CERT Response - SCDF · 2019-12-19 · CERT Audit Findings WY18/19 Documentation • Emergency...
Transcript of CERT Response - SCDF · 2019-12-19 · CERT Audit Findings WY18/19 Documentation • Emergency...
![Page 1: CERT Response - SCDF · 2019-12-19 · CERT Audit Findings WY18/19 Documentation • Emergency Response Plan (ERP) ERP should be updated regularly to reflect any changes CERT and](https://reader033.fdocuments.us/reader033/viewer/2022060300/5f080bc07e708231d4200f4b/html5/thumbnails/1.jpg)
CERT Response
Chng Chin KiatAudit Team LeaderCentral Enforcement Department | Plans & Audit Branch
![Page 2: CERT Response - SCDF · 2019-12-19 · CERT Audit Findings WY18/19 Documentation • Emergency Response Plan (ERP) ERP should be updated regularly to reflect any changes CERT and](https://reader033.fdocuments.us/reader033/viewer/2022060300/5f080bc07e708231d4200f4b/html5/thumbnails/2.jpg)
Scope Latest development for CERT
Proposed FSA Amendments
Emphasis on Training and Equipping
Progressive Enforcement
CERT Audit Findings WY18/19
Case Studies – Actual CERT Response
![Page 3: CERT Response - SCDF · 2019-12-19 · CERT Audit Findings WY18/19 Documentation • Emergency Response Plan (ERP) ERP should be updated regularly to reflect any changes CERT and](https://reader033.fdocuments.us/reader033/viewer/2022060300/5f080bc07e708231d4200f4b/html5/thumbnails/3.jpg)
Proposed FSA Amendments
Fire Emergency Plan
Fire-fighting team
Before 2013Emergency
Response Plan
Company Emergency
Response Team
2013-2014Training
subsidies
Basic equipping
Basic training (firefighting)
2015 -2016Full equipping
Full training (firefighting,
first aid)
Full CERT capability
CERT audit
2017-2018Emergency
Preparedness (EP) requirements
Envisioned to take place in Q1/2020
More CERTs are required to be
established
2019-2020
![Page 4: CERT Response - SCDF · 2019-12-19 · CERT Audit Findings WY18/19 Documentation • Emergency Response Plan (ERP) ERP should be updated regularly to reflect any changes CERT and](https://reader033.fdocuments.us/reader033/viewer/2022060300/5f080bc07e708231d4200f4b/html5/thumbnails/4.jpg)
Emphasis on Training and EquippingUpdated CERT Audit Checklist (Since 1st Apr 2019) Weightage score:
40% for Documentation 60% for Practical
More bandings (Pass with Commendation, Pass, Conditional Pass)
Updated CERT Audit Checklist can be downloaded from our SCDF website
Proposals (Envision to implement in 1H 2020) Documentation Audit Exemption for 1 year (Top 10% percentile)
Bonus score (Meeting more than just the minimum stipulated in the National CERT Standard)
Immediate failure (Without proper training etc.)
For feedback, you may write in to [email protected]
![Page 5: CERT Response - SCDF · 2019-12-19 · CERT Audit Findings WY18/19 Documentation • Emergency Response Plan (ERP) ERP should be updated regularly to reflect any changes CERT and](https://reader033.fdocuments.us/reader033/viewer/2022060300/5f080bc07e708231d4200f4b/html5/thumbnails/5.jpg)
Progressive Enforcement
Public Feedback
Engagement
2010-2012 Legislation
Fine-tuning
Progressive implementation
2013-2014Email notice
Phone Call
Reminder
Consultation
FSM briefing
2015 -2016
2nd Reminder
Final reminder
Email warning
Last warning
Final warning
Inspection
Enforcement (NFSO)
2017-2018
No more reminders
No more warnings
Audits
Inspections
Enforcement
(NFSO, Court Action)
2019-2020
![Page 6: CERT Response - SCDF · 2019-12-19 · CERT Audit Findings WY18/19 Documentation • Emergency Response Plan (ERP) ERP should be updated regularly to reflect any changes CERT and](https://reader033.fdocuments.us/reader033/viewer/2022060300/5f080bc07e708231d4200f4b/html5/thumbnails/6.jpg)
CERT Audit Findings WY18/19
![Page 7: CERT Response - SCDF · 2019-12-19 · CERT Audit Findings WY18/19 Documentation • Emergency Response Plan (ERP) ERP should be updated regularly to reflect any changes CERT and](https://reader033.fdocuments.us/reader033/viewer/2022060300/5f080bc07e708231d4200f4b/html5/thumbnails/7.jpg)
CERT Audit Findings WY18/19
Overview More than 90% Passing Rate
Areas that company usually do well• Emergency Response Plan (ERP)
• Training records
• Equipping
Areas for improvement• Refresher training
• Proper donning of PPE
• Mitigation skills
![Page 8: CERT Response - SCDF · 2019-12-19 · CERT Audit Findings WY18/19 Documentation • Emergency Response Plan (ERP) ERP should be updated regularly to reflect any changes CERT and](https://reader033.fdocuments.us/reader033/viewer/2022060300/5f080bc07e708231d4200f4b/html5/thumbnails/8.jpg)
Positive findings
Linking up with SCDF
Proper PPE
Casualty evacuation
Buddy system
![Page 9: CERT Response - SCDF · 2019-12-19 · CERT Audit Findings WY18/19 Documentation • Emergency Response Plan (ERP) ERP should be updated regularly to reflect any changes CERT and](https://reader033.fdocuments.us/reader033/viewer/2022060300/5f080bc07e708231d4200f4b/html5/thumbnails/9.jpg)
Areas for improvement
Insufficient walkie-talkie
Instructions from SIC
Improper PPE
Insufficient SCBA
![Page 10: CERT Response - SCDF · 2019-12-19 · CERT Audit Findings WY18/19 Documentation • Emergency Response Plan (ERP) ERP should be updated regularly to reflect any changes CERT and](https://reader033.fdocuments.us/reader033/viewer/2022060300/5f080bc07e708231d4200f4b/html5/thumbnails/10.jpg)
CERT Audit Findings WY18/19Documentation• Emergency Response Plan (ERP)
ERP should be updated regularly to reflect any changes
CERT and employees are not familiar with the ERP and their roles
• Training records and Certifications Training courses must still be maintained even when there is high turnover rate
• Maintenance Record Ensuring that all the equipment and PPE are in order and serviceable condition
• Equipment Readiness and Non-fire retardant jackets & gloves
No AED
![Page 11: CERT Response - SCDF · 2019-12-19 · CERT Audit Findings WY18/19 Documentation • Emergency Response Plan (ERP) ERP should be updated regularly to reflect any changes CERT and](https://reader033.fdocuments.us/reader033/viewer/2022060300/5f080bc07e708231d4200f4b/html5/thumbnails/11.jpg)
Case Studies –
Actual CERT Response
![Page 12: CERT Response - SCDF · 2019-12-19 · CERT Audit Findings WY18/19 Documentation • Emergency Response Plan (ERP) ERP should be updated regularly to reflect any changes CERT and](https://reader033.fdocuments.us/reader033/viewer/2022060300/5f080bc07e708231d4200f4b/html5/thumbnails/12.jpg)
Actual CERT ResponseDate & Time : 1st Jan 2019 @ 1830 hrs
Location: Yishun Northpoint City
Nature of Incident: Fire involved the engine compartment of a car
CERT Response: CERT put out the fire with hosereel and fire extinguishers.
![Page 13: CERT Response - SCDF · 2019-12-19 · CERT Audit Findings WY18/19 Documentation • Emergency Response Plan (ERP) ERP should be updated regularly to reflect any changes CERT and](https://reader033.fdocuments.us/reader033/viewer/2022060300/5f080bc07e708231d4200f4b/html5/thumbnails/13.jpg)
Actual CERT ResponseCompany: Details of incidents
ExxonMobil Asia Pacific Pte Ltd
Date: March 2019Nature of incident: Steel column within an empty storage tankCERT Response:• Set up 4 ground monitors for effective boundary cooling purposes• Continued to support SCDF officers in firefighting efforts
Shell Eastern Petroleum Pte Ltd Refinery
Date: January 2019Nature of incident: Fire involving a drum of sulphur waste materialCERT Response:• Set up 1 x 38mm water jet and extinguished the fire within 10 minutes• Assisted in damping down• Provided the requested evidence such as CCTV footage
CERT should remain on site to support SCDF in consequence management until the end of the operation.
![Page 14: CERT Response - SCDF · 2019-12-19 · CERT Audit Findings WY18/19 Documentation • Emergency Response Plan (ERP) ERP should be updated regularly to reflect any changes CERT and](https://reader033.fdocuments.us/reader033/viewer/2022060300/5f080bc07e708231d4200f4b/html5/thumbnails/14.jpg)
CERT Training and Responsibilities CERT Training Courses Responsibilities
• SMC– Key decision maker– Point of contact with government
agencies– Authorise operation shutdown &
evacuation
• SIC– Response Team leader– Link between SMC & ERT (and FSM)
• ERT Members– Provide emergency response– Conduct evacuation– Implement In-Place Protection– Provide first aid
![Page 15: CERT Response - SCDF · 2019-12-19 · CERT Audit Findings WY18/19 Documentation • Emergency Response Plan (ERP) ERP should be updated regularly to reflect any changes CERT and](https://reader033.fdocuments.us/reader033/viewer/2022060300/5f080bc07e708231d4200f4b/html5/thumbnails/15.jpg)
Summary
Review of premises required to meet EP requirementsMore CERTs are expected to be formed
Ensure that CERTs are trained and equipped adequately Align with National CERT Standard
Enforcement actions, for non-compliances