TM Eco sol WASTEWATER FILTRATION SYSTEMS CITY OF BOTANY BAY FLOODVALE DRAIN - TRASH RACK

Transcript of CITY OF BOTANY BAY FLOODVALE DRAIN - TRASH …ecosol.com.au/skin/thumbs/Floodvale-Drain.pdfCITY OF...

Page 1: CITY OF BOTANY BAY FLOODVALE DRAIN - TRASH …ecosol.com.au/skin/thumbs/Floodvale-Drain.pdfCITY OF BOTANY BAY FLOODVALE DRAIN - TRASH RACK . ... 2.1 of closed conduit and 0.8 of open

TM

EcosolW A S T E W A T E R F I L T R A T I O N S Y S T E M S

CITY OF BOTANY BAY FLOODVALE DRAIN - TRASH RACK

Page 2: CITY OF BOTANY BAY FLOODVALE DRAIN - TRASH …ecosol.com.au/skin/thumbs/Floodvale-Drain.pdfCITY OF BOTANY BAY FLOODVALE DRAIN - TRASH RACK . ... 2.1 of closed conduit and 0.8 of open

The Floodvale Drain catchment is situated within the City of Botany Bay LGA, flowing from Pagewood at the northern extent to Botany Bay via the Penrhyn Estuary in the south. This includes portions of the suburbs of Pagewood, Eastgardens, Botany and Banksmeadow. Combined the catchment drains an area of approximately 375 ha (3.75km2). The catchment is heavily urbanised and is predominately comprised of industrial development. The total length of Floodvale drain is approximately 2.9km comprising 2.1 of closed conduit and 0.8 of open channel. Previous flood studies had detailed 1% AEP Peak Flood Discharges at the McPherson Street intersection of between 7.2 and 8.2 m3/s

CITY OF BOTANY BAY, FLOODVALE DRAIN

TM

EcosolW A S T E W A T E R F I L T R A T I O N S Y S T E M S

Page 1

Page 3: CITY OF BOTANY BAY FLOODVALE DRAIN - TRASH …ecosol.com.au/skin/thumbs/Floodvale-Drain.pdfCITY OF BOTANY BAY FLOODVALE DRAIN - TRASH RACK . ... 2.1 of closed conduit and 0.8 of open

The existing failed infrastructure consisted of a direct screen rack with dilapidated retaining structures which encroached on each of the outer culverts. This along with the heavily silted culverts meant that almost each and every rain event caused the area to surcharge resulting in the flooding of the heavily trafficked intersection of McPherson Street & Coal Pier Road. DESIGN DETAILS The Ecosol designed solution offered numerous advantages over the current infrastructure. Whilst it was noted that the site would still be subject to flooding during peak events (due to service infrastructure and nature of the site). The new design would significantly reduce any such instance. Furthermore the site would become more accessible and maintenance friendly. This was made possible with the inclusion of the innovative angled stainless steel rack design, concrete access ramp and holding bay.

TM

EcosolW A S T E W A T E R F I L T R A T I O N S Y S T E M S

Page 2

Page 4: CITY OF BOTANY BAY FLOODVALE DRAIN - TRASH …ecosol.com.au/skin/thumbs/Floodvale-Drain.pdfCITY OF BOTANY BAY FLOODVALE DRAIN - TRASH RACK . ... 2.1 of closed conduit and 0.8 of open

TM

EcosolW A S T E W A T E R F I L T R A T I O N S Y S T E M S

Page 3

CONSTRUCTIONOn the 21st of July 2014 The City of Botany Bay awarded Ecosol Pty Ltd the contract to construct the designed solution for the problematic McPherson Street site in Banksmeadow. Construction and progress of the project was always going to be dictated by the weather and overall site conditions. Following early inclement weather the project started on the 16 September 2014. The construction zone was rife with the challenges typical of that found in this LGA, particularly in regards to drainage infrastructure. Along with alluvial material it was also tidal and required work close to the water table,all with varying levels of contamination. On the 14th October a 1:100yr storm event stopped in for a brief visit. This particular event saw the water level rise from the invert of the culvert to some 1.5m. Undetered by this event and with the implementation of clever construction contingencies to manage the elements works continued.

Page 5: CITY OF BOTANY BAY FLOODVALE DRAIN - TRASH …ecosol.com.au/skin/thumbs/Floodvale-Drain.pdfCITY OF BOTANY BAY FLOODVALE DRAIN - TRASH RACK . ... 2.1 of closed conduit and 0.8 of open

Clever decision key to overall project success. The new design set about using the culverts to their full potential. The dilapidated and encroaching retaining structure were removed, a portion of the existing damaged base slab was also removed along with the ineffective cumbersome filtration rack. With the newly presented blank canvas the improved design was under construction. For ease of construction and due to tidal effects the form work for the retaining wall footings were not constructed in-situ, instead they were constructed off-site using Pecaform sacrificial form work. This allowed for the efficient steel fixing of the retaining walls and footings once they were excavated to the desired design levels. The footings and walls were constructed simultaneously by shot-crete. The newly constructed walls were aligned as much as possible with the extremities of the culverts (increasing the width from 4.5m – 7m). The original rack was situated at 90 degrees to the flow and was often completely blocked as the design lacked any directional encouragement to disburse the retained material. The newly constructed concrete apron was designed to cater for the angled trash rack which also enabled access to the upstream side of the rack for a bobcat or similar plant.

TM

EcosolW A S T E W A T E R F I L T R A T I O N S Y S T E M S

Page 4

Page 6: CITY OF BOTANY BAY FLOODVALE DRAIN - TRASH …ecosol.com.au/skin/thumbs/Floodvale-Drain.pdfCITY OF BOTANY BAY FLOODVALE DRAIN - TRASH RACK . ... 2.1 of closed conduit and 0.8 of open

The new Stainless Steel Trash Rack was designed and manufactured by Ecosol, significantly different to the previous. The new rack was angled in excess of 35 degrees to allow the material to be conveyed to the capture bay situated offline of the watercourse. The rack was stepped across the length to allow adequate by–pass during peak events. The frame construction consisted of 100mm x 100mm SHS uprights with 75mm x 50mm SHS cross members. The directional bars were spaced at 75mm intervals at 45 degrees to assist with the conveyance of pollutants and large quantities of pine needles. This model was based on previous Ecosol designs with proven results. Whilst this site would still suffer from localised flooding during peak events as previously discussed, this design would eliminate issues such as premature blocking, scouring of the surrounding areas and the necessity to clean after each and every event. The Ecosol design ensured effective retention of pollutants with safe efficient access. The requirement for the removal and disposal of debris was likely to change from monthly to quarterly. Grouted sand stone scour protection was incorporated upstream of the concrete apron to protect against undermining of the apron and access ramp. The surrounding areas were backfilled and reinstated with councils choice of vegetation. A 30m section of cyclone boundary fence was also replaced.

TM

EcosolW A S T E W A T E R F I L T R A T I O N S Y S T E M S

Page 5

Page 7: CITY OF BOTANY BAY FLOODVALE DRAIN - TRASH …ecosol.com.au/skin/thumbs/Floodvale-Drain.pdfCITY OF BOTANY BAY FLOODVALE DRAIN - TRASH RACK . ... 2.1 of closed conduit and 0.8 of open

The project was completed by mid-December 2014. Council proposed to remove the sediment and debris that had accumulated over many years in the three culverts by the early stages of 2015. They also anticipated that further clearing downstream of the McPherson street bridge would also commence by February 2015. This work would likely allow the rack to function to its full potential. The innovative design and upgrade of this site has delivered a host of positive outcomes for the City of Botany Bay, including • Longevity – Due to the products stainless steel construction • Life Cycle Cost Benefits – Due to improved cleaning intervals and almost zero requirement for maintenance • WHS – Safe, efficient access for council or contracted staff • Flood Mitigation – Due to design efficiencies • Amenity & Functionality – Vastly improved aesthetics and operation, ensuring a reprieve from local business for council. Should you require any information about this project or on any of Ecosol’s other products or services please do not hesitate to contact us on 1300 706 624 or via email at [email protected]. Alternatively please visit our website at www.ecosol.com.au

TM

EcosolW A S T E W A T E R F I L T R A T I O N S Y S T E M S

Page 6

CONCLUSION

Page 8: CITY OF BOTANY BAY FLOODVALE DRAIN - TRASH …ecosol.com.au/skin/thumbs/Floodvale-Drain.pdfCITY OF BOTANY BAY FLOODVALE DRAIN - TRASH RACK . ... 2.1 of closed conduit and 0.8 of open

TM

EcosolW A S T E W A T E R F I L T R A T I O N S Y S T E M S

Page 7

Footings and retaining walls constructed along with upstream scouring protection walls

Bulk earthworks completed and construction of footings and retaining walls commenced

Existing site prior to rehabilitation works.

Constructed hardstand and access ramp

Page 9: CITY OF BOTANY BAY FLOODVALE DRAIN - TRASH …ecosol.com.au/skin/thumbs/Floodvale-Drain.pdfCITY OF BOTANY BAY FLOODVALE DRAIN - TRASH RACK . ... 2.1 of closed conduit and 0.8 of open

Construction of hardstand and access ramp.

TM

EcosolW A S T E W A T E R F I L T R A T I O N S Y S T E M S

Page 8

Stainless Steel Trash Rack Installed and works nearing completion.

Hardstand constructed and Rip-Rap scouring protection in place.

Page 10: CITY OF BOTANY BAY FLOODVALE DRAIN - TRASH …ecosol.com.au/skin/thumbs/Floodvale-Drain.pdfCITY OF BOTANY BAY FLOODVALE DRAIN - TRASH RACK . ... 2.1 of closed conduit and 0.8 of open

TM

EcosolW A S T E W A T E R F I L T R A T I O N S Y S T E M S

Page 9

Newly installed stainless steel Trash Rack

Newly installed stainless steel Ttrash Rack

Site works completed and the system operational

Page 11: CITY OF BOTANY BAY FLOODVALE DRAIN - TRASH …ecosol.com.au/skin/thumbs/Floodvale-Drain.pdfCITY OF BOTANY BAY FLOODVALE DRAIN - TRASH RACK . ... 2.1 of closed conduit and 0.8 of open

In-house manufacturing enables custom solutions to be built specific to site conditions Ecosol provides a quality, reliable and very competitive stainless steel engineering and fabrication service. With over 15 years of industry know how and experience we can provide specialist services in the design and manufacture of a broad range of products Ecosol's rapidly-expanding team of qualified and experienced tradespeople enable it to offer a wide range of off-the shelf and custom-designed products and services to its clients. Our workshop is equipped with reliable, well-maintained plant and equipment and is staffed with industry-trained and accredited personnel thereby ensuring our products and services are of the highest quality.

TM

EcosolW A S T E W A T E R F I L T R A T I O N S Y S T E M S

Page 10

Page 12: CITY OF BOTANY BAY FLOODVALE DRAIN - TRASH …ecosol.com.au/skin/thumbs/Floodvale-Drain.pdfCITY OF BOTANY BAY FLOODVALE DRAIN - TRASH RACK . ... 2.1 of closed conduit and 0.8 of open

Ecosol Pty Ltd ABN 86 059 012 243

Telephone: 1300 706 624 Fax: 1300 706 634

Website: www.ecosol.com.au

Ecological Filtration System Sdn Bhd (Reg No. 651041-U)

Telephone: +603 7710 6514 Fax: +603 7710 2586

Website: www.ecosol.com.my

TM

EcosolW A S T E W A T E R F I L T R A T I O N S Y S T E M S

©Ecosol Pty Ltd 2014 ABN 86 059 012 243 Ecological Filtration Systems Sdn Bhd REG. No 651041-U This document is copyright. No part may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical photocopying, recording or otherwise without prior written permission of Ecosol Pty Ltd.