Sheet List Structural Scheme Drawings Propping of ... · Reinforced concrete - circa 1954...

80
Sheet List Sheet No. Title 8/5/19 S1 Foundation Plan - Existing A S2 Ground Floor Plan Existing A S3 First Floor Framing Plan - Existing A S4 Proposed Foundation Plan A S5 Proposed Collector Plan A S6 Proposed Sections A Distributed to Draft Scheme Masterton District Council X Xigo X Structural Scheme Drawings For Propping of Municipal Building Façade (Option B) For Masterton District Council At Civic Centre, 64 Chapel Street, Masterton Printed: 8/05/2019 4:46:17 p.m. Note: -All dimensions shall be verified on site prior to any shop drawings or the commencement of any work. -The copyright of this drawing remains the property of LGE Consulting Ltd. -This drawing shall be read in conjunction with the architectural drawings PO Box 2113 Kuripuni Masterton 5842 06-377 2541 [email protected] Iss: Job №: Cover Page A 1681 442

Transcript of Sheet List Structural Scheme Drawings Propping of ... · Reinforced concrete - circa 1954...

  • Sheet List

    Sheet

    No.

    Title

    8/5/19

    S1Foundation Plan - Existing

    A

    S2 Ground Floor Plan Existing

    A

    S3 First Floor Framing Plan - Existing

    A

    S4Proposed Foundation Plan

    A

    S5Proposed Collector Plan

    A

    S6Proposed Sections

    A

    Distributed to

    Draft Schem

    e

    Masterton District Council

    X

    Xigo

    X

    Structural Scheme Drawings

    For

    Propping of Municipal Building Façade

    (Option B)

    For

    Masterton District Council

    At

    Civic Centre, 64 Chapel Street,

    Masterton

    Printed: 8/05/2019 4:46:17 p.m.

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Iss:Job №:

    Cover Page

    A1681

    442

  • A B C D E F G H I

    11

    2

    3

    4

    5

    6

    7

    Footing

    under brick

    masonry

    walls

    800sq footing

    under post

    Slab on

    grade

    Slab

    650sq pad

    under columns

    650sq pad

    under

    columns

    Local piles

    for timber

    flooring

    not shown

    Original

    concrete

    footing under

    brick masonry

    walls

    K M N P QOJ

    7A

    4

    5B

    6B

    4A

    6A

    5A

    5

    6

    7

    KEY:

    Building Perimeter

    Existing foundations

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    Foundation Plan - Existing

    Propping of Municipal Building Façade (Option B)

    Civic Centre, 64 Chapel Street, Masterton

    1681 A

    S1

    A Draft Scheme

    8/5/19JP

    Foundation Plan - Existing

    1:200

    443

  • A B C D E F G H I

    11

    2

    3

    4

    5

    6

    7

    22

    25

    109

    1

    2

    3

    4

    5

    6

    7

    8

    11 12 13 14 15 16 17 18 19

    47

    20 21

    49

    24

    23

    27

    28

    29

    3233

    34

    35

    36 37 38 39 40 41

    42

    43

    44

    4546

    48

    50

    51

    52

    53 54

    55

    5657 58

    59

    60

    61

    6263

    26

    26C

    26D

    32A

    S11

    (over)

    S10S9

    16A

    S8

    S17

    S18

    S18A

    15A

    S18B

    S18C

    3031

    S7S6

    S5

    S3

    S4

    S2

    S1

    S14S13S12

    Lift

    K M N P QOJ

    7A

    4

    5B

    6B

    4A

    6A

    5A

    5

    6

    7

    KEY:

    Building perimeter

    Unreinforced masonry - circa 1915

    Reinforced concrete - circa 1954

    Reinforced concrete column 9

    Structural column S6

    Reinforced concrete (CD bld.) - 1984

    9

    S6

    Ground Floor Plan Existing

    1:200

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    Ground Floor Plan Existing

    Propping of Municipal Building Façade (Option B)

    Civic Centre, 64 Chapel Street, Masterton

    1681 A

    S2

    A Draft Scheme

    8/5/19JP

    444

  • A B C D E F G H I

    11

    2

    3

    4

    5

    6

    7

    22

    25

    109

    1

    2

    3

    4

    5

    6

    7

    8

    11 12 13 14 15 16 17 18 19

    47

    20 21

    49

    24

    23

    27

    28

    29

    3233

    34

    35

    36 37 38 39 40 41

    42

    43

    44

    4546

    48

    50

    51

    52

    53 54

    55

    5657 58

    59

    60

    61

    6263

    26

    26C

    26D

    32A

    B8 - 18"x6" RSJ

    (Original)

    B6 - 18"x7" RSJ

    (Original)

    S11

    (over)

    S10S9

    16A

    S8

    S17

    S18

    S18A

    15A

    S18B

    S18C

    3031

    B4 - 18"x7" RSJ

    (Original)

    S7S6

    S5

    S3

    S4

    S2

    S1

    S14S13S12

    B3 - 18"x7" RSJ

    (Original)

    250UB (1984)

    410UB (1984)

    15"x6" 35lb RSJ

    (O

    riginal)

    15"x6" 35lb RSJ

    (O

    riginal)

    Lift

    Slab

    Slab

    Slab

    Slab

    Slab

    B8 - 18"x6" RSJ

    (Original)

    150

    RC

    wall

    150

    RC

    wall

    B6 - 18"x7" RSJ

    (Original)

    B4 - 18"x7" RSJ

    (Original)

    B3 - 18"x7" RSJ

    (Original)

    250UB (1984)

    410UB (1984)

    15"x6" 35lb RSJ

    (O

    riginal)

    15"x6" 35lb RSJ

    (O

    riginal)

    2x 12"x4" DD

    31.33lb

    10"x4"

    beams at

    ~1500 ctrs

    2x 12"x4"

    31.33lb

    B5 -

    12"x6" RSJ

    (Original)

    B1 -

    12"x4"

    31.33 lb

    B2 - 12"x4"

    31.33 lb

    RSJ

    (Existing)

    150x50

    Joists

    New floor

    1984

    B3 - 12"x4"

    31.11lb

    B7 - 18"x6" RSJ

    (Original)

    B4 - 12"x4"

    31.11lb

    K M N P QOJ

    7A

    4

    5B

    6B

    4A

    6A

    5A

    5

    6

    7

    KEY:

    Building perimeter

    Unreinforced masonry - circa 1915

    Reinforced concrete - circa 1954

    Reinforced concrete column 9

    Structural column S6

    Suspended floor slab

    Reinforced concrete (CD bld.) - 1984

    9

    S6

    First Floor Framing Plan - Existing

    1:200

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    First Floor Framing Plan - Existing

    Propping of Municipal Building Façade (Option B)

    Civic Centre, 64 Chapel Street, Masterton

    1681 A

    S3

    A Draft Scheme

    8/5/19JP

    445

  • 22

    25

    109

    1

    2

    3

    4

    5

    6

    7

    8

    11 12 13 14 15 16 17 18 19

    47

    20 21

    49

    24

    23

    27

    28

    29

    3233

    34

    35

    36 37 38 39 40 41

    42

    43

    44

    4546

    48

    50

    51

    52

    53 54

    55

    5657 58

    59

    60

    61

    6263

    26

    26C

    26D

    32A

    16A

    15A

    3031

    Lift

    A B C D E F G H

    I

    1

    2

    3

    4

    5

    6

    7

    1

    2

    3

    4

    5

    6

    7

    A B C D E F G H

    1/S6

    S11

    (over)

    S10

    S9

    S8

    S17

    S18

    S18A

    S18B

    S18C

    S6

    S5

    S3

    S4

    S2

    S14

    S13

    S1

    S12

    2/S6

    S7

    Proposed Foundation Plan

    (Showing existing ground floor structure for construction purposes)

    1:200

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    Proposed Foundation Plan

    Propping of Municipal Building Façade (Option B)

    Civic Centre, 64 Chapel Street, Masterton

    1681 A

    S4

    A Draft Scheme

    8/5/19JP

    KEY:

    Proposed

    1200m deep x 1200m wide x 9m long

    foundation

    600mm dia. x 2m deep augured pile

    460UB67 propped cantilever with

    250UB72 strut

    Existing

    Unreinforced masonry - circa 1915

    Reinforced concrete - circa 1954

    Reinforced concrete column 9

    Structural steel column S6

    9

    S6

    446

  • 22109

    1

    2

    3

    4

    5

    6

    7

    8

    11 12 13 14 15 16 17 18 19 20 21

    53

    16A

    15A

    A B C D E F G H

    I

    1

    2

    3

    4

    5

    6

    7

    1

    2

    3

    4

    5

    6

    7

    A B C D E F G H

    1/S6

    410U

    B60

    410U

    B60

    410U

    B60

    410U

    B60

    410UB60

    410UB60

    410UB60 410UB60 410UB60 410UB60

    S11

    (over)

    S10

    S9

    S8

    S6

    S5

    S3

    S4

    S2

    S14

    S13

    S1

    410UB60

    S12

    2/S6

    S7

    Demolished

    Proposed Collector Plan

    1:200

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    Proposed Collector Plan

    Propping of Municipal Building Façade (Option B)

    Civic Centre, 64 Chapel Street, Masterton

    1681 A

    S5

    A Draft Scheme

    8/5/19JP

    KEY:

    Proposed:

    460UB67 propped cantilever

    410UB60 collector

    Existing:

    Unreinforced masonry - circa 1915

    Reinforced concrete - circa 1954

    Reinforced concrete column 9

    Structural steel column S6

    9

    S6

    447

  • Ground Floor

    Level

    First Floor

    Level

    1200mm wide x

    1200mm deep

    reinforced concrete

    ground beam, 9000mm

    long. HD20 at 200 ctrs,

    R10 at 200 ctrs

    First Floor Level

    Connect each frame

    to existing

    reinforced concrete

    facade beam

    Existing TFC

    "sandwich" member,

    Connect to each new

    frame

    Existing TFC

    "sandwich" member,

    Connect to each new

    frame

    9000

    7000

    250UC72

    7000

    Existing URM

    Existing reinforced

    concrete façade

    10.0m

    8.7m

    410UB60

    collector

    410UB60

    collector

    460UB67

    410UB60

    collector

    410UB60

    collector

    5.0m

    Allow Heliflex tie brick to

    concrete, 600 x 600 grid

    typical

    7

    A

    Allow Heliflex tie brick to

    concrete, 600 x 600 grid

    typical

    Allow Heliflex tie brick to

    concrete, 600 x 600 grid

    typical

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    Proposed Sections

    Propping of Municipal Building Façade (Option B)

    Civic Centre, 64 Chapel Street, Masterton

    1681 A

    S6

    A Draft Scheme

    8/5/19JP

    Section 1/S4

    1:50

    Section 2/S4

    1:50

    448

  • Sheet List

    Sheet

    No.

    Title

    8/5/19

    15/5/19

             

    S1Foundation Plan - Existing

    A          

    S2 Ground Floor Plan - Existing

    A

    S3 First Floor Framing Plan - Existing

    A

    S4First Floor Plan - Existing

    A

    S5Roof Plan Existing

    A

    S6Elevation Grid H - Existing

    A

    S10

    Ground Floor Demolition Plan A

    S11

    First Floor Demolition Plan A

    S20

    Foundation Plan A B

    S21

    Ground Floor Plan A B

    S22First Floor Framing Plan

    A B

    S23

    First Floor Plan A B

    S24Roof & Ceiling Plan

    A B

    S25 Typical Frame Elevation

    A B

    S26

    Plant Room Frame Elevation A B

    S27 Typical CBF Elevation

    A B

    Distributed to

    Draft Schem

    e

    Schem

    e for Pricing

             

    Masterton District Council

    X X

    Xigo

    X X

    Structural Scheme Drawings

    For

    Seismic Strenthening of Municipal & Civil

    Defence Buildings to 100% NBS (IL2)

    (Option C)

    For

    Masterton District Council

    At

    Civic Centre, 64 Chapel Street, Masterton

    Printed: 15/05/2019 1:39:14 p.m.

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Iss:Job №:

    Cover Page

    B1681

    449

  • KEY:

    Building Perimeter

    Existing foundations

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    Foundation Plan - Existing

    Seismic Strenthening of Municipal & Civil Defence Buildings

    to 100% NBS (IL2) (Option C)

    Civic Centre, 64 Chapel Street, Masterton

    1681 A

    S1

    A Draft Scheme

    8/5/19JP

           

           

           

           

           

    Foundation Plan - Existing

    1:200

    450

  • A B C D E F G H I

    11

    2

    3

    4

    5

    6

    7

    22

    25

    109

    1

    2

    3

    4

    5

    6

    7

    8

    11 12 13 14 15 16 17 18 19

    47

    20 21

    49

    24

    23

    27

    28

    29

    3233

    34

    35

    36 37 38 39 40 41

    42

    43

    44

    4546

    48

    50

    51

    52

    53 54

    55

    5657 58

    59

    60

    61

    6263

    26

    26C

    26D

    32A

    S11

    (over)

    S10S9

    16A

    S8

    S17

    S18

    S18A

    15A

    S18B

    S18C

    3031

    S7S6

    S5

    S3

    S4

    S2

    S1

    S14S13S12

    Lift

    K M N P QOJ

    7A

    4

    5B

    6B

    4A

    6A

    5A

    5

    6

    7

    KEY:

    Building perimeter

    Unreinforced masonry - circa 1915

    Reinforced concrete - circa 1954

    Reinforced concrete column 9

    Structural column S6

    Reinforced concrete (CD bld.) - 1984

    9

    S6

    Ground Floor Plan - Existing

    1:200

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    Ground Floor Plan - Existing

    Seismic Strenthening of Municipal & Civil Defence Buildings

    to 100% NBS (IL2) (Option C)

    Civic Centre, 64 Chapel Street, Masterton

    1681 A

    S2

    A Draft Scheme

    8/5/19JP

           

           

           

           

           

    451

  • A B C D E F G H I

    11

    2

    3

    4

    5

    6

    7

    22

    25

    109

    1

    2

    3

    4

    5

    6

    7

    8

    11 12 13 14 15 16 17 18 19

    47

    20 21

    49

    24

    23

    27

    28

    29

    3233

    34

    35

    36 37 38 39 40 41

    42

    43

    44

    4546

    48

    50

    51

    52

    53 54

    55

    5657 58

    59

    60

    61

    6263

    26

    26C

    26D

    32A

    B8 - 18"x6" RSJ

    (Original)

    B6 - 18"x7" RSJ

    (Original)

    S11

    (over)

    S10S9

    16A

    S8

    S17

    S18

    S18A

    15A

    S18B

    S18C

    3031

    B4 - 18"x7" RSJ

    (Original)

    S7S6

    S5

    S3

    S4

    S2

    S1

    S14S13S12

    B3 - 18"x7" RSJ

    (Original)

    250UB (1984)

    410UB (1984)

    15"x6" 35lb RSJ

    (O

    riginal)

    15"x6" 35lb RSJ

    (O

    riginal)

    Lift

    Slab

    Slab

    Slab

    Slab

    Slab

    B8 - 18"x6" RSJ

    (Original)

    150

    RC

    wall

    150

    RC

    wall

    B6 - 18"x7" RSJ

    (Original)

    B4 - 18"x7" RSJ

    (Original)

    B3 - 18"x7" RSJ

    (Original)

    250UB (1984)

    410UB (1984)

    15"x6" 35lb RSJ

    (O

    riginal)

    15"x6" 35lb RSJ

    (O

    riginal)

    2x 12"x4" DD

    31.33lb

    10"x4"

    beams at

    ~1500 ctrs

    2x 12"x4"

    31.33lb

    B5 -

    12"x6" RSJ

    (Original)

    B1 -

    12"x4"

    31.33 lb

    B2 - 12"x4"

    31.33 lb

    RSJ

    (Existing)

    150x50

    Joists

    New floor

    1984

    B3 - 12"x4"

    31.11lb

    B7 - 18"x6" RSJ

    (Original)

    B4 - 12"x4"

    31.11lb

    K M N P QOJ

    7A

    4

    5B

    6B

    4A

    6A

    5A

    5

    6

    7

    KEY:

    Building perimeter

    Unreinforced masonry - circa 1915

    Reinforced concrete - circa 1954

    Reinforced concrete column 9

    Structural column S6

    Suspended floor slab

    Reinforced concrete (CD bld.) - 1984

    9

    S6

    First Floor Framing Plan - Existing

    1:200

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    First Floor Framing Plan - Existing

    Seismic Strenthening of Municipal & Civil Defence Buildings

    to 100% NBS (IL2) (Option C)

    Civic Centre, 64 Chapel Street, Masterton

    1681 A

    S3

    A Draft Scheme

    8/5/19JP

           

           

           

           

           

    452

  • A B C D E F G H I

    1

    2

    3

    4

    5

    6

    7

    Slab

    Slab

    Slab

    Slab

    Slab

    Lift

    KEY:

    Unreinforced masonry - circa 1915

    Reinforced concrete - circa 1954

    Suspended Floor Slab

    Reinforced concrete (CD bld.) - 1984

    22

    25

    109

    1

    2

    3

    4

    5

    6

    7

    8

    11 12 13 14 15 16 17 18 19

    47

    20 21

    49

    24

    23

    27

    28

    29

    3233

    34

    35

    36 37 38 39 40 41 43

    44

    4546

    48

    50

    51

    52

    53 54

    31

    5657 58

    60

    6263

    26

    26C

    32A

    16A15A

    30

    Projector

    room over

    Elevated

    seating

    K M N P QOJ

    7A

    4

    5B

    6B

    4A

    6A

    5A

    5

    6

    7

    First Floor Plan - Existing

    1:200

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    First Floor Plan - Existing

    Seismic Strenthening of Municipal & Civil Defence Buildings

    to 100% NBS (IL2) (Option C)

    Civic Centre, 64 Chapel Street, Masterton

    1681 A

    S4

    A Draft Scheme

    8/5/19JP

           

           

           

           

           

    453

  • A B C D E F G H I

    1

    2

    3

    4

    5

    6

    7

    7A

    4

    5B

    6B

    4A

    6A

    5A

    5

    6

    7

    K M N P QOJ

    Hall

    Civil

    Defence

    Building

    Municipal

    Building

    Civil

    Defence

    Building

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    Roof Plan Existing

    Seismic Strenthening of Municipal & Civil Defence Buildings

    to 100% NBS (IL2) (Option C)

    Civic Centre, 64 Chapel Street, Masterton

    1681 A

    S5

    Roof Plan Existing

    1:200

    A Draft Scheme

    8/5/19JP

           

           

           

           

           

    454

  • 5 6 7

    Ground Floor Level

    First Floor Level

    Elevation Grid I

    1:100

    X/-

    Y/-

    Section Y/-

    1:100

    Section X/-

    1:100

    Brick wall

    demolished

    1950s

    concrete

    parapet

    Original

    18" RSJ

    Original

    URM

    (brick)

    Opening

    made into

    brick

    1950s

    concrete

    banding

    1984 concrete

    gavity support

    structure

    Original

    URM

    (brick)

    Original

    external

    wall line

    1984 opening made in

    brick to access new Civil

    Defence building

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    Elevation Grid H - Existing

    Seismic Strenthening of Municipal & Civil Defence Buildings

    to 100% NBS (IL2) (Option C)

    Civic Centre, 64 Chapel Street, Masterton

    1681 A

    S6

    A Draft Scheme

    8/5/19JP

           

           

           

           

           

    455

  • A B C D E F G H I

    11

    2

    3

    4

    5

    6

    7

    Demolish

    Demolish all

    brick this line

    (Grid 5)

    Lift

    Demolish

    brick and

    concrete

    banding

    Gravity support

    columns may be

    removed once new

    frames are installed

    Gravity support

    columns may be

    removed once new

    frames are installed

    Demolish reinforced

    concrete stairs

    K M N P QOJ

    7A

    4

    5B

    6B

    4A

    6A

    5A

    5

    6

    7

    Demolish Hall

    KEY:

    Building perimeter

    Unreinforced masonry - circa 1915

    Reinforced concrete - circa 1954

    Building element to be demolished

    Reinforced concrete (CD bld.) - 1984

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    Ground Floor Demolition Plan

    Seismic Strenthening of Municipal & Civil Defence Buildings

    to 100% NBS (IL2) (Option C)

    Civic Centre, 64 Chapel Street, Masterton

    1681 A

    S10

    Ground Floor Demolition Plan

    1:200

    A Draft Scheme

    8/5/19JP

           

           

           

           

           

    456

  • A B C D E F G H I

    1

    2

    3

    4

    5

    6

    7

    Slab

    Slab

    Slab

    Slab

    Slab

    Demolish roof/floor

    framing here

    KEY:

    Unreinforced masonry - circa 1915

    Reinforced concrete - circa 1954

    Suspended Floor Slab

    Reinforced concrete (CD bld.) - 1984

    NOTE:

    All original unreinforced brick masonry to be

    removed except that in the building facade along

    grid lines A & 7. TBC on site with Engineer.

    Lift

    Demolish brick and

    concrete banding

    Demolish

    projector

    room

    Demolish

    slab

    Demolish

    slab

    Demolish

    slab

    Demolish reinforced concrete

    stairs reinstate in lightweight

    mild steel

    K M N P QOJ

    7A

    4

    5B

    6B

    4A

    6A

    5A

    5

    6

    7

    Demolish Hall

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    First Floor Demolition Plan

    Seismic Strenthening of Municipal & Civil Defence Buildings

    to 100% NBS (IL2) (Option C)

    Civic Centre, 64 Chapel Street, Masterton

    1681 A

    S11

    First Floor Demolition Plan

    1:200

    A Draft Scheme

    8/5/19JP

           

           

           

           

           

    457

  • A B C D E F G H I

    11

    2

    3

    4

    5

    6

    7

    K M N P QOJ

    7A

    4

    5B

    6B

    4A

    6A

    5A

    5

    6

    7

    100

    100

    1500 deep lift pit +

    sump. 20 series block

    wall + 300mm thick

    foundation

    100

    Allow for local pad

    footings under stair

    posts

    KEY:

    Building Perimeter

    100mm slab. SE62 ductile reinforcing mesh

    35mm top cover in slab. Slab on insulation.

    New foundations, 700mm wide x 1000mm

    deep ground beam

    100

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    Proposed Foundation Plan

    Seismic Strenthening of Municipal & Civil Defence Buildings

    to 100% NBS (IL2) (Option C)

    Civic Centre, 64 Chapel Street, Masterton

    1681 B

    S20

    A Draft Scheme

    8/5/19JP

    B

    Scheme for Pricing15/5/19

    JP

           

           

           

           

           

    Proposed Foundation Plan

    1:200

    Project Design Assumptions

    · Building as per original drawings

    · Building materials in a sound condition

    · Concrete facade f'c = 20 MPa

    · Reinforcing fy = 275 MPa

    458

  • UP

    UP

    A B C D E F G H I

    11

    2

    3

    4

    5

    6

    7

    CBF

    CBF CBF CBF CBF

    CBF

    CBF

    530UB92 columns

    to form frame

    K M N P QOJ

    7A

    4

    5B

    6B

    4A

    6A

    5A

    5

    6

    7

    1/S27

    2/S27

    5/S25

    3/S25

    Sim to

    3/S25

    4/S26

    New steel

    framed stairs

    Allow for new windows

    to be in seismic frames

    Allow for new windows

    to be in seismic frames

    (Grids J-Q)

    KEY:

    Concentrically Braced Frame

    CBF

    A Draft Scheme

    8/5/19JP

    B

    Scheme for Pricing 15/5/19JP

           

           

           

           

           

    Proposed Ground Floor Plan

    1:200

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    Proposed Ground Floor Plan

    Seismic Strenthening of Municipal & Civil Defence Buildings

    to 100% NBS (IL2) (Option C)

    Civic Centre, 64 Chapel Street, Masterton

    1681 B

    S21

    459

  • A B C D E F G H I

    1

    2

    3

    4

    5

    6

    7

    New 530UB92

    frame

    New

    530U

    B92

    fram

    e

    New

    530U

    B92

    fram

    e

    New

    530U

    B92

    fram

    e

    New

    530U

    B92

    fram

    e

    New

    530U

    B92

    fram

    e

    New

    530U

    B92

    fram

    e

    New

    530U

    B92

    fram

    e

    New external wall.

    Refer to Architect

    Allow to improve wall to

    floor joist/diaphragm

    connection along facade.

    Provide steel cleat each

    side + 4/M16 bolts total

    to wall

    Re-nail

    flooring to

    joists

    Seismic

    Seperation

    New 530UB92

    frame

    New 530UB92

    frame

    New 530UB92

    frame

    New 530UB92

    frame

    JJ

    J

    JJ

    J

    J

    J

    J

    JJ

    g

    d

    a

    f

    e

    e

    h

    h

    i i

    New reinforced concrete beam

    400 wide x 475mm deep -

    8/D16 bars (epoxy 250 into

    columns on Grid G (beam is

    under floor slab)

    New

    410U

    B

    K M N P QOJ

    7A

    4

    5B

    6B

    4A

    6A

    5A

    5

    6

    7

    310UB32 310UB32 310UB32 310UB32 310UB32 310UB32

    310U

    B32

    310U

    B32

    310U

    B32

    New

    410U

    B

    J1

    J1

    J2

    J2

    J1

    New external wall.

    Refer to Architect

    300 PFC

    300 PFC

    400U

    B67 collector

    Allow for seismic

    separation

    Allow to provide connection

    between facade to flooring.

    Note: joists run parallel to facade

    on this line

    Provide 3 rows of double blocking

    + fixings at 1000mm ctrs. Typical

    4/M16 bolts to wall at 1000mm

    ctrs

    310UB32

    KEY:

    Existing beams

    New beams

    Existing floor joists

    New floor joists

    Double up existing floor joists

    New 15mm ply diaphragm over entire floor

    a

    J1

    J2

    J

    A Draft Scheme

    8/5/19JP

    B

    Scheme for Pricing15/5/19

    JP

           

           

           

           

           

    Proposed First Floor Framing Plan

    1:200

    Existing Members:

    a

    250UB (1984)

    d

    18"x7" RSJ (Original)

    e 2/12"x4" channels 31.33lb

    f

    12"x6" RSJ (Original)

    g 18"x7" RSJ (Original)

    h 12"x4" channel 31.11lb

    i

    18"x6" RSJ (Original)

    j Floor joists

    NOTE:

    Allow to splice new Hyspan joists to

    existing joists at all new plant locations

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    Proposed First Floor Framing Plan

    Seismic Strenthening of Municipal & Civil Defence Buildings

    to 100% NBS (IL2) (Option C)

    Civic Centre, 64 Chapel Street, Masterton

    1681 B

    S22

    460

  • DO

    WN

    VOID

    A B C D E F G H I

    1

    2

    3

    4

    5

    6

    7

    CBF

    CBFCBF

    CBF

    CBF

    K M N P QOJ

    7A

    4

    5B

    6B

    4A

    6A

    5A

    5

    6

    7

    4/125x6 SHS

    posts around

    lift and stair

    125x6 SHS

    posts at stairs

    KEY:

    Concentrically Braced Frame

    CBF

    A Draft Scheme

    8/5/19JP

    B

    Scheme for Pricing 15/5/19JP

           

           

           

           

           

    Proposed First Floor Plan

    1:200

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    Proposed First Floor Plan

    Seismic Strenthening of Municipal & Civil Defence Buildings

    to 100% NBS (IL2) (Option C)

    Civic Centre, 64 Chapel Street, Masterton

    1681 B

    S23

    461

  • A B C D E F G H I

    1

    2

    3

    4

    5

    6

    7

    102x4 SH

    S

    102x4 SH

    S

    102x4 SH

    S

    102x4 SH

    S

    102x4 SH

    S

    410UB60

    frame

    410UB60

    frame

    410UB60

    frame

    410UB60

    frame

    410UB60

    frame

    310UB32

    410U

    B60

    fram

    e

    410U

    B60

    fram

    e

    410U

    B60

    fram

    e

    310U

    B32

    310U

    B32

    310U

    B32

    310U

    B32

    310U

    B32

    410U

    B60

    fram

    e

    410U

    B60

    fram

    e

    410U

    B60

    fram

    e

    410U

    B60

    fram

    e

    125x6 SHS starts at

    ceiling level + new

    connections to grid Q

    columns

    DB20 bracing to

    truss bottom chord

    310UB32 310UB32 310UB32 310UB32 310UB32

    3/S25

    89x5 SHS strut

    250UB31

    89x5 SHS strut

    K M N P QOJ

    7A

    4

    5B

    6B

    4A

    6A

    5A

    5

    6

    7

    D

    B

    2

    0

    4/S26

    C

    New jack framing over

    to support existing roof

    structure TBC

    89x5 SH

    S strut

    D

    B

    2

    0

    D

    B

    2

    0

    D

    B

    2

    0

    D

    B

    2

    0

    150x6 SH

    S strut

    180 thick

    slab

    Seismic

    separation

    Seismic

    separation

    D

    B

    2

    0

    A Draft Scheme

    8/5/19JP

    B

    Scheme for Pricing 15/5/19JP

           

           

           

           

           

    Proposed Roof & Ceiling Plan

    1:200

    KEY:

    DonoBrace DB20 Bracing

    Comflor 80 - 180mm slab, 0.9mm

    Allow to upgrade existing steel to column

    connections Grids 4, J-P & 7a, J-P. Allow for new

    steel cleats, welding and 4/M16 bolts to existing

    column. Epoxy 250 into column

    C

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    Proposed Roof & Ceiling Plan

    Seismic Strenthening of Municipal & Civil Defence Buildings

    to 100% NBS (IL2) (Option C)

    Civic Centre, 64 Chapel Street, Masterton

    1681 B

    S24

    462

  • 567 7

    Ground Floor Level

    First Floor Level

    First Floor Level

    A

    310UB32

    Floor beam

    Ground Floor Level

    700 wide x

    1000 deep

    ground beam

    700 wide x

    1000mm deep

    ground beam

    Existing

    original

    18"x6"

    55lb RSJ

    530UB92

    530UB92

    530UB92

    Existing

    concrete

    beam

    530UB92

    410UB60

    Connect each frame

    to existing

    reinforced concrete

    facade beam

    Existing TFC

    "sandwich" member,

    Connect to each new

    frame

    Existing TFC

    "sandwich" member,

    Connect to each new

    frame

    Re-nail flooring

    around perimeter to

    new boundary

    element

    Re-nail flooring

    to joists

    89x5 SHS

    strut

    Locally demolish end

    of existing beam to

    accomodate new

    structure

    Helifix ties at

    600 grid brick

    to concrete

    Helifix ties at

    600 grid brick

    to concrete

    Helifix ties at

    600 grid brick

    to concrete

    Helifix ties at

    600 grid brick

    to concrete

    New 15mm ply

    diaphragm over floor

    New 100mm slab

    + insulation

    A Draft Scheme

    8/5/19JP

    B

    Scheme for Pricing15/5/19

    JP

           

           

           

           

           

    Section 3/S21 - Typical Frame Elevation

    1:50

    Section 5/S21

    1:50

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    Typical Frame Elevation

    Seismic Strenthening of Municipal & Civil Defence Buildings

    to 100% NBS (IL2) (Option C)

    Civic Centre, 64 Chapel Street, Masterton

    1681 B

    S25

    463

  • 57

    Floor beam

    Ground Floor Level

    First Floor Level

    530UB92

    530UB92

    530UB92

    530UB92

    410UB60

    Connect each frame

    to existing

    reinforced concrete

    facade beam

    Existing TFC

    "sandwich" member,

    Connect to each new

    frame

    Existing TFC

    "sandwich" member,

    Connect to each new

    frame

    Re-nail flooring

    around perimeter to

    new boundary

    element

    Helifix ties at

    600 grid brick

    to concrete

    250UB37

    530UB92

    530UB92

    310UB32

    Comflor 80

    180mm floor slab

    New 100mm slab

    + insulation

    A Draft Scheme

    8/5/19JP

    B

    Scheme for Pricing 15/5/19JP

           

           

           

           

           

    Section 4/S21 - Plant room support frame

    1:50

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    Plant Room Frame Elevation

    Seismic Strenthening of Municipal & Civil Defence Buildings

    to 100% NBS (IL2) (Option C)

    Civic Centre, 64 Chapel Street, Masterton

    1681 B

    S26

    464

  • 310UB32

    1

    5

    0

    x

    5

    S

    H

    S

    1

    5

    0

    x

    5

    S

    H

    S

    1

    5

    0

    x

    5

    S

    H

    S

    53

    0U

    B9

    2

    53

    0U

    B9

    25

    30

    UB

    92

    1

    5

    0

    x

    5

    S

    H

    S

    2/-

    310UB32

    310Ub32

    CBF

    brace

    Re-hang

    existing floor

    joists to new

    310UB32

    CBF

    brace

    New external

    wall, cladding

    and linings

    New

    footing

    Exsiting

    timber floor

    joists and

    flooring

    CBF

    brace

    Moment

    frame

    column

    530UB92

    moment

    frame beam

    Gravity

    support to

    flooring, and

    CBF collector

    410UB60

    moment frame

    beam

    CBF

    brace

    53

    0U

    B9

    2

    5/HD24

    2/HD20

    5/HD20

    1000

    700

    A Draft Scheme

    8/5/19JP

    B

    Scheme for Pricing15/5/19

    JP

           

           

           

           

           

    Section 1/S21 - Typical CBF Elevation

    1:50

    Section 2/S21

    1:50

    Typical Ground Beam

    1:20

    PO Box 2113

    Kuripuni

    Masterton 5842

    06-377 2541

    [email protected]

    Note:

    -All dimensions shall be verified on site

    prior to any shop drawings or the

    commencement of any work.

    -The copyright of this drawing remains

    the property of LGE Consulting Ltd.

    -This drawing shall be read in

    conjunction with the architectural

    drawings

    Rev:

    Sheet Number:

    Job №:Title:

    Project:

    Rev. Date

    Drawn

    by

    Typical CBF Elevation

    Seismic Strenthening of Municipal & Civil Defence Buildings

    to 100% NBS (IL2) (Option C)

    Civic Centre, 64 Chapel Street, Masterton

    1681 B

    S27

    465

  • L.010000

    7

    L.114380

    6

    L.SITE9300

    L.2 ROOF18180

    5 436-01

    136-04

    1

    FIRE RATING MIN. : FRR 30/30/30ACCOUSTIC MIN. : STC55 / IIC55

    SYSTEM: GBDFA60b 2x13mm GIB FYRELINE ON GIB RONDO BATTENS WITH DIRECT FIX CLIPR1.8 PINK BATTS BIB (75mm)

    EX1 KOROK SPEEDWALL 78mm PANLES VERTICALFRR -/240/120 SUPPORTED ON STEEL FRAMEMIN FRR: FRR 60/60/60 FIXED L0, L1 & L2

    FLOATING BULKHEAD

    90x45 H1.2 TIMBER STRAPPINGR2.8 WALL BATT INSULATION13mm GIB STANDARD

    31

    00

    SU

    SP

    EN

    DE

    D C

    EIL

    ING

    HE

    IGH

    T3

    20

    0 S

    US

    PE

    ND

    ED

    CE

    ILIN

    G H

    EIG

    HT

    140x45 STUDSR4.0 PINK BATTS ULTRA13mm GIB STANDARD INTERNAL WALL LINING

    FIRE RATE HORIZONATL STEEL SUPPORTING KOROK SPEED WALL PANELS

    90mm TIMBER FRAMED OR STEEL STUD (CBI OR SIMILAR)

    MID SPAN SUPPORT TO KOROK SPEEDWALL

    INTERNAL GUTTERS NURAPLY 3PM GUTTER MEMBRANERE-FORM 17mm H3.2 CCA TREATED PLYWOOD LINING WIDTH 400mmFALL: 1:100 MIN

    NEW WARM ROOF TO SPAN BETWEEN ROOF TRUSSES, EXISTING SARKING TO BE REMOVED

    NEW ROOF IN-PLANE BRACING, REFER STRUCTURAL ENGINEER

    NEW PARTITION WALL TO BE BRACED TO ROOF STRUCTURE

    VENTED RIDGE FLASHING

    0.55 COLORSTEEL MAX 300mm BOX GUTTER TO REAR ELEVATIONS

    EXTERNAL 150DIA UVC DOWNPIPES

    92mm ALUMINIUM PARTITION SYSTEM (ECLIPSE 92mm ALUMINIUM)

    32

    00

    FU

    LL

    HE

    IGH

    GL

    AZ

    ING

    600

    600x600 FLOATING CEILING GRID (CBI)DAIKEN HARMONY CEILING TILE

    NEW DOUBLE GLAZED TIMBER SASHES TO EXISTING TIMBER FRAMES (SINGLE SASHE WITH FIXED RAIL TO MATCH EXISTING DOUBLE HUNG)

    70

    0

    NEW PINE WINDOW LINER EXTENSIONS, PAINT FINISH

    RESOURCE ROOMOFFICE SPACE

    MEETING ROOM OFFICE SPACE

    PORTION OF EXISTING ROOF STRUCTURE IS PARTIALLY VAULTED RAFTERS WITH COLLAR TIES AND EXISTTING PFC STEEL STRENGTHENING

    38

    00

    FL

    OO

    R T

    O U

    /S C

    EIL

    ING

    JO

    IST

    S4

    06

    0 F

    LO

    OR

    TO

    U/S

    FL

    OO

    R J

    OIS

    TS

    DRAWING TITLE: COORDINATED SERVICES ZONING

    DRAWING No: CSK01

    PROJECT: MASTERTON CIVIC CENTRE

    PROJECT No: 23458

    SCALE: 1:200 @ A3

    DATE: 20/05/2019

    DRAWN: WC

    ELECTRICAL SERVICES ZONE

    SPRINKLER SERVICES ZONE

    HVAC PIPEWORK ZONE

    FC UNITS ZONE

    ELECTRICAL SERVICES ZONE

    SPRINKLER SERVICES ZONE

    HVAC PIPEWORK ZONE

    FC UNITS ZONE

    HAVC DUCTWORK ZONE

    NOTE: ZONING NOT SHOWN IN ROOF VOID AT THISSTAGE DUE TO SPACE AVAILABLE

    ICT CABLING ZONE

    ICT CABLING ZONE

    466

  • 7 7

    A

    A

    B

    B

    6 6

    5 5

    1 1

    3 3

    2 2

    4 4

    D

    D

    C

    C

    E

    E

    F

    F

    G

    G

    H

    H

    I

    I

    J

    J

    K

    K

    L

    L

    M

    M

    N

    N

    O

    O

    P

    P

    UP

    UP

    DRAWING TITLE: GROUND FLOOR DUCT WORK

    DRAWING No: MSK012

    PROJECT: MASTERTON CIVIC CENTRE

    PROJECT No: 23458

    SCALE: 1:200 @ A3

    DATE: 20/05/2019

    DRAWN: WC

    FCUG06

    FC

    UG

    02F

    CU

    G04

    FC

    UG

    03

    FC

    UG

    05

    FCUG07

    FCUG08

    FCUG09

    FCUG10

    FCUG11

    FCUG12

    FCUG13

    FCUG15

    FCUG14

    FCUG16

    FCUG01

    400W X 300HEXTRACT DUCTWORK

    400W X 300HEXTRACT DUCTWORK

    400W X 300H SUPPLYDUCTWORK

    400W X 300H SUPPLYDUCTWORK

    DUCTWORK DROPSFROM ABOVE

    467

  • 7

    A B

    6

    5

    1

    3

    2

    4

    DC E F G H IJ K L M N O P

    DO

    WN

    VOID

    DRAWING TITLE: FIRST FLOOR DUCT WORK

    DRAWING No: MSK013

    PROJECT: MASTERTON CIVIC CENTRE

    PROJECT No: 23458

    SCALE: 1:200 @ A3

    DATE: 20/05/2019

    DRAWN: WC

    AHU1

    FCUF01

    FC

    UF

    02

    FC

    UF

    03

    FC

    UF

    04F

    CU

    F06

    FC

    UF

    05

    FCUF07 FCU

    F08

    FCUF09

    FCUF10

    FCUF11

    FCUF12

    FCUF13

    FCUF14

    FCUF16

    FCUF15

    FCUF17

    FCUF18

    400W X 300HEXTRACT DUCTWORK

    400W X 300HEXTRACT DUCTWORK

    400W X 300H SUPPLYDUCTWORK

    400W X 300H SUPPLYDUCTWORK

    DUCTWORK DROPSTO BELOW

    ROOF MOUNTEDAIR HANDLINGUNIT

    468

  • 7 7

    A

    A

    B

    B

    6 6

    5 5

    1 1

    3 3

    2 2

    4 4

    D

    D

    C

    C

    E

    E

    F

    F

    G

    G

    H

    H

    I

    I

    J

    J

    K

    K

    L

    L

    M

    M

    N

    N

    O

    O

    P

    P

    UP

    UP

    EXPECTED EXISTINGMAINS CABLE ROUTEUNDER WAIATA HOUSEEXTERIOR PAVING

    EXISTINGTRANSFORMER500 kVA

    EXISTINGMAINS CABLEROUTE EVIDENTIN CAR PARK

    Ex. MSB

    Ex. GENSET

    BOTH INROOMS BELOWSTAGE

    DRAWING TITLE: GROUND FLOOR ELECTRICAL WORK

    DRAWING No: ESK012

    PROJECT: MASTERTON CIVIC CENTRE

    PROJECT No: 23458

    SCALE: 1:200 @ A3

    DATE: 20/05/2019

    DRAWN: WC

    NEW DATACABINET

    NEWDB:G1

    NEWDB:G2 NEW

    MSB

    NEW MAINSCABLE ROUTEUNDERCARPARK

    CUT EXISTINGMAINS CABLE& JOIN TO NEW

    469

  • 7

    A B

    6

    5

    1

    3

    2

    4

    DC E F G H IJ K L M N O P

    DO

    WN

    VOID

    DRAWING TITLE: FIRST FLOOR ELECTRICAL WORK

    DRAWING No: ESK013

    PROJECT: MASTERTON CIVIC CENTRE

    PROJECT No: 23458

    SCALE: 1:200 @ A3

    DATE: 20/05/2019

    DRAWN: WC

    NEW DATACABINET

    NEWDB:F1

    NEWDB:F2

    470

  • DRAWING TITLE: ROOFTOP PLANT LAYOUT

    DRAWING No: MSK015

    PROJECT: MASTERTON CIVIC CENTRE

    PROJECT No: 23458

    SCALE: 1:200 @ A3

    DATE: 20/05/2019

    DRAWN: WC

    SECTION VIEW

    UP

    D D

    AC1900x900x

    1800300 kg

    5

    6

    AHU13000W x 2000D x 2000H

    900 kg

    AC2900x900x

    1800300 kg

    AC1900x900x

    1800300 kg

    60

    60

    L.2 ROOF18180

    NEW STEEL BEAM SUPPORTING CONCRETE SERVICES PLATFORM

    HVAC SERVICES PLATFORM

    ALUMINIUM POWDERCOATED ALUMINIUM ENCLOSURE TO SERVICES ROOM - HOLYOAKE LOUVERS OR SIMILARPROVIDES BARRIER FROM FALLING AND VISUAL SCREENING

    POSTS SUPPORTING LOUVERS TO BE FACE FIXED TO CONCRETE NIB

    HEIGHT OF SERVICE PLATFORM SET TO FALL INTO CONTINUOUS GUTTER LINE

    REINSTATE ORIGINAL STEEL FRAMED WINDOW (ORIGINAL 1915) WITH ARTIFICIAL BACK LIGHTING

    GLASS BALUSTRADES WITH LEANER FORMING INTERLINKING HANDRAIL

    POWDERCOATED METAL BALUSTRADES TO GANG WAY

    SUSPENDED CEILING GRID WITH 600x600 TIMBER HUSH PANELS (GROUP 1-S) WITHIN CEILING GRID

    SIDE DOOR ACCESS POINT FROM WET SERVICES ROOM VIA INTERNAL LADDER

    AHU AC

    ROOF PLAN

    DUCTWORK AND PIPEWORKPASSES THROUGH SIDE WALLS

    THREE DX HEAT REJECTION OUTDOORUNITS ROOF MOUNTED ON PLINTHS

    OUTDOOR AIR SUPPLY AIRHANDLING UNIT ROOFMOUNTED ON PLINTHS

    471

  • STATUS:

    MASTERTON: 06 378 6332

    JOB NO:

    PROJECT:

    CLIENT:

    ADDRESS:

    WELLINGTON: 04 972 1906

    24 Church Street, Masterton, P.O

    Box 120

    Suite 3, L2, 182 Vivian Street,

    Wellington

    www.silverwoodarchitects.co.nz [email protected]

    M1918

    64 Chapel Street, Masterton

    Seismic Strengthening and Office Fit-Out

    to MDC Municiple & CD Building

    Masterton District Council

    Concept Design

    S H E E T I N D E X

    NO. SHEET NAMECURRENTREVISION ISSUE DATE

    10 Indexes, Miscellaneous

    10-01 Cover Sheet 15/05/2019

    11 Location Plan, Site Plans

    11-01 Location Plan 15/05/2019

    11-02 Existing Site Plan 15/05/2019

    11-03 Proposed Site Plan 15/05/2019

    11-04 Aerial Photo & GIS Services 15/05/2019

    20 Floor Plans, Roof Plan

    20-01 L0. Existing Floor Plan 15/05/2019

    20-02 L1. Existing Floor Plan 15/05/2019

    20-03 L0. Demolition Floor Plan 15/05/2019

    20-04 L1. Demolition Floor Plan 15/05/2019

    20-05 L2. Demolition Roof Plan 15/05/2019

    20-06 L0. Proposed Floor Plan - Fitout 15/05/2019

    20-07 L1. Proposed Floor Plan - Fitout 15/05/2019

    20-08 L2. Proposed Roof Plan 15/05/2019

    20-09 L0. Floor Plan - Base Build Part 1 of 2 15/05/2019

    20-10 L0. Floor Plan - Base Build Part 2 of 2 15/05/2019

    20-11 L1. Floor Plan - Base Build Part 1 of 2 15/05/2019

    20-12 L1. Floor Plan - Base Build Part 2 of 2 15/05/2019

    36 Sections

    36-01 Existing Section 1-1 15/05/2019

    36-02 Existing Section 2-2 15/05/2019

    36-03 Proposed Section 1-1 15/05/2019

    36-04 Proposed Section 2-2 15/05/2019

    36-05 Proposed Section 3-3 15/05/2019

    36-06 Proposed Section 4-4 15/05/2019

    472

  • CHAPEL STREET

    LIN

    CO

    LN

    RO

    AD

    PE

    RR

    Y S

    TR

    EE

    T

    CO

    LE

    STR

    EE

    T

    MASTERTON TOWN

    SQUARESITE

    N

    PART SECTION 104 TN OF

    MASTERTON

    SH

    EE

    T:

    ST

    AT

    US

    :

    (HA

    LF S

    CA

    LE a

    tA

    3)

    JOB

    NO

    :

    DA

    TE

    :

    SC

    ALE

    :

    RE

    V:

    PR

    OJE

    CT

    :

    CLIE

    NT

    :

    AD

    DR

    ES

    S:

    SH

    EE

    T:

    MA

    ST

    ER

    TO

    N:

    06

    37

    8 6

    33

    2W

    ELL

    ING

    TO

    N:

    04

    97

    2 1

    90

    6

    24

    Ch

    urc

    h S

    tre

    et,

    Ma

    ste

    rto

    n,

    P.O

    Bo

    x 1

    20

    Su

    ite

    3,

    L2 1

    82

    , V

    ivia

    n S

    tre

    et

    We

    llin

    gto

    n

    ww

    w.s

    ilve

    rwo

    od

    arc

    hit

    ect

    s.co

    .nz

    in

    fo@

    silv

    erw

    oo

    da

    rch

    ite

    cts.

    co.n

    z

    1 :

    50

    0 a

    t A

    1

    11

    -01

    Loca

    tio

    n P

    lan

    M1

    91

    8

    15

    /05

    /20

    19

    64 Chapel Street, Masterton

    Se

    ism

    ic S

    tre

    ng

    the

    nin

    g a

    nd

    Off

    ice

    Fit

    -Ou

    t to

    MD

    C M

    un

    icip

    le &

    CD

    Bu

    ild

    ing

    Masterton District Council

    Concept Design

    473

  • REMOVE EXISTING DIESEL TANKREGISTERED CONTAMINATION ON GWRC SLUR REGISTERFILE NO: SN/06/069/02HAIL: CHEMICAL MANUFACTURE, APPLICATION AND BULK STORAGEHAIL SUB: STORAGE TANKS OR DRUMS FOR FUEL, CHEMICALS OR LIQUID WASTECATEGORY: VERIFIED HISTORY OF HAZARDOUS ACTIVITY OR INDUSTRY

    DIESEL BOILERPOTENTIAL HYDROCARBON CONTAMINATED AREA

    TOWN HALL BUILDING TO BE

    DEMOLISHED

    DEMOLISH EXISTING RAMP

    EXISTING MUNICIPAL

    BUILDING

    EXISTING CIVIL

    DEFENCE BUILDING

    CHAPEL STREET

    LIN

    CO

    LN

    RO

    AD

    N

    DEMOLISH EXISTING RAMP & STEPS

    DEMOLISH EXISTING STEPS & EXTERNAL DOORS

    SHEET:

    STATUS:

    (HALF SCALE at A3)

    JOB NO:

    DATE:

    SCALE:

    REV:

    PROJECT:

    CLIENT:

    ADDRESS:

    SHEET:

    MASTERTON: 06 378 6332 WELLINGTON: 04 972 1906

    24 Church Street, Masterton, P.O

    Box 120

    Suite 3, L2, 182 Vivian Street,

    Wellington

    www.silverwoodarchitects.co.nz [email protected]

    1 : 200 at A1

    11-02Existing Site Plan

    M1918

    15/05/2019

    64 Chapel Street, Masterton

    Seismic Strengthening and Office

    Fit-Out to MDC Municiple & CD

    Building

    Masterton District Council

    Concept Design

    REVISION SCHEDULEREF. DESCRIPTION DATE

    474

  • NEW 1:12 ACCESSIBLE RAMP (STAFF) WITH HANDRAILS TO BOTH SIDES

    NEW HANDRAILS TO EXISTING STAIR

    SPRINKLER VALVE & PUMP ROOM

    COVERED SECURE BIKE STORE WITH CHARGING CAPACITY (24 BIKES)

    NEW ENTRANCE STAIRS TO CHAPEL STREET ENTRANCE

    REMOVE EXISTING STAIR AND EXTERNAL DOOR, MAKE GOOD ASPHALT

    CHAPEL STREET

    LIN

    CO

    LN

    RO

    AD

    191 2 3 4 5 6

    7 8 9 10 11 12 13 14 15 16 16 17 18

    20 21 22 23 24 25

    27

    26

    28

    28 NEW CARPARKS

    BIKE STORE

    NEW ASPHALT AREA TO DEMOLISHED TOWN

    HALL FOOT PRINT

    WET SERVICES ROOM

    DRY SERVICES ROOM

    EXISTING MUNICIPAL

    BUILDING

    EXISTING CIVIL

    DEFENCE BUILDING

    WAIATA HOUSEWAIATA HOUSE

    CARPARK

    EXISTING

    CARPARK

    NNEW STAINLESS STEEL HANDRIALS TO BOTH SIDES OF EXISTING RAMP

    NEW STAINLESS STEEL HANDRIALS TO BOTH SIDES OF EXISTING RAMP

    ALLOW TO REPLACE EXISTING ASPHALT PAVING TO AREA HATCHED

    ALLOW TO REPLACE EXISTING ASPHALT PAVING TO AREA HATCHED

    NE

    W E

    LE

    CT

    RIC

    AL

    TR

    EN

    CH

    A

    LL

    OW

    AN

    CE

    NEW SEWER/STORMWATER TRENCH ALLOWANCE

    SHEET:

    STATUS:

    (HALF SCALE at A3)

    JOB NO:

    DATE:

    SCALE:

    REV:

    PROJECT:

    CLIENT:

    ADDRESS:

    SHEET:

    MASTERTON: 06 378 6332 WELLINGTON: 04 972 1906

    24 Church Street, Masterton, P.O

    Box 120

    Suite 3, L2, 182 Vivian Street,

    Wellington

    www.silverwoodarchitects.co.nz [email protected]

    1 : 200 at A1

    11-03Proposed Site Plan

    M1918

    15/05/2019

    64 Chapel Street, Masterton

    Seismic Strengthening and Office

    Fit-Out to MDC Municiple & CD

    Building

    Masterton District Council

    Concept Design

    REVISION SCHEDULEREF. DESCRIPTION DATE

    475

  • SH

    EE

    T:

    ST

    AT

    US

    :

    (HA

    LF S

    CA

    LE a

    tA

    3)

    JOB

    NO

    :

    DA

    TE

    :

    SC

    ALE

    :

    RE

    V:

    PR

    OJE

    CT

    :

    CLIE

    NT

    :

    AD

    DR

    ES

    S:

    SH

    EE

    T:

    MA

    ST

    ER

    TO

    N:

    06

    37

    8 6

    33

    2W

    ELL

    ING

    TO

    N:

    04

    97

    2 1

    90

    6

    24

    Ch

    urc

    h S

    tre

    et,

    Ma

    ste

    rto

    n,

    P.O

    Bo

    x 1

    20

    Su

    ite

    3,

    L2 1

    82

    , V

    ivia

    n S

    tre

    et

    We

    llin

    gto

    n

    ww

    w.s

    ilve

    rwo

    od

    arc

    hit

    ect

    s.co

    .nz

    in

    fo@

    silv

    erw

    oo

    da

    rch

    ite

    cts.

    co.n

    z

    1 :

    20

    0 a

    t A

    1

    11

    -04

    Ae

    ria

    l P

    ho

    to &

    GIS

    Se

    rvic

    es

    M1

    91

    8

    15

    /05

    /20

    19

    64 Chapel Street, Masterton

    Se

    ism

    ic S

    tre

    ng

    the

    nin

    g a

    nd

    Off

    ice

    Fit

    -Ou

    t to

    MD

    C M

    un

    icip

    le &

    CD

    Bu

    ild

    ing

    Masterton District Council

    Concept Design

    476

  • 7 7

    A

    A

    B

    B

    6 6

    5 5

    1 1

    3 3

    2 2

    4 4

    D

    D

    C

    C

    E

    E

    F

    F

    G

    G

    H

    H

    I

    I

    J

    J

    K

    K

    L

    L

    M

    M

    N

    N

    O

    O

    P

    P

    36-011

    36-011

    36-021

    36-021

    AUDITORIUM MAIN STAGE

    BACK STAGE ROOMS

    AUDITORIUMFOYER

    FRANK CODY

    LOUNGE

    STAFF ROOM

    RECEPTION

    ADMIN OFFICE

    CIVIL DEFENCE

    ST

    AIR

    ST

    AIR

    STAIR

    LIFT

    ST

    AIR

    ST

    AIR

    SHEET:

    STATUS:

    (HALF SCALE at A3)

    JOB NO:

    DATE:

    SCALE:

    REV:

    PROJECT:

    CLIENT:

    ADDRESS:

    SHEET:

    MASTERTON: 06 378 6332 WELLINGTON: 04 972 1906

    24 Church Street, Masterton, P.O

    Box 120

    Suite 3, L2, 182 Vivian Street,

    Wellington

    www.silverwoodarchitects.co.nz [email protected]

    1 : 100 at A1

    20-01L0. Existing Floor Plan

    M1918

    15/05/2019

    64 Chapel Street, Masterton

    Seismic Strengthening and Office

    Fit-Out to MDC Municiple & CD

    Building

    Masterton District Council

    Concept Design

    REVISION SCHEDULEREF. DESCRIPTION DATE

    477

  • 7

    A B

    6

    5

    1

    3

    2

    4

    DC E F G H IJ K L M N O P

    36-011

    36-011

    36-021

    36-021

    AUDITORIUM MAIN STAGE

    BACK STAGE ROOMS

    OFFICES

    PUBLIC RECEPTIONOFFICES

    STORE

    STAIR

    STAIR

    LIFT

    ST

    AIR

    ST

    AIR

    ST

    AIR

    ST

    AIR

    ST

    AIR

    36-041

    36-041

    36-051

    36-051

    SHEET:

    STATUS:

    (HALF SCALE at A3)

    JOB NO:

    DATE:

    SCALE:

    REV:

    PROJECT:

    CLIENT:

    ADDRESS:

    SHEET:

    MASTERTON: 06 378 6332 WELLINGTON: 04 972 1906

    24 Church Street, Masterton, P.O

    Box 120

    Suite 3, L2, 182 Vivian Street,

    Wellington

    www.silverwoodarchitects.co.nz [email protected]

    1 : 100 at A1

    20-02L1. Existing Floor Plan

    M1918

    15/05/2019

    64 Chapel Street, Masterton

    Seismic Strengthening and Office

    Fit-Out to MDC Municiple & CD

    Building

    Masterton District Council

    Concept Design

    REVISION SCHEDULEREF. DESCRIPTION DATE

    478

  • 7 7

    A

    A

    B

    B

    6 6

    5 5

    1 1

    3 3

    2 2

    4 4

    D

    D

    C

    C

    E

    E

    F

    F

    G

    G

    H

    H

    I

    I

    J

    J

    K

    K

    L

    L

    M

    M

    N

    N

    O

    O

    P

    P

    36-011

    36-011

    36-021

    36-021

    AUDITORIUM MAIN STAGE

    BACK STAGE ROOMS

    AUDITORIUMFOYER

    FRANK CODY

    LOUNGE

    STAFF ROOM

    RECEPTION

    ADMIN OFFICE

    CIVIL DEFENCE

    REMOVE EXISTING ROOF CANOPY OVER DOOR

    DEMOLISH ENTIRE TOWN

    HALL STRUCTURE

    DEMOLISH EXTERNAL WALL ON GRID 1

    REMOVE ALL EXTERNAL WINDOW & DOOR JOINERY TO MUNICIPAL BUILDING

    DEMOLISH REAR WALL OF MUNICIPAL BUILDING ON GRID B

    DEMOLISH REAR WALL OF MUNICIPAL BUILDING ON GRID 5

    REMOVE EXISTING REINFORCED CONCRETE STAIR

    REMOVE ALL EXTERNAL WINDOW & DOOR JOINERY TO CIVIL DEFENCE BUILDING

    DEMOLISH EXISTING STAIR

    DEMOLISH EXISTING STAIR

    DEMOLISH EXISTING LIFT

    REMOVE EXISTING DOORS

    REMOVE EXISTING ROOF CANOPY

    REMOVE EXISTING STEPS & EXTERNAL DOOR

    REMOVE EXISTING STEPS AND RAMP

    REMOVE EXISTING RAMP

    DEMOLISH EXISTING MASONRY WALL TO END OF MUNICIPAL BUILDING

    CUT NEW DOOR OPENING WITHIN EXISTING WINDOW OPENING

    RETAINING EXISTING GROUND FLOOR COLUMNS

    DEMOLISH EXISTING TIMBER FRAMED

    GROUND FLOOR STRUCTURE &

    ASSOCIATED CONCRETE PILES

    REMOVE ALL EXISTING SERVICES TO

    MUNICIPAL, CIVIL DEFENCE & TOWN HALL

    BUILDING FOOT PRINTS

    READ ARCHITECTS DEMOLITION PLANS IN

    CONJUNCTION WITH STRUCTURAL

    ENGINEERS DEMOLITION DRAWINGS

    REMOVE EXISTING LUNDIA STORAGE SYSTEM

    SHEET:

    STATUS:

    (HALF SCALE at A3)

    JOB NO:

    DATE:

    SCALE:

    REV:

    PROJECT:

    CLIENT:

    ADDRESS:

    SHEET:

    MASTERTON: 06 378 6332 WELLINGTON: 04 972 1906

    24 Church Street, Masterton, P.O

    Box 120

    Suite 3, L2, 182 Vivian Street,

    Wellington

    www.silverwoodarchitects.co.nz [email protected]

    1 : 100 at A1

    20-03L0. Demolition Floor Plan

    M1918

    15/05/2019

    64 Chapel Street, Masterton

    Seismic Strengthening and Office

    Fit-Out to MDC Municiple & CD

    Building

    Masterton District Council

    Concept Design

    REVISION SCHEDULEREF. DESCRIPTION DATE

    479

  • 7

    A B

    6

    5

    1

    3

    2

    4

    DC E F G H IJ K L M N O P

    36-011

    36-011

    36-021

    36-021

    AUDITORIUM MAIN STAGE

    BACK STAGE ROOMS

    OFFICES

    PUBLIC RECEPTIONOFFICES

    STORE

    REMOVE EXISTING ROOF CLADDING TO WIND LOBBY

    DEMOLISH EXTERNAL WALL ON GRID 1

    REMOVE ALL EXTERNAL WINDOW & DOOR JOINERY TO MUNICIPAL BUILDING

    DEMOLISH ENTIRE TOWN

    HALL STRUCTURE

    DEMOLISH REAR WALL OF MUNICIPAL BUILDING ON GRID B

    DEMOLISH REAR WALL OF MUNICIPAL BUILDING ON GRID 5

    REMOVE EXISTING REINFORCED CONCRETE STAIR

    REMOVE ALL EXTERNAL WINDOW & DOOR JOINERY TO CIVIL DEFENCE BUILDING

    DEMOLISH ALL INTERIOR WALLS

    DEMOLISH EXISTING STAIR

    DEMOLISH EXISTING STAIR

    DEMOLISH EXISTING LIFT

    DEMOLISH EXISTING STAIRS

    REMOVE EXISTING STEEL FRAMED WINDOW FOR RE-USE

    REMOVE ALL EXISTING SERVICES TO

    MUNICIPAL, CIVIL DEFENCE & TOWN HALL

    BUILDING FOOT PRINTS

    READ ARCHITECTS DEMOLITION PLANS IN

    CONJUNCTION WITH STRUCTURAL

    ENGINEERS DEMOLITION DRAWINGS

    SHEET:

    STATUS:

    (HALF SCALE at A3)

    JOB NO:

    DATE:

    SCALE:

    REV:

    PROJECT:

    CLIENT:

    ADDRESS:

    SHEET:

    MASTERTON: 06 378 6332 WELLINGTON: 04 972 1906

    24 Church Street, Masterton, P.O

    Box 120

    Suite 3, L2, 182 Vivian Street,

    Wellington

    www.silverwoodarchitects.co.nz [email protected]

    1 : 100 at A1

    20-04L1. Demolition Floor Plan

    M1918

    15/05/2019

    64 Chapel Street, Masterton

    Seismic Strengthening and Office

    Fit-Out to MDC Municiple & CD

    Building

    Masterton District Council

    Concept Design

    REVISION SCHEDULEREF. DESCRIPTION DATE

    480

  • 7

    A B

    6

    5

    1

    3

    2

    4

    DC E F G H IJ K L M N O P

    36-031

    36-031

    36-061

    36-061

    REMOVE EXISTING INTERNAL MEMBRANE GUTTER INCLUDING SUBSTRATE

    REMOVE EXISTING PROFILE METAL ROOF CLADDING (CORRUGATE PROFILE)RETAIN EXISTING ROOF SARKING

    REMOVE EXISTING SPOUTING

    REMOVE EXISTING MEMBRANE ROOFING AND SUBSTRATE

    25

    O F

    AL

    L

    25O FALL

    25

    O F

    AL

    L

    25O FALL

    25

    O F

    AL

    L

    25O FALL

    25

    O F

    AL

    L

    25

    O F

    AL

    L

    25

    O F

    AL

    L2

    5O

    FA

    LL

    25

    O F

    AL

    L

    EXISTING PARAPET

    ALLOW TO REPLACE ROOF FRAMING TO MAKE GOOD SLUMP IN EXISTING ROOF STRUCTURE

    REMOVE EXISTING ROOF MEMBRANE TO L1 WIND LOBBY ROOF

    REMOVE EXISTING CANOPY AT L1.

    DEMOLISH ROOFING INC FRAMING FOR

    NEW SERVICES PLATFORM

    REMOVE EXISTING CANOPY AT L1.

    REMOVE ROOF HOODS OVER WINDOWS AT L1. & L2.

    REMOVE ROOF HOODS OVER WINDOWS AT L1. & L2.

    REMOVE EXISTING CANOPY AT L1.

    REMOVE EXISTING PROFILE METAL ROOF CLADDING (CORRUGATE PROFILE)RETAIN EXISTING ROOF PURLINS

    REMOVE ALL EXISTING SERVICES TO

    MUNICIPAL, CIVIL DEFENCE & TOWN HALL

    BUILDING FOOT PRINTS

    READ ARCHITECTS DEMOLITION PLANS IN

    CONJUNCTION WITH STRUCTURAL

    ENGINEERS DEMOLITION DRAWINGS

    DEMOLISH ENTIRE TOWN

    HALL STRUCTURE

    DEMOLISH LEAN-

    TO ROOFS DEMOLISH LEAN-TO ROOFS

    REMOVE SECTION OF LOW PITCH ROOF FOR NEW ROOF ADDITION TO HOUSE SERVICES

    SHEET:

    STATUS:

    (HALF SCALE at A3)

    JOB NO:

    DATE:

    SCALE:

    REV:

    PROJECT:

    CLIENT:

    ADDRESS:

    SHEET:

    MASTERTON: 06 378 6332 WELLINGTON: 04 972 1906

    24 Church Street, Masterton, P.O

    Box 120

    Suite 3, L2, 182 Vivian Street,

    Wellington

    www.silverwoodarchitects.co.nz [email protected]

    1 : 100 at A1

    20-05L2. Demolition Roof Plan

    M1918

    15/05/2019

    64 Chapel Street, Masterton

    Seismic Strengthening and Office

    Fit-Out to MDC Municiple & CD

    Building

    Masterton District Council

    Concept Design

    REVISION SCHEDULEREF. DESCRIPTION DATE

    481

  • 7 7

    A

    A

    B

    B

    6 6

    5 5

    1 1

    3 3

    2 2

    4 4

    D

    D

    C

    C

    E

    E

    F

    F

    G

    G

    H

    H

    I

    I

    J

    J

    K

    K

    L

    L

    M

    M

    N

    N

    O

    O

    P

    P

    36-031

    36-031

    36-061

    36-061

    PUBLIC FOYER

    WIND LOBBY

    PU

    BLIC

    T

    OIL

    ET

    S

    PARENTS ROOM

    PLANNING &

    ENVIRONMENTAL

    SPRINKLER VALVE/PUMP

    ROOM

    RECEPTION

    ADMIN SUPPORT

    WAITING

    LIFT

    STAIR 2

    STAIR 3

    WIND LOBBY

    ST

    AIR

    1

    DRY SERVICES

    ROOM

    SEPARATE OFFICE

    STAND ALONE TEAM OR PUBLIC MEETING ROOM

    STORE ROOM

    MEETING ROOM

    MEETING ROOM

    MEETING ROOM

    STORE ROOM

    MEETING

    ROOM

    MEETING ROOMU

    P

    UP

    AREA LEGEND

    L1. GROSS FLOOR AREA: 884m2

    SITE AREA: 2,655m2

    L2. GROSS FLOOR AREA: 886m2

    L1. SUSPENDED CEILING HEIGHT

    3.2m

    L2. SUSPENDED CEILING HEIGHT

    3.1m

    36-041

    36-041

    36-051

    36-051

    NEW ENTRANCE STEPS

    DIS

    PL

    AY

    DIS

    PL

    AY

    MA

    LE

    S

    HO

    WE

    RS

    LOCKERROOM

    2000W x 1500D

    FE

    MA

    LE

    S

    HO

    WE

    RS

    QUIETROOM

    QUIET ROOM

    STAFF BREAK AREA

    WET SERVICES

    ROOM

    MALE

    UNI-SEX ACCESSIBLE

    TOILET

    FEMALE

    LOCKERS LOCKERS

    RESOURCE

    RE

    SO

    UR

    CE

    ST

    AT

    ION

    PUBLIC MEETING SPACE STAFF COMMUNITY SPACETEAM MEETING SPACE (6+ PEOPLE)SOCIAL / WELLBEING SPACE REFUGE SPACE (1-3 PEOPLE)ENCLAVE SPACE (3-6 PEOPLE)

    SHEET:

    STATUS:

    (HALF SCALE at A3)

    JOB NO:

    DATE:

    SCALE:

    REV:

    PROJECT:

    CLIENT:

    ADDRESS:

    SHEET:

    MASTERTON: 06 378 6332 WELLINGTON: 04 972 1906

    24 Church Street, Masterton, P.O

    Box 120

    Suite 3, L2, 182 Vivian Street,

    Wellington

    www.silverwoodarchitects.co.nz [email protected]

    1 : 100 at A1

    20-06L0. Proposed Floor Plan - Fitout

    M1918

    15/05/2019

    64 Chapel Street, Masterton

    Seismic Strengthening and Office

    Fit-Out to MDC Municiple & CD

    Building

    Masterton District Council

    Concept Design

    REVISION SCHEDULEREF. DESCRIPTION DATE

    482

  • 7

    A B

    6

    5

    1

    3

    2

    4

    DC E F G H IJ K L M N O P

    36-031

    36-031

    36-061

    36-061

    CHIEF EXECUTIVE TEAM OPERATIONS TEAM

    MAYOR OFFICE

    CEO OFFICE

    RECEPTION

    STAFF BREAK AREA

    ST

    AIR

    1

    ST

    AIR

    3

    STORE ROOM

    MEETING ROOM

    DRY SERVICES

    ROOM

    VOID VOID

    MEZZANINE

    MEETING ROOM

    MEETING ROOM

    VOID

    OFFICE

    OFFICE

    STAIR 2

    QUIETROOM

    QUIET ROOM

    DOWN

    DO

    WN

    36-041

    36-041

    WET SERVICES

    ROOM

    36-051

    36-051

    SE

    RV

    ICE

    S

    ST

    AIR

    MALE

    UNI-SEX ACCESSIBLE

    TOILET

    FEMALE

    LOCKERS LOCKERS

    STORE ROOM

    MEETING ROOM

    MEETING ROOM

    RE

    SO

    UR

    CE

    VOID

    LIFT

    2000W x 1500D

    PUBLIC MEETING SPACE STAFF COMMUNITY SPACETEAM MEETING SPACE (6+ PEOPLE)SOCIAL / WELLBEING SPACE REFUGE SPACE (1-3 PEOPLE)ENCLAVE SPACE (3-6 PEOPLE)

    AREA LEGEND

    L1. GROSS FLOOR AREA: 884m2

    SITE AREA: 2,655m2

    L2. GROSS FLOOR AREA: 886m2

    L1. SUSPENDED CEILING HEIGHT

    3.2m

    L2. SUSPENDED CEILING HEIGHT

    3.1m

    SHEET:

    STATUS:

    (HALF SCALE at A3)

    JOB NO:

    DATE:

    SCALE:

    REV:

    PROJECT:

    CLIENT:

    ADDRESS:

    SHEET:

    MASTERTON: 06 378 6332 WELLINGTON: 04 972 1906

    24 Church Street, Masterton, P.O

    Box 120

    Suite 3, L2, 182 Vivian Street,

    Wellington

    www.silverwoodarchitects.co.nz [email protected]

    1 : 100 at A1

    20-07L1. Proposed Floor Plan - Fitout

    M1918

    15/05/2019

    64 Chapel Street, Masterton

    Seismic Strengthening and Office

    Fit-Out to MDC Municiple & CD

    Building

    Masterton District Council

    Concept Design

    REVISION SCHEDULEREF. DESCRIPTION DATE

    483

  • 7

    A B

    6

    5

    1

    3

    2

    4

    DC E F G H IJ K L M N O P

    36-031

    36-031

    36-061

    36-061

    36-041

    36-041

    36-051

    36-051

    INTERNAL GUTTERS NURAPLY 3PM GUTTER MEMBRANERE-FORM 17mm H3.2 CCA TREATED PLYWOOD LINING WIDTH 400mmFALL: 1:100 MIN

    NEW WARM ROOF SYSTEM(ROOFING LOGIC SYSTEM TO MUNICIPAL BUILDING - REFER ARCHITECTS OUTLINE SPECIFICATION

    NEW 300mm BOX GUTTER

    NEW WARM ROOF SYSTEM(ROOFING LOGIC SYSTEM TO MUNICIPAL BUILDING -REFER ARCHITECTS OUTLINE SPECIFICATION

    INTERNAL GUTTERS NURAPLY 3PM GUTTER MEMBRANERE-FORM 17mm H3.2 CCA TREATED PLYWOOD LINING WIDTH 400mmFALL: 1:100 MIN

    RELINE EXISTING LOW PITCH ROOF:NURAPLY 3PM GUTTER MEMBRANE OVER EPS INSULATION BOARD (WARM ROOF CONSTRUCTION)RE-FORM 17mm H3.2 CCA TREATED PLYWOOD LINING FALL: 2 DEGREES MINSERVICES PLATFORM:

    NURAPLY 3PM GUTTER MEMBRANEOVER CONCRETE SUBSTRATEFALL: 2 DEGREES MIN

    LOCATION OF INTERNAL VERTICAL HVAC DUCTS

    2OF

    AL

    L

    2OF

    AL

    L2

    OF

    AL

    L

    25

    O F

    AL

    L

    25O FALL

    25

    O F

    AL

    L

    25O FALL

    25

    O F

    AL

    L

    25O FALL

    25

    O F

    AL

    L

    25

    O F

    AL

    L

    25

    O F

    AL

    L2

    5O

    FA

    LL

    25

    O F

    AL

    L

    EXISTING PARAPET

    HVAC DUCTING TO PENETRATE THROUGH WALLS

    NEW ROOF ACCESS HATCH

    HORIZONTAL ALUMINIUM LOUVERS ENCLOSING SERVICES PLATFORM AND PROVIDING BARRIER FROM FALLING

    SERVICES

    PLATFORM

    NEW PROFILE METAL WALL CLADDING TO GABLE ENDS

    ALLOW TO REPLACE ROOF FRAMING TO MAKE GOOD SLUMP IN EXISTING ROOF STRUCTURE

    INTERNAL DOWN PIPES REQUIRED TO MUNICIPAL PARAPET INTERNAL GUTTER

    ALLOW TO FORM NEW OVER FLOWS THROUGH PARAPET

    RELINE EXISTING LOW PITCH ROOF:NURAPLY 3PM GUTTER MEMBRANE OVER EPS INSULATION BOARD (WARM ROOF CONSTRUCTION)RE-FORM 17mm H3.2 CCA TREATED PLYWOOD LINING FALL: 2 DEGREES MIN

    NEW ALUMINIUM HORIZONTAL LOUVRE SOLAR SHADE

    NEW CANOPY ROOF STRUCTURE OVER ENTRANCE AT MID-FLOOR LEVEL

    NEW ALUMINIUM HORIZONTAL LOUVRE SOLAR SHADE

    NEW ALUMINIUM HORIZONTAL LOUVRE SOLAR SHADE

    SE

    ISM

    IC S

    EP

    AR

    AT

    ION

    SE

    ISM

    IC S

    EP

    AR

    AT

    ION

    NEW WALKING ACCESS PLATFORM WITH SAFETY BARRIER

    NEW LADDER WITH SAFETY BARRIER

    NEW PITCHED ROOF EXTENSION TO HOUSE DUCTED/PIPED SERVICES RUNNING FROM MUNICIPAL BUILDING TO CIVIL DEFENCE

    NEW PROFILE METAL WALL CLADDING TO ROOF EXTENSION

    25

    O

    FA

    LL

    NEW RAIN WATER HEADS

    RW

    H

    RW

    H

    RW

    HRW

    H

    DP &

    OF

    DP

    & O

    F

    NEW DOWNPIPE & OVERFLOW

    DP &

    OF

    DP &

    OF

    DP &

    OF

    DP

    & O

    F

    RW

    H

    RW

    H

    2OF

    AL

    L2

    OF

    AL

    L

    DP

    DP

    DP

    DP

    DP

    SHEET:

    STATUS:

    (HALF SCALE at A3)

    JOB NO:

    DATE:

    SCALE:

    REV:

    PROJECT:

    CLIENT:

    ADDRESS:

    SHEET:

    MASTERTON: 06 378 6332 WELLINGTON: 04 972 1906

    24 Church Street, Masterton, P.O

    Box 120

    Suite 3, L2, 182 Vivian Street,

    Wellington

    www.silverwoodarchitects.co.nz [email protected]

    1 : 100 at A1

    20-08L2. Proposed Roof Plan

    M1918

    15/05/2019

    64 Chapel Street, Masterton

    Seismic Strengthening and Office

    Fit-Out to MDC Municiple & CD

    Building

    Masterton District Council

    Concept Design

    REVISION SCHEDULEREF. DESCRIPTION DATE

    484

  • 60 6060 60 60

    60 6060 60 60

    30 3030 30 30 30

    30 3030 30 30 30

    30 3030 30 30 30

    30 3030 30 30 30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    60

    60

    60

    60

    60

    60

    60

    60

    60

    60

    60

    60

    60

    60

    60 60 60 60 60 60 60 60 60 60 60

    60 60 60 60 60 60 60 60 60 60 60

    7

    6

    5

    1

    3

    2

    4

    36-031

    36-041

    UP

    UP

    NEW TRACTION MECHANICAL LIFT PIT: 1.5mHEAD ROOM: 4.2m TOP FLOORCAR SIZE: 2.0mW x 1.5m DSHS STEEL FRAMESAFETY GLASS SURROUND TO LIFT SHAFTLIFT ROOM ABOVE LIFT TO BE FIRE RATED AS A SEPARATE FIRE CELL

    NEW FRAMELESS GLASS DOORS TO ENTRANCE FOYER

    XLAM CLT AIR STAIR WITH STAINLESS STEEL HANDRAILS

    SE

    ISM

    IC S

    EP

    AR

    AT

    ION

    NEW STAINLESS STEEL HANDRAIL TO EITHER SIDE OF EXISTING RAMP

    NEW STAINLESS STEEL HANDRAIL TO EITHER SIDE OF EXISTING RAMP

    TWO WAY FIRE RATED WALL 140mm TIMBER STUD WALLGIB SYSTEM: GNT134 (STC 48)

    FIRE RATED GLAZED TIMBER DOORS WITH ELECTROMAGNETIC HOLD BACKSFRR -/30/30SM

    RETAIN EXISTING FLOOR STRUCTURE TO WIND LOBBY

    EX1 KOROK SPEEDWALL 78mm PANELS VERTICALFRR -/240/120 SUPPORTED ON STEEL FRAMEMIN FRR: FRR 60/60/60 FIXED L0, L1 & L2THERMAL BREAK (NYLON STRIP) BETWEEN STEEL AND KOROK

    NEW FRAMELESS GLASS DOORS TO ENTRANCE FOYER

    FIRE RATED GLAZED TIMBER DOORS WITH ELECTROMAGNETIC HOLD BACKSFRR -/30/30SMFIRE RATED INTERNAL GLAZINGFRR -/30/30SM

    REMOVE EXISTING EXTERNAL DOOR AND STEPS, REPLACE WITH TIMBER WINDOW AND CONCRETE WALL. PLASTER TO MATCH EXISTING

    TWO WAY FIRE RATED WALL 140mm TIMBER STUD WALLGIB SYSTEM: GNT134 (STC 48)

    CREATE SEISMIC SEPARATION BETWEEN MUNICIPAL BUILDING AND NORTHERN EXTENSION

    PUBLIC FOYER

    WIND LOBBY

    PU

    BL

    IC

    TO

    ILE

    TS

    PARENTS ROOM

    ADMIN SUPPORT

    WAITING

    LIFT

    STAIR 2

    WIND LOBBY

    ST

    AIR

    1

    DRY SERVICES

    ROOM

    SEPARATE OFFICE

    STORE ROOM

    MEETING ROOM

    MEETING ROOM

    MEETING ROOM

    NEW ENTRANCE

    STEPS

    DIS

    PL

    AY

    DIS

    PL

    AY

    2000W x 1500D

    WET SERVICES

    ROOM

    RESOURCE

    NEW AUTOMATIC SLIDING DOORS

    FOYER

    FLOOR AND WALL UPSTANDS TO WET SERVICES ROOM TO BE DRAINED WITH IMPERVIOUS COATING (EPOXY RESIN/ VINYL) FLOOR

    DB

    :G1

    DATA

    XLAM CLT AIR STAIR

    XLAM CLT STAIR LANDINGS

    SHS STEEL POSTS SUPPORTING CLT STAIR LANDINGS TO MATCH LIFT SHAFT STRUCTURE

    NEW STAINLESS STEEL HANDRAILS

    NEW AUTOMATIC SLIDING DOORS

    SH

    EE

    T:

    ST

    AT

    US

    :

    (HA

    LF S

    CA

    LE a

    tA

    3)

    JOB

    NO

    :

    DA

    TE

    :

    SC

    ALE

    :

    RE

    V:

    PR

    OJE

    CT

    :

    CLIE

    NT

    :

    AD

    DR

    ES

    S:

    SH

    EE

    T:

    MA

    ST

    ER

    TO

    N:

    06

    37

    8 6

    33

    2W

    ELL

    ING

    TO

    N:

    04

    97

    2 1

    90

    6

    24

    Ch

    urc

    h S

    tre

    et,

    Ma

    ste

    rto

    n,

    P.O

    Bo

    x 1

    20

    Su

    ite

    3,

    L2 1

    82

    , V

    ivia

    n S

    tre

    et

    We

    llin

    gto

    n

    ww

    w.s

    ilve

    rwo

    od

    arc

    hit

    ect

    s.co

    .nz

    in

    fo@

    silv

    erw

    oo

    da

    rch

    ite

    cts.

    co.n

    z

    1 :

    50

    at

    A1

    20

    -09

    L0.

    Flo

    or

    Pla

    n -

    Ba

    se

    Bu

    ild

    Pa

    rt 1

    of

    2

    M1

    91

    8

    15

    /05

    /20

    19

    64 Chapel Street, Masterton

    Se

    ism

    ic S

    tre

    ng

    the

    nin

    g a

    nd

    Off

    ice

    Fit

    -Ou

    t to

    MD

    C M

    un

    icip

    le &

    CD

    Bu

    ild

    ing

    Masterton District Council

    Concept Design

    485

  • 6060 60 60 60 60

    6060 60 60 60 60

    60

    60

    60

    60

    30

    30

    30

    30

    30 3030 30

    30 30 EX EX

    EX EX

    EX EX

    EX EX

    30

    30

    30

    30

    30

    30 30

    30 3030 30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30 30

    30 3030

    30

    30

    30

    30

    30

    30

    30 3030

    30 3030

    30 30

    30 30

    7

    6

    5

    1

    3

    2

    4

    G H IJ K L M N O P

    SE

    ISM

    IC S

    EP

    AR

    AT

    ION

    ENCLOSE EXISTING WALL OPENING WITH REINFORCED CONCRETE TO MATCH EXISTING

    NEW DURADOOR DOORS CUT INTO EXISTING WINDOW OPENING TO SPRINKLER ROOM

    FIRE ALARM PANEL LOCATION BEHIND NEW ALUMINIUM WINDOW

    NEW REPLACEMENT DOUBLE GLAZED ALUMINIUM WINDOWS TO NORTHERN EXTENSIONCREATE SEISMIC SEPARATION BETWEEN

    MUNICIPAL BUILDING AND NORTHERN EXTENSION

    FLOOR AND WALL UPSTANDS TO SPRINKLER ROOM TO BE DRAINED WITH IMPERVIOUS COATING (EPOXY RESIN/ VINYL) FLOOR

    HWC TO SHOWERS

    FULL HEIGHT 140mm STUD WALLS BETWEEN OFFICE AND STAFF BREAK ROOM FOR ACOUSTIC SEPARATION

    CEILING TO BATHROOM AREAS TO BE 13mm GIB AQUALINE ON SUSPENDED BATTEN SYSTEM

    PLANNING &

    ENVIRONMENTAL

    SPRINKLER VALVE/PUMP

    ROOM

    STAIR 3

    STORE ROOM

    MEETING

    ROOM

    MEETING ROOM

    MA

    LE

    S

    HO

    WE

    RS

    LOCKERROOM

    FE

    MA

    LE

    S

    HO

    WE

    RS

    QUIETROOM

    QUIET ROOM

    UNI-SEX ACCESSIBLE

    TOILET

    FEMALE

    LOCKERS

    RE

    SO

    UR

    CE

    ST

    AT

    ION

    TWO WAY FIRE RATED WALL 140mm TIMBER STUD WALLGIB SYSTEM: GNT134 (STC 48)

    MS

    SB

    FA

    P

    DB

    :G2

    SH

    EE

    T:

    ST

    AT

    US

    :

    (HA

    LF S

    CA

    LE a

    tA

    3)

    JOB

    NO

    :

    DA

    TE

    :

    SC

    ALE

    :

    RE

    V:

    PR

    OJE

    CT

    :

    CLIE

    NT

    :

    AD

    DR

    ES

    S:

    SH

    EE

    T:

    MA

    ST

    ER

    TO

    N:

    06

    37

    8 6

    33

    2W

    ELL

    ING

    TO

    N:

    04

    97

    2 1

    90

    6

    24

    Ch

    urc

    h S

    tre

    et,

    Ma

    ste

    rto

    n,

    P.O

    Bo

    x 1

    20

    Su

    ite

    3,

    L2 1

    82

    , V

    ivia

    n S

    tre

    et

    We

    llin

    gto

    n

    ww

    w.s

    ilve

    rwo

    od

    arc

    hit

    ect

    s.co

    .nz

    in

    fo@

    silv

    erw

    oo

    da

    rch

    ite

    cts.

    co.n

    z

    1 :

    50

    at

    A1

    20

    -10

    L0.

    Flo

    or

    Pla

    n -

    Ba

    se

    Bu

    ild

    Pa

    rt 2

    of

    2

    M1

    91

    8

    15

    /05

    /20

    19

    64 Chapel Street, Masterton

    Se

    ism

    ic S

    tre

    ng

    the

    nin

    g a

    nd

    Off

    ice

    Fit

    -Ou

    t to

    MD

    C M

    un

    icip

    le &

    CD

    Bu

    ild

    ing

    Masterton District Council

    Concept Design

    486

  • 60 6060 60 60

    60 6060 60 60

    60

    60

    60

    60

    60

    60

    60

    60

    60

    60

    60

    60

    60

    60

    60 60 60 60 60 60 60 60 60 60 60

    60 60 60 60 60 60 60 60 60 60 60

    30 3030 30 30 30

    30 3030 30 30 30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30

    30 30

    30 30

    3030 3030

    3030 30

    7

    6

    5

    1

    3

    4

    DO

    WNVOID

    SE

    ISM

    IC S

    EP

    AR

    AT

    ION

    CHIEF EXECUTIVE TEAM

    MAYOR OFFICE

    CEO OFFICE RECEPTION

    MEETING ROOM

    DRY SERVICES

    ROOM

    VOID VOID

    MEZZANINE

    MEETING ROOM

    VOID

    OFFICE

    OFFICE

    STAIR 2

    WET SERVICES

    ROOM

    SE

    RV

    ICE

    S

    ST

    AIR

    MALE

    LOCKERS

    STORE ROOM VOID

    LIFT

    2000W x 1500D

    BATHROOM

    TWO WAY FIRE RATED WALL 140mm TIMBER STUD WALLGIB SYSTEM: GNT134 (STC 48)

    DB

    :F1

    DATA

    SH

    EE

    T:

    ST

    AT

    US

    :

    (HA

    LF S

    CA

    LE a

    tA

    3)

    JOB

    NO

    :

    DA

    TE

    :

    SC

    ALE

    :

    RE

    V:

    PR

    OJE

    CT

    :

    CLIE

    NT

    :

    AD

    DR

    ES

    S:

    SH

    EE

    T:

    MA

    ST

    ER

    TO

    N:

    06