US Coal ReservesPartnersTechnologySiteProject OptionsImpact (Economic & Environmental)ProgressQuestions
US Coal ReservesUS Coal Reserves
US Coal ReservesUS Coal Reserves
Select History of Gasification ProjectsSelect History of Gasification Projects
140Power, Methanol1,0001GermanySVZ92,080138
50/80Fuel Gas350/5002GBBritish Gas1
100Town Gas9406GermanyRuhrgas AG1
90Town Gas8205GBBritish Gas1
65Town Gas5804GBBritish Gas1
170Electric Power1,5605GermanySteag AG1
140Ammonia1,0804PR ChinaCNTIC
830SNG16,00014USAGreat Plains
2,680Liquid Fuels30,00040RSASasol III
2,680Liquid Fuels30,00040RSASasol II1,200Syngas/Chemicals1,0005USA*EPIC
MWeMain ProductsCoal Input (tpd)GasifiersCountryClient
*Over EPIC designed gasifiers operate in China. At least 50 run on Anthracite!
Typical Gasifier Operations: Typical Gasifier Operations: Much CLEANER Than burning coalMuch CLEANER Than burning coal
EPIC EPIC AirBlowAirBlow
nn
Coal Gasification ProcessCoal Gasification Process
Future NEPA Project: Map IFuture NEPA Project: Map I
Site
Mine
Future NEPA Project: Map IIFuture NEPA Project: Map II
Future NEPA Project OptionsFuture NEPA Project Options
Option #1: 140 MW Clean Power Project$300 Million investment$68 Million annual revenue450k tons anthracite required annually
Option #2: 60MMSCFD SNG Project$550 Million investment$120 Million annual revenue1 Million tons anthracite required annually
Future NEPA 60MMSCFD Coal to SNG Future NEPA 60MMSCFD Coal to SNG ProjectProject
BGL
Optional Chemicals
Mass Balance - SNGMass Balance - SNGMASS BALANCE Future Fuels PA Project CoalINPUT as rec'd
material % lbs/hr COAL moisture 1.50 1299
carbon 84.50 73180hydrogen 1.96 1697oxygen 1.17 1015nitrogen 1.18 1024chlorine 0.00 0sulfur 0.55 478ash 9.13 7907
COAL TOTAL 100.0 86600TARS / OILS IN 0FLUX 2620AIR 0OXYGEN 54453NITROGEN 0STEAM 40647NAT GAS 140
TOTAL ALL INPUT 184460
OUTPUT volume weight% scf/hr % lbs/hr
SYNGAS CO 67.17 1865998 86.0 145609H2 22.42 622833 2.1 3495CH4 6.43 178627 4.7 8001CO2 2.80 77785 5.7 9600N2 , Ar 0.53 14724 0.7 1150CnHm 0.65 18057 0.9 1515
SYNGAS TOTAL 100.00 2778024 100.0 169370TARS / OILS OUT 942SULFUR 477H2 (in H2S) 26.7WATER 3540SLAG 9371CARBON LOSS 468AMMONIA 320
TOTAL ALL OUTPUT 184516
Future NEPA 140 MW Coal to Power ProjectFuture NEPA 140 MW Coal to Power Project
GE 7E A
EPIC
EXPORT
SUMMITMINE
Mass Balance - Coal to ElectricityMass Balance - Coal to Electricity
Economic Impact on the CommunityEconomic Impact on the Community
Investment in Schuylkill County $400 mmConstruction Jobs 200 @ $50K $10 mm
Cluster Jobs 75 @ $50K $3.5 mm
Permanent Jobs 150 @ $50K $7.5 mm
Property Tax Base: $400 mmAnnual Revenue: $100 mm
$XX mm
ProgressProgress140 MW Clean Power Project
Binding Term Sheet for plant and technologyTurnkey EPC commitmentsMass - Balance ReportSuccessful coal tests, prelim emission report