CENTENNIAL AWABA · 2017-12-05 · insect/plant remains and polysaccharide slime, 35% was made up...

14
CENTENNIAL AWABA Environmental Monitoring Data February 2017 Monitoring Data

Transcript of CENTENNIAL AWABA · 2017-12-05 · insect/plant remains and polysaccharide slime, 35% was made up...

Page 1: CENTENNIAL AWABA · 2017-12-05 · insect/plant remains and polysaccharide slime, 35% was made up of clay dirt material and

CENTENNIAL AWABA

Environmental Monitoring Data

February 2017

Monitoring Data

May 2012

Page 2: CENTENNIAL AWABA · 2017-12-05 · insect/plant remains and polysaccharide slime, 35% was made up of clay dirt material and

2

TABLE OF CONTENTS

Introduction ................................................................................................................................................................................ 4

Surface water quality ................................................................................................................................................................. 4

Water volume ............................................................................................................................................................................. 5

Air Quality Monitoring ............................................................................................................................................................... 5

Noise Monitoring ....................................................................................................................................................................... 9

Meteorological Data ................................................................................................................................................................. 10

Complaints ............................................................................................................................................................................... 10

Appendix 1 – Plan AW2259 ..................................................................................................................................................... 11

Appendix 2 – Plan AW2258 ..................................................................................................................................................... 12

TABLES

Table 1. Colliery Information ..................................................................................................................................................... 4

Table 2. LDP Volume Limits ...................................................................................................................................................... 5

Table 3. Monthly Dust Deposition Gauge Results .................................................................................................................. 5

Table 4. Rolling Annual Average dust deposition ................................................................................................................... 7

Table 5. High Volume Air Sampler PM10 Results ................................................................................................................... 8

Table 6. High Volume Air Sampler TSP Results ...................................................................................................................... 8

Table 7. Meteorological Monitoring Data ............................................................................................................................... 10

Page 3: CENTENNIAL AWABA · 2017-12-05 · insect/plant remains and polysaccharide slime, 35% was made up of clay dirt material and

3

FIGURES

Figure 1. Monthly Dust Deposition Gauge Results .................................................................................................. 6

Figure 2. Rolling Annual Average Dust Deposition ................................................................................................. 7

Figure 3. High Volume Air Sampler PM10 Results ................................................................................................... 8

Figure 4. High Volume Air Sampler TSP Results ..................................................................................................... 9

Figure 5. Complaints by type ................................................................................................................................... 10

Page 4: CENTENNIAL AWABA · 2017-12-05 · insect/plant remains and polysaccharide slime, 35% was made up of clay dirt material and

4

INTRODUCTION

This monitoring report is to satisfy the requirements under the Protection of the Environment Legislation Amendment

Act 2011 (POELA Act) to publish or make pollution monitoring data available to members of the public.

This document also satisfies condition 7 schedule 5 of Project Approval 10_0038, this report summarises

environmental monitoring results for Awaba Colliery for the period of February 2017.

Table 1. Colliery Information

Colliery Information

Premises Details Awaba Colliery

Address Wilton Road, Awaba NSW 2280

Licensee Centennial Awaba

EPL no 443

EPL location http://www.epa.nsw.gov.au/prpoeoapp/ViewPOEOLicence.aspx?DOCID=65130&S

YSUID=1&LICID=443

SURFACE WATER QUALITY

The following parameters Electrical Conductivity (EC µs/cm), Oil and Grease (mg/L), pH and Total Suspended Solids

(TSS mg/L) are monitored at Licenced Discharge Point 1 – 9 during discharge in accordance with the requirements of

Environmental Protection Licence 443.

There were no discharges from Awaba licenced discharge points during the reporting period.

Page 5: CENTENNIAL AWABA · 2017-12-05 · insect/plant remains and polysaccharide slime, 35% was made up of clay dirt material and

5

WATER VOLUME

Water volume discharged off site is measured through licenced discharge points (LDPs) 1 to 9. Environment

Protection Licences (EPLs) set limits on the maximum volume of water to be discharged for a given period.

The volume limits for EPL443 Licenced Discharge Points are listed in Table 3.

Table 2. LDP Volume Limits

Point Unit Of Measure Volume / Mass Limit

1 KL/day 200

2 KL/day 200

3 KL/day 2000

4 KL/day 2000

5 KL/day 200

6 KL/day 200

7 KL/day 500

9 ML/year 8

There were no discharges from Awaba licenced discharge points during the reporting period.

AIR QUALITY MONITORING

The air quality monitoring results for the reporting period are summarised below. There is no limit criteria for the air

quality monitoring required under EPL443.

Depositional Dust

Depositional dust (g/m2/mth) results (insoluble solids) for February 2017 are shown in Table 5.

Table 3. Monthly Dust Deposition Gauge Results

Data Published: 14/03/2017 Licensee: Awaba

Data Sampled:

23/1/17 - 22/2/17 Address: Wilton Road, Awaba

Data Obtained: 6/03/2017 EPL No. 443

Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17

DG1 0.5 0.6 0.4 0.3 0.3 0.3 0.3 0.7 1.0 1.9 0.4 4.4

DG2 1.5 0.4 0.4 0.8 0.2 0.4 0.2 0.8 0.8 0.6 4.1c 2.9

DG3 1.0 1.7 1.0 5.8c 2.2 2.8 6.1c 4.1c 2.3 1.7 1.5 4.7c

DG4 0.3 0.6 0.5 0.8 0.4 0.3 0.2 1.1 0.9 0.7 1.9 1.8

DG – Dust Gauge

c - Contaminated

June – DG3 recorded a reading of 5.8g/m2/month. 75% of the dust was vegetation matter including

insect/plant remains, 10% was made up of clay dirt material and 10% coal. Due to the high vegetation

content of the sample, DG3 is considered to be contaminated and has been excluded from the results.

Page 6: CENTENNIAL AWABA · 2017-12-05 · insect/plant remains and polysaccharide slime, 35% was made up of clay dirt material and

6

September – DG3 recorded a reading of 6.3g/m2/month. 60% of the dust was vegetation matter including

insect/plant remains, 30% was made up of clay dirt material and 10% coal. Due to the high vegetation

content of the sample, DG3 is considered to be contaminated and has been excluded from the results.

October – DG3 recorded a reading of 4.1g/m2/month. 60% of the dust was vegetation matter including

insect/plant remains and polysaccharide slime, 30% was made up of clay dirt material and 10% coal.

January – DG2 recorded dust deposition of 4.1 g/m2/month. 80% of the dust was vegetation matter including

insect/plant remains and polysaccharide slime, 20% was made up of clay dirt material and <5% coal fines.

February – DG3 recorded a reading of 4.7g/m2/month. 65% of the dust was vegetation matter including

insect/plant remains and polysaccharide slime, 35% was made up of clay dirt material and <5% coal fines.

It is noted that the coal stockpile at the Awaba pit top has been removed and rehabilitated.

Depositional dust monitoring data indicates that dust deposition results for February range from 1.8 g/m2/month to 4.4

g/m2/month. A graphical representation of depositional dust monitoring data is shown in Figure 1.

Figure 1. Monthly Dust Deposition Gauge Results

The Awaba Colliery Development Consent 10_0038 contains the following criteria for dust;

Annual average maximum total deposited dust level of 4 g/m2/month.

Maximum increase in Annual Average deposited dust level, 2 g/m2/month.

The rolling annual averages for each of the dust gauges in February 2017 are shown in table 4 and Figure 2 below.

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Mar

-16

Apr

-16

May

-16

Jun-

16

Jul-1

6

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Inso

lub

le S

olid

s (g

/m2/

mth

)

Monthly Dust Deposition

DG1 DG2 DG3 DG4

Page 7: CENTENNIAL AWABA · 2017-12-05 · insect/plant remains and polysaccharide slime, 35% was made up of clay dirt material and

7

Table 4. Rolling Annual Average dust deposition

Data Published: 14/03/2017 Licensee: Awaba

Data Sampled:

23/1/17 - 22/2/17 Address: Wilton Road, Awaba

Data Obtained: 6/03/2017 EPL No. 443

Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17

DG1 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.5 0.6 0.6 0.9

DG2 0.8 0.8 0.8 0.9 0.9 0.9 0.9 0.8 0.8 0.8 0.6 0.8

DG3 2.0 2.1 2.0 2.0 1.8 1.9 1.9 2.1 2.2 2.2 1.9 2.0

DG4 1.0 1.0 0.9 0.8 0.7 0.7 0.6 0.7 0.7 0.7 0.7 0.8

Annual Average Limit (4g/m2/mth) 4 4 4 4 4 4 4 4 4 4 4 4

Figure 2. Rolling Annual Average Dust Deposition

There were no exceedances of the development consent rolling annual averages limit criteria of 4 g/m2/month for the

reporting period.

High Volume Air Sampling (HVAS)

High volume air samplers monitor particulate concentrations (less than 10 micrometres in size [PM10] and Total

Suspended Particulates [TSP]). A summary of monitoring results for January is provided below. At the time of

reporting for the February report the HVAS samples had not yet been received by the lab.

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

Mar

-16

Apr

-16

May

-16

Jun-

16

Jul-1

6

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Ro

llin

g A

nn

ual

Ave

rag

e (g

/m2/

mth

)

Rolling Annual Average Monthly Dust Deposition

DG1 DG2 DG3 DG4

Page 8: CENTENNIAL AWABA · 2017-12-05 · insect/plant remains and polysaccharide slime, 35% was made up of clay dirt material and

8

Table 5. High Volume Air Sampler PM10 Results

Data Published: 14/03/2017 Licensee: Awaba Data Sampled: 01/1/17 - 31/1/17 Address: Wilton Rd

Data Obtained: 6/03/2017 EPL No. 443 06/01/17 12/01/17 18/01/17 24/01/17 30/01/17

PM10 24 hour concentration 7 17 23 19 18

PM10 Rolling Annual Average 10.5 10.5 10.5 10.6 10.5

PM10 24 hour limit 50 50 50 50 50

Annual Average PM10 limit 30 30 30 30 30

Figure 3. High Volume Air Sampler PM10 Results

Table 6. High Volume Air Sampler TSP Results

Data Published: 14/03/2017 Licensee: Awaba Data Sampled: 01/1/17 - 31/1/17 Address: Wilton Rd

Data Obtained: 6/03/2017 EPL No. 443

06/01/17 12/01/17 18/01/17 24/01/17 30/01/17

TSP (ug/mS) 24 hr concentration

12 28 51 33 31

TSP Rolling Annual Average 16.7 16.8 17.1 17.3 17.2

TSP Annual Average Limit 90 90 90 90 90

0

10

20

30

40

50

60

06-Jan-17 12-Jan-17 18-Jan-17 24-Jan-17 30-Jan-17

PM

10 (

ug

/m3

)

PM10 Concentration

PM10 24 hour concentration PM10 Rolling Annual Average

PM10 24 hour limit Annual Average PM10 limit

Page 9: CENTENNIAL AWABA · 2017-12-05 · insect/plant remains and polysaccharide slime, 35% was made up of clay dirt material and

9

Figure 4. High Volume Air Sampler TSP Results

There were no exceedances of the limit criteria for PM10 and TSP during the reporting period.

NOISE MONITORING

EPL443 was varied on the 16th December 2015 with the provision to remove regular noise monitoring from the Licence

due to no activity at the Awaba pit top. The EPA however has added a condition that Noise Monitoring recommence a

month before any mining or significant surface operation activities are undertaken on the premises.

0

10

20

30

40

50

60

70

80

90

100

06-Jan-17 12-Jan-17 18-Jan-17 24-Jan-17 30-Jan-17

TS

P (

ug

/m3)

TSP Concentration

TSP (ug/mS) 24 hr concentration TSP Rolling Annual Average

TSP Annual Average Limit

Page 10: CENTENNIAL AWABA · 2017-12-05 · insect/plant remains and polysaccharide slime, 35% was made up of clay dirt material and

10

METEOROLOGICAL DATA

A summary of rainfall and temperature data recorded at the onsite meteorological monitoring station during the

reporting period is shown in Table 9 below.

Table 7. Meteorological Monitoring Data

Data Published: 14/03/2017

Data Sampled: 1/2/17 - 28/02/17 Licensee: Awaba

Data Obtained: 6/03/2016 EPL No. 443

Month Total Rainfall ( mm) Minimum Temperature (oC) Maximum Temperature (oC)

Mar-16 56.4 11.6 32.7

Apr-16 28.2 10 34.7

May-16 58.8 1.3 28

Jun-16 169 0.5 21.2

Jul-16 64.4 0 24.8

Aug-16 74.2 2 24.7

Sep-16 60.8 4.6 25.8

Oct-16 56.8 4.3 32.7

Nov-16 46.8 8 36.6

Dec-16 78.2 12.2 40

Jan-17 83.8 15 44

Feb-17 124 12.6 43.4

COMPLAINTS

There were no community complaints during the month regarding Awaba Colliery.

Figure 5. Complaints by type

0

1

2

Mar

-16

Apr

-16

May

-16

Jun-

16

Jul-1

6

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16

Jan-

17

Feb

-17

Sub

Tot

al

Tot

alNo

. o

f C

om

pla

ints

Complaints By Type

Air Water Noise Flora & Fauna Subsidence Waste Blasting

Page 11: CENTENNIAL AWABA · 2017-12-05 · insect/plant remains and polysaccharide slime, 35% was made up of clay dirt material and

11

APPENDIX 1 – PLAN AW2259

Page 12: CENTENNIAL AWABA · 2017-12-05 · insect/plant remains and polysaccharide slime, 35% was made up of clay dirt material and
Page 13: CENTENNIAL AWABA · 2017-12-05 · insect/plant remains and polysaccharide slime, 35% was made up of clay dirt material and

12

APPENDIX 2 – PLAN AW2258

Centennial Coal Company Limited

P O Box 1000

Toronto NSW 2283

www.centennialcoal.com.au

Page 14: CENTENNIAL AWABA · 2017-12-05 · insect/plant remains and polysaccharide slime, 35% was made up of clay dirt material and