Charging Ahead: Electric Vehicles & the Impact on Electricity Delivery In California
Managing Public Charging Access
August 6, 2010
![Page 2: Charging Ahead: Electric Vehicles & the Impact on Electricity Delivery In California Managing Public Charging Access August 6, 2010.](https://reader035.fdocuments.us/reader035/viewer/2022072014/56649eb25503460f94bb8530/html5/thumbnails/2.jpg)
EV PROJECT OVERVIEW Project Markets
Arizona (Phoenix and Tucson)
California (Los Angeles & San Diego)
Oregon (Corvallis, Eugene, Portland, Salem)
Tennessee (Chattanooga, Knoxville, Nashville)
Washington (Seattle)
Texas (Dallas, Ft. Worth and Houston)
Washington DC
40 Project Partners
SC Edison, San Diego Gas and Electric, LADWP, etc.
![Page 3: Charging Ahead: Electric Vehicles & the Impact on Electricity Delivery In California Managing Public Charging Access August 6, 2010.](https://reader035.fdocuments.us/reader035/viewer/2022072014/56649eb25503460f94bb8530/html5/thumbnails/3.jpg)
Charging Infrastructure Locations
2 million gallons of gasoline saved per year.
2.3 billion CO2e lbs. in five years.
27.1 billion CO2e lbs. in ten years.
750 New Jobs by 2012
5500 New Jobs by 2017
![Page 4: Charging Ahead: Electric Vehicles & the Impact on Electricity Delivery In California Managing Public Charging Access August 6, 2010.](https://reader035.fdocuments.us/reader035/viewer/2022072014/56649eb25503460f94bb8530/html5/thumbnails/4.jpg)
OBJECTIVES
Deploy 4,700 Nissan Battery Electric Vehicles In 5 Regions
Establish Mature Charge Infrastructure To Support Electric Vehicles
Identify And Resolve Barriers To Infrastructure Deployment
Develop An Infrastructure Utilization Data Base
Evaluate Infrastructure Effectiveness
Develop Models For Future Infrastructure Deployments
Model Infrastructure For The Next 5 Million Vehicles
![Page 5: Charging Ahead: Electric Vehicles & the Impact on Electricity Delivery In California Managing Public Charging Access August 6, 2010.](https://reader035.fdocuments.us/reader035/viewer/2022072014/56649eb25503460f94bb8530/html5/thumbnails/5.jpg)
INFRASTRUCTURE DEPLOYMENT
Electric Vehicle Supply Equipment (EVSE) Designed And Manufactured To Allow Power And Energy Data Collection And Demand Response Control
Residential EVSE Installed For All Vehicles
14,650 Level 2 Chargers
310 Level 3 DC FC
5700 Nissan Leafs and 2600 Chevrolet Volts
Data Collected From All Chargers Via Internet
Infrastructure Data Base Maintained And Analyzed At Idaho National Laboratory
![Page 6: Charging Ahead: Electric Vehicles & the Impact on Electricity Delivery In California Managing Public Charging Access August 6, 2010.](https://reader035.fdocuments.us/reader035/viewer/2022072014/56649eb25503460f94bb8530/html5/thumbnails/6.jpg)
Infrastructure Planning
1. Develop EV Infrastructure Deployment Guidelines with localized content (Completed!)
2. Educate Stakeholders on EV Infrastructure Requirements
3. Develop 10-Year Plan
4. Develop Roadmap (Locations)
![Page 7: Charging Ahead: Electric Vehicles & the Impact on Electricity Delivery In California Managing Public Charging Access August 6, 2010.](https://reader035.fdocuments.us/reader035/viewer/2022072014/56649eb25503460f94bb8530/html5/thumbnails/7.jpg)
EV Infrastructure Deployment Guidelines
By March 2010A. Reviewed by Local Technical Advisory Team
B. Includes local requirements for: Permitting Accessibility Signage Point of Sale Utility Interface
C. Guidelines Workshops for Stakeholders
Public Sector, Private, Utilities, Energy Commissions, Associations of Governments, etc.
![Page 8: Charging Ahead: Electric Vehicles & the Impact on Electricity Delivery In California Managing Public Charging Access August 6, 2010.](https://reader035.fdocuments.us/reader035/viewer/2022072014/56649eb25503460f94bb8530/html5/thumbnails/8.jpg)
EV Micro-Climate Plan & RoadmapBy July 2010
Develop EV Micro-Climates© Plan Project Boundaries Incorporates Local Demographic and Transportation Studies Survey of existing EVSE 10-Year EV Infrastructure Feedback
Incorporates Stakeholder Feedback
Develop EV Micro-Climate© Roadmap (Locations) Publicly Available Charging Station Installation Detailed Plan
Commercial & Public Fast Charger Installation Detailed Plan Home Base Charging Station Installation Detailed Plan
Residential/Fleet
![Page 9: Charging Ahead: Electric Vehicles & the Impact on Electricity Delivery In California Managing Public Charging Access August 6, 2010.](https://reader035.fdocuments.us/reader035/viewer/2022072014/56649eb25503460f94bb8530/html5/thumbnails/9.jpg)
Hardware Deployment
1. “Must Have” charging locations
2. Traffic Patterns
3. Strategic Locations
4. Destinations
5. Zoning
6. Grid Sensitivities
7. Range Anxiety
8. Convenience
9. Installation Costs
![Page 10: Charging Ahead: Electric Vehicles & the Impact on Electricity Delivery In California Managing Public Charging Access August 6, 2010.](https://reader035.fdocuments.us/reader035/viewer/2022072014/56649eb25503460f94bb8530/html5/thumbnails/10.jpg)
THANK YOU FOR ALL YOUR HELP!