BGR Support to Mineral Certification in Rwanda Roadmap on Recent Progress Nov-Dec 2011: RINR SCOM formally approves the Regional Certification Mechanism (RCM) manual and appendix; the RCM includes CTC standards as “progress criteria” (that is, monitored but not enforced) Jan-Feb 2012: Consultations on the development of a new mine inspection template (checklist) in Rwanda, integrating national and RCM standards, start; inspector field training on health and safety; draft and consultations on national regulation for RCM implementation framework in RWA Feb 2012: RNRA, BGR, and ICGLR formally enter into MOU to implement certification/formalization support project in RWA Mar 2012: project planning workshop with ICGLR, BGR, GIZ, PAC, Rwandan and Burundian counterparts in Bujumbura; MINIRENA issues comprehensive regulation on RCM implementation in RWA; certification workshop at LMU regarding lessons learnt/best practice in global certification initiatives May 2012: initial progress on certification is presented by Rwandan counterparts at ICGLR-OECD- UN forum in Paris; BGR supports organization of the election of the ICGLR audit committee member for the Rwandan private sector Jun 2012: BGR and RMCA support the organization of a peer learning exchange program on certification, traceability, and formalization: Burundian delegation tours Rwanda for one week July 2012: BGR is nominated to oversee SCBI capacity building regarding capacity building on mineral certification in RWA; RBS and RNRA enter into MOU regarding the establishment of a Certification Unit for ICGLR certification of export shipments; July-Aug 2012: update of mine inspection template; successful field testing of new inspection template at four Rwandan mines (eventually until November), supported by BGR; optimization and finalization of inspection template taking into account practical lessons from the field; export certification trial runs start with several exporters in Kigali under coordination of the Certification Unit; draft export certification procedures are developed and optimized in collaboration with mineral exporters Oct 2012: training of two RNRA counterparts on AFP sample preparation at BGR labs in Germany; inaugural meeting of ICGLR audit committee in Kigali Nov 2012: BGR supports attendance of RNRA counterparts to ICGLR SCOM in Bujumbura, and preparation of information documents for upcoming international meetings Dec 2012: RNRA counterparts present progress at the ICGLR-OECD-UN forum in Paris Feb-Mar 2013: RNRA laboratory in Kigali is renovated to serve as AFP sample preparation center; BGR organizes health and safety short course for mine inspectors; pilot baseline evaluation of chain of custody systems in RWA against ICGLR standards Mar-Apr 2013: BGR supports broad-scale RNRA mine inspection program; associated outreach workshops in all Rwandan provinces to inform miners, local authorities, and security organs on ICGLR RCM and national standards May 2013: RNRA counterparts present progress at the ICGLR-OECD-UN forum in Paris and the EICC-GeSI workshop in Hong Kong Jun 2013: meeting of Certification Unit Steering Board, taking decisions on procurement procedures and funding of ICGLR export certificates

description

Roadmap on recent progress on mineral certification in Rwanda, from the German government's Federal Institute for Geosciences and Natural Resources.

Transcript of CFSI Workshop 12: Pre-read: BGR Support to Mineral Certification in Rwanda – Roadmap on Recent...

Page 1: CFSI Workshop 12: Pre-read: BGR Support to Mineral Certification in Rwanda – Roadmap on Recent Progress

BGR Support to Mineral Certification in Rwanda – Roadmap on Recent Progress

Nov-Dec 2011: RINR SCOM formally approves the Regional Certification Mechanism (RCM)

manual and appendix; the RCM includes CTC standards as “progress criteria” (that is, monitored

but not enforced)

Jan-Feb 2012: Consultations on the development of a new mine inspection template (checklist) in

Rwanda, integrating national and RCM standards, start; inspector field training on health and

safety; draft and consultations on national regulation for RCM implementation framework in RWA

Feb 2012: RNRA, BGR, and ICGLR formally enter into MOU to implement

certification/formalization support project in RWA

Mar 2012: project planning workshop with ICGLR, BGR, GIZ, PAC, Rwandan and Burundian

counterparts in Bujumbura; MINIRENA issues comprehensive regulation on RCM implementation

in RWA; certification workshop at LMU regarding lessons learnt/best practice in global certification

initiatives

May 2012: initial progress on certification is presented by Rwandan counterparts at ICGLR-OECD-

UN forum in Paris; BGR supports organization of the election of the ICGLR audit committee

member for the Rwandan private sector

Jun 2012: BGR and RMCA support the organization of a peer learning exchange program on

certification, traceability, and formalization: Burundian delegation tours Rwanda for one week

July 2012: BGR is nominated to oversee SCBI capacity building regarding capacity building on

mineral certification in RWA; RBS and RNRA enter into MOU regarding the establishment of a

Certification Unit for ICGLR certification of export shipments;

July-Aug 2012: update of mine inspection template; successful field testing of new inspection

template at four Rwandan mines (eventually until November), supported by BGR; optimization and

finalization of inspection template taking into account practical lessons from the field; export

certification trial runs start with several exporters in Kigali under coordination of the Certification

Unit; draft export certification procedures are developed and optimized in collaboration with mineral

exporters

Oct 2012: training of two RNRA counterparts on AFP sample preparation at BGR labs in Germany;

inaugural meeting of ICGLR audit committee in Kigali

Nov 2012: BGR supports attendance of RNRA counterparts to ICGLR SCOM in Bujumbura, and

preparation of information documents for upcoming international meetings

Dec 2012: RNRA counterparts present progress at the ICGLR-OECD-UN forum in Paris

Feb-Mar 2013: RNRA laboratory in Kigali is renovated to serve as AFP sample preparation center;

BGR organizes health and safety short course for mine inspectors; pilot baseline evaluation of

chain of custody systems in RWA against ICGLR standards

Mar-Apr 2013: BGR supports broad-scale RNRA mine inspection program; associated outreach

workshops in all Rwandan provinces to inform miners, local authorities, and security organs on

ICGLR RCM and national standards

May 2013: RNRA counterparts present progress at the ICGLR-OECD-UN forum in Paris and the

EICC-GeSI workshop in Hong Kong

Jun 2013: meeting of Certification Unit Steering Board, taking decisions on procurement

procedures and funding of ICGLR export certificates

Page 2: CFSI Workshop 12: Pre-read: BGR Support to Mineral Certification in Rwanda – Roadmap on Recent Progress

Jul 2013: AFP preparation laboratory center opens in Kigali

Aug-Sep 2013: BGR commissions study to develop ICGLR third party audit methodology, in

collaboration with the ICGLR audit committee