700 20.100 24.500

15.700 20.100 24.500

1.300 1.765 2.230

(4) SBNHH-1D65C (Verizon)

A From Face 4.000 0.000

0.000 140.000 No Ice 1/2'' Ice

11.445 12.064

7.696 8.289

0.060 0.126

tnxTowertnxTower Job

CLMB315 Page

4 of 10

Harper Engineering, Inc. 815 Superior Ave., Suite 1514

Project 9-151-1103

Date

13:54:26 01/05/17 Cleveland, OH 44114

Phone: (216) 344-3855 FAX: (216) 344-3856

Client Verizon

Designed by

A.Hebovia

Description Face or

Leg

Offset Type

Offsets: Horz

Lateral Vert

ft ft ft

Azimuth Adjustment

°

Placement

ft

CAAA Front

ft2

CAAA Side

ft2

Weight

K

0.000 1'' Ice 12.689 8.889 0.199 (4) SBNHH-1D65C

(Verizon) B From Face 4.000

0.000 0.000

0.000 140.000 No Ice 1/2'' Ice 1'' Ice

11.445 12.064 12.689

7.696 8.289 8.889

0.060 0.126 0.199

(4) SBNHH-1D65C (Verizon)

C From Face 4.000 0.000 0.000

0.000 140.000 No Ice 1/2'' Ice 1'' Ice

11.445 12.064 12.689

7.696 8.289 8.889

0.060 0.126 0.199

(3) B13 RRH4x30-4R (Verizon)

A From Face 4.000 0.000 0.000

0.000 142.000 No Ice 1/2'' Ice 1'' Ice

2.520 2.742 2.973

1.890 2.093 2.304

0.057 0.077 0.099

(3) B25 RRH4x30-4R (Verizon)

B From Face 3.000 0.000 0.000

0.000 142.000 No Ice 1/2'' Ice 1'' Ice

2.497 2.717 2.947

1.498 1.688 1.886

0.051 0.068 0.089

(3) B66a RRH 4x45 (Verizon)

C From Face 3.000 0.000 0.000

0.000 142.000 No Ice 1/2'' Ice 1'' Ice

3.010 3.259 3.517

1.831 2.050 2.277

0.067 0.087 0.111

OVP distribution box (Verizon)

A From Face 3.000 0.000 0.000

0.000 142.000 No Ice 1/2'' Ice 1'' Ice

2.586 2.804 3.031

1.145 1.313 1.489

0.020 0.037 0.056

OVP distribution box (Verizon)

A From Face 2.000 0.000 0.000

0.000 142.000 No Ice 1/2'' Ice 1'' Ice

2.586 2.804 3.031

1.145 1.313 1.489

0.020 0.037 0.056

3' x 3.5'' Pipe Mount A From Face 2.000 0.000 0.000

0.000 142.000 No Ice 1/2'' Ice 1'' Ice

0.764 0.956 1.161

0.764 0.956 1.161

0.040 0.048 0.058

3' x 3.5'' Pipe Mount A From Face 2.000 0.000 0.000

0.000 142.000 No Ice 1/2'' Ice 1'' Ice

0.764 0.956 1.161

0.764 0.956 1.161

0.040 0.048 0.058

Mini T-arm C None 0.000 80.000 No Ice 1/2'' Ice 1'' Ice

4.500 9.870

15.240

4.500 9.870

15.240

0.214 0.275 0.336

Speaker A From Face 1.000 0.000 0.000

0.000 61.000 No Ice 1/2'' Ice 1'' Ice

2.586 2.804 3.031

1.145 1.313 1.489

0.020 0.037 0.056

Electric box C None 0.000 10.000 No Ice 1/2'' Ice 1'' Ice

6.024 6.536 7.056

3.800 4.302 4.804

0.016 0.046 0.083

Electric box C None 0.000 14.000 No Ice 1/2'' Ice 1'' Ice

6.024 6.536 7.056

3.800 4.302 4.804

0.016 0.046 0.083

Electric box C None 0.000 18.000 No Ice 1/2'' Ice 1'' Ice

6.024 6.536 7.056

3.800 4.302 4.804

0.016 0.046 0.083

(2) CBC721-DF Diplexer (Verizon)

A From Face 3.000 0.000 0.000

0.000 142.000 No Ice 1/2'' Ice 1'' Ice

1.167 1.314 1.469

0.467 0.575 0.691

0.004 0.012 0.021

(2) CBC721-DF Diplexer (Verizon)

B From Face 3.000 0.000 0.000

0.000 142.000 No Ice 1/2'' Ice 1'' Ice

1.167 1.314 1.469

0.467 0.575 0.691

0.004 0.012 0.021

(2) CBC721-DF Diplexer (Verizon)

C From Face 3.000 0.000 0.000

0.000 142.000 No Ice 1/2'' Ice 1'' Ice

1.167 1.314 1.469

0.467 0.575 0.691

0.004 0.012 0.021

tnxTowertnxTower Job

CLMB315 Page

5 of 10

Harper Engineering, Inc. 815 Superior Ave., Suite 1514

Project 9-151-1103

Date

13:54:26 01/05/17 Cleveland, OH 44114

Phone: (216) 344-3855 FAX: (216) 344-3856

Client Verizon

Designed by

A.Hebovia

Dishes

Description Face or

Leg

Dish Type

Offset Type

Offsets: Horz

Lateral Vert

ft

Azimuth Adjustment

°

3 dB Beam Width

°

Elevation

ft

Outside Diameter

ft

Aperture Area

ft2

Weight

K P2-57W C Paraboloid w/o

Radome From Face

1.000 5.600 0.000

0.000 80.000 2.000 No Ice 1/2'' Ice 1'' Ice

3.140 3.407 3.674

0.025 0.042 0.060

P2-57W C Paraboloid w/o Radome

From Face

1.000 3.400 0.000

0.000 80.000 2.000 No Ice 1/2'' Ice 1'' Ice

3.140 3.407 3.674

0.025 0.042 0.060

P2-57W C Paraboloid w/o Radome

From Face

1.000 1.100 0.000

0.000 80.000 2.000 No Ice 1/2'' Ice 1'' Ice

3.140 3.407 3.674

0.025 0.042 0.060

P2-57W C Paraboloid w/o Radome

From Face

1.000 -1.100 0.000

0.000 80.000 2.000 No Ice 1/2'' Ice 1'' Ice

3.140 3.407 3.674

0.025 0.042 0.060

P2-57W C Paraboloid w/o Radome

From Face

1.000 -3.400 0.000

0.000 80.000 2.000 No Ice 1/2'' Ice 1'' Ice

3.140 3.407 3.674

0.025 0.042 0.060

P2-57W C Paraboloid w/o Radome

From Face

1.000 -5.600 0.000

0.000 80.000 2.000 No Ice 1/2'' Ice 1'' Ice

3.140 3.407 3.674

0.025 0.042 0.060

Load Combinations Comb.

No. Description

1 Dead Only 2 1.2 Dead+1.6 Wind 0 deg - No Ice 3 0.9 Dead+1.6 Wind 0 deg - No Ice 4 1.2 Dead+1.6 Wind 90 deg - No Ice 5 0.9 Dead+1.6 Wind 90 deg - No Ice 6 1.2 Dead+1.6 Wind 180 deg - No Ice 7 0.9 Dead+1.6 Wind 180 deg - No Ice 8 1.2 Dead+1.0 Ice 9 1.2 Dead+1.0 Wind 0 deg+1.0 Ice

10 1.2 Dead+1.0 Wind 90 deg+1.0 Ice 11 1.2 Dead+1.0 Wind 180 deg+1.0 Ice 12 Dead+Wind 0 deg - Service 13 Dead+Wind 90 deg - Service 14 Dead+Wind 180 deg - Service

Maximum Member Forces Section

No. Elevation

ft Component

Type Condition Gov.

Load Comb.

Axial

K

Major Axis Moment

kip-ft

Minor Axis Moment

kip-ft L1 140 - 95.78 Pole Max Tension 1 0.000 0.000 0.000

Max. Compression 8 -14.630 1.626 0.533 Max. Mx 4 -5.695 -362.544 -1.444 Max. My 2 -5.685 2.183 362.801 Max. Vy 4 10.425 -362.544 -1.444

tnxTowertnxTower Job

CLMB315 Page

6 of 10

Harper Engineering, Inc. 815 Superior Ave., Suite 1514

Project 9-151-1103

Date

13:54:26 01/05/17 Cleveland, OH 44114

Phone: (216) 344-3855 FAX: (216) 344-3856

Client Verizon

Designed by

A.Hebovia

Section No.

Elevation ft

Component Type

Condition Gov. Load

Comb.

Axial

K

Major Axis Moment

kip-ft

Minor Axis Moment

kip-ft Max. Vx 2 -10.414 2.183 362.801 Max. Torque 2 0.962

L2 95.78 - 47.6 Pole Max Tension 1 0.000 0.000 0.000 Max. Compression 8 -27.408 1.827 -0.634 Max. Mx 4 -14.019 -951.445 -4.033 Max. My 2 -13.985 4.213 976.132 Max. Vy 4 14.782 -951.445 -4.033 Max. Vx 2 -15.700 4.213 976.132 Max. Torque 2 1.062

L3 47.6 - 1 Pole Max Tension 1 0.000 0.000 0.000 Max. Compression 8 -46.413 1.827 -0.634 Max. Mx 4 -27.872 -1843.910 -7.764 Max. My 2 -27.871 7.460 1916.548 Max. Vy 4 19.408 -1843.910 -7.764 Max. Vx 2 -20.315 7.460 1916.548 Max. Torque 2 1.062

Maximum Reactions

Location Condition Gov. Load

Comb.

Vertical K

Horizontal, X K

Horizontal, Z K

Pole Max. Vert 9 46.413 0.008 4.320 Max. Hx 3 20.911 0.061 20.300 Max. Hz 2 27.882 0.061 20.300 Max. Mx 2 1916.548 0.061 20.300 Max. Mz 4 1843.910 -19.393 -0.070 Max. Torsion 2 1.061 0.061 20.300 Min. Vert 5 20.911 -19.393 -0.070 Min. Hx 4 27.882 -19.393 -0.070 Min. Hz 6 27.882 -0.061 -19.909 Min. Mx 6 -1885.739 -0.061 -19.909 Min. Mz 2 -7.460 0.061 20.300 Min. Torsion 6 -1.052 -0.061 -19.909

Tower Mast Reaction Summary

Load Combination

Vertical

K

Shearx

K

Shearz

K

Overturning Moment, Mx

kip-ft

Overturning Moment, Mz

kip-ft

Torque

kip-ft Dead Only 23.235 0.000 0.000 0.224 0.572 0.000 1.2 Dead+1.6 Wind 0 deg - No Ice

27.882 -0.061 -20.300 -1916.548 7.460 -1.061

0.9 Dead+1.6 Wind 0 deg - No Ice

20.911 -0.061 -20.300 -1906.214 7.237 -1.050

1.2 Dead+1.6 Wind 90 deg - No Ice

27.882 19.393 0.070 7.764 -1843.910 0.456

0.9 Dead+1.6 Wind 90 deg - No Ice

20.911 19.393 0.070 7.653 -1833.962 0.460

1.2 Dead+1.6 Wind 180 deg - No Ice

27.882 0.061 19.909 1885.739 -6.037 1.052

0.9 Dead+1.6 Wind 180 deg - No Ice

20.911 0.061 19.909 1875.386 -6.182 1.041

tnxTowertnxTower Job

CLMB315 Page

7 of 10

Harper Engineering, Inc. 815 Superior Ave., Suite 1514

Project 9-151-1103

Date

13:54:26 01/05/17 Cleveland, OH 44114

Phone: (216) 344-3855 FAX: (216) 344-3856

Client Verizon

Designed by

A.Hebovia

Load Combination

Vertical

K

Shearx

K

Shearz

K

Overturning Moment, Mx

kip-ft

Overturning Moment, Mz

kip-ft

Torque

kip-ft 1.2 Dead+1.0 Ice 46.413 -0.000 0.000 0.634 1.827 0.000 1.2 Dead+1.0 Wind 0 deg+1.0 Ice

46.413 -0.008 -4.320 -393.429 2.879 -0.211

1.2 Dead+1.0 Wind 90 deg+1.0 Ice

46.413 4.177 0.010 1.745 -380.568 0.048

1.2 Dead+1.0 Wind 180 deg+1.0 Ice

46.413 0.008 4.258 389.715 0.951 0.211

Dead+Wind 0 deg - Service 23.235 -0.015 -5.045 -474.737 2.263 -0.263 Dead+Wind 90 deg - Service 23.235 4.820 0.017 2.084 -456.459 0.113 Dead+Wind 180 deg - Service 23.235 0.015 4.948 467.412 -1.081 0.262

Solution Summary

Load Comb.

Sum of Applied Forces Sum of Reactions % Error PX

K PY K

PZ K

PX K

PY K

PZ K

1 0.000 -23.235 0.000 0.000 23.235 0.000 0.000% 2 -0.061 -27.882 -20.300 0.061 27.882 20.300 0.000% 3 -0.061 -20.911 -20.300 0.061 20.911 20.300 0.000% 4 19.393 -27.882 0.070 -19.393 27.882 -0.070 0.000% 5 19.393 -20.911 0.070 -19.393 20.911 -0.070 0.000% 6 0.061 -27.882 19.909 -0.061 27.882 -19.909 0.000% 7 0.061 -20.911 19.909 -0.061 20.911 -19.909 0.000% 8 0.000 -46.413 0.000 0.000 46.413 0.000 0.000% 9 -0.008 -46.413 -4.320 0.008 46.413 4.320 0.000%

10 4.177 -46.413 0.010 -4.177 46.413 -0.010 0.000% 11 0.008 -46.413 4.258 -0.008 46.413 -4.258 0.000% 12 -0.015 -23.235 -5.045 0.015 23.235 5.045 0.000% 13 4.820 -23.235 0.017 -4.820 23.235 -0.017 0.000% 14 0.015 -23.235 4.948 -0.015 23.235 -4.948 0.000%

Non-Linear Convergence Results

Load Combination

Converged? Number of Cycles

Displacement Tolerance

Force Tolerance

1 Yes 4 0.00000001 0.00000001 2 Yes 4 0.00000001 0.00017603 3 Yes 4 0.00000001 0.00010756 4 Yes 4 0.00000001 0.00004344 5 Yes 4 0.00000001 0.00002690 6 Yes 4 0.00000001 0.00014374 7 Yes 4 0.00000001 0.00008800 8 Yes 4 0.00000001 0.00000001 9 Yes 4 0.00000001 0.00003840

10 Yes 4 0.00000001 0.00002543 11 Yes 4 0.00000001 0.00003748 12 Yes 4 0.00000001 0.00001283 13 Yes 4 0.00000001 0.00000001 14 Yes 4 0.00000001 0.00001215

tnxTowertnxTower Job

CLMB315 Page

8 of 10

Harper Engineering, Inc. 815 Superior Ave., Suite 1514

Project 9-151-1103

Date

13:54:26 01/05/17 Cleveland, OH 44114

Phone: (216) 344-3855 FAX: (216) 344-3856

Client Verizon

Designed by

A.Hebovia

Maximum Tower Deflections - Service Wind

Section No.

Elevation

ft

Horz. Deflection

in

Gov. Load

Comb.

Tilt °

Twist °

L1 140 - 95.78 14.648 12 1.044 0.004 L2 100.21 - 47.6 7.067 12 0.703 0.001 L3 53.39 - 1 1.898 12 0.336 0.000

Critical Deflections and Radius of Curvature - Service Wind

Elevation

ft

Appurtenance Gov. Load

Comb.

Deflection

in

Tilt °

Twist °

Radius of Curvature

ft 142.000 (3) B13 RRH4x30-4R 12 14.648 1.044 0.004 41228 140.000 PiROD 13' Low Profile Platform

Top (Monopole) 12 14.648 1.044 0.004 41228

80.000 P2-57W 12 4.292 0.537 0.000 5857 61.000 Speaker 12 2.449 0.391 0.000 6679 18.000 Electric box 12 0.391 0.104 0.000 21809 14.000 Electric box 12 0.290 0.079 0.000 28520 10.000 Electric box 12 0.197 0.055 0.000 41196

Maximum Tower Deflections - Design Wind

Section No.

Elevation

ft

Horz. Deflection

in

Gov. Load

Comb.

Tilt °

Twist °

L1 140 - 95.78 59.134 2 4.211 0.016 L2 100.21 - 47.6 28.545 2 2.840 0.004 L3 53.39 - 1 7.667 2 1.358 0.001

Critical Deflections and Radius of Curvature - Design Wind

Elevation

ft

Appurtenance Gov. Load

Comb.

Deflection

in

Tilt °

Twist °

Radius of Curvature

ft 142.000 (3) B13 RRH4x30-4R 2 59.134 4.211 0.016 10281 140.000 PiROD 13' Low Profile Platform

Top (Monopole) 2 59.134 4.211 0.016 10281

80.000 P2-57W 2 17.341 2.172 0.002 1456 61.000 Speaker 2 9.894 1.581 0.001 1655 18.000 Electric box 2 1.577 0.419 0.001 5393 14.000 Electric box 2 1.172 0.320 0.000 7053 10.000 Electric box 2 0.794 0.221 0.000 10187

tnxTowertnxTower Job

CLMB315 Page

9 of 10

Harper Engineering, Inc. 815 Superior Ave., Suite 1514

Project 9-151-1103

Date

13:54:26 01/05/17 Cleveland, OH 44114

Phone: (216) 344-3855 FAX: (216) 344-3856

Client Verizon

Designed by

A.Hebovia

Base Plate Design Data

Plate Thickness

in

Number of Anchor

Bolts

Anchor Bolt Size

in

Actual Allowable

Ratio Bolt

Tension K

Actual Allowable

Ratio Concrete

Stress ksi

Actual Allowable

Ratio Plate Stress

ksi

Actual Allowable

Ratio Stiffener

Stress ksi

Controlling Condition

Critical Ratio

2.250 14 2.250 83.251 223.654

0.37

1.260 3.060 0.41

22.680 45.000

0.50

Plate 0.50

Compression Checks

Pole Design Data Section

No. Elevation

ft

Size

L

ft

Lu

ft

Kl/r

A

in2

Pu

K

φPn

K

Ratio Pu

φPn L1 140 - 95.78 (1) TP31.46x21x0.188 44.220 0.000 0.0 17.987 -5.685 1131.500 0.005 L2 95.78 - 47.6 (2) TP42.29x30.037x0.313 52.610 0.000 0.0 40.299 -13.985 2769.140 0.005 L3 47.6 - 1 (3) TP52.5x40.317x0.375 52.390 0.000 0.0 62.042 -27.871 4159.330 0.007

Pole Bending Design Data Section

No. Elevation

ft

Size

Mux

kip-ft

φMnx

kip-ft

Ratio Mux

φMnx

Muy

kip-ft

φMny

kip-ft

Ratio Muy

φMny L1 140 - 95.78 (1) TP31.46x21x0.188 362.808 704.407 0.515 0.000 704.407 0.000 L2 95.78 - 47.6 (2) TP42.29x30.037x0.313 976.142 2313.908 0.422 0.000 2313.908 0.000 L3 47.6 - 1 (3) TP52.5x40.317x0.375 1916.558 4461.167 0.430 0.000 4461.167 0.000

Pole Shear Design Data Section

No. Elevation

ft

Size

Actual Vu

K

φVn

K

Ratio Vu

φVn

Actual Tu

kip-ft

φTn

kip-ft

Ratio Tu

φTn L1 140 - 95.78 (1) TP31.46x21x0.188 10.414 565.752 0.018 0.961 1410.533 0.001 L2 95.78 - 47.6 (2) TP42.29x30.037x0.313 15.701 1384.570 0.011 1.062 4633.475 0.000 L3 47.6 - 1 (3) TP52.5x40.317x0.375 20.316 2079.660 0.010 1.061 8933.250 0.000

tnxTowertnxTower Job

CLMB315 Page

10 of 10

Harper Engineering, Inc. 815 Superior Ave., Suite 1514

Project 9-151-1103

Date

13:54:26 01/05/17 Cleveland, OH 44114

Phone: (216) 344-3855 FAX: (216) 344-3856

Client Verizon

Designed by

A.Hebovia

Pole Interaction Design Data Section

No. Elevation

ft

Ratio Pu

φPn

Ratio Mux

φMnx

Ratio Muy

φMny

Ratio Vu

φVn

Ratio Tu

φTn

Comb. Stress Ratio

Allow. Stress Ratio

Criteria

L1 140 - 95.78 (1) 0.005 0.515 0.000 0.018 0.001 0.520 1.000 4.8.2 L2 95.78 - 47.6 (2) 0.005 0.422 0.000 0.011 0.000 0.427 1.000 4.8.2 L3 47.6 - 1 (3) 0.007 0.430 0.000 0.010 0.000 0.436 1.000 4.8.2

Section Capacity Table Section

No. Elevation

ft Component

Type Size Critical

Element P K

øPallow

K %

Capacity Pass Fail

L1 140 - 95.78 Pole TP31.46x21x0.188 1 -5.685 1131.500 52.0 Pass L2 95.78 - 47.6 Pole TP42.29x30.037x0.313 2 -13.985 2769.140 42.7 Pass L3 47.6 - 1 Pole TP52.5x40.317x0.375 3 -27.871 4159.330 43.6 Pass

Summary Pole (L1) 52.0 Pass Base Plate 50.4 Pass RATING = 52.0 Pass

Program Version 6.0.0.8 - 9/7/2011 File:Z:/(9-151) Verizon LTE New Builds/Verizon Sites/Site 1103/Structural/Risa/CLMB315/CLMB315 (G-Code).eri

STAMP

ENGINEERED ENDEAVORS10975 Kinsman Road * Newbury, OH 44065-9787

Ph: (440) 564-5484 * Ph: (888) 270-3855Fx: (440) 564-5489 * www.engend.com

FOR REVIEWTHIS DRAWING IS CONFIDENTIAL AND MAY NOT BE LOANED, REPRODUCED,

COPIED EITHER WHOLLY OR IN PART, OR MADE PUBLIC IN ANY MANNERWITHOUT THE WRITTEN CONSENT OF ENGINEERED ENDEAVORS. -

ALL RIGHTS OF DESIGN OR INVENTION ARE RESERVED.

REVISION HISTORY

REV. # DATE BY DESCRIPTION

DRAWN BY CREATED PROJECT NUMBER

DRAWING NUMBER

RVH 6/17/15 17476

17476-E01-S1

140' STADIUM LIGHT POLEVERIZON WIRELESS

DUBLIN-COFFMAN HS/CLMB-315

FRANKLIN COUNTY, OHELEVATION VIEW & DETAILS

0 6/25/15 RVH ISSUED FOR REVIEW

B

SLIP JOINT JACKING

EQ

.E

Q.

CL SPLICE

LEN

GTH

SP

LIC

E

PROVISION DETAIL

3'-0

"3'

-0"

10"

20"

6"12

"

1"Ø (A194-2H TYPE 3)JACKING H.N. WELDED OVER1 3/16"Ø HOLES IN SHAFT @CL FLATS 2 & 11

2" HORIZ. SHAFTORIENTATION WELDBEAD @ CORNEROF FLATS #7 & 81"Ø (A194-2H TYPE 3) JACKING H.N.

WELDED OVER 1 3/16"Ø HOLES INSHAFT @ CL FLATS 2 & 11

NOTE: FOR REQUIRED TOLERANCES AT SLIPJOINTS AND REQD. JACKING FORCES SEE"STRUCTURE ASSEMBLY AND ERECTIONPROCEDURES".

(2) 1 1/2"x4' HANDLING SLOTSw/ 3/4"R @ THIS END

LS-261 TOPBRKT. ASSY.

GUIDE ASSY.LS-379 CABLE

BRKT. ASSEMBLYLS-262 BOTTOM

SAFETY CLIMB ATTACHMENT DETAILS

HOLES

CABLE

UPPER

HOLES

HOLES

TENSIONERL-251

LOWER

INTERMEDIATEMTG. BRKT.

MTG. BRKT.

MTG. BRKT.

(2) H.N., (2) F.W.& TENSIONINDICATOR

(LOCATED ALONG CL OF FLAT #4)

(2) 9/16"Ø

(2) 9/16"Ø

(2) 7/16"Ø 3/8"Ø SAFETY

STEP BOLT DETAIL

STEP BOLT BRKT. (3/16" PL~A871-GR65)

3/4"Ø HOLE

AELEVATION VIEW

5/8"Ø x 6 1/2" LG.BUTTON HEAD

STEP BOLT w/(1)5/8" HEX NUT & (1)5/8" SQUARE NUT

1

32

30BVIEW

G

H

CL SPLICE

SEE SLIP JOINTJACKING PROVISIONDETAIL

WORK POINT

11'-0

"

12'-0

SA

FETY

CLI

MB

PR

OV

ISIO

NS

UP

CL

OF

FLA

T #4

TO

TO

P O

F P

OLE

PR

OV

ISIO

NS

FO

R S

TEP

SC

EN

TER

ED

AB

OU

T FL

AT

#4(S

PA

CE

D 1

'-3" A

PA

RT

VE

RT.

& A

MA

X. O

F 24

" CIR

CU

M.)

TO T

OP

OF

PO

LE (S

EE

STE

PB

OLT

DE

TAIL

)

GROUND LINE

3

12

21

3

4

5

6

7

89 10

11

13

14

15

1617

18

DSECTION

CSECTION

(A871-GR65)CL 6" x 18" OD HANDHOLE

@ CL FLATS 1, 7 & 13 w/INTERNAL KELLUM HOOKS

3/16

5/163/16

2

1'-0

"15°

Ø25 3/4" BC

(24) Ø1 3/16" HOLES

CL KELLUM HOOKS @INTERIOR @ CL FLATS3, 6, 9, 12, 15 & 18

C

NOTE: PLATFORM REMOVED FOR CLARITY

CL SPLICE

7

11 12

(A871-GR65)CL 5" x 7" OD HANDHOLE

@ CL FLAT 17w/INTERNAL KELLUM HOOKS

14

16

6

4

8

5

4

9

8 9

6

5

& SLOT COVERS REQUIREDFOR PLATFORM ATTACHMENT

(9) 1"Ø (A325) HEX BOLTSNOTE:7"

10

139'

-0"

10'-0

"

49'-6"

97'-0"

121'

-0"

2 1/

4"52

'-2 1

/2"

3/8"

PL

A87

1-G

R65

PO

LY-1

8 S

HA

FT

3'-0

"

52'-7

11/

32"

5/16

" PL

A87

1-G

R65

PO

LY-1

8 S

HA

FT

44'-1

19/

32"

3/16

" PL

A87

1-G

R65

PO

LY-1

8 S

HA

FT1"

4'-5

5/3

2"S

PLI

CE

LE

NG

TH5'

-9 1

/2"

SP

LIC

E L

EN

GTH

(A871-GR65)18"x18"x1/2" BRACKET@ 79'-0" & 76'-0" ELEV

(FIELD DRILL BOTH BRACKETS)(FOR SERVICE PLATFORM)

PO

LE T

AP

ER

= 0

.236

97 in

/ft

31

106'

-0"

PL 1"(A588-GR50)

3'-6 5/16" AF [42.3127] AF

3'-4 1/8" AF [40.1284] AF

4'-4 1/2" AF [52.5000] AF

2'-7 15/32" AF [31.4583] AF

2'-5 27/32" AF [29.8454] AF

1'-9" AF [21.0000] AF

5" x 7" HANDHOLE(A871-GR65)@ 76'-0" ELEV

x 3

12

2 13

45

67

8 9 1011

131415

161718

Ø1 1/2" S.S. THREADED PIPECOUPLING @ 60°

D

76'-0"

79'-0"

3"TYP

59'-0"

E

12

21

3

4

5

6

7

89 10

11

13

14

15

16

1718

ESECTION

3/16TYP

(A871-GR65)12"x12"x1/2" BRACKET@ 59'-0" ELEV(FIELD DRILL BRACKET)(FOR SPEAKER RELOCATION)

5/167/16

TYP

Ø1 1/2" S.S.THREADED PIPECOUPLING @ 76'-0" ELEV

Ø28 1/2" ODØ18" ID

60°

240°

60°

TYP3/16

Ø1 1/2" S.S. THREADED PIPECOUPLING @ 60°(A304 STAINLESS)

F

150°

12

21

3

4

5

6

7

89 10

11

13

14

15

16

1718

FSECTION

3/16

5" x 7" HANDHOLE(A871-GR65)@ 10'-0" ELEV

Ø1 1/2" S.S. THREADED PIPE COUPLING@ 10'-0" ELEV

3/81/2

TYP

12

21

3

4

5

6

7

89 10

11

13

14

15

16

17

18

(A588-GR50)9" x 24" ACCESS PORT

@ 3'-0" ELEV

3/81/2

100%

12(A588-GR50)9" x 24" ACCESS PORT@ 3'-0" ELEV

11

GSECTION

2"TYP

HSECTION

3/81/2

UT1/4

PL 2 1/4"(A588-GR50)

12

21

3

4

5

6

7

89 10

11

13

14

15

16

1718

(14) Ø2 3/4" HOLES

Ø60" BC

Ø42 1/2"

Ø66"

NOTE: PLATFORM, ANTENNA MOUNTS & LIGHTNING ROD EXTENSION TO BE PAINTED CORE 10 BROWN.

315°22

135°

(A588-GR50)9" x 24" ACCESS PORT

@ 3'-0" ELEV

(A871-GR65)CL 5" x 7" OD HANDHOLE@ CL FLAT 17w/INTERNAL KELLUM HOOKS

15 16

13

NOTE: RE-LOCATE FIELDLIGHTING FROM EXISTING POLE

1211

1211

1615

1615

TYP3/16

TYP 5/16

140' AGL

33

3315

(A871-GR65)CL 5" x 7" OD HANDHOLE

@ CL FLAT 17w/INTERNAL KELLUM HOOKS

16 3315NOTE: RE-LOCATE FIELD

SPEAKERS FROM EXISTING POLE

33

33

0° FIELD

33

5" x 7" HANDHOLE(A871-GR65)@ 59'-0" ELEV

5/167/16

TYP

1615 33

PAINTED CORE-10 BROWN.PLATFORM AND MOUNTSNOTE:

FIELD

25.7°

3333

33

33

60°

6/25/15

3

DRAWING NO.

PROJECT NO.

2

3

1

2

12" MIN.3

12"

3"(1

4) @

6" O

.C. =

7'-0

"3"

2

3

1

1

1. ANCHOR BOLTS SHALL BE ATTACHED w/(2) HEX NUTS TO BOTH TEMPLATES2. ANCHOR BOLTS SHALL BE INSTALLED w/LONGER THREADED END UP.

REV DESCRIPTION DATE DWN CHK

ANCHOR BOLT PROJECTION

VOL. CONCRETE @ 4000 psi (TYPE II CEMENT)

STEEL (ASTM A615-GR.60) lbs

yd 3

MATERIAL LISTDESCRIPTIONITEM QTY.

VIEW "A-A"(TEMPLATE NOT SHOWN)

"A""A"

-0.0

"C" "C"

4"

VIEW "B-B"INSTALL 2" BELOW TOP

OF CONCRETE

45

6" ±

6" ±

4

5

4

5

"B""B"

REBAR SHOULD BE CENTERED BETWEEN

ANCHOR BOLTS

EQ EQ

3" MINCLEARANCE

000

LEAN CLAY W/SAND

SEE STRUCTURE DRAWING17476-P01 FOR ANCHOR

BOLT ORIENTATION ACCORDING

-25'-0"

12"

(18)

@ 1

2" O

.C. =

18'

-0"

25'-6

"

26'-0

"

6'-4"5'-3"

1'-4

"

1'-4" 1'-4"

14

22 #11 REBAR x 25'-6" (ASTM A615-GR.60)

33 #5 REBAR x 22'-0" (ASTM A615-GR.60)

2 #5 REBAR x 7'-4" (ASTM A615-GR.60)

4 #5 REBAR x 6'-3" (ASTM A615-GR.60)

38

3800

1. FOUNDATION DESIGN IS BASED ON THE FOLLOWING: EEI JOB# 17476, DRAWING# 17476-E01. 140' MONOPOLE. SOIL REPORT BY CTL ENGINEERING, INC., JULY 30, 2014.

2. FOUNDATION EMBEDMENT IS SHOWN FROM THE GROUND LEVEL AT THE TIME OF SOIL INVESTIGATION AS DEPICTED IN THE SOIL REPORT. SHOULD THE ACTUAL SOIL CONDITIONS DIFFER FROM THOSE IN THE REPORT, THE GEOTECHNICAL ENGINEER AND FOUNDATION DESIGNER SHOULD BE NOTIFIED IN ORDER TO RE-EVALUATE THE FOUNDATION DESIGN.

3. SOIL REPORT SHOULD BE CONSULTED PRIOR TO CONSTRUCTION. STEEL CASING OR SLURRY METHOD MAY BE REQUIRED TO PREVENT SOIL FROM CAVING DURING CONSTRUCTION. THE CASING SHOULD BE REMOVED AFTER COMPLETION OF CONCRETING OR, IF LEFT IN THE GROUND, ALL VOIDS AROUND THE CASING SHALL BE FILLED WITH PRESSURIZED GROUT.

4. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES,AND PROCEDURES.

5. SPECIAL INSPECTION IS REQUIRED IN ACCORDANCE WITH 2012 IBC CHAPTER 17, SECTION 1704. 5.1. SOIL. 5.1.a. FOUNDATION EXCAVATION SHALL BE INSPECTED PRIOR TO INSTALLATION OF REINFORCEMENT. 5.1.b. VERIFY DEPTH AND DIAMETER OF THE EXCAVATION. 5.1.c. VERIFY ACTUAL SOIL CONDITIONS AGAINST THE GEOTECHNICAL REPORT.

5.2. REINFORCING STEEL. 5.2.a. VERIFY GRADE, LENGTH, DIAMETER, AND QUANTITY OF REBARS AND COMPLIANCE WITH THE DRAWINGS. 5.2.b. VERIFY GRADE, LENGTH, DIAMETER, AND QUANTITY OF ANCHOR BOLTS AND BOLT PATTERN ON THE TEMPLATES.

5.3. CONCRETE. 5.3.a. VERIFY STRENGTH, SLUMP, AIR, TEMPERATURE OF CONCRETE, AND DESIGN MIX.

6. REINFORCING STEEL. 6.1. REINFORCING STEEL SHALL CONFORM TO ASTM A615, Fy=60 ksi. 6.2. ALL REINFORCEMENT SHALL BE ASSEMBLED USING STEEL WIRE. WELDING IS NOT PERMITTED.

6.4. HORIZONTAL STIRRUPS SHALL BE STAGGERED ALONG THE REBAR CAGE WITH NO MORE THAN 50% OF SPLICES IN ONE PLACE.

7. CONCRETE. 7.1. MIX DESIGN AND CONSTRUCTION PROCEDURE SHALL BE IN COMPLIANCE WITH ACI 318, ACI 336.3R-93,AND ALL APPLICABLE STATE AND LOCAL CODES. 7.2. MINIMUM COMPRESSIVE STRENGTH - 4000 psi AT 28 DAYS AND TYPE II CEMENT SHALL BE USED UNLESS STATED OTHERWISE.

7.4. CONCRETE SHALL BE DEPOSITED AS NEARLY AS PRACTICAL IN ITS FINAL POSITION TO AVOID SEGREGATION DUE TO REHANDLING OR FLOWING. 7.5. CONCRETE SHALL BE THOROUGHLY CONSOLIDATED BY ALL SUITABLE MEANS DURING PLACEMENT AND SHALL BE THOROUGHLY WORKED AROUND REINFORCEMENT AND EMBEDDED FIXTURES AND INTO CORNERS OF FORMS.

8. ANCHOR BOLT INSTALLATION. ANCHOR BOLT ORIENTATION SHALL BE VERIFIED WITH THE SITE PLANS AND MONOPOLE DRAWING FOR PROPER FIELD LIGHT, ACCESS PORT ORIENTATION, AND ANCHOR BOLT ALIGNMENT PRIOR TO CONCRETE PLACEMENT.

VERIZON WIRELESS140' MONOPOLE

DUBLIN-COFFMAN HS / CLMB-315FRANKLIN COUNTY, OH

17476-E01

17476D.140.00 COMPLETED DRAWING LAP6/25/15

60" ANCHORBOLT EMBEDMENT

FIELD LIGHT AND

10975 Kinsman Road * Newbury, OH 44065-9787

Fx: (440) 564-5489 * www.engend.comPh: (440) 564-5484 * Ph: (888) 270-3855

The Experienced Point of View

FOUNDATION LOADINGTIA-222 G

MOMENT

SHEAR

AXIAL

kip-ft

kips

kips

3878

36

41

SEE SOIL REPORT "GEOTECHNICAL CONSTRUCTION CONSIDERATIONS".

LEAN CLAY

ACCESS PORT ORIENTATION

6/25/15