CDP Chakghat English

354

Click here to load reader

description

City Development Plan Madhya Pradesh

Transcript of CDP Chakghat English

  • City Development Plan

    Chakghat, Madhya Pradesh

    Submitted to:

    Urban Administration and Development Department, GoMP Palika Bhawan, Bhopal, Madhya Pradesh

    Project co-ordination:

    City Managers Association, Madhya Pradesh (CMAMP) Palika Bhawan, Bhopal, Madhya Pradesh

    Submitted by:

    DMG Consulting Pvt. Ltd. A-81, Sector 65, Noida, Uttar Pradesh

  • Chakghat Town

    DISTRICT REWA

    POPULATION- 10676

    Chakghat is also known as a Mandi Town. About 70 percent of

    working population is engaged in tertiary activities such as trade

    & commerce, informal business activities. Chakghat

    Bazar/Market, Galla Mandi and krishi Upaj Mandi (food grains)

    are the main market area for the town.

  • 8167.2

  • Latitude

    Longitude

    Average rainfall (annual) MM

    Height above mean sea level Mts

    Municipal area (1991) Sq kms

    Municipal area (2001) Sq kms

    Municipal area (2011) Sq kms

    Date of Constitution of ULB Date

    Historic importanceIn one or two

    sentences

    Population Year 1981 (under Municipal

    boundary only)

    Population Year 1991 (under Municipal

    boundary only)

    Population Year 2001 (under Municipal

    boundary only)

    Population Year 2011 (under Municipal

    boundary only)

    Name of Population projection Method

    Projected population adopted Year 2015

    Projected population adopted Year 2025

    Projected population adopted Year 2035

    Land Use% Standard (as per

    UDPFI)

    Land use (Tentative

    in Sq kms )

    Land use (Tentative

    in percentage)

    Residential 45-50% 0.221 22.74

    Commercial 2-3% 0.048 4.93

    Public - semi public 6-8% 0.044 4.49

    Industrial 8-10% 0.003 0.35

    Roads 10-12% 0.104 10.65

    Recreational 12-14% NA NA

    Sensitive rest NA NA

    Water bodies rest 0.553 56.85

    Total Developed area 0.972 100.00

    Agriculture / Undeveloped area rest 4.237 81.35

    Total Municipal Area 5.208

    City Profile

    16,399

    22,163

    DMG Consulting P. Ltd.

    Chakghat

    Yes

    4,637

    6,576

    9,105

    10,676

    Geometric Progression Method

    12,133

    25 degree 80'

    81 degree 41'

    1100 mm

    390 m

    5.21 sqkm

    5.21 sqkm

    5.21 sqkm

    NA

    Lan

    d U

    se

    Town level

    NA

    CompanyName

    ULB Name

    Whether the Sectoral Analysis report is as per UADD requisitesP

    op

    ula

    tio

    nT

    ow

    n B

    rief

    Geographical location (Town)

    1

  • Ward # Ward 1 Ward 2 Ward 3 Ward 4 Ward 5 Ward 6 Ward 7 Ward 8 Ward 9 Ward 10 Ward 11 Ward 12 Ward 13 Ward 14 Ward 15 Total

    Name of ward NA Tilak ward Ramlila ward NA NA NA NA NA NA Tamsa wordBhagat singh

    ward

    Rajiv gandhi

    ward

    Dr.

    Rammanohar

    lohia ward

    NA NA

    Ward Population (2001) 667 784 588 445 347 426 643 665 689 810 589 675 597 505 675 9105

    Area (sq kms) 0.06 0.07 0.16 0.23 0.05 0.04 0.07 0.92 0.12 1.33 0.05 0.48 1.04 0.23 0.34 5.2081

    Density (PPSqkm) 2001 11600 11089 3641 1919 6414 10416 8619 724 5704 611 11687 1394 572 2154 1988 1748

    Male 363 409 309 234 175 229 340 341 373 438 318 361 314 264 352 4820

    Female 304 375 279 211 172 197 303 324 316 372 271 314 283 241 323 4285

    SC NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1702

    ST NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1736

    BPL (year 2012) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1924

    Sex ratio 837 917 903 902 983 860 891 950 847 849 852 870 901 913 918 889

    Literacy rate (%) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 0.6256

    No. of Primary schools NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 3

    No. of Primary Health

    CentreNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 3

    No. of Households NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1494

    Primary occupation

    (Majority)Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Agriculture Agriculture Manufacturing Manufacturing Manufacturing

    Seconday occupation AgricultureCommerce and

    TradeAgriculture NA

    Commerce and

    TradeNA

    Commerce and

    TradeAgriculture Agriculture Agriculture

    Commerce and

    TradeManufacturing NA Agriculture Agriculture Agriculture

    Tertiary occupationCommerce and

    TradeAgriculture

    Commerce and

    TradeNA Agriculture NA Agriculture

    Commerce and

    Trade

    Commerce and

    Trade

    Commerce and

    TradeAgriculture

    Commerce and

    TradeManufacturing

    Commerce and

    Trade

    Commerce and

    Trade

    Commerce and

    Trade

    No. of SS/LS industrial

    unitsNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Small scale

    industries

    No. of Commercial

    establishmentsNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Slum pockets NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Slum population NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 3207

    No. of Slum Households NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Individual water

    connections in the wardNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 421

    No. of Community water

    connectionsNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Commercial water

    connectionsNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Tubewells NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 9

    No. of Handpumps NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    400 private & 92

    municipal

    handpump

    No. of OHTs NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 3

    % Coverage of piped water

    supplyNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Individual Toilets NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 374 HHs

    No. of Individual Septic

    tanksNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Community Septic

    tanksNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Community toilets NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    % of population NA Open

    defecationNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1120 HHs

    No. of Dust bins NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA four to six

    Wardwise Waste generated

    (Kgs)189 180.25 186 125.75 820 101 181.25 199.5 172.25 259.75 136.5 206.75 262.5 146.25 240.25 3407

    Road sweeping (1 time or 2

    times)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA daily

    City Profile (Ward Wise)

    2

  • Ward # Ward 1 Ward 2 Ward 3 Ward 4 Ward 5 Ward 6 Ward 7 Ward 8 Ward 9 Ward 10 Ward 11 Ward 12 Ward 13 Ward 14 Ward 15 Total

    Name of ward NA Tilak ward Ramlila ward NA NA NA NA NA NA Tamsa wordBhagat singh

    ward

    Rajiv gandhi

    ward

    Dr.

    Rammanohar

    lohia ward

    NA NA

    City Profile (Ward Wise)

    Total no. of sanitary

    workers in the wardNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Length of Pucca road (Mts) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 14000 mts

    Length of Kuccha road

    (Mts)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 5900 mts

    Length of State Highway NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Length of National

    HighwayNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 3770 mts

    Length of Road side drains

    Pucca (Mts)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Length of Natural drains

    (Nallah)

    Pucca/Channelized (Mts)

    560 200 400 120 60 200 50 400 200 0 150 100 200 300 800 3740

    Length of Natural drains

    (Nallah) Kuttcha (Mts)10 0 40 0 0 0 0 0 0 0 0 0 0 900 600 1550

    No. of Streetlights NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 597

    No. of Electricity

    connections NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1241

    Name of Tourist site if any NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Name of Heritage site if

    anyNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Bus stop (No.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Bus stand(No.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Parks (No.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Playground(No.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Residential

    propertiesNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Commercial

    propertiesNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Total Property tax

    collection (in Rs.)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Property tax coverage(in

    %)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Available Government

    land (Sq kms)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Remarks NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Note: Population data has been given as per the Census-2001. As per the discussion with RGI Census Data for 2011 has not published, which will publish by July 2013.

    3

  • SourceTubewell/Ha

    ndpumpWell River/Lake/Talab

    No. of Tubewell / River / Well

    9 Tube wells /

    492

    Handpump

    Tamas river

    Water Supplied by Tubewell /

    River / Well in MLDNA

    0.19 MLD (River: 0.09 MLD & Ground

    water: 0.1 MLD)

    17.8 lpcd

    Rs. 60/-

    32%

    Yes, WTP with 2 chambers each of capacity

    45,000 L

    NA

    0.15 MLD

    No

    374

    NA

    NA

    NA

    NA

    Khakkha nallah and Senarwar gram nallah

    NA

    Tamas river

    NA

    NA

    Either in low lying area or in Tamas river

    No

    ~70 gram per capita per day

    34.07 Tons

    NA

    25%

    No

    No

    No

    No

    No

    No

    1 Tractor / 1 Trolley / 4-6 Dust bins / 7

    Handpull cart /4 Tricycle

    Yes

    Ph

    ysi

    cal

    Infr

    ast

    ru

    ctu

    re

    Existing Source

    Frequency of Cleaning Individual Septic tanks

    % Coverage under paid water supply

    Is the existing site Dumping site or allotted site for

    Scientific disposal

    Area of allotted landfill site for Scientific disposal

    No. of Tractor trolleys/vehicles available with the ULB for

    carrying Solid waste to the LF site

    Total no. of community septic tanks

    Total no. of Sewage/Mud pumps available with the ULB

    Frequency of Cleaning Community Septic tanks

    Name of natural nallah (Storm water drain)

    Length of natural nallah (Storm water drain) Kms

    Sectoral Analysis

    Frequency of SW collection by the ULB (1 time per day/2

    times per day)

    Collection efficiency of the ULB (%)

    Any initiative for DTDC (Yes /No)

    Any initiative for scientific disposal of waste

    Name of dumping/ landfill site

    Distance of the Dumping site/landfill site from main

    settlement area (Kms)

    Length of road side drain (Kms)

    Coverage of road side drainage w.r.t roads (%)

    Ultimate disposal point of Road side drains

    Any treatment plant/procedure adopted

    Per capita Solid waste generation (Considering Standards)

    (in gms)

    Total SW generation (in Tons)

    Total water supply in the town (MLD)

    Existing Supply rate (LPCD) considering distribution

    losses

    Water Charges per household per month (Rs.)

    Flat/Metered

    Whether any treatment plant exists (Y/N),If yes mention

    capacity (MLD)

    Proposed source (Surface)

    Total sewage generation (MLD)

    Whether any treatment plant exists (Y/N),If yes mention

    capacity

    Total no. of individual septic tanks

    Wate

    r S

    up

    ply

    Sew

    erage

    Drain

    age

    Ultimate disposal point of nallah

    If site for Scientific disposal is not allotted then whether

    formally requested by the ULB

    SW

    M

    4

  • Sectoral Analysis

    NH-27

    NA

    NA

    NA

    CC 14 km

    WBM NA

    Total (kms) 14 km

    (kms) 5.90 km

    (kms) 13.35 km till the year 2035

    ~1400 vehicles including pvt. And IPT

    mode

    Yes

    yes (under private operates)

    1 Galla mandi

    2 Vegitable & fruit market, Grain market

    3 Old Chauraha

    NA

    597

    597

    450

    125

    -

    3

    15

    4

    33/11KV

    1241 HH

    NA

    NA

    NA

    Ph

    ysi

    cal

    Infr

    ast

    ru

    ctu

    re

    Duration of Electricity supply per day (in Hrs)

    Name of National Highway passing from or nearby from

    the town (NH-XYZ)

    Distance of National Highway if nearby from the town

    (NH-XYZ) in Kms

    Name of State Highway passing from or nearby from the

    town (SH-XYZ)

    Any intracity mass transport mode (yes/no)

    Name of locations facing major traffic issues

    Name of the street beautified as per the

    instructions of UADD

    Bus stand (yes/No)

    Traff

    ic &

    tran

    sporta

    tion

    Str

    eet

    ligh

    tin

    gP

    ow

    er

    Distance of State Highway if nearby from the town (SH-

    XYZ) in Kms

    Total length of Pucca roads (Kms)

    Total length of Kuccha roads (kms)

    Gap w.r.t Standards

    Total no. of vehicles in the town

    No. of Streetlights having LPS

    Location of Substation

    http://www.mptransco.nic.in

    Total no. of residential connections

    Total no. of Commercial connections

    Total no. of street lights

    No. of Streetlights having Sodium lights

    Road

    s

    No. of Streetlights under working condition

    No. of Streetlights having Tubes

    No. of Streetlights having CFL

    No. of Streetlights having Incandescent bulbs

    No. of Streetlights having LED

    Any subsidy for BPL (Y/N)

    5

  • Sectoral AnalysisNA

    -

    -

    -

    -

    NA

    Tamas river

    NA

    water bodies

    3 PHC in surroundin panchayat

    Government NA

    Beds NA

    Private NA

    Beds NA

    NA

    Name of

    townAllahabad

    Distance

    (Kms)~50 km

    3

    31 high school for boys, 1 secondary school

    for girls and 1 private higher sec. school

    2 1 Pharmacy & 1 Art & science college

    0 -

    NA

    NA

    NA

    NA

    NA

    The social security pension scheme for old

    age, physically challenged and widows etc.

    No. of ITI

    No. of Hospitals

    Multispeciality hospital if any (Y/N)

    Name of Nearby town reffered for Treatment

    No. of Primary schools

    No. of Secondary/High schools

    No. of Colleges

    Ownership/agency

    Total no. of Pilgrims/ Tourists visiting town per day

    Name of River/Lake/Forest range/Any specific species

    Prevailing Environmental Act/s

    Areas facing threats

    No. of Primary Health centres/Dispensary

    Socia

    l se

    cu

    rit

    y s

    ch

    em

    es

    No. of Rain Basera/Night Shelter

    No. of Beneficiaries under Gharelu Kamkaji Mahila

    Yojana

    Ownership of Rain Basera (with ULB/Rental)

    Name of other Social security schemes

    No. of Beneficiaries under SJSRY (Street Vendor)

    No. of Beneficiaries under Haath thela/Rickshaw chalak

    yojna

    Socia

    l In

    frast

    ru

    ctu

    re

    Ed

    ucati

    on

    Healt

    h

    Herit

    age &

    tou

    ris

    m

    Herit

    age &

    tou

    ris

    mE

    nvir

    on

    men

    t

    Name of Heritage site/s

    Ownership/agency

    Prevailing Heritage Act/s

    Name of Tourist site/s

    6

  • Ward

    No

    Name of Slum

    pocket/

    reference

    name

    Notified/ Un-

    notified

    Ward

    population

    Slum

    population

    of Notified

    slums

    Slum

    population

    Individual

    water

    connections

    No. of

    Communit

    y taps

    No. of

    Handpump

    s

    No. of

    Individual

    toilets

    No. of

    Communit

    y toilets

    No. of

    Pucca

    houses

    No. of Semi

    pucca

    houses

    No. of

    Kuccha

    houses

    No. of

    Permanent

    pattas

    distributed

    No. of

    Temporary

    pattas

    distributed

    No. of

    Primary

    school in

    the slum

    pocket

    No. of

    Primary

    Health

    centres in

    the slum

    pocket

    Beneficiari

    es under

    social

    security

    schemes

    Any

    interventio

    ns under

    IHSDP

    (Y/N)

    1 Ward no. 1 NA 667 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    2 Ward no. 2 NA 784 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    3 Ward no. 3 NA 588 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    4 Ward no. 4 NA 445 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    5 Ward no. 5 NA 347 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    6 Ward no. 6 NA 426 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    7 Ward no. 7 NA 643 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    8 Ward no. 8 NA 665 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    9 Ward no. 9 NA 689 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    10 Ward no. 10 NA 810 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    11 Ward no. 11 NA 589 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    12 Ward no. 12 NA 675 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    13 Ward no. 13 NA 597 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    14 Ward no. 14 NA 505 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    15 Ward no. 15 NA 675 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Total 9105 3207

    Slums & Urban Poor

    Sectoral Analysis

    Note: Box shows ward having slum population

    7

  • Components 2015 2025 2035 City specific Strategies Preliminary estimate Implementing agency Mode of Implementation (PPP etc.)

    Network coverage to households 40% 100% 100% CNP, UADD, Govt. of M.P. Contract basis

    Per capita supply as per norms (135 lpcd) 135 135 135 CNP, UADD, Govt. of M.P.

    24/7 water supply 40% 100% 100% CNP, UADD, Govt. of M.P.

    Quality of waterAs per WHO

    Standards

    As per WHO

    Standards

    As per WHO

    StandardsCNP, UADD, Govt. of M.P.

    Non revenue water 25% 15% 5% CNP, UADD, Govt. of M.P.

    Consumer metering 80% 100% 100% CNP, UADD, Govt. of M.P. Contract basis

    Cost recovery 100% 100% 100% CNP, UADD, Govt. of M.P.

    Roof water harvesting 40% 80% 100% CNP, UADD, Govt. of M.P.

    Private sector participation 10% 70% 100% Yes

    Storm water drainage network coverage 80% 100% 100% CNP, UADD, Govt. of M.P. PPP

    Rehabilitation of existing pucca drains 100% 100% 100% CNP, UADD, Govt. of M.P. PPP

    Rehabilitation of existing primary nallahs and water

    bodies100% 100% 100% CNP, UADD, Govt. of M.P. PPP

    Flood prone areas 100% 100% 100% CNP, UADD, Govt. of M.P.

    Sewer network coverage to households 60% 100% 100% CNP, UADD, Govt. of M.P. PPP

    Sewage Treatment and disposal arrangements 80% 100% 100% CNP, UADD, Govt. of M.P. PPP

    Sewage Recycling and reuse 60% 80% 100% CNP, UADD, Govt. of M.P. PPP

    Cost recovery (as a % of O&M )As per WHO

    Standards

    As per WHO

    Standards

    As per WHO

    StandardsCNP PPP

    Safe sanitation facilities (with focus on Urban poor) 80% 100% 100% CNP, UADD, Govt. of M.P. PPP

    Door-to-door collection system 80% 100% 100% CNP

    Source segregation 100% 100% 100% CNP

    Improve waste collection efficiency 100% 100% 100% CNP

    Mechanized waste handling Partial Full Full CNP

    Scientific waste disposal Partial Full Full CNP

    Landfill site adequacy Partial Full Full CNP

    Cost recovery of O&M 80% 100% 100% CNP

    Private sector participation 70% 100% 100% CNP, PWD

    671 Lakhs Including

    slum area

    246 Lakhs Including

    slum area

    338 Lakhs

    Including slum area

    245 Lakhs Including

    slum area

    To provide 100%

    sewerage system with

    low cost sanitation

    projects, proper

    treatment before

    disposal with Root zone

    treatment system and

    DEWATS.

    Preparation of master

    plan, rehabilitation and

    improvement

    programmes.

    Implementation of

    Integrated waste

    management system.

    PPP

    SECTORIAL GOALSYEAR

    PH

    YSI

    CA

    L IN

    FRA

    STR

    UC

    TUR

    E

    WA

    TER

    SU

    PP

    LYD

    RA

    INA

    GE

    SEW

    ERA

    GE

    & S

    AN

    ITA

    TIO

    NSW

    M

    By 2035, 24x7 hours

    water supply as per the

    standard and full

    network coverage,

    water harvesting,

    consumer metering and

    low cost water

    treatment plant (Rapid

    Sand filteration).

    8

  • New road formations - 100% 100% CNP, PWD BOOT

    Road upgradations 50% 100% 100% CNP, PWD PPP

    Widening/ strengthening 50% 100% 100% CNP, PWD PPP

    ROBs/flyovers - - - CNP, PWD -

    Development of bus terminus 60% 100% 100% CNP, PWD BOOT

    Development of truck terminus 70% 100% 100% CNP, PWD BOOT

    Junctions and traffic signal improvements 100% 100% 100% CNP, PWD PPP

    Mass transit system 30% 60% 100% CNP, PWD BOOT

    Parking facilities 100% 100% 100% CNP, PWD Contract

    New Installation 30% 70% 100% CNP Contract

    Upgradation 100% 100% 100% CNP Contract

    Underground cabling - 70% 100% CNP Contract

    Energy savings 70% 100% 100% CNP Contract

    24/7 electricity supply CNP

    100 % electricity supply CNP

    Development of alternative energy sources CNP PPP

    100% Fire safety coverage 100% 100% 100% CNP

    Fully equipped fire station 100% 100% 100% CNP

    Identify archaeological resources in the city

    (Heritage listing)CNP, State tourism Dept., CNP & State Tourism Dept.

    Development of green areas as per norms CNP, State tourism Dept., PPP

    Water bodies preservation/Conservation CNP, State tourism Dept., PPP

    Tourist accommodation adequacy CNP, State tourism Dept.,

    Tourist attraction and circuits regional and city level CNP, State tourism Dept., PPP

    Clean and healthy environment CNP

    Conserved natural environment - water bodies PPP

    Eco-friendly vehicles CNP, GoMP PPP

    Disposal of treated sewage in nallahs CNP

    Desilting of nallahs CNP PPP

    Incineration of bio-medical waste CNP PPP

    Implementation of norms/standards for pollution

    controlCNP CNP

    393 Lakhs

    Including slum area

    435 Lakhs

    NA

    1925 Lakhs

    Including slum area

    Road upgradation and

    development,

    development of bus &

    truck terminal,

    signalised junctions,

    provision of parking

    facilities and

    strenthening Public

    transport.

    Installation of solar

    street lights with CFL &

    LED lights to save

    energy.

    Development of

    underground cabling.

    provision of well

    equipped fire station.

    Development of

    Chakghat as transit

    point for surrounding

    tourist points,

    development of water

    fronts, improvement of

    connectivity of tourist

    places.

    Development of water

    bodies, plantation,

    checking of pollution

    level, use of eco-

    friendly vehicles,

    treatment facilities for

    wastes etc.

    NA

    NA

    NA

    NA

    NA

    NA

    100% *

    100% *

    NA

    FIR

    E

    FIG

    H

    TIN

    G

    HER

    EITA

    GE

    & T

    OU

    RIS

    M

    HER

    ITA

    GE

    & T

    OU

    RIS

    MEN

    VIR

    ON

    MEN

    T

    100% *

    100% *

    CNP

    State dovt.

    PH

    YSI

    CA

    L IN

    FRA

    STR

    UC

    TUR

    E

    RO

    AD

    S &

    TR

    AFF

    IC M

    AN

    AG

    EMEN

    TST

    REE

    T

    LIG

    HTN

    ING

    PO

    WER

    100% *

    100% *

    9

  • 100% doctor-patient ratio CNP, health dept. Recruitment

    100% patient-bed ratio CNP, health dept. Contract

    Effective implementation of health programmes and

    related services in the slum areas of the cityCNP, health dept. Contract

    Regular checks for water contamination in all water

    bodies of the cityCNP, health dept. Contract

    Literacy rates

    Ensure 100% enrollment in primary schools Edu. Dept of M.P. and CNP

    100% Teacher student ratio Edu. Dept of M.P. and CNP Recruitment

    Technical, engineering & medical education in the

    cityEdu. Dept of M.P. and CNP PPP

    Developed existing parks CNP Contract / PPP

    Area coverage under recreational facilities CNP

    Playing facilities CNP

    Provision for green-belts in future development

    plansCNP

    Sufficient infrastructure at mela/exhibition ground CNP contract

    Security of tenure for urban poor MPHB, CNP

    Inclusion of 100% urban poor population under

    various central and state govts social sectors

    schemes like old-age pension schemes, Scheme for

    handicapped persons, deen-dayal antyoday yojana,

    mid-day meals schemes, etc

    - -

    Pucca housing for urban poor 4000 Lakhs PPP

    Access to water connection CNP

    Access to public toilets and urinal facilities for all

    slum householdsCNP Contract / PPP

    Access to dustbins and secondary storage points CNP Contract / PPP

    Upgradation of kutcha roads to PCC roads in slums CNP PPP

    Improved drainage systems CNP PPP

    Adequate street lighting facilities CNP PPP

    Education facilities CNP PPP

    Community halls etc. CNP PPP

    Adequate health facilities CNP PPP

    Security of tenure for urban poor MPHB, CNP

    Note:

    1140 Lakhs

    Including slum area

    Included in tourism

    NA100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    275 Lakhs Including

    slum area

    Provision of Land

    ownership,

    improvement schemes,

    relocation of hazardous

    slums, pucca drain

    network, financial

    support for the

    construction of houses

    Strenthening

    infrastructures in health

    centers and to run

    health initiative

    programs.

    Provision of co-

    education, strengthning

    of education

    infrastructures and

    opening of vocational

    training centres.

    Development of water

    bodies, mini-stadium,

    exibition ground,

    community halls, public

    library etc.

    100% *

    100% *

    100% *

    * Marks - project has to be done till year 2035 by CNP, depending upon city need and available resources.

    100% *

    100% *

    100% *

    100% *

    included in other

    sectors

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    SLU

    MS

    & U

    RB

    AN

    PO

    OR

    SLU

    MS

    & U

    RB

    AN

    PO

    OR

    SOC

    IAL

    INFR

    AST

    RU

    CTU

    RE

    HEA

    LTH

    EDU

    CA

    TIO

    NR

    ECR

    EATI

    ON

    AL

    Soci

    al s

    ecu

    rity

    sch

    em

    es

    10

  • 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11

    Rates and Tax Revenue - - - - - -

    Assigned Revenues & Compensation - - - - - -

    Rental Income from Municipal Properties - - - - - -

    Fees & User Charges - - - - - -

    Sale & Hire Charges - - - - - -

    Revenue Grants, Contribution and Subsidies - - - 364165 1473313 8815183

    Income from Investments - - - - - -

    Interest Earned - - - - - -

    Tax - - - 4689514 4029878 6959783

    Non-Tax - - - 2782376 6616183 686207

    Other Income - - - - - -

    - - - 7836055 12119374 16461173

    Grants, Contribution for specific purposes - - - - - -

    Secured Loans - - - - - -

    Unsecured Loans - - - - - -

    Deposits - - - - - -

    Deposit works - - - - - -

    - - - - - -

    Establishment Expenses - - - 8984968 5187511 10062985

    Administrative Expenses - - - - - -

    Operations & Maintenance - - - 263337 4181738 2628174

    Interest & Finance Charges - - - - - 541772

    Programme Expenses - - - - - -

    Revenue Grants, Contribution and Subsidies - - - - - -

    Miscellaneous Expenses - - - - - -

    Transfer to Fund - - - - - -

    - Other - - - 1315533 590422 -

    - - - 10563838 9959671 13232931

    Fixed Assets - - - - - -

    Capital Work-in-Progress - - - - - -

    Investments -General Fund - - - - - -

    Investments-Other Funds - - - - - -

    Stocks/Inventory - - - - - -

    Loans, Advances and Deposits - - - - - -

    Other Assets - - - - - -

    Miscellaneous Expenditure - - - - - -

    - - - - - -

    - - - - - -

    - - - - - -

    Note: Refer Madhya Pradesh Municipal Accounting Manual for further details. Can be downloaded from "Download" Section of www.mpurban.gov.in.

    Year

    Municipal Finance (Should be filled carefully and it should be checked whether the capital income is factual or based on assumptionR

    even

    ue

    Inco

    me

    Total - Revenue Income

    Total Income

    Total Expenditure

    Ca

    pit

    al

    Rec

    eip

    ts

    Total Capital Receipts

    Rev

    enu

    e E

    xp

    end

    itu

    re

    Total - Revenue Expenditure

    Cap

    ital

    Exp

    end

    itu

    res

    Total Capital Expenditure

    11

  • Reforms Achieved (Y/N)

    Any City specific

    Strategies

    adopted

    Preliminary

    estimate (if any)

    for

    implementation

    Implementing

    agency

    2012-13 2013-14 2014-15 2015-16

    Full migration of double accounting

    System

    N25% 50% 75% 100% No Not Available UADD

    Property tax reforms, 85% coverage ratio

    and 90% collection ratio

    N25% 50% 75% 100% No Not Available Nagar Parishad

    Levy of user charges : full recovery of O

    & M charges for sewerage, water supply

    and SWM

    N

    25% 50% 75% 100% No Not Available Nagar Parishad

    Internal earmarking of basic services to

    urban poor

    N25% 50% 75% 100% No Not Available

    Nagar Parishad &

    UADD

    E-governance & Capacity Building N - 67% 33% 100% No 30 lakh UADD

    Provision of basic services to urban poor

    including security of tenure at affordable

    prices, improved existing housing, water

    supply, sanitation

    N

    25% 50% 75% 100% No Not AvailableNagar Parishad &

    UADD

    Reforms Action Plan

    Timeline to achieve reforms till 2015

    12

  • City Development Plan, Chakghat, M.P.

    i | P a g e DMG Consulting Pvt. Ltd., Noida

    City Development Plan

    Chakghat, Madhya Pradesh

    SUBMITTED TO:-

    Urban Administration and Development

    Department, GoMP

    PROJECT CO-ORDINATION:-

    City Managers' Association Madhya Pradesh

    CONSULTANT:-

    DMG Consulting Pvt. Ltd.

    A-81, Sector- 65, NOIDA (UP)

    Chief Municipal Officer Sub Engineer

    Chakghat Chakghat

  • City Development Plan, Chakghat, M.P.

    ii | P a g e DMG Consulting Pvt. Ltd., Noida

    LIST OF TABLES -------------------------------------------------------------------------------------------------------------- IX

    LIST OF FIGURES ------------------------------------------------------------------------------------------------------------ X

    LIST OF GRAPHS----------------------------------------------------------------------------------------------------------- XIV

    LIST OF MAPS -------------------------------------------------------------------------------------------------------------- XV

    1. INTRODUCTION --------------------------------------------------------------------------------------------- 12

    1.1 BACKGROUND ----------------------------------------------------------------------------------------------------------- 12

    1.2 CONCEPT AND PRINCIPLE OF CITY DEVELOPMENT PLAN ------------------------------------------------------------- 12

    1.3 OBJECTIVE OF THE ASSIGNMENT --------------------------------------------------------------------------------------- 13

    1.4 UNDERSTANDING OF TERMS OF REFERENCE VIS A VIS METHODOLOGY OF THE STUDY --------------------------- 13

    1.5 APPROACH AND METHODOLOGY FOR PREPARATION OF CDP ------------------------------------------------------ 14

    1.6 SCOPE OF WORK -------------------------------------------------------------------------------------------------------- 15

    2. INTRODUCTION TO CHAKGHAT -------------------------------------------------------------------------- 23

    2.1 ADMINISTRATIVE BOUNDARY ------------------------------------------------------------------------------------------ 23

    2.2 LOCATION AND CONNECTIVITY ----------------------------------------------------------------------------------------- 24

    2.3 STUDY AREA ------------------------------------------------------------------------------------------------------------- 26

    2.4 PHYSICAL CHARACTERISTICS -------------------------------------------------------------------------------------------- 27

    2.4.1 TOPOGRAPHY & GEOLOGY --------------------------------------------------------------------------------------------- 27

    2.4.2 CLIMATE ------------------------------------------------------------------------------------------------------------------ 28

    2.5 AGRICULTURE, INDUSTRY, MINERALS & FLORA FAUNA ------------------------------------------------------------- 28

    2.6 SWOT ANALYSIS -------------------------------------------------------------------------------------------------------- 29

    3. DEMOGRAPHIC PROFILE OF THE TOWN ---------------------------------------------------------------- 31

    3.1 BACKGROUND ----------------------------------------------------------------------------------------------------------- 31

    3.2 POPULATION TREND AND URBANIZATION ---------------------------------------------------------------------------- 31

    3.3 POPULATION DENSITY -------------------------------------------------------------------------------------------------- 33

    3.4 POPULATION PROJECTIONS --------------------------------------------------------------------------------------------- 34

    3.5 METHODOLOGY ADOPTED TO ESTIMATE POPULATION -------------------------------------------------------------- 35

    3.5.1 ARITHMETIC PROGRESSION METHOD --------------------------------------------------------------------------------- 35

    3.5.2 GEOMETRICAL PROGRESSION METHOD ------------------------------------------------------------------------------- 36

    3.5.3 INCREMENTAL INCREASE METHOD ------------------------------------------------------------------------------------- 36

    3.6 SUMMARY OF POPULATION PROJECTION THROUGH VARIOUS METHODS ----------------------------------------- 37

    3.7 SCHEDULE CASTE & SCHEDULE TRIBE POPULATION ------------------------------------------------------------------ 38

    3.8 LITERACY RATE ----------------------------------------------------------------------------------------------------------- 38

    3.9 SEX RATIO ---------------------------------------------------------------------------------------------------------------- 40

    3.10 SWOT ANALYSIS -------------------------------------------------------------------------------------------------------- 42

    TABLE OF CONTENTS

  • City Development Plan, Chakghat, M.P.

    iii | P a g e DMG Consulting Pvt. Ltd., Noida

    4. SOCIO-ECONOMIC PROFILE OF THE TOWN ------------------------------------------------------------- 44

    4.1 BACKGROUND ----------------------------------------------------------------------------------------------------------- 44

    4.2 SEX RATIO ---------------------------------------------------------------------------------------------------------------- 44

    4.3 LITERACY RATE ----------------------------------------------------------------------------------------------------------- 44

    4.4 AVERAGE HOUSEHOLD SIZE -------------------------------------------------------------------------------------------- 44

    4.5 WORKFORCE PARTICIPATION ------------------------------------------------------------------------------------------- 45

    4.6 WORKFORCE DISTRIBUTION -------------------------------------------------------------------------------------------- 45

    4.7 DEPENDENCY RATIO ----------------------------------------------------------------------------------------------------- 46

    4.8 INDUSTRIAL ACTIVITIES ------------------------------------------------------------------------------------------------- 48

    4.8.1 INFORMAL BUSINESS AND LOCAL ECONOMY (TRADE & COMMERCE) ---------------------------------------------- 49

    4.8.2 WHOLESALE TRADE ----------------------------------------------------------------------------------------------------- 49

    4.9 ISSUES -------------------------------------------------------------------------------------------------------------------- 51

    4.10 HERITAGE AND TOURISM ----------------------------------------------------------------------------------------------- 51

    5. PHYSICAL PLANNING AND GROWTH MANAGEMENT ------------------------------------------------ 55

    5.1 BACKGROUND ----------------------------------------------------------------------------------------------------------- 55

    5.2 SPATIAL GROWTH TRENDS --------------------------------------------------------------------------------------------- 55

    5.3 SPATIAL DISTRIBUTION OF POPULATION ------------------------------------------------------------------------------ 55

    5.4 LANDUSE ANALYSIS ----------------------------------------------------------------------------------------------------- 57

    5.5 MASTER PLAN PROVISION ---------------------------------------------------------------------------------------------- 59

    5.5.1 REVIEW OF PROPOSED DRAFT MASTER PLAN-2021 ----------------------------------------------------------------- 61

    5.6 HOUSING SCENARIO ----------------------------------------------------------------------------------------------------- 61

    5.6.1 INTRODUCTION ---------------------------------------------------------------------------------------------------------- 61

    HOUSING STOCK -------------------------------------------------------------------------------------------------------------------------- 62

    DISTRIBUTION OF HOUSES BY TYPES ----------------------------------------------------------------------------------------- 62

    CATEGORIES OF HOUSING STRUCUTRE -------------------------------------------------------------------------------------- 62

    DISTRIBUTION OF HOUSES BY USE ------------------------------------------------------------------------------------------- 64

    OWNERSHIP STATUS ---------------------------------------------------------------------------------------------------------- 64

    5.6.2 PRESENT AND FUTURE HOUSING DEMAND --------------------------------------------------------------------------- 64

    5.6.3 HOUSING GAP ASSESSMENT ------------------------------------------------------------------------------------------- 66

    5.7 FUTURE GROWTH POSSIBILITIES --------------------------------------------------------------------------------------- 66

    5.8 SWOT ANALYSIS -------------------------------------------------------------------------------------------------------- 67

    5.9 CITY SPECIFIC STRATEGIES AND ACTION PLAN ------------------------------------------------------------------------ 68

    6. URBAN INFRASTRUCUTRE SERVICES -------------------------------------------------------------------- 70

    6.1 INTRODUCTION ---------------------------------------------------------------------------------------------------------- 70

    6.2 PHYSICAL INFRASTRUCUTRE -------------------------------------------------------------------------------------------- 70

    6.2.1 WATER SUPPLY ---------------------------------------------------------------------------------------------------------- 70

    SOURCES OF WATER SUPPLY ------------------------------------------------------------------------------------------------- 70

    WATER DISTRIBUTION SYSTEM----------------------------------------------------------------------------------------------- 70

    OTHER SOURCES --------------------------------------------------------------------------------------------------------------- 71

    WATER DISTRIBUTION ARRANGEMENTS ------------------------------------------------------------------------------------ 71

  • City Development Plan, Chakghat, M.P.

    iv | P a g e DMG Consulting Pvt. Ltd., Noida

    INTERNAL DISTRIBUTION NETWORK ----------------------------------------------------------------------------------------- 72

    WATER TREATMENT FACILITIES ---------------------------------------------------------------------------------------------- 73

    PRESENT AND FUTURE DEMAND AND SUPPLY GAPS ----------------------------------------------------------------------- 74

    COMPARATIVE ANALYSIS WITH UDPFI, CPHEEO GUIDELINES ----------------------------------------------------------- 75

    SWOT ANALYSIS -------------------------------------------------------------------------------------------------------------- 76

    CITY SPECIFIC STRATEGIES AND ACTION PLAN ------------------------------------------------------------------------------ 77

    LOW COST WATER TREATMENT PLANT ------------------------------------------------------------------------------------- 80

    PROJECT IDENTIFICATION & COSTING --------------------------------------------------------------------------------------- 81

    6.2.2 SEWERAGE AND SANITATION ------------------------------------------------------------------------------------------- 82

    EXISTING SEWERAGE SYSTEM ------------------------------------------------------------------------------------------------ 82

    MEANS OF SEWAGE DISPOSAL ----------------------------------------------------------------------------------------------- 82

    HOUSEHOLD TOILETS (DRY LATRINES AND FLUSH LATRINES) -------------------------------------------------------------- 83

    PUBLIC TOILETS ---------------------------------------------------------------------------------------------------------------- 83

    PRESENT AND FUTURE DEMAND AND SUPPLY GAPS ----------------------------------------------------------------------- 84

    COMPARATIVE ANALYSIS WITH THE UDPFI, CPHEEO GUIDELINES ------------------------------------------------------ 85

    SWOT ANALYSIS -------------------------------------------------------------------------------------------------------------- 86

    CITY SPECIFIC STRATEGIES AND ACTION PLANS ----------------------------------------------------------------------------- 86

    BEST PRACTICES --------------------------------------------------------------------------------------------------------------- 88

    LOW COST WASTE WATER TREATMENT OPTIONS ------------------------------------------------------------------------- 89

    LOW COST SANITATION OPTION --------------------------------------------------------------------------------------------- 93

    PROJECT IDENTIFICATION & COSTING --------------------------------------------------------------------------------------- 95

    6.2.3 DRAINAGE SYSTEM ------------------------------------------------------------------------------------------------------ 96

    EXISTING DRAINAGE SYSTEM ------------------------------------------------------------------------------------------------- 96

    MAJOR WATER BODIES ------------------------------------------------------------------------------------------------------- 97

    PRIMARY, SECONDARY AND TERTIARY DRAINS ----------------------------------------------------------------------------- 97

    FLOOD-PRONE AREAS --------------------------------------------------------------------------------------------------------- 98

    FLOODING IN CATCHMENT AREA OF MAJOR NALLAHS --------------------------------------------------------------------- 98

    PRESENT AND FUTURE DEMAND AND SUPPLY GAPS ----------------------------------------------------------------------- 98

    COMPARATIVE ANALYSIS WITH THE UDPFI, CPHEEO GUIDELINES ------------------------------------------------------ 98

    SWOT ANALYSIS -------------------------------------------------------------------------------------------------------------- 98

    CITY SPECIFIC STRATEGIES AND ACTION PLAN ------------------------------------------------------------------------------ 99

    PROJECT IDENTIFICATION & COSTING -------------------------------------------------------------------------------------- 100

    6.2.4 SOLID WASTE MANAGEMENT ----------------------------------------------------------------------------------------- 101

    SOLID WASTE GENERATION ------------------------------------------------------------------------------------------------- 101

    CONSTITUENT OF MUNICIPAL WASTE -------------------------------------------------------------------------------------- 101

    CURRENT PRACTICE OF SOLID WASTE MANAGEMENT -------------------------------------------------------------------- 102

    PRIMARY AND SECONDARY COLLECTION ----------------------------------------------------------------------------------- 102

    WASTE STORAGE AND SEGREGATION --------------------------------------------------------------------------------------- 102

    PROCESSING AND DISPOSAL ------------------------------------------------------------------------------------------------- 103

    RESUSE AND RECYCLING ----------------------------------------------------------------------------------------------------- 103

    VEHICLES FOR SOLID WASTE COLLECTION AND TRANSPORTATION ------------------------------------------------------ 103

    ESTIMATION OF WASTE COLLECTION --------------------------------------------------------------------------------------- 104

    PRESENT AND FUTURE DEMAND AND SUPPLY GAPS ---------------------------------------------------------------------- 104

    COMPARATIVE ANALYSIS WITH THE UDPFI, CPHEEO GUIDELINES ----------------------------------------------------- 105

    SWOT ANALYSIS ------------------------------------------------------------------------------------------------------------- 105

  • City Development Plan, Chakghat, M.P.

    v | P a g e DMG Consulting Pvt. Ltd., Noida

    CITY SPECIFIC STRATEGIES AND ACTION PLAN ----------------------------------------------------------------------------- 106

    GOALS AND SERVICE OUTCOMES ------------------------------------------------------------------------------------------- 106

    STRATEGIES AND ACTION PLAN --------------------------------------------------------------------------------------------- 106

    BEST PRACTICES -------------------------------------------------------------------------------------------------------------- 109

    PROJECT IDENTIFICATION & COSTING -------------------------------------------------------------------------------------- 110

    6.2.5 TRAFFIC AND TRANSPORTATION -------------------------------------------------------------------------------------- 111

    EXISTING TRAFFIC AND TRANSPORTATION SCENARIO --------------------------------------------------------------------- 111

    VEHICLE POPULATION -------------------------------------------------------------------------------------------------------- 112

    AGENCIES IN TRAFFIC AND TRANSPORTATION ----------------------------------------------------------------------------- 112

    TRAVEL CHARACTERISTICS --------------------------------------------------------------------------------------------------- 113

    PUBLIC TRANSPORT/MASS TRANSIT---------------------------------------------------------------------------------------- 113

    TRAFFIC MANAGEMENT AND CIRCULATION -------------------------------------------------------------------------------- 113

    INTER-CITY BUS TRANSPORT ------------------------------------------------------------------------------------------------ 117

    INTERMEDIATE PUBLIC TRANSPORT ----------------------------------------------------------------------------------------- 118

    PARKING REQUIREMENT ----------------------------------------------------------------------------------------------------- 118

    PRESENT AND FUTURE DEMAND AND SUPPLY GAPS ---------------------------------------------------------------------- 119

    COMPARATIVE ANALYSIS WITH UDPFI AND OTHER GUIDELINES -------------------------------------------------------- 120

    SWOT ANALYSIS ------------------------------------------------------------------------------------------------------------- 120

    CITY SPECIFIC STRATEGIES AND ACTION PLAN ----------------------------------------------------------------------------- 122

    GOALS AND SERVICE OUTCOMES ------------------------------------------------------------------------------------------- 122

    STRATEGIES AND ACTION PLAN --------------------------------------------------------------------------------------------- 122

    PROJECT IDENTIFICATION & COSTING -------------------------------------------------------------------------------------- 123

    6.2.6 STREET LIGHTING AND FIRE FIGHTING -------------------------------------------------------------------------------- 124

    EXISTING SITUATION OF STREET LIGHTS ------------------------------------------------------------------------------------ 124

    FIRE SERVICE ------------------------------------------------------------------------------------------------------------------ 125

    VEHICLE AND EQUIPMENTS FOR FIRE FIGHTING AND RESCUE OPERATIONS --------------------------------------------- 125

    OPERATIONAL SYSTEM ------------------------------------------------------------------------------------------------------- 125

    PRESENT AND FUTURE DEMAND AND SUPPLY GAPS STREET LIGHTING ------------------------------------------------ 125

    PRESENT AND FUTURE DEMAND AND SUPPLY GAPS FIRE FIGHTING --------------------------------------------------- 126

    COMPARATIVE ANALYSIS WITH THE UDPFI AND OTHER GUIDELINES --------------------------------------------------- 127

    SWOT ANALYSIS ------------------------------------------------------------------------------------------------------------- 127

    OTHER SOURCES OF ENERGY ------------------------------------------------------------------------------------------------ 128

    ISSUES ------------------------------------------------------------------------------------------------------------------------- 128

    CITY SPECIFIC STRATEGIES AND ACTION PLAN ----------------------------------------------------------------------------- 129

    GOALS AND SERVICE OUTCOMES ------------------------------------------------------------------------------------------- 129

    STRATEGIES AND ACTION PLAN --------------------------------------------------------------------------------------------- 129

    PROJECT IDENTIFICATION & COSTING -------------------------------------------------------------------------------------- 130

    6.2.7 URBAN POOR AND THEIT ACCESSIBILITY TO BASIS SERVICES ------------------------------------------------------- 131

    POVERTY IN THE TOWN ------------------------------------------------------------------------------------------------------ 131

    SEPARATE INFORMATION ON BPL POPULATION AND SLUM POPULATION ---------------------------------------------- 131

    SLUMS IN THE TOWN --------------------------------------------------------------------------------------------------------- 131

    GENERAL CHARACTERISTICS OF SLUM -------------------------------------------------------------------------------------- 132

    STATUS OF SLUMS (NOTIFIED/ UN-NOTIFIED) ----------------------------------------------------------------------------- 132

    LAND OWNERSHIP AND TENURE STATUS ----------------------------------------------------------------------------------- 132

    URBAN BASIC SERVICES IN SLUMS (IN LINE WITH JNNURMS 7 POINT CHATER) --------------------------------------- 133

  • City Development Plan, Chakghat, M.P.

    vi | P a g e DMG Consulting Pvt. Ltd., Noida

    STATUS OF PHYSICAL INFRASTRUCTURE IN SLUMS------------------------------------------------------------------------- 133

    HOUSING ---------------------------------------------------------------------------------------------------------------------- 133

    WATER SUPPLY --------------------------------------------------------------------------------------------------------------- 133

    DRAINAGE --------------------------------------------------------------------------------------------------------------------- 133

    SANITATION ------------------------------------------------------------------------------------------------------------------- 133

    SEWERAGE -------------------------------------------------------------------------------------------------------------------- 133

    RAOD & STREET LIGHTING --------------------------------------------------------------------------------------------------- 133

    SOLID WASTE MANAGEMENT ----------------------------------------------------------------------------------------------- 134

    STATUS OF SOCIAL INFRASTRUCTURE IN SLUMS --------------------------------------------------------------------------- 134

    EDUCATIONAL FACILITIES ---------------------------------------------------------------------------------------------------- 134

    HEALTH FACILITIES ------------------------------------------------------------------------------------------------------------ 134

    SOCIAL SECURITY SCHEMES AND BENEFICIARIES --------------------------------------------------------------------------- 134

    PRESENT AND FUTURE HOUSING DEMAND -------------------------------------------------------------------------------- 134

    HOUSING GAP ASSESSMENT ------------------------------------------------------------------------------------------------- 135

    COMPARATIVE ANALYSIS WITH THE UDPFI, CPHEEO GUIDELINES ----------------------------------------------------- 135

    SWOT ANALYSIS ------------------------------------------------------------------------------------------------------------- 136

    ISSUES ------------------------------------------------------------------------------------------------------------------------- 137

    CITY SPECIFIC STATEGIES AND ACTION PLANS ----------------------------------------------------------------------------- 137

    PROJECT IDENTIFICATION & COSTING -------------------------------------------------------------------------------------- 137

    6.3 SOCIAL INFRASTRUCUTRE ---------------------------------------------------------------------------------------------- 138

    6.3.1 HEALTH ------------------------------------------------------------------------------------------------------------------ 138

    OVERALL HEALTH FACILITIES------------------------------------------------------------------------------------------------- 138

    BASIC HEALTH INDICATORS -------------------------------------------------------------------------------------------------- 138

    MEDICAL FACILITY PROVIDED BY MUNICIPAL BODY ---------------------------------------------------------------------- 138

    ROLE OF MUNICIPAL BODY IN HEALTH PROGRAMMES ------------------------------------------------------------------- 138

    6.3.2 EDUCATION ------------------------------------------------------------------------------------------------------------- 139

    OVERALL EDUCATIONAL FACILITIES AND TEACHERS IN THE TOWN ------------------------------------------------------- 139

    BASIC EDUCATION AND LITERACY INDICATORS ---------------------------------------------------------------------------- 140

    EDUCATIONAL FACILITIES PROVIDED BY MUNICIPAL BODY --------------------------------------------------------------- 141

    6.3.3 RECREATION AND ENTERTAINMENT ---------------------------------------------------------------------------------- 142

    RECREATIONAL FACILITIES (PARKS, PLAYGROUNDS ETC) ------------------------------------------------------------------ 142

    SPORTS FACILITIES ------------------------------------------------------------------------------------------------------------ 142

    6.3.4 FIRE FIGHTING SERVICES ----------------------------------------------------------------------------------------------- 142

    6.3.5 COMPARATIVE ANALYSIS WITH THE UDPFI GUIDELINES ----------------------------------------------------------- 143

    6.3.6 SWOT ANALYSIS ------------------------------------------------------------------------------------------------------- 146

    6.3.7 ISSUES ------------------------------------------------------------------------------------------------------------------- 147

    6.3.8 CITY SPECIFIC STRATEGIES AND ACTION PLAN ----------------------------------------------------------------------- 148

    PROJECT IDENTIFICATION & COSTING -------------------------------------------------------------------------------------- 149

    HEALTH FACILITIES ------------------------------------------------------------------------------------------------------------ 149

    EDUCATIONAL FACILITIES ---------------------------------------------------------------------------------------------------- 149

    6.3.9 FLORA AND FAUNA ----------------------------------------------------------------------------------------------------- 150

    6.3.10 POLLUTION LEVELS (AIR, WATER AND SOIL) ------------------------------------------------------------------------- 151

    6.3.11 CITY GREEN SPACES ---------------------------------------------------------------------------------------------------- 151

    6.3.12 WATER FRONT DEVELOPMENT AND CONSERVATION --------------------------------------------------------------- 151

    6.3.13 ISSUES ------------------------------------------------------------------------------------------------------------------- 152

  • City Development Plan, Chakghat, M.P.

    vii | P a g e DMG Consulting Pvt. Ltd., Noida

    6.3.14 CITY SPECIFIC STRATEGIES AND ACTION PLAN ----------------------------------------------------------------------- 152

    6.3.15 CITY SPECIFIC STRATEGIES AND ACTION PLAN ----------------------------------------------------------------------- 152

    6.4 HERITAGE AND CONSERVATION --------------------------------------------------------------------------------------- 152

    6.4.1 IDENTIFICATION OF TOURIST SPOTS AT LOCAL LEVEL ---------------------------------------------------------------- 152

    6.4.2 IDENTIFICATION OF TOURIST SPOTS AT LOCAL LEVEL ---------------------------------------------------------------- 153

    6.4.3 IDENTIFICATION OF TOURIST SPOTS AT LOCAL LEVEL ---------------------------------------------------------------- 156

    6.4.4 EXISTING REGULATIONS/HERITAGE GUIDELINES AT THE ULB AND STATE LEVEL --------------------------------- 156

    6.4.5 HERITAGE ISSUES ------------------------------------------------------------------------------------------------------- 157

    6.4.6 TOURISM POTENTIAL OF THE TOWN ---------------------------------------------------------------------------------- 157

    6.4.7 POSSIBILITY OF TOURISM CIRCUITS ----------------------------------------------------------------------------------- 157

    6.4.8 COMPARATIVE ANALYSIS WITH THE UDPFI & UNESCO GUIDELINES -------------------------------------------- 158

    6.4.9 SWOT ANALYSIS ------------------------------------------------------------------------------------------------------- 158

    6.4.10 ISSUES ------------------------------------------------------------------------------------------------------------------- 159

    6.4.11 CITY SPECIFIC STRATEGIES AND ACTION PLAN ----------------------------------------------------------------------- 159

    6.4.12 SECTOR WISE PROJECT IDENTIFICATION AND COSTING: ------------------------------------------------------------- 160

    7. SPECIAL PAPER: TRAFFIC AND TRANSPORTATION SYSTEM ---------------------------------------- 162

    7.1 BACKGROUND ---------------------------------------------------------------------------------------------------------- 162

    7.2 EXISTING TRAFFIC AND TRANSPORTATION SCENARIO --------------------------------------------------------------- 162

    7.3 VEHICLE POPULATION -------------------------------------------------------------------------------------------------- 162

    7.4 AGENCIES IN TRAFFIC AND TRANSPORTATION ----------------------------------------------------------------------- 163

    7.5 TRAVEL CHARACTERISTICS --------------------------------------------------------------------------------------------- 163

    7.6 PUBLIC TRANSPORT/MASS TRANSIT --------------------------------------------------------------------------------- 164

    7.7 TRAFFIC MANAGEMENT AND CIRCULATION -------------------------------------------------------------------------- 164

    7.8 INTER-CITY BUS TRANSPORT ------------------------------------------------------------------------------------------ 168

    7.9 INTERMEDIATE PUBLIC TRANSPORT ----------------------------------------------------------------------------------- 168

    7.10 PARKING REQUIREMENT ----------------------------------------------------------------------------------------------- 169

    7.11 PRESENT AND FUTURE DEMAND AND SUPPLY GAPS ---------------------------------------------------------------- 170

    7.12 COMPARATIVE ANALYSIS WITH UDPFI AND OTHER GUIDELINES -------------------------------------------------- 171

    7.13 SWOT ANALYSIS ------------------------------------------------------------------------------------------------------- 172

    7.14 ISSUES ------------------------------------------------------------------------------------------------------------------- 172

    7.15 CITY SPECIFIC STRATEGIES AND ACTION PLAN ----------------------------------------------------------------------- 173

    7.16 PROJECT IDENTIFICATION ---------------------------------------------------------------------------------------------- 175

    7.17 TRAFFIC AND TRANSPORTATION -------------------------------------------------------------------------------------- 175

    8. EXISTING INSTITUTIONAL FRAMEWORK FOR DEVELOPMENT ------------------------------------ 173

    8.1 URBAN LOCAL BODY STRUCTURE ------------------------------------------------------------------------------------- 173

    8.2 TOWN AND COUNTRY PLANNING DEPARTMENT -------------------------------------------------------------------- 174

    8.3 DEVELOPMENT AUTHORITY ------------------------------------------------------------------------------------------- 175

    8.4 PUBLIC HEALTH ENGINEERING DEPARTMENT ------------------------------------------------------------------------ 175

    8.1 MADHYA PRADESH HOUSING AND INFRASTRURE BOARD ---------------------------------------------------------- 175

    8.5 MADHYA PRADESH POLLUTION CONTROL BOARD ------------------------------------------------------------------ 176

    8.6 ROLE OF PRIVATE SECTOR IN INFRASTRUCUTRE SERVICE PROVISION ---------------------------------------------- 176

    8.7 ISSUES ------------------------------------------------------------------------------------------------------------------- 176

  • City Development Plan, Chakghat, M.P.

    viii | P a g e DMG Consulting Pvt. Ltd., Noida

    8.8 CITY SPECIFIC STRATEGIES AND ACTION PLAN ----------------------------------------------------------------------- 176

    9. INVESTMENT PLAN AND FINANCING STRATEGIES -------------------------------------------------- 179

    9.1 REVENUE ACCOUNTS --------------------------------------------------------------------------------------------------- 179

    9.1.1 KEY ASSUMPTIONS ----------------------------------------------------------------------------------------------------- 179

    9.1.2 NON TAX SOURCES ----------------------------------------------------------------------------------------------------- 179

    9.2 REVENUE INCOME ------------------------------------------------------------------------------------------------------ 179

    9.3 GROWTH IN INCOME --------------------------------------------------------------------------------------------------- 180

    9.4 REVENUE EXPENDITURE ------------------------------------------------------------------------------------------------ 180

    9.5 CAPITAL ACCOUNT ----------------------------------------------------------------------------------------------------- 181

    9.5.1 CAPITAL INCOME ------------------------------------------------------------------------------------------------------- 181

    9.5.2 CAPITAL EXPENDITURE ------------------------------------------------------------------------------------------------- 182

    9.6 KEY FINANCIAL INDICATORS ------------------------------------------------------------------------------------------- 182

    9.6.1 REVENUE INDICATORS ------------------------------------------------------------------------------------------------- 182

    9.6.2 EXPENDITURE INDICATORS -------------------------------------------------------------------------------------------- 183

    9.7 INCOME, EXPENDITURE AND SURPLUS DEFICIT ANALYSIS ---------------------------------------------------------- 183

    9.7.1 FINANCIAL STATUS AT A GLANCE-------------------------------------------------------------------------------------- 183

    9.8 KEY ISSUES AND CONCLUSION ----------------------------------------------------------------------------------------- 184

    9.9 CITY SPECIFIC STATEGIES AND ACTION PLAN------------------------------------------------------------------------- 185

    10. INVESTMENT PRIORITIZATION PLAN ------------------------------------------------------------------ 187

    10.1 PROJECT IDENTIFICATION ---------------------------------------------------------------------------------------------- 187

    10.2 PHYSICAL INFRASTRUCTURE ------------------------------------------------------------------------------------------- 187

    10.3.1 WATER SUPPLY --------------------------------------------------------------------------------------------------------- 187

    10.3.2 DRAINAGE --------------------------------------------------------------------------------------------------------------- 187

    10.3.3 SEWERAGE AND SANITATION ------------------------------------------------------------------------------------------ 188

    10.3.4 SOLID WASTE MANAEMENT ------------------------------------------------------------------------------------------ 188

    10.3.5 TRAFFIC AND TRANSPORTATION -------------------------------------------------------------------------------------- 189

    10.3.6 URBAN POOR ----------------------------------------------------------------------------------------------------------- 190

    10.3 SOCIAL INFRASTRUCTURE ---------------------------------------------------------------------------------------------- 191

    10.4.1 HEALTH FACILITES ------------------------------------------------------------------------------------------------------ 191

    10.4.2 EDUCATIONAL FACILITES ----------------------------------------------------------------------------------------------- 191

    10.4.3 RECREATION AND ENTERTAINMENT ---------------------------------------------------------------------------------- 192

    10.4.4 HERITAGE AND TOURISM ---------------------------------------------------------------------------------------------- 192

    10.4 BASIS FOR PROJECT IDENTIFICATION ---------------------------------------------------------------------------------- 193

    10.5 PROJECTS FOR SYSTEM AND INFRASTRUCTURE AUGMENTATION -------------------------------------------------- 194

    10.6 PROJECTS FOR SYSTEM AND INFRASTRUCTURE REFURBISHMENT -------------------------------------------------- 195

    10.7 OTHER DEVELOPMENT PROJECT -------------------------------------------------------------------------------------- 195

    10.8 SECTOR WISE PROJECT IDENTIFICATION AND COSTING ------------------------------------------------------------- 195

    10.9.1 PHYSICAL INFRASTRUCTURE ------------------------------------------------------------------------------------------- 195

    WATER SUPPLY --------------------------------------------------------------------------------------------------------- 195

    SEWERAGE AND SANITATION ------------------------------------------------------------------------------------------ 196

    SOLID WASTE MANAGEMENT ----------------------------------------------------------------------------------------- 197

    STORM WATER DRAINAGE -------------------------------------------------------------------------------------------- 197

  • City Development Plan, Chakghat, M.P.

    ix | P a g e DMG Consulting Pvt. Ltd., Noida

    TRAFFIC AND TRANSPORTATION -------------------------------------------------------------------------------------- 198

    STREET LIGHTING AND FIRE FIGHTING -------------------------------------------------------------------------------- 198

    URBAN POOR ----------------------------------------------------------------------------------------------------------- 199

    10.9.2 SOCIAL INFRASTRUCTURE ---------------------------------------------------------------------------------------------- 199

    HEALTH FACILITIES ----------------------------------------------------------------------------------------------------- 199

    EDUCATIONAL FACILITIES ---------------------------------------------------------------------------------------------- 200

    TOURISM ---------------------------------------------------------------------------------------------------------------- 201

    OTHER COMPONENTS -------------------------------------------------------------------------------------------------- 201

    URBAN REFORMS & CAPACITY BUILDING ---------------------------------------------------------------------------- 202

    SECTOR WISE TOTAL COST -------------------------------------------------------------------------------------------- 202

    10.10 CITY INVESTMENT PLAN ----------------------------------------------------------------------------------------------- 203

    10.10.1 CITY INVESTMENT PLAN FOR 2012- 2015 (PHASE I) --------------------------------------------------------------- 203

    10.10.2 CITY INVESTMENT PLAN FOR 2016- 2020 (PHASE II) -------------------------------------------------------------- 205

    10.10.3 CITY INVESTMENT PLAN FOR 2021- 2025 (PHASE III) ------------------------------------------------------------- 206

    10.10.4 CITY INVESTMENT PLAN FOR 2026- 2030 (PHASE IV) ------------------------------------------------------------- 207

    10.10.5 CITY INVESTMENT PLAN FOR 2031- 2035 (PHASE V) -------------------------------------------------------------- 208

    10.11 FINANCING PLAN:------------------------------------------------------------------------------------------------------- 209

    11. URBAN REFORMS ---------------------------------------------------------------------------------------- 220

    11.1 BACKGROUND ---------------------------------------------------------------------------------------------------------- 220

    11.2 OBJECTIVES OF REFORMS: --------------------------------------------------------------------------------------------- 220

    11.3 NEED FOR REFORM INITIATIVES --------------------------------------------------------------------------------------- 220

    11.4 STRUCTURE OF REFORMS ---------------------------------------------------------------------------------------------- 221

    11.5 MANDATORY REFORMS: ------------------------------------------------------------------------------------------ 221

    11.6 OPTIONAL REFORMS (STATE AND ULB/PARA-STATAL LEVEL) ------------------------------------------------- 222

    11.7 STATUS OF MANDATORY & OPTIONAL REFORMS: ------------------------------------------------------------------ 222

    11.8 ISSUES ------------------------------------------------------------------------------------------------------------------- 224

    11.9 TOWN SPECIFIC STRATEGIES AND ACTION PLAN--------------------------------------------------------------------- 225

    12. TOWN VISION --------------------------------------------------------------------------------------------- 227

    12.1 SUMMARY OF SECTORAL STRATEGIES: ------------------------------------------------------------------------------- 227

    12.2 TOWN VISION: ---------------------------------------------------------------------------------------------------------- 237

    12.3 TOWN POSITIONING: -------------------------------------------------------------------------------------------------- 238

    ANNEXURES- ------------------------------------------------------------------------------------------------------------- 240

  • City Development Plan, Chakghat, M.P.

    x | P a g e DMG Consulting Pvt. Ltd., Noida

    LIST OF TABLES

    Table 2-1: Study Area ............................................................................................................................ 26

    Table 2-2: Average Annual Rainfall in Chakghat ................................................................................... 28

    Table 3-1: Comparative Assessment of Urban Population ................................................................... 31

    Table 3-2: Population Growth Trends .................................................................................................. 32

    Table 3-3: Population Density Trends ................................................................................................... 33

    Table 3-4: Demographics of the Town - Chakghat ............................................................................... 33

    Table 3-5: Trend of Population Growth in Chakghat Town .................................................................. 35

    Table 3-6: Projected Population Arithmetic Progression Method .................................................... 35

    Table 3-7: Projected Population Geometrical Progression Method .................................................. 36

    Table 3-8: Calculation of Population Projection Incremental Increase Method ............................... 37

    Table 3-9: Projected Population Incremental Increase Method ....................................................... 37

    Table 3-10: Comparative Assessment of Urban SC & ST Population .................................................... 38

    Table 3-11: Comparative Assessment of Literacy Rate Chakghat, M.P. ............................................ 38

    Table 3-12: Ward Wise Comparative Assessment of Literacy Rate Chakghat, M.P. ......................... 39

    Table 3-13: Comparative Assessment of Sex Ratio .............................................................................. 40

    Table 3-14: Ward Wise Comparative Assessment of Sex Ratio Chakghat, M.P. ............................... 41

    Table 4-1: Comparative Assessment of Household Size ....................................................................... 44

    Table 4-2: Comparative Assessment of WFPR ...................................................................................... 45

    Table 4-3 Ward Wise Comparative Assessment of WFPR & Work Force Distribution ......................... 46

    Table 4-4 Comparative Assessment of Non-working Population ......................................................... 47

    Table 4-5: Ward Wiae Comparative Assessment of Dependent Population & Dependency Ratio...... 47

    Table 4-6: List of Important Industries in Rewa District and in its surrounding Districts .................... 48

    Table 4-7: List of Important Centers/Spots for Tourists in Town and in its Proximity ......................... 51

    Table 5-1: Ward Wise Distribution of Population Density .................................................................... 56

    Table 5-2: Existing Landuse Distribution; 2011 Chakghat .................................................................. 57

    Table 5-3: Comparision between Existing (2011) and Proposed Landuse (2021) Distribution

    Chakghat ............................................................................................................................................... 60

    Table 5-4: Comparative Assessment of Household Size ....................................................................... 62

    Table 5-5: Ward Wise Present Housing Demand and Gap ................................................................... 65

    Table 5-6: Present and Future Housing Demand and Gap ................................................................... 65

    Table 6-1: Main Sources of Water Supply ............................................................................................ 70

    Table 6-2: Silent Feature of Water Supply System in Chakghat ........................................................... 71

    Table 6-3: Projected Future demand Water Supply .......................................................................... 74

  • City Development Plan, Chakghat, M.P.

    xi | P a g e DMG Consulting Pvt. Ltd., Noida

    Table 6-4: Present and Future Requirement/Demand and Gap Assessment Water Supply ............. 75

    Table 6-5: Performance Indicators Water Supply .............................................................................. 75

    Table 6-6: Goals & Services Outcomes for different Horizon Years ..................................................... 77

    Table 6-7: Present and Future Demand and Supply Gaps Sewerage System .................................... 84

    Table 6-8: Performance Indicators Sewerage System ....................................................................... 85

    Table 6-9: Goals & Services Outcomes for different Horizon Years ..................................................... 87

    Table 6-10: Length of Drains in Town ................................................................................................... 96

    Table 6-11: List of Major Water Bodies and Drains .............................................................................. 98

    Table 6-12: Present and Future Demand and Supply Gaps for Drainage System ................................ 98

    Table 6-13: Goals & Services Outcomes for different Horizon Years ................................................... 99

    Table 6-14: Ward Wise Municipal Solid Waste Generation Chakghat Town .................................. 101

    Table 6-15: List of Vehicles and Equipments available with CNP for Solid Waste Collection &

    Transportation .................................................................................................................................... 104

    Table 6-16: Present and Future Demand and Supply Gaps of Waste Collection Chakghat Town... 104

    Table 6-17: Performance Indicators Solid Waste Management ...................................................... 105

    Table 6-18: Goals & Services Outcomes for different Horizon Years ................................................. 106

    Table 6-19: List of Transport Agencies for Inter City Goods Transport .............................................. 112

    Table 6-20: Types of Raods and Lengths in Chakghat Town............................................................... 114

    Table 6-21: Ward Wise Detail of Road Length in Chakghat Town ...................................................... 114

    Table 6-22: Major Roads of the Town ................................................................................................ 115

    Table 6-23: Present and Future Demand and Supply Gaps Traffic and Transportation .................. 119

    Table 6-24: Space Standards of Roads ................................................................................................ 120

    Table 6-25: Desirable of Footpaths..................................................................................................... 120

    Table 6-26: Goals & Services Outcomes for Different Horizon Years ................................................. 122

    Table 6-27: Street Lighting in Chakghat Nagar Parishad .................................................................... 124

    Table 6-28: Present and Future Demand and Supply Gaps Street Lighting ..................................... 126

    Table 6-29: Present and Future Demand of Equipment (vehicles) and Man Power for Street Lighting

    and Fire Fighting ................................................................................................................................. 126

    Table 6-30: Performance Indicators Street Lighting ........................................................................ 127

    Table 6-31: Sources of Lighting at Household Level in Chakghat ....................................................... 128

    Table 6-32: Type of Cooking Fuel Used at Household Level in Chakghat ........................................... 128

    Table 6-33: Goals & Services Outcomes for Different Horizon Years ................................................. 129

    Table 6-34: Ward Wise Distribution of Slum and BPL Population ...................................................... 131

    Table 6-35: Present and Future Housing Demand and Gap for Slum Population .............................. 134

  • City Development Plan, Chakghat, M.P.

    xii | P a g e DMG Consulting Pvt. Ltd., Noida

    Table 6-36: Comparative Assessment of Literacy Rate ...................................................................... 140

    Table 6-37: Ward Wise Comparative Assessment of Literacy Rate - Chakghat ................................. 140

    Table 6-38: Comparative Analysis with UDPFI Guidelines Social Infrastructure ............................. 143

    Table 6-39: Present and Future Demand and Supply Gaps Social Infrastructure ........................... 143

    Table 6-40: List of Important Tourist Spots in Town .......................................................................... 153

    Table 6-41: List of Important Tourist/Destination Spots at Regional Level ........................................ 154

    Table 7-1 List of Transport Agencies for Inter City Goods Transport ................................................. 163

    Table 7-2 : Types of Roads and Lengths in Chakghat Town ................................................................ 164

    Table 7-3: Ward Wise Detail of Road Length in Chakghat Town ........................................................ 165

    Table 7-4: Major Roads of the Town .................................................................................................. 166

    Table 7-5: Present and Future Demand and Supply Gaps Traffic and Transportation .................... 170

    Table 7-6: Space Standards of Roads .................................................................................................. 171

    Table 7-7: Desirable of Footpaths....................................................................................................... 171

    Table 7-8: Goals & Services Outcomes for Different Horizon Years ................................................... 173

    Table 8-1: Power and Functions of Chakghat Nagar Parishad ............................................................ 174

    Table 9-1: Year Wise Income of Chakghat Nagar Parishad from Various Sources ............................. 181

    Table 9-2: Year Wise Expenditure of Chakghat Nagar Parishad ......................................................... 182

    Table 9-3: Total Revenue Income and Expenditure of CNP ................................................................ 183

    Table 10-19: Overall financing plan of investment plans: .................................................................. 213

  • City Development Plan, Chakghat, M.P.

    xiii | P a g e DMG Consulting Pvt. Ltd., Noida

    LIST OF FIGURES

    Figure 1.5-1: Specific Objectives of CDP ............................................................................................... 15

    Figure 1.6-2: Stage 1: Inception ............................................................................................................ 17

    Figure 1.6-1 Kick-off Workshops at Chakghat Nagar Parishad ............................................................. 17

    Figure 1.6-3: Stage 2: Sector Assessment and City Profile ................................................................... 18

    Figure 1.6-4: Stage 3: City Vision and Development Objectives ........................................................... 19

    Figure 1.6-5: Stage 4: Draft CDP ........................................................................................................... 20

    Figure 1.6-6: Schematic Diagram for Methodology of City Development Plan Preparation ............... 21

    Figure 4.8-1: Informal Business Activites along the Major Roads of the Town .................................... 49

    Figure 4-4.8-2 Major Market Areas (Chak Bazar) in Town ................................................................... 50

    Figure 6.2-1: Water Supply Distribution Arrangements ....................................................................... 72

    Figure 6.2-2: Condition of Major Roads in Town ................................................................................ 116

    Figure 6.2-3: Unorganised On-street parking in Town ....................................................................... 118

    Figure 6.2-4: Street Light at Old Chowk - Chakghat ............................................................................ 125

    Figure 6.2-5: Slums in Chakghat Town ................................................................................................ 132

    Figure 6.3-1: Health Facilities at CHC in Chakghat Town .................................................................... 138

    Figure 6.3-2: Schools in Chakghat Town ............................................................................................. 139

    Figure 6.3-4: NSPG College in Chakghat Town ................................................................................... 140

    Figure 6.3-3: Building Structure and Basic Infrastructure Ser