© ABB Group May 28, 2010 | Slide 1 ABB FACTS Grid connection of Wind Farms Christian PAYERL

Transcript of Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading...

Page 1: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 1

ABB FACTS Grid connection of Wind Farms

Christian PAYERL

Page 2: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 2

ABB – Power of Wind

Page 3: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 3

ABB FACTS

300 engineers, highly skilled in the following disciplines:

Development

Marketing and Sales

System studies and design

Project management

Quality control

Testing and commissioning

After sales

Page 4: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 4

FACTS Applications Flexible AC Transmission Systems

Page 5: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 5

FACTS Business structure and development

Static Var Compensation - Utilities Series Compensation

TCSC

Page 6: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 6

SVC Light® (STATCOM) SVC for Power Quality

FACTS Business structure and development

Page 7: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 8

ABB SVC Installations

450 SVC installations (more than 310 for Power Quality)

Page 8: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 9

SVC - Static Var Compensator SC – Serial Compensations

Start of research

First commercial installation

Installed power

Number of installations

1967 1945

1972 1950

52.000 Mvar 60.000 Mvar

415 235

Page 9: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 10

Generator Size Background

Page 10: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 11

System Studies - Grid Codes Many markets are currently installing or discussing

installing large amounts of renewable generation

Of all the renewable energy sources, wind is currently the most viable technology

In the past wind farms were generally small (ten’s of MWs) and connected mainly to distribution systems

Today most of the wind farms planned are +100 MWs and many are being connected to sub-transmission and transmission level

This prompts the need for systems analysis in the early stages of wind farm development to ensure proper integration into the transmission system

Background

Why shall large wind plants NOT match the same demands as other large traditional power plants ?

Page 11: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 12

Grid Connection

Onshore

Offshore

AC networkCollection

grid

On-shore S/S

Reactive PowerCompensation

Off-shore HVSubstation

Sub-Sea Export Cable transmission

Background

Page 12: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 13

Reactive Power Balance

Voltage Stability

Frequency Control

Fault Ride-Through

Power flow

Critical aspect, Grid compliance - wind power

PICTUREJPG-FORMAT

WEB OPTIMIZED RESOLUTION

General

Page 13: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 14

Voltage & Transient Stability

Power Oscillation Damping

Load Balancing

Power quality issues

Harmonic Mitigation

“Flicker” Mitigation

Voltage Transient Issues

Resonance Issues

Other Advantages with an SVC at the GCP

PICTUREJPG-FORMAT

WEB OPTIMIZED RESOLUTION

General

Page 14: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 15

Static analysis To define apparatus data and reactive

power demand

Load flow

Short circuit

Dynamic analysis To verify system design

Harmonics

Transient Stability

Transient overvoltage

Relay coordination

Power quality analysis Harmonics

Flicker

System Design Studies

Page 15: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 16

European Wind Integration Study - EWIS

EWIS – Report

Page 22, page 24, page 47f

General

Page 16: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 17

Large Wind Farm Grid Connection

Source: National Grid

Reactive PowerBalance

Page 17: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 18

Reactive PowerReactive Power is a local phenomenon and cannot be transmitted

effectively across large distances.

Reactive PowerBalance

The German power factor requirements for Prated above 100MW

Page 18: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 19

Reaktive power balance

Grid Connection Point

Important impedance

P=Pgen-losses

Q=Qgen+Qcabel-I2XPgen

SVC

IG

DFIG

FPC

Qgen

Lagg

ing

MVa

rLe

adin

g MW

MVa

r Lagg

ing

Lead

ing MW

Lagg

ing

MVa

rLe

adin

g MW

+.95pf

-.95pf

Reactive PowerBalance

Page 19: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 20

Reactive power balance

Generators giving local reactive power support are being retired, this disturbs reactive power balance.

Load sensitivity regarding both fundamental frequency and harmonic voltages is increased. Customers are more sensitive to outages.

Changed and often reversed power flow calls for studies and actions.

Reactive PowerBalance

Page 20: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 21

Typical Requirement at the Connection Point (NGT)

Reactive PowerBalance

P (MW) Rated Power output (MW) 100%

20%

A C D B Q (MVAr)

Point A is equivalent to: 0.95 leading Power Factor at Rated MW outputPoint B is equivalent to: 0.95 lagging Power Factor at Rated MW outputPoint C is equivalent to: -5% of Rated MW output Point D is equivalent to: +5% of Rated MW output

Page 21: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 22

Possible FACTS Application

An SVC at the Connection Point can be used to control the entire, or part of, the reactive power.

An SVC at the Connection Point makes it possible to minimize the losses within the wind farm and mitigates the risk for over voltages as well as reduce resonance problems.

Reactive PowerBalance

Page 22: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 23

Historically, wind farms have been excluded from the demand that generating devices should contribute to voltage stability. They cannot, however, expect to enjoy this favorable treatment forever.

Many regulatory authorities adapt the requirement that the wind parks should be able to vary there reactive power output depending on the grid voltage level.

Voltage Stability, Introduction

PICTUREJPG-FORMAT

WEB OPTIMIZED RESOLUTION

Voltage Stability

Page 23: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 24

Possible FACTS Applications

An centrally placed SVC stabilizes the grid.

A solution with an SVC at PCC contribute to voltage stability independent of the active power production.

Voltage Stability

Page 24: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 25

PICTUREJPG-FORMAT

WEB OPTIMIZED RESOLUTION

Frequency control

As well as for the voltage stability,

new wind generation units are requested

to contribute to frequency stability.

Frequency Control

Page 25: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 26

Frequency controlFrequency

Control

Page 26: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 27

Possible FACTS Applications Frequency Control

Active power needed.

A FACTS device equipped with an energy storage is a possible solution.

Clustering of smaller wind farms into larger production units makes it easier to apply solutions.

Page 27: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 28

Fault ride through

Minimum fault the system is required to survive.

Symmetric and asymmetric faults.

Depending on voltage level at Connection Point.

Post fault behavior.

Minimum active power as compared to before event.

Reactive power and voltage control.

FaultRide-Through

Page 28: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 29

Fault ride throughFault

Ride-Through

Page 29: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 30

Advantages with an SVC at Connection Point

Fault Ride-Through is first and foremost a question for the Wind turbine generator manufacturers.

An SVC can have a significant impact on the system after clearance of the fault.

FaultRide-Through

Page 30: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 32

Wind Turbine Concepts

Fixed speed

Induction generator (SCIG - fixed speed)

Danish concept (2

Induction generator with variable slip (WRIG)

Variable speed

ASG with Inverter system (SCIG)

Double feed induction generator with PWM inverter (WRIG)

SG with Inverter system

General

Page 31: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 33

Reactive power, voltage control

Voltage stability, fault ride through

Induction generator direct connected to the grid

Page 32: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 35

Reactive power, voltage control

Voltage stability, fault ride through

Danish concept

Page 33: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 36

Reactive power, voltage control

Voltage stability, fault ride through

Induction generator with variable slip

Page 34: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 37

Reactive power, voltage control

Voltage stability, fault ride through

Wind turbine with inverter in main power circuit

Page 35: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 38

Synchronous generator

Pitch control wind turbine Variable Speed Multi-Pole Synchronous

Generator – direct driven Rectifier + Inverter

wind

SG

ACAC

Gtransformer

grid/standalone

PowerConverter

Page 36: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 39

Reactive power, voltage control

Voltage stability, fault ride through

Double feed induction generator with PWM-inverter

Page 37: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 42

Background

Modelling aspects

Aspect Model level Time scale Tool

Wind turbines mechanical loads RMS 10-1 s – 103 s HAWC

Wind turbines power quality RMS 10-1 s – 103 s DigSilent

Wind turbine control system RMS/EMT 10-3 s – 102 s Matlab

Wind turbine switchings EMT 10-3 s – 101 s DigSilent/SABER

Grid faults EMT 10-6 s – 10-1 s PSCAD, EMTDC, SIMPOW, DigSilent

Power electronic control and design EMT 10-9 s – 10-2 s SABER

Other aspects

Page 38: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 43

Harmonic Requirements Harmonic emission

Background emission onshore grid

WTG:s System resonance

200 400 600 800 1000 1200 1400 1600 1800 2000 2200 2400FREQUENCY HZ

0

200

400

600

800

1000

0

200

400

600

800

0,0

10,0

20,0

30,0

40,0

50,0

0,00

1,00

2,00

3,00

4,00

5,00

6,00

NODE PL33-W5B U POS. p.u. 33.0000/ SQRT[3] kV NODE PL33-W6A U POS. p.u. 33.0000/ SQRT[3] kV NODE PL33-W4A U POS. p.u. 33.0000/ SQRT[3] kV NODE PL33-W3A U POS. p.u. 33.0000/ SQRT[3] kV

Harmonic Filter Design

Type of filter, S-filter, C-filter, etc.

Resistor for increased damping

Resistor => Heating => Losses => Forced Ventilation

Network studyNetwork study

Page 39: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 44

Reasons for bad power qualityPower Line (T or D)

200 400 600 800 1000 1200 1400 1600 1800 2000 2200 2400FREQUENCY HZ

0

200

400

600

800

1000

0

200

400

600

800

0,0

10,0

20,0

30,0

40,0

50,0

0,00

1,00

2,00

3,00

4,00

5,00

6,00

NODE PL33-W5B U POS. p.u. 33.0000/ SQRT[3] kV NODE PL33-W6A U POS. p.u. 33.0000/ SQRT[3] kV NODE PL33-W4A U POS. p.u. 33.0000/ SQRT[3] kV NODE PL33-W3A U POS. p.u. 33.0000/ SQRT[3] kV

↨ P, ↨ Q

IG

DFIG

FPC

Power quality

Page 40: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 45

What is flicker ?IEC 61000-3-7,

IEC 61400-21

UK, P28

China, GB/T 12326-2000

Flicker

Definition

A group exposed to a flicker dose of Pst(99%) = 1.0, 50 % of them can observe the light flicker.

Page 41: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 46

Network In/out switching

Tower shadow

Power electronic failure

Background flicker

Flicker

Page 42: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 47

Continouse operation

Switching operation

Flicker

Page 43: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 48

Can harmonics create problems ?

IEC 61000-3-6, THD < 3.0%, Odd.. Even ..

IEC 61400-21

China, GB/T 14549-93

IEEE, THD < 1.5 %, Odd, even, current..

Communication systems and modern remote metering devices (Turtle)

Overheating of power transformers

Harmonics

Page 44: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 49

Network

200 400 600 800 1000 1200 1400 1600 1800 2000 2200 2400FREQUENCY HZ

0

200

400

600

800

1000

0

200

400

600

800

0,0

10,0

20,0

30,0

40,0

50,0

0,00

1,00

2,00

3,00

4,00

5,00

6,00

NODE PL33-W5B U POS. p.u. 33.0000/ SQRT[3] kV NODE PL33-W6A U POS. p.u. 33.0000/ SQRT[3] kV NODE PL33-W4A U POS. p.u. 33.0000/ SQRT[3] kV NODE PL33-W3A U POS. p.u. 33.0000/ SQRT[3] kV

DFIG

FPC

Harmonics

Page 45: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 50

Shunt banks Small SVC Full rated SVC SVC Light (STATCOM) SVC Light Energy Storage Hybrid solutions

ABB Smart Grid Wind power integration in networks

ABB Solutions

Page 46: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 52

Mechanical switched capacitors from ABB

SIKAP - enclosed capacitor bank

Q-bank - open capacitor bank

CHARM – filter banks

ABBACUS – containerized capacitor bank 12-24 kV

EMPAC- enclosed capacitor bank 36 kV

ABB Solutions

Page 47: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 53

SVC Light with energi storage - applications

February 12, 2010| Slide 53© ABB Group

ABB Solutions

Page 48: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 54

SVC Light Energy Storage

Energy storage connected on DC-side of converter (SVC Light)

Size depends on power level and duration

Charge energy equal to load energy

Focus on “dynamic”, manages:

High number charge and discharge cycles

High Power at medium duration

Chosen high performance battery as energy storage

ABB Solutions

Page 49: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 55

SVC Light Energy Storage SVC Light

First project in 1999 for flicker mitigation of electric arc furnace

In total 12 project for both industry and utility applications

Power range up 164 Mvar, direct connected without transformer up to 35kV grid

SVC Light Energy Storage First project in 2009 Energy Company in UK System Voltage 11 kV Reactive Power:

600 kVAr inductive 600 kVAr capacitive

Active Power: 200 kW during 1 hour 600 kW (short time) Picture of the new Li-ion battery

after testing, October 2008

ABB Solutions

Page 50: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 56

SVC Light med energilager

© ABB Group

Cell Module Room

String Storage

February 12, 2010| Slide 56

ABB Solutions

Page 51: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 57

SVC Light med energilager

February 12, 2010| Slide 57© ABB Group

50 m65 m

Typisk layout för 20 MW under 15 mininuter och +/-30 Mvar kontinuerlig

ABB Solutions

Page 52: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 62

AC Offshore system issues

PCC

PQ working area

Compensation(Localization?!)-Static-Dynamic-SVC vz STATCOM-SVC Light/DynaPow-MINICOMP

Cable parametersCable cost-Laying/burying-Trench width

Harmonics

Energization

Shield overvoltage

XkWeight

ProtectivecapacitorGrounding

-System-Equivpotential

Voltage level

Vt and ferroresonanceABB do not have a voltage divider above 24 kV

Aux. Power-Diesel-Energy Storage

RMU 36 kV

Protectivecapacitor

Type, ratio

Redundancy

RC-protectionSurgearresters

Faultcurrent

CircuitBreaker-Vaccum

Power Electronics

Booster

BLASIGGearbox

d d

Bergeron study, n*d

Fault detection-Ground faults-Short Circuit Currents-Need for further protection?

EMTDC model from SANDYS

Grounding?

CableShielding

Separate 600 V auxiliary grid?

Platform

Ride through

Thermal Cyclic rating

Lightning

Collection Grid Switchboard-Energizing-Normal Operation

ABB Off-shoreSolutions

Page 53: Christian PAYERL ABB FACTS Grid connection of Wind Farms · Point A is equivalent to: 0.95 leading Power Factor at Rated MW output Point B is equivalent to: 0.95 lagging Power Factor

© ABB Group May 28, 2010 | Slide 67