CKG Architects Porfolio
-
Upload
ckgarchitects -
Category
Design
-
view
3.992 -
download
2
Transcript of CKG Architects Porfolio
Lennox A Lennox A CaruthCaruth SrSr AIA NCARBAIA NCARB36 + Years Experience36 + Years Experience
Francis Francis CuthbertsonCuthbertson JrJr RA RA NCARBNCARB26 + Years Experience
22
CKG ARCHITECTS STAFFCKG ARCHITECTS STAFF(3) REGISTRED ARCHITECTS/(3) PROJECT ARCHITECTS/(1) (3) REGISTRED ARCHITECTS/(3) PROJECT ARCHITECTS/(1) CaddCadd
Drafter/(1) ADMINISTRATIVE ASSISTANTDrafter/(1) ADMINISTRATIVE ASSISTANT
Lennox A Caruth Sr AIA-NCARB
Principal
Joseph McCarthyConstruction
AdministrationRA
Cynthia AyarzaProject Architect
Douglas PooleSenior Project
Architect
Ola AlhaffarProject Architect
Joseph CrumlishAuto Cadd Drafter
Peggy MerryAdministrative
Assistant
Francis C Cuthbertson Jr
RA-NCARB Principal
33
CKG SERVICESCKG SERVICES
NAICS CodesArchitectural Services-541310
Interior Design Services -541410
44
CKG SERVICESCKG SERVICES
Architectural Design/PlanningInterior Design
Interior Space Planning Building Assessment StudiesResolve Zoning Code IssuesConstruction Management
55
CKG FEDERAL CERTIFICATIONSCKG FEDERAL CERTIFICATIONS
CCR Cage Code No. 3DJN2 (Valid to 11-19-2010)
Small Business 8(a)-PendingGSA Schedule-Pending
66
PROJECTS by TYPEPROJECTS by TYPE
Office/Commercial/Government Office/Commercial/Government
Sports/Entertainment Sports/Entertainment
Mass Transit Mass Transit
MultiMulti--Family/Residential Family/Residential
Educational/Institutional/DaycareEducational/Institutional/Daycare
Religious Religious
77
CKG PERFORMED IN THE CKG PERFORMED IN THE FOLLOWING ROLES:FOLLOWING ROLES:
Prime ArchitectPrime Architect=Performed all Architectural =Performed all Architectural Duties directly for the ClientDuties directly for the Client
SoleSole ArchitectArchitect=Teamed=Teamed with an Engineering Firm, with an Engineering Firm, Performing all Architectural Duties directly for the ClientPerforming all Architectural Duties directly for the Client
SubSub--ConsultantConsultant ArchitectArchitect=Under contract by =Under contract by an Engineering or Architectural Firm, sharing an Engineering or Architectural Firm, sharing Architectural DutiesArchitectural Duties
88
OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT
Greater Philadelphia Health Action Greater Philadelphia Health Action –– Construction Value = $1.5 millionConstruction Value = $1.5 million–– CKG Design Fee=$50,000.00CKG Design Fee=$50,000.00–– Design ScheduleDesign Schedule--July 2009July 2009--May 2010May 2010–– Project ResponsibilityProject Responsibility--Architectural Design for an existing 10,500 Architectural Design for an existing 10,500
square foot building into a full service Healthcare Facility. square foot building into a full service Healthcare Facility. –– Design Team RoleDesign Team Role--Prime Architect Prime Architect
99
OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT
BristolBristol--MeyersMeyers--Squibb Computer Room Entry Squibb Computer Room Entry –– Construction Value = $125,000.00Construction Value = $125,000.00–– CKG Design Fee=$22,000.00CKG Design Fee=$22,000.00–– Design ScheduleDesign Schedule--JuneJune--September 2009September 2009–– Project ResponsibilityProject Responsibility--Architectural Design for the upgrade of an Architectural Design for the upgrade of an
existing minimum security computer room entry area existing minimum security computer room entry area –– Design Team RoleDesign Team Role--SoleSole ArchitectArchitect
No Photos or Drawings Allowed due to Security Guidelines by the No Photos or Drawings Allowed due to Security Guidelines by the OwnerOwner
1010
OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT
Williamsport Readiness CenterWilliamsport Readiness Center–– Construction Value = $18 millionConstruction Value = $18 million–– CKG Design Fee=$40,000.00CKG Design Fee=$40,000.00–– Design ScheduleDesign Schedule--MarchMarch--September 2009September 2009–– Project ResponsibilityProject Responsibility--Assisted with the Architectural Design for Assisted with the Architectural Design for
the Toilet, Locker & Shower Rooms for two new Air National the Toilet, Locker & Shower Rooms for two new Air National Guard Readiness CentersGuard Readiness Centers
–– Design Team RoleDesign Team Role--SubSub--Consultant Architect Consultant Architect
1111
OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT
City of Philadelphia Firehouse and Police Roof Renovation City of Philadelphia Firehouse and Police Roof Renovation ProjectProject–– Construction Value = $1.2 millionConstruction Value = $1.2 million–– CKG Design Fee=$30,000.00CKG Design Fee=$30,000.00–– Design ScheduleDesign Schedule--FebruaryFebruary--June 2009June 2009–– Project ResponsibilityProject Responsibility--Field surveys and assistance with Field surveys and assistance with
Architectural Design Architectural Design –– Design Team RoleDesign Team Role--SubSub--Consultant Architect Consultant Architect
1212
OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT
PRWT Services, Inc. PRWT Services, Inc. -- Interior Office RenovationsInterior Office Renovations–– Construction Value = $275,000.00Construction Value = $275,000.00–– CKG Design Fee=$35,000.00CKG Design Fee=$35,000.00–– Design ScheduleDesign Schedule--JulyJuly--October 2007October 2007–– Project ResponsibilityProject Responsibility--Architectural Design for a 4500 square foot Architectural Design for a 4500 square foot
interior office and Elevator Lobby renovationinterior office and Elevator Lobby renovation–– Design Team RoleDesign Team Role--PrimePrime ArchitectArchitect
1313
OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT
Renovations to Philadelphia City Hall Room 153Renovations to Philadelphia City Hall Room 153–– Construction Value = $1.1 millionConstruction Value = $1.1 million–– CKG Design Fee=$38,000.00CKG Design Fee=$38,000.00–– Design ScheduleDesign Schedule--November 2007 JuneNovember 2007 June--20092009–– Project ResponsibilityProject Responsibility--Construction documents for a 5600 square Construction documents for a 5600 square
foot interior renovation foot interior renovation –– Design Team RoleDesign Team Role--SoleSole ArchitectArchitect
1414
OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT
BristolBristol--MeyersMeyers--Squibb Central Monitoring RoomSquibb Central Monitoring Room–– Construction Value = $650,000.00Construction Value = $650,000.00–– CKG Design Fee=$30,000.00CKG Design Fee=$30,000.00–– Design ScheduleDesign Schedule--AugustAugust--December 2008December 2008–– Project ResponsibilityProject Responsibility--Construction documents for a 1100 square Construction documents for a 1100 square
foot Security Monitoring room in an existing buildingfoot Security Monitoring room in an existing building–– Design Team RoleDesign Team Role--Sole ArchitectSole Architect
No Photos or Drawings Allowed due to Security Guidelines by the No Photos or Drawings Allowed due to Security Guidelines by the OwnerOwner
1515
OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT
Oxford Valley Mall Toilet Room Oxford Valley Mall Toilet Room –– Construction Value = $200,000.00Construction Value = $200,000.00–– CKG Design Fee=$12,500.00CKG Design Fee=$12,500.00–– Design ScheduleDesign Schedule--AugustAugust--December 2008December 2008–– Project ResponsibilityProject Responsibility--Construction documents for designing new Construction documents for designing new
Floor, Wall and Ceiling finishes in four public restroomsFloor, Wall and Ceiling finishes in four public restrooms–– Design Team RoleDesign Team Role--PrimePrime ArchitectArchitect
1616
OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT
Dr. Warren E. Smith Health Centers Dr. Warren E. Smith Health Centers -- 25142514--18 N. Broad 18 N. Broad StrStr..–– Construction Value = $1.3 millionConstruction Value = $1.3 million–– CKG Design Fee=$45,500.00CKG Design Fee=$45,500.00–– Design ScheduleDesign Schedule--JanuaryJanuary--September 2006September 2006–– Project ResponsibilityProject Responsibility--Construction documents for a 1400 square Construction documents for a 1400 square
foot Behavioral Health Clinicfoot Behavioral Health Clinic–– Design Team RoleDesign Team Role--Prime Architect Prime Architect
1717
OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT
HaddingtonHaddington Progress PlazaProgress Plaza–– Construction Value = $275,000.00Construction Value = $275,000.00–– CKG Design Fee=$22,500.00CKG Design Fee=$22,500.00–– Design ScheduleDesign Schedule--July 2004July 2004--November 2005November 2005–– Project ResponsibilityProject Responsibility--Construction documents for refurbishing an Construction documents for refurbishing an
existing shopping centerexisting shopping center–– Design Team RoleDesign Team Role--Prime Architect Prime Architect
1818
OFFICE/COMMERCIAL/GOVERNMENT OFFICE/COMMERCIAL/GOVERNMENT
2121stst Century Office Interior Century Office Interior FitoutFitout ProjectProject–– Construction Value = $780,000.00Construction Value = $780,000.00–– CKG Design Fee=$35,500.00CKG Design Fee=$35,500.00–– Design ScheduleDesign Schedule--JanuaryJanuary--May 2002May 2002–– Project ResponsibilityProject Responsibility--Construction documents for the Interior Construction documents for the Interior
design of a new 8500 square foot tenant spacedesign of a new 8500 square foot tenant space–– Design Team RoleDesign Team Role--PrimePrime Architect Architect
1919
SPORTS and ENTERTAINMENTSPORTS and ENTERTAINMENT
New Meadowlands Stadium, East Rutherford, NJNew Meadowlands Stadium, East Rutherford, NJ–– Construction Value = $850 millionConstruction Value = $850 million–– CKG Design Fee=$162,000.00CKG Design Fee=$162,000.00–– Design ScheduleDesign Schedule--April 2007April 2007--December 2009December 2009–– Project ResponsibilityProject Responsibility--Exterior wall components and partial Exterior wall components and partial
interior workinterior work–– Design Team RoleDesign Team Role--SubSub--Consultant Architect Consultant Architect
2020
SPORTS and ENTERTAINMENTSPORTS and ENTERTAINMENT
FoxwoodsFoxwoods Casino, Philadelphia, PACasino, Philadelphia, PA–– Construction Value = $275 millionConstruction Value = $275 million–– CKG Design Fee=$275,000.00CKG Design Fee=$275,000.00–– Design ScheduleDesign Schedule--March 2007March 2007--June 2008June 2008–– Project ResponsibilityProject Responsibility--Interior Rest Room Finishes, Stair Well Interior Rest Room Finishes, Stair Well
layouts, Loading Dock design. layouts, Loading Dock design. –– Design Team RoleDesign Team Role--SubSub--Consultant Architect Consultant Architect
2121
SPORTS and ENTERTAINMENTSPORTS and ENTERTAINMENT
–– Example of CKG Work on Example of CKG Work on FoxwoodsFoxwoods
Roof Core & Shell Column Enclosure Details
2222
SPORTS and ENTERTAINMENTSPORTS and ENTERTAINMENT
Citizens Bank Park, Philadelphia, PACitizens Bank Park, Philadelphia, PA–– Construction Value = $335 millionConstruction Value = $335 million–– CKG Design Fee=$390,000.00CKG Design Fee=$390,000.00–– Design ScheduleDesign Schedule--April 2000April 2000--June 2001June 2001–– Project ResponsibilityProject Responsibility--Interior Design support of Interior Design support of PhilliesPhillies
Administrative Offices, Concourse and Luxury SuitesAdministrative Offices, Concourse and Luxury Suites–– Design Team RoleDesign Team Role--SubSub--Consultant Architect Consultant Architect
2323
SPORTS and ENTERTAINMENTSPORTS and ENTERTAINMENT
Citizens Bank Park, Philadelphia, PACitizens Bank Park, Philadelphia, PA–– Example of CKG Work on Citizens Bank ParkExample of CKG Work on Citizens Bank Park
Luxury Box MockLuxury Box Mock--UpsUpsCeiling Ceiling Luxury Box Luxury Box FinishesFinishes FinishesFinishesMockMock--UpsUps
2424
MASS TRANSITMASS TRANSIT
SEPTA: MargaretSEPTA: Margaret--Orthodox Station RenovationsOrthodox Station Renovations–– Construction Value = $20 millionConstruction Value = $20 million–– CKG Design Fee=$250,000.00CKG Design Fee=$250,000.00–– Design ScheduleDesign Schedule--August 2008August 2008--March 2010March 2010–– Project ResponsibilityProject Responsibility--Full Mass Transit Station Renovation Full Mass Transit Station Renovation
including ADA upgrades. including ADA upgrades. –– Design Team RoleDesign Team Role--Sole Architect Sole Architect
2525
MASS TRANSITMASS TRANSIT
SEPTA: SEPTA: BerridgeBerridge--Wyoming Roof ReplacementWyoming Roof Replacement–– Construction Value = $10 millionConstruction Value = $10 million–– CKG Design Fee=$130,000.00CKG Design Fee=$130,000.00–– Design ScheduleDesign Schedule--August 2009August 2009--May 2010May 2010–– Project ResponsibilityProject Responsibility--Construction Documents for a 100,000+ Construction Documents for a 100,000+
Square Foot Full Roof Replacement. Square Foot Full Roof Replacement. –– Design Team RoleDesign Team Role--Sole Architect Sole Architect
2626
MASS TRANSITMASS TRANSIT
SEPTA: Smart Stations Phase 1SEPTA: Smart Stations Phase 1–– Construction Value = $25 millionConstruction Value = $25 million–– CKG Design Fee=$569,000.00CKG Design Fee=$569,000.00–– Design ScheduleDesign Schedule--September 2004September 2004--March 2006March 2006–– Project ResponsibilityProject Responsibility--Construction Documents for 21 Mass Construction Documents for 21 Mass
Transit Smart Station RenovationsTransit Smart Station Renovations–– Design Team RoleDesign Team Role--Sole Architect Sole Architect
2727
MASS TRANSITMASS TRANSIT
SEPTA: Smart Stations Phase 2SEPTA: Smart Stations Phase 2–– Construction Value = $36 millionConstruction Value = $36 million–– CKG Design Fee=$890,000.00CKG Design Fee=$890,000.00–– Design ScheduleDesign Schedule--June 2006June 2006--December 2007December 2007–– Project ResponsibilityProject Responsibility--Construction Documents for 36 Mass Construction Documents for 36 Mass
Transit Smart Station RenovationsTransit Smart Station Renovations–– Design Team RoleDesign Team Role--Sole Architect Sole Architect
2828
MASS TRANSITMASS TRANSIT
SEPTA: 69SEPTA: 69thth Street Station Motor Shop Window Street Station Motor Shop Window ReplacementsReplacements–– Construction Value = $500,000.00Construction Value = $500,000.00–– CKG Design Fee=$31,000.00CKG Design Fee=$31,000.00–– Design ScheduleDesign Schedule--JanuaryJanuary--May 2009May 2009–– Project ResponsibilityProject Responsibility--Construction Documents for the Construction Documents for the
Replacement of Windows for a Motor Shop BuildingReplacement of Windows for a Motor Shop Building–– Design Team RoleDesign Team Role--SoleSole ArchitectArchitect
2929
MASS TRANSITMASS TRANSIT
SEPTA: Midvale Yard Site ImprovementsSEPTA: Midvale Yard Site Improvements–– Construction Value = $45 millionConstruction Value = $45 million–– CKG Design Fee=$40,000.00CKG Design Fee=$40,000.00–– Design ScheduleDesign Schedule--OctoberOctober--January 2009January 2009–– Project DescriptionProject Description--Schematic Design Documents for a 46,000 Schematic Design Documents for a 46,000
and 105,000 square foot Maintenance and Storage Facility and 105,000 square foot Maintenance and Storage Facility buildingsbuildings
–– Design Team RoleDesign Team Role--SoleSole Architect Architect
3030
MASS TRANSITMASS TRANSIT
PATCO: WalnutPATCO: Walnut--Locust Stations Interior RenovationsLocust Stations Interior Renovations–– Construction Value = $450,000.00Construction Value = $450,000.00–– CKG Design Fee=$35,000.00CKG Design Fee=$35,000.00–– Design ScheduleDesign Schedule--September 1996September 1996--March 1997March 1997–– Project ResponsibilityProject Responsibility--Construction Administration services for the Construction Administration services for the
Platform Floor, Wall & Ceiling Finishes and Railing installationPlatform Floor, Wall & Ceiling Finishes and Railing installation–– Design Team RoleDesign Team Role--SoleSole Architect Architect
3131
MASS TRANSITMASS TRANSIT
SEPTA: YorkSEPTA: York--DauphinDauphin--Tioga & Somerset Station RenovationsTioga & Somerset Station Renovations–– Construction Value = $25 millionConstruction Value = $25 million–– CKG Design Fee=$225,000.00CKG Design Fee=$225,000.00–– Design ScheduleDesign Schedule--June 1993June 1993--January 1995January 1995–– Project ResponsibilityProject Responsibility--Construction Administration services for Construction Administration services for
three Mass Transit Station Renovations including ADA upgrades. three Mass Transit Station Renovations including ADA upgrades. –– Design Team RoleDesign Team Role--SoleSole ArchitectArchitect
3232
RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY
5135 Judson Drive 5135 Judson Drive –– Construction Value = $75,000.00Construction Value = $75,000.00–– CKG Design Fee=$6,000.00CKG Design Fee=$6,000.00–– Design ScheduleDesign Schedule--JulyJuly--December 2009December 2009–– Project ResponsibilityProject Responsibility--Zoning and construction documentation for Zoning and construction documentation for
adding 800 square feet with existing interior renovations to anadding 800 square feet with existing interior renovations to anexisting single family home existing single family home
–– Design Team RoleDesign Team Role--PrimePrime Architect Architect
3333
RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY
Manor Heights Housing ComplexManor Heights Housing Complex–– Construction Value = $8,000,000.00Construction Value = $8,000,000.00–– CKG Design Fee=$55,000.00CKG Design Fee=$55,000.00–– Design ScheduleDesign Schedule--December 2005December 2005--July 2006July 2006–– Project ResponsibilityProject Responsibility--Construction Administration servicesConstruction Administration services–– Design Team RoleDesign Team Role--SubSub--Consultant Architect Consultant Architect
3434
RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY
Philadelphia Housing Authority Philadelphia Housing Authority --Blumberg ApartmentsBlumberg Apartments–– Construction Value = $675,000.00Construction Value = $675,000.00–– CKG Design Fee=$25,000.00CKG Design Fee=$25,000.00–– Design ScheduleDesign Schedule--OctoberOctober--December 2006December 2006–– Project ResponsibilityProject Responsibility--Schematic documentation and cost Schematic documentation and cost
estimate for replacing three existing Guard Booths with one estimate for replacing three existing Guard Booths with one central Guard Boothcentral Guard Booth
–– Design Team RoleDesign Team Role--SoleSole Architect Architect
3535
RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY
12211221--23 23 ShackamaxonShackamaxon CourtCourt–– Construction Value = $875,000.00Construction Value = $875,000.00–– CKG Design Fee=$35,000.00CKG Design Fee=$35,000.00–– Design ScheduleDesign Schedule--January 2005January 2005--December 2006December 2006–– Project ResponsibilityProject Responsibility--Zoning and construction documentation for Zoning and construction documentation for
six six townhometownhome style condominiumsstyle condominiums–– Design Team RoleDesign Team Role--PrimePrime Architect Architect
3636
RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY
Trenton Housing Authority Trenton Housing Authority --Scattered Renovations to 39 Scattered Renovations to 39 UnitsUnits–– Construction Value = $560,000.00Construction Value = $560,000.00–– CKG Design Fee=$51,000.00CKG Design Fee=$51,000.00–– Design ScheduleDesign Schedule--September 2004September 2004--May 2005May 2005–– Project ResponsibilityProject Responsibility--Construction documentation for renovating Construction documentation for renovating
the kitchens, bathrooms and living spaces for 39 unitsthe kitchens, bathrooms and living spaces for 39 units–– Design Team RoleDesign Team Role--PrimePrime Architect Architect
3737
RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY
Philadelphia Housing Authority Philadelphia Housing Authority --WestparkWestpark ApartmentsApartments–– Construction Value = $1.2 millionConstruction Value = $1.2 million–– CKG Design Fee=$55,000.00CKG Design Fee=$55,000.00–– Design ScheduleDesign Schedule--August 2004August 2004--February 2005February 2005–– Project ResponsibilityProject Responsibility--Schematic documentation and cost Schematic documentation and cost
estimate for renovating three entry area Elevator Lobbiesestimate for renovating three entry area Elevator Lobbies–– Design Team RoleDesign Team Role--SoleSole Architect Architect
3838
RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY
Trenton Housing Authority Trenton Housing Authority --Campus Utility StudyCampus Utility Study–– Construction Value = $750,000.00Construction Value = $750,000.00–– CKG Design Fee=$28,000.00CKG Design Fee=$28,000.00–– Design ScheduleDesign Schedule--May 2004May 2004--September 2004September 2004–– Project ResponsibilityProject Responsibility--Coordination for a report of the existing Coordination for a report of the existing
utility distribution for a Public Housing Complexutility distribution for a Public Housing Complex–– Design Team RoleDesign Team Role--PrimePrime ArchitectArchitect
3939
RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY
13021302--12 West Cumberland Street12 West Cumberland Street–– Construction Value = $850,000.00Construction Value = $850,000.00–– CKG Design Fee=$40,000.00CKG Design Fee=$40,000.00–– Design ScheduleDesign Schedule--January 2004January 2004--September 2004September 2004–– Project ResponsibilityProject Responsibility--Zoning and construction documentation for Zoning and construction documentation for
renovating an existing warehouse into 17 condominium unitsrenovating an existing warehouse into 17 condominium units–– Design Team RoleDesign Team Role--PrimePrime Architect Architect
4040
RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY
Philadelphia Housing Authority Philadelphia Housing Authority --Germantown House Germantown House ApartmentsApartments–– Construction Value = $13 millionConstruction Value = $13 million–– CKG Design Fee=$56,000.00CKG Design Fee=$56,000.00–– Design ScheduleDesign Schedule--AprilApril--August 2003August 2003–– Project ResponsibilityProject Responsibility--Schematic documentation and cost Schematic documentation and cost
estimate for upgrading 240 studio units into 141 ADA compliant estimate for upgrading 240 studio units into 141 ADA compliant unitsunits
–– Design Team RoleDesign Team Role--SoleSole Architect Architect
4141
RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY
University of PennsylvaniaUniversity of Pennsylvania--Kings Court ApartmentsKings Court Apartments–– Construction Value = $275,000.00Construction Value = $275,000.00–– CKG Design Fee=$25,000.00CKG Design Fee=$25,000.00–– Design ScheduleDesign Schedule--MayMay--September 2002September 2002–– Project ResponsibilityProject Responsibility--Construction documentation for the Construction documentation for the
renovation of a one bedroom apartmentrenovation of a one bedroom apartment–– Design Team RoleDesign Team Role--SoleSole Architect Architect
4242
RESIDENTIAL/MULTIRESIDENTIAL/MULTI--FAMILYFAMILY
Neighborhood Transformation Initiative (NTI), Philadelphia, Neighborhood Transformation Initiative (NTI), Philadelphia, PAPA–– Construction Value = $125 millionConstruction Value = $125 million–– CKG Design Fee=$225,000.00CKG Design Fee=$225,000.00–– Design ScheduleDesign Schedule--August 2001August 2001--November 2005November 2005–– Project ResponsibilityProject Responsibility--OnOn--Call Architect for supporting General Call Architect for supporting General
Contractor in the field demolition and clearing of vacant Contractor in the field demolition and clearing of vacant propertiesproperties
–– Design Team RoleDesign Team Role--SubSub--ConsultantConsultant Architect Architect
4343
EDUCATIONAL/INSTITUTIONAL/DAYCAREEDUCATIONAL/INSTITUTIONAL/DAYCARE
Pennsylvania Hospital OnPennsylvania Hospital On--Call Services Call Services –– Construction Value = $275,000.00Construction Value = $275,000.00–– CKG Design Fee=$25,000.00CKG Design Fee=$25,000.00–– Design ScheduleDesign Schedule--MayMay--September 2002September 2002–– Project ResponsibilityProject Responsibility--Maintain base plans for all buildings on the Maintain base plans for all buildings on the
Hospital CampusHospital Campus–– Design Team RoleDesign Team Role--SubSub--Consultant Architect Consultant Architect
4444
EDUCATIONAL/INSTITUTIONAL/DAYCAREEDUCATIONAL/INSTITUTIONAL/DAYCARE
AfricanAfrican--American MuseumAmerican Museum–– Construction Value = $750,000.00Construction Value = $750,000.00–– CKG Design Fee=$45,000.00CKG Design Fee=$45,000.00–– Design ScheduleDesign Schedule--November 2009November 2009--May 2010May 2010–– Project ResponsibilityProject Responsibility--Construction documentation for a full Construction documentation for a full
Museum RenovationMuseum Renovation–– Design Team RoleDesign Team Role--SoleSole Architect Architect
4545
EDUCATIONAL/INSTITUTIONAL/DAYCAREEDUCATIONAL/INSTITUTIONAL/DAYCARE
Temple University BioTemple University Bio--Life Sciences LibraryLife Sciences Library–– Construction Value = $450,000.00Construction Value = $450,000.00–– CKG Design Fee=$25,000.00CKG Design Fee=$25,000.00–– Design ScheduleDesign Schedule--August 2005August 2005--January 2006January 2006–– Project ResponsibilityProject Responsibility--Construction documentation for full reConstruction documentation for full re--
design of a Main Entry Lobby design of a Main Entry Lobby –– Design Team RoleDesign Team Role--PrimePrime Architect Architect
4646
EDUCATIONAL/INSTITUTIONAL/DAYCAREEDUCATIONAL/INSTITUTIONAL/DAYCARE
West Grove Daycare CenterWest Grove Daycare Center–– Construction Value = $385,000.00Construction Value = $385,000.00–– CKG Design Fee=$25,000.00CKG Design Fee=$25,000.00–– Design ScheduleDesign Schedule--JanuaryJanuary--July 2006July 2006–– Project ResponsibilityProject Responsibility--Construction documentation for renovation of a Construction documentation for renovation of a
Church into a Daycare CenterChurch into a Daycare Center–– Design Team RoleDesign Team Role--PrimePrime Architect Architect
4747
EDUCATIONAL/INSTITUTIONAL/DAYCAREEDUCATIONAL/INSTITUTIONAL/DAYCARE
Philadelphia School District Buildings Assessment StudyPhiladelphia School District Buildings Assessment Study–– Construction Value = $94 millionConstruction Value = $94 million–– CKG Design Fee=$97,000.00CKG Design Fee=$97,000.00–– Design ScheduleDesign Schedule--JanuaryJanuary--November 2004November 2004–– Project ResponsibilityProject Responsibility-- Participated in the general construction Participated in the general construction
assessment for all City of Philadelphia Public Schoolsassessment for all City of Philadelphia Public Schools–– Design Team RoleDesign Team Role--SubSub--ConsultantConsultant Architect Architect
4848
EDUCATIONAL/INSTITUTIONAL/DAYCAREEDUCATIONAL/INSTITUTIONAL/DAYCARE
Philadelphia School District Renaissance Charter SchoolPhiladelphia School District Renaissance Charter School–– Construction Value = $1.5 millionConstruction Value = $1.5 million–– CKG Design Fee=$65,000.00CKG Design Fee=$65,000.00–– Design ScheduleDesign Schedule--MarchMarch--September 2002September 2002–– Project ResponsibilityProject Responsibility--Construction Documents for an interior Construction Documents for an interior
fitoutfitout of converting for a private Charter Schoolof converting for a private Charter School–– Design Team RoleDesign Team Role--PrimePrime Architect Architect
4949
Religious InstitutionsReligious Institutions
Williams Temple CME ChurchWilliams Temple CME Church–– Construction Value = $2 millionConstruction Value = $2 million–– CKG Design Fee=$120,000.00CKG Design Fee=$120,000.00–– Design ScheduleDesign Schedule--MayMay--AugustAugust--20102010–– Project ResponsibilityProject Responsibility--Architectural Design for a new 12,500 Architectural Design for a new 12,500
square foot Church with a Worship Space, Offices, Meeting square foot Church with a Worship Space, Offices, Meeting Room, and Classrooms all meeting current ADA guidelines.Room, and Classrooms all meeting current ADA guidelines.
–– Design Team RoleDesign Team Role--PrimePrime Architect Architect
5050
Religious InstitutionsReligious Institutions
Zion Baptist ChurchZion Baptist Church–– Construction Value = $155,000.00Construction Value = $155,000.00–– CKG Design Fee=$22,000.00CKG Design Fee=$22,000.00–– Design ScheduleDesign Schedule--MayMay--AugustAugust--20092009–– Project ResponsibilityProject Responsibility--Architectural Design for a 5000 square foot Architectural Design for a 5000 square foot
Roof Renovation.Roof Renovation.–– Design Team RoleDesign Team Role--PrimePrime Architect Architect
5151
Religious InstitutionsReligious Institutions
Mt. Airy Presbyterian ChurchMt. Airy Presbyterian Church–– Construction Value = $40,000.00Construction Value = $40,000.00–– CKG Design Fee=$10,000.00CKG Design Fee=$10,000.00–– Design ScheduleDesign Schedule--OctoberOctober--NovemberNovember--20092009–– Project ResponsibilityProject Responsibility--Architectural Design for the replacement Architectural Design for the replacement
of an existing railing on an ADA compliant Ramp. of an existing railing on an ADA compliant Ramp. –– Design Team RoleDesign Team Role--PrimePrime Architect Architect
`̀
5252
Religious InstitutionsReligious Institutions
Mt. Calvary ChurchMt. Calvary Church–– Construction Value = $150,000.00Construction Value = $150,000.00–– CKG Design Fee=$20,000.00CKG Design Fee=$20,000.00–– Design ScheduleDesign Schedule--FebruaryFebruary--JuneJune--20082008–– Project ResponsibilityProject Responsibility--Architectural Design for the replacement Architectural Design for the replacement
of an existing railing on an ADA compliant Ramp. of an existing railing on an ADA compliant Ramp. –– Design Team RoleDesign Team Role--PrimePrime Architect Architect
5353
Religious InstitutionsReligious Institutions
Buddhist Temple Buddhist Temple –– Construction Value = $750,000.00Construction Value = $750,000.00–– CKG Design Fee=$41,000.00CKG Design Fee=$41,000.00–– Design ScheduleDesign Schedule--NovemberNovember--20052005--AugustAugust--20062006–– Project ResponsibilityProject Responsibility--Architectural Design for the renovation of Architectural Design for the renovation of
an existing Church into a Buddhist Temple.an existing Church into a Buddhist Temple.–– Design Team RoleDesign Team Role--PrimePrime Architect Architect
5454
Religious InstitutionsReligious Institutions
Hope Church Christian School Hope Church Christian School –– Construction Value = $50,000.00Construction Value = $50,000.00–– CKG Design Fee=$27,000.00CKG Design Fee=$27,000.00–– Design ScheduleDesign Schedule--NovemberNovember--20042004--SeptemberSeptember--20052005–– Project ResponsibilityProject Responsibility--Architectural Report for the legalization of Architectural Report for the legalization of
the School Certificate of Occupancy.the School Certificate of Occupancy.–– Design Team RoleDesign Team Role--PrimePrime Architect Architect
5555
Religious InstitutionsReligious Institutions
Zion Baptist Church Bell Tower Renovation Zion Baptist Church Bell Tower Renovation –– Construction Value = $60,000.00Construction Value = $60,000.00–– CKG Design Fee=$8,000.00CKG Design Fee=$8,000.00–– Design ScheduleDesign Schedule--NovemberNovember--20092009--FebrauryFebraury--20102010–– Project ResponsibilityProject Responsibility--Architectural Report and Design for the Architectural Report and Design for the
stabilization of roof top Stone Bell Tower.stabilization of roof top Stone Bell Tower.–– Design Team RoleDesign Team Role--PrimePrime Architect Architect
5656
CKG HAS TEAMED WITH THE CKG HAS TEAMED WITH THE FOLLOWING FIRMSFOLLOWING FIRMS
Ewing ColeEwing Cole–– Citizens Bank ParkCitizens Bank Park–– FoxwoodsFoxwoods CasinoCasino–– New York Giants StadiumNew York Giants Stadium
Gillian & HartmannGillian & Hartmann–– Room 153 City HallRoom 153 City Hall–– PhilaPhila. Prison Multi. Prison Multi--Purpose CenterPurpose Center–– PhilaPhila. Prison Mezzanine . Prison Mezzanine
CSA GroupCSA Group–– AMTRAK Coatesville StationAMTRAK Coatesville Station–– SEPTA YorkSEPTA York--Dauphin, Tioga & Dauphin, Tioga &
Somerset Stations Somerset Stations –– Philadelphia Housing Authority; Philadelphia Housing Authority;
Germantown HouseGermantown HouseBlumberg ApartmentsBlumberg ApartmentsWest Park ApartmentsWest Park Apartments
–– Trenton Housing Authority;Trenton Housing Authority;39 Scattered Units39 Scattered UnitsUtility StudyUtility Study
Hill InternationalHill International–– Neighborhood Transformation Neighborhood Transformation
Initiative Initiative
Maida EngineersMaida Engineers–– BristolBristol--MeyersMeyers--Squibb;Squibb;
Central Monitoring RoomCentral Monitoring RoomComputer Entry Computer Entry
Parsons Transportation GroupParsons Transportation Group–– SEPTA Phase 1 & 2 ProjectsSEPTA Phase 1 & 2 Projects–– SEPTA MargaretSEPTA Margaret--Orthodox StationOrthodox Station
The The IngermannIngermann GroupGroup–– Manor Heights ProjectManor Heights Project
The Burns GroupThe Burns Group–– Midvale Midvale –– 6969thth Street Motor Shop Street Motor Shop –– BerridgeBerridge Roof Roof
L. Robert Kimball & AssociatesL. Robert Kimball & Associates–– Williamsport Readiness Center Williamsport Readiness Center
NTH Consultants GroupNTH Consultants Group–– Nine (9) Firehouse & Police Roof Nine (9) Firehouse & Police Roof
Renovations Renovations Highland AssociatesHighland Associates
–– Philadelphia School DistrictPhiladelphia School District--Field Field Survey of existing BuildingsSurvey of existing Buildings
5757
MEASURE of SUCCESSMEASURE of SUCCESS
CKG Architects measures its success by:CKG Architects measures its success by:
–– RecurringRecurring alliances it has established alliances it has established with reputable Engineering firms and with reputable Engineering firms and Architectural firmsArchitectural firms
–– RepeatRepeat businessbusiness–– ReferralsReferrals
5858
THANK YOUTHANK YOU
CKG ARCHITECTSCKG ARCHITECTS5443 Germantown Avenue5443 Germantown AvenueFirst FloorFirst FloorPhiladelphia, PA 19144Philadelphia, PA 19144--22152215215215--844844--5191 (ph) 5191 (ph) 215215--844844--5196 (fax)5196 (fax)[email protected]@aol.com (email)(email)