CITY OF CAMBRIDGE
DOVER STREET SANITARY PUMPING STATION MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT
City of Cambridge
Dover Street Sanitary Pumping Station
Municipal Class Environmental Assessment
Public Information Centre
Thursday, March 8, 2018
Preston Auditorium, 1458 Hamilton Street, Cambridge
5:00 pm – 7:00 pm
CITY OF CAMBRIDGE
DOVER STREET SANITARY PUMPING STATION MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT
City of Cambridge
Dover Street Sanitary Pumping Station
Municipal Class Environmental Assessment
Public Information Centre
Thursday, March 8, 2018
Preston Auditorium, 1458 Hamilton Street, Cambridge
5:00 pm – 7:00 pm
CITY OF CAMBRIDGE
DOVER STREET SANITARY PUMPING STATION MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT
Why is this Study being Undertaken?
Purpose of the Study
• The City of Cambridge has initiated a Municipal Class Environmental
Assessment (EA) Study to assess the preferred sanitary servicing
strategy for existing and future servicing needs within the Dover
Street Sanitary Pumping Station (SPS) catchment area.
Dover St SPS Class EA
PIC
Gain an understanding of the Municipal Class EA process
Hear about the preliminary preferred servicing option
Provide your feedback in the Class EA process -
Stay involved …
Process
Ideas
Feedback
Study Context
• The Dover Street Sanitary Pumping Station was constructed in 1968;
the station currently has condition and operational constraints
• The station is required to service the catchment of existing residential
and business properties within a 900 hectare service area
• The City of Cambridge is planning for future development which will
result in additional sanitary flow in the existing system and to the SPS
• The City must determine if the existing pumping station can
accommodate existing and future servicing requirements
CITY OF CAMBRIDGE
DOVER STREET SANITARY PUMPING STATION MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT
Municipal Class EA Process and Consultation
The study follows the Municipal Class Environmental Assessment
process as outlined in the Municipal Engineers Association (MEA)
Municipal Class Environmental Assessment (Oct 2000, as amended in
2007, 2011 and 2015).
This study is being undertaken as a Schedule “B” Class EA which
involves completion of Phases 1 and 2 of the MEA Municipal Class EA
process.
PHASE 1Identify & Describe the
Problem/Opportunity Statement
PHASE 2Complete Study Area Inventory
Identify & Evaluate Alternative
Solutions
Dover St SPS Class EA
Project File Report
Notice of Completion(Mandatory Contact Point)
Spring 2018
We Are
Here
Study Problem / Opportunity Statement“Support existing servicing needs and projected growth within
the Dover Street Sanitary Pumping Station catchment area ”
PIC
Public Consultation/Review
Agency Contact Point
March 2018
Study Overview
Step 1 - Understand Existing Conditions
• Undertake condition assessment of the
facility
• Establish existing capacity and flow
• Understand existing environmental
features
This step confirmed the need for extensive
upgrades
Step 2 - Assessment to Identify and
Recommend Servicing Solution
• Establish capacity/servicing requirements
to meet existing & future needs
• Develop & evaluate servicing options
• Complete Class EA requirements
• Develop Implementation Plan
This step identified and evaluated a range of
options to address existing deficiencies and
future needs
CITY OF CAMBRIDGE
DOVER STREET SANITARY PUMPING STATION MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT
Environmental Features
CITY OF CAMBRIDGE
DOVER STREET SANITARY PUMPING STATION MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT
Evaluation of Servicing Alternatives
7.NEW PUMPING STATION
Construct new pumping station
adjacent to existing SPS
RECOMMENDED? NO
• Most costly alternative
• Longest construction time/traffic
impact
• Does not maximize use of
existing station
4.FACILITY REFURBISHMENT
Refurbishment of existing station
to meet standards
RECOMMENDED? NO
• Little opportunity to improve existing
site and building
• Does not address existing O&M issues
• More difficult to operate during
construction
• No increase in emergency storage
5.NEW CONTROL BUILDING ON EXISTING
FOOTPRINT
Refurbishment of existing wet well and dry well +
construction of new control building on same footprint
RECOMMENDED? NO
• More difficult to operate during construction
• No increase in available emergency storage
• Does not address existing wet well O&M issues
6.NEW CONTROL BUILDING ON NEW FOOTPRINT
Convert existing wet well and dry well into single wet well +
construct new control building on alternative footprint
RECOMMENDED? YES
• Opportunities to construct control building outside of floodplain
• Eliminates need for new well
• Reduces potential environmental and socio impact
• Provides increased emergency storage and provides
opportunity to improve O&M
• Presents optimum capital and lifecycle costs
SELECTION OF PRELIMINARY
PREFERRED ALTERNATIVE
Option 6: New Control Building
on New Footprint
PASS / FAIL CRITERIA
Does the alternative meet the
problem/opportunity statement
Does the alternative meet
technical requirements
SHORTLIST ALTERNATIVES
Option 4: Full Facility
Refurbishment (meet standards)
Option 5:New Control Building
on Existing Footprint
Option 6: New Control Building
on New Footprint
Option 7: New Pumping Station
LONGLIST ALTERNATIVES
Option 1: Do Nothing
(screened out)
Option 2: Limited Growth
(screened out)
Option 3: Status Quo Facility
Refurbishment (screened out)
Option 4: Full Facility
Refurbishment (meet standards)
Option 5:New Control Building
on Existing Footprint
Option 6: New Control Building
on New Footprint
Option 7: New Pumping Station
PLANNING POLICY FRAMEWORK
AND DRIVERS
City of Cambridge
Official Plan
Region of Waterloo
Official Plan
City of Cambridge Sanitary
Servicing Master Plan
Region of Waterloo Wastewater
Treatment Master Plan
Condition Assessment
Environmental Inventory
Existing and Future
Service Area
5 POINT EVALUATION CRITERIA
1. Technical
2. Environmental
3. Socio/Cultural
4. Financial
5. Legal/Jurisdictional
CITY OF CAMBRIDGE
DOVER STREET SANITARY PUMPING STATION MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT
The Preliminary Preferred Servicing Alternative
New Control Building on New
Footprint
Convert existing wet well and dry
well into single wet well + construct
new control building on alternative
footprint
• Opportunities to construct control
building outside of floodplain
• Eliminates need for new wet/dry
well
• Reduces potential environmental
and socio/economic impact
• Provides increased emergency
storage and provides opportunity to
improve O&M
• Presents optimum capital and
lifecycle costs
CITY OF CAMBRIDGE
DOVER STREET SANITARY PUMPING STATION MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT
How to Get Involved
Please …
• Fill out the comment sheet provided
• Contact the project team with your input
Next Steps
Following this PIC, the project team will:
• Review and consider your input received during the PIC and comments sheets
• Select preferred servicing alternative strategy
• Complete the Project File (final report) for public review and Issue a Notice of Completion
• Continue to work with review agencies and stakeholders
• Identify precise SPS upgrades and location within the site during detailed design
• Develop a construction plan to minimize impact. (Including but not limited to: Traffic Management Plan, Odour Control Plan, Noise and Dust Control Strategy)