ANNE ARUNDEL COUNTY
MARYLAND
DEPARTMENT OF PUBLIC WORKS
CHAPTER III
REFERENCE DRAWINGS for
CONCRETE AND ROMAR STEP AND GRAVITY
SEPTIC TANK INSTALLATIONS
January 2001
![Page 2: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/2.jpg)
TOC-1 of 1
Published: 01/01 Revised:
REFERENCE DRAWINGS FOR CONCRETE AND ROMAR STEP AND GRAVITY
SEPTIC TANK INSTALLATIONS
INDEX OF DRAWINGS DESCRIPTION DRAWING NO.
1. Concrete Pressure and Gravity Installations, Sheet 1................................................SS-L-1 2. HDPE Pressure and Gravity Installations, Sheet 1....................................................SS-L-2 3. HDPE or Concrete Pressure Service Installation Details, Sheet 2 ............................SS-L-3 4. HDPE and concrete, Pressure and Gravity Installations Notes,
Sheet 3 (Pressure), Sheet 2 (Gravity) ......................................................SS-L-4 5. Plan – 1000 Gal. Concrete Septic Tank, Pressure Installation..................................SS-S-1a 6. Section – 1000 Gal. Concrete Septic Tank, Pressure Installation .............................SS-S-1b 7. Section – 1000 Gal. Concrete Septic Tank, Pressure Installation .............................SS-S-1c 8. Plan – 1000 Gal. Concrete Septic Tank, Gravity Installation ...................................SS-S-2a 9. Section – 1000 Gal. Concrete Septic Tank, Gravity Installation ..............................SS-S-2b 10. Plan – Romar STEP Septic Tank, Severe Duty, Pressure Installation ......................SS-S-3a 11. Section – Romar STEP Septic Tank, Severe Duty, Pressure Installation .................SS-S3b 12. Plan, View, Tank Top/Riser......................................................................................SS-S-3c 13. Plan – Romar SDG Septic Tank, Severe Duty, Gravity Installation.........................SS-S-4a 14. Section – Romar SDG Septic Tank, Severe Duty, Gravity Installation ....................SS-S-4b 15. Cover/Riser and Riser/Tank Joint Details.................................................................SS-S-5 16. Riser and Cover Detail for HDPE Tanks ..................................................................SS-S-6 17. Concrete Tank Wall Penetrations..............................................................................SS-S-7 18. Pipe Trench and Bedding Detail ...............................................................................SS-C-1 19. Septic Tank Simplex Pump System Typical Arrangement at Residence..................SS-E-1 20. One Line Diagram for Pumps ½ H.P. or Less (115V) ..............................................SS-E-2 21. One Line Diagram for Pumps ¾ H.P. to 2 H.P. (230V)............................................SS-E-3 22. Tank Riser Electrical Conduit Entry for Use with Explosion Proof Junction Box...SS-E-4 23. Tank Riser Electrical Conduit Entry for Use with Quazite Composolite Enclosure SS-E-5 24. Explosion Proof Junction Box ..................................................................................SS-E-6 25. Quazite Composolite Enclosure ................................................................................SS-E-7 26. Curb Valve Detail......................................................................................................SS-M-1 27. Pump Insert Detail.....................................................................................................SS-M-2 28. Concrete Pressure Service Installation Notes............................................................SS-G-1a 29. Concrete Pressure Service Installation Notes............................................................SS-G-1b 30. Concrete Pressure Service Installation Notes............................................................SS-G-1c 31. Concrete Pressure Service Installation Notes............................................................SS-G-1d 32. Concrete Pressure Service Installation Notes............................................................SS-G-1e 33. Concrete Gravity Service Installation Notes .............................................................SS-G-2a 34. Concrete Gravity Service Installation Notes .............................................................SS-G-2b 35. Concrete Gravity Service Installation Notes .............................................................SS-G-2c 36. HDPE Tank, Pressure Service Installation Notes .....................................................SS-G-3a 37. HDPE Tank, Pressure Service Installation Notes .....................................................SS-G-3b 38. HDPE Tank, Pressure Service Installation Notes .....................................................SS-G-3c 39. HDPE Tank, Pressure Service Installation Notes .....................................................SS-G-3d 40. HDPE Tank, Pressure Service Installation Notes .....................................................SS-G-3e 41. HDPE Tank, Gravity Service Installation Notes .......................................................SS-G-4a 42. HDPE Tank, Gravity Service Installation Notes ....................................................... SS-G-4b
![Page 3: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/3.jpg)
III-1 of 42
Published: 01/01 Revised:
![Page 4: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/4.jpg)
III-2 of 42
Published: 01/01 Revised:
![Page 5: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/5.jpg)
III-3 of 42
Published: 01/01 Revised:
![Page 6: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/6.jpg)
III-4 of 42
Published: 01/01 Revised:
![Page 7: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/7.jpg)
III-5 of 42
Published: 01/01 Revised:
![Page 8: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/8.jpg)
III-6 of 42
Published: 01/01 Revised:
![Page 9: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/9.jpg)
III-7 of 42
Published: 01/01 Revised:
![Page 10: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/10.jpg)
III-8 of 42
Published: 01/01 Revised:
![Page 11: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/11.jpg)
III-9 of 42
Published: 01/01 Revised:
![Page 12: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/12.jpg)
III-10 of 42
Published: 01/01 Revised:
![Page 13: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/13.jpg)
III-11 of 42
Published: 01/01 Revised:
![Page 14: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/14.jpg)
III-12 of 42
Published: 01/01 Revised:
![Page 15: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/15.jpg)
III-13 of 42
Published: 01/01 Revised:
![Page 16: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/16.jpg)
III-14 of 42
Published: 01/01 Revised:
![Page 17: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/17.jpg)
III-15 of 42
Published: 01/01 Revised:
![Page 18: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/18.jpg)
III-16 of 42
Published: 01/01 Revised:
![Page 19: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/19.jpg)
III-17 of 42
Published: 01/01 Revised:
![Page 20: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/20.jpg)
III-18 of 42
Published: 01/01 Revised:
![Page 21: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/21.jpg)
III-19 of 42
Published: 01/01 Revised:
![Page 22: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/22.jpg)
III-20 of 42
Published: 01/01 Revised:
![Page 23: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/23.jpg)
III-21 of 42
Published: 01/01 Revised:
![Page 24: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/24.jpg)
III-22 of 42
Published: 01/01 Revised:
![Page 25: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/25.jpg)
III-23 of 42
Published: 01/01 Revised:
![Page 26: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/26.jpg)
III-24 of 42
Published: 01/01 Revised:
![Page 27: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/27.jpg)
III-25 of 42
Published: 01/01 Revised:
![Page 28: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/28.jpg)
III-26 of 42
Published: 01/01 Revised:
![Page 29: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/29.jpg)
III-27 of 42
Published: 01/01 Revised:
![Page 30: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/30.jpg)
III-28 of 42
Published: 01/01 Revised:
![Page 31: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/31.jpg)
III-29 of 42
Published: 01/01 Revised:
![Page 32: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/32.jpg)
III-30 of 42
Published: 01/01 Revised:
![Page 33: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/33.jpg)
III-31 of 42
Published: 01/01 Revised:
![Page 34: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/34.jpg)
III-32 of 42
Published: 01/01 Revised:
![Page 35: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/35.jpg)
III-33 of 42
Published: 01/01 Revised:
![Page 36: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/36.jpg)
III-34 of 42
Published: 01/01 Revised:
![Page 37: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/37.jpg)
III-35 of 42
Published: 01/01 Revised:
![Page 38: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/38.jpg)
III-36 of 42
Published: 01/01 Revised:
![Page 39: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/39.jpg)
III-37 of 42
Published: 01/01 Revised:
![Page 40: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/40.jpg)
III-38 of 42
Published: 01/01 Revised:
![Page 41: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/41.jpg)
III-39 of 42
Published: 01/01 Revised:
![Page 42: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/42.jpg)
III-40 of 42
Published: 01/01 Revised:
![Page 43: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/43.jpg)
III-41 of 42
Published: 01/01 Revised:
![Page 44: CHAPTER III REFERENCE DRAWINGS for CONCRETE AND ROMAR …€¦ · SEPTIC TANK INSTALLATIONS January 2001. TOC-1 of 1 Published: 01/01 Revised: REFERENCE DRAWINGS FOR CONCRETE AND](https://reader035.fdocuments.us/reader035/viewer/2022070916/5fb6efd6a75c2017975b079c/html5/thumbnails/44.jpg)
III-42 of 42
Published: 01/01 Revised: