  • City Development plan

    Hanumana, Madhya Pradesh

    Submitted to:

    Urban Administration and Development Department, GoMP Palika Bhawan, Bhopal, Madhya Pradesh

    Project co-ordination:

    City Managers Association, Madhya Pradesh (CMAMP) Palika Bhawan, Bhopal, Madhya Pradesh

    Submitted by:

    DMG Consulting Pvt. Ltd. A-81, Sector 65, Noida, Uttar Pradesh

  • `

    Hanumana Town

    Hanumana has become educational hub after 2000. People from

    nearby villages come Hanumana to pursue a good education.

    Many of the aspirants undertake private technical coaching in

    Engineering and Management and get success and selected for

    IITs, NITs, and IIMs.

    DISTRICT REWA

    POPULATION- 16773

  • Latitude

    Longitude

    Average rainfall (annual) MM

    Height above mean sea level Mts

    Municipal area (1991) Sq kms

    Municipal area (2001) Sq kms

    Municipal area (2011) Sq kms

    Date of Constitution of ULB Date

    Historic importanceIn one or two

    sentences

    Population Year 1981 (under Municipal

    boundary only)

    Population Year 1991 (under Municipal

    boundary only)

    Population Year 2001 (under Municipal

    boundary only)

    Population Year 2011 (under Municipal

    boundary only)

    Name of Population projection Method

    Projected population adopted Year 2015

    Projected population adopted Year 2025

    Projected population adopted Year 2035

    Land Use% Standard (as per

    UDPFI)

    Land use (Tentative

    in Sq kms )

    Land use (Tentative

    in percentage)

    Residential 45-50% 1.822 87.76

    Commercial 2-3% 0.034 1.65

    Public - semi public 6-8% 0.026 1.23

    Industrial 8-10% - 0.00

    Roads 10-12% 0.121 5.82

    Recreational 12-14% - 0.00

    Sensitive rest - 0.00

    Water bodies rest 0.074 3.56

    Total Developed area 2.076 100.00

    Agriculture / Undeveloped area rest 28.280 93.18

    Total Municipal Area 30.35

    CompanyName

    ULB Name

    Whether the Sectoral Analysis report is as per UADD requisitesP

    op

    ula

    tio

    nT

    ow

    n B

    rief

    Geographical location (Town)

    30.35 sqkm

    30.35 sqkm

    NA

    Lan

    d U

    se

    Town level

    NA

    NA

    City Profile

    22,525

    27,735

    DMG Consulting P. Ltd.

    Hanumana

    Yes

    11,346

    14,871

    16,773

    Geometric Progression Method

    18,293

    24 degree 77N

    82 degree 09E

    1100 mm

    500 M

    NA

    1

  • Ward # Ward 1 Ward 2 Ward 3 Ward 4 Ward 5 Ward 6 Ward 7 Ward 8 Ward 9 Ward 10 Ward 11 Ward 12 Ward 13 Ward 14 Ward 15 Total

    Name of ward

    Ward Population (2001) 1334 744 847 800 956 1476 1240 1142 848 760 1286 1026 777 861 774 14871

    Area (sq kms) 2.5442 4.3462 1.0627 0.5247 1.7921 1.2852 3.9614 1.4668 1.3396 1.1061 2.098 4.5099 2.1333 1.4175 0.7645 30.35

    Density (PPSqkm) 2001 524 171 797 1525 533 1148 313 779 633 687 613 227 364 607 1012 490

    Male 706 396 427 453 515 796 646 579 458 390 656 551 417 417 391 7798

    Female 628 348 420 347 441 680 594 563 390 370 630 475 360 444 383 7073

    SC NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1309

    ST NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 2556

    BPL NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Sex ratio 890 879 984 766 856 854 920 972 852 949 960 862 863 1065 980 907

    Literacy rate (%) 39.24 74.24 54.8 82.56 60 62.81 52.32 72.02 80.79 79.49 65.55 63.16 71.22 55.88 53.96 64.54

    No. of Primary schoolsNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    7

    No. of Primary Health

    CentreNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    NA (but one CHC

    with 30 beds is

    there)

    No. of Households 236 105 127 128 183 304 223 210 123 123 199 176 124 131 121 2513Primary occupation

    (Majority)Manufacturing Agricultural Manufacturing Manufacturing Manufacturing Agricultural Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Manufacturing Agricultural Agricultural Agricultural Manufacturing

    Seconday occupation Agricultural Manufacturing AgriculturalTrade and

    CommerceAgricultural Manufacturing Agricultural Agricultural

    Trade and

    Commerce

    Trade and

    CommerceAgricultural Agricultural Manufacturing Manufacturing Manufacturing Agriculture

    Tertiary occupationTrade and

    Commerce

    Trade and

    Commerce

    Trade and

    CommerceAgricultural

    Trade and

    Commerce

    Trade and

    Commerce

    Trade and

    Commerce

    Trade and

    CommerceAgricultural Agricultural

    Trade and

    Commerce

    Trade and

    Commerce- -

    Trade and

    CommerceTrade & Commerce

    No. of SS/LS industrial

    unitsNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Small scale

    industries such as

    bidi, soap, pickles,

    etc. at HH scale. No

    Major industries.

    No. of Commercial

    establishmentsNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Slum pockets * NA NA NA * * * NA NA NA NA * NA * *total 7 wards having

    slum.

    Slum population NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 4467

    No. of Slum Households NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Individual water

    connections in the wardNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 470 HHs

    No. of Community water

    connectionsNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Commercial water

    connectionsNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA Nil

    No. of Tubewells NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA -

    No. of Handpumps NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA -

    No. of OHTs NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA2 (volume: 45,000 L

    each)

    % Coverage of piped water

    supplyNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA -

    No. of Individual Toilets NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Individual Septic

    tanksNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 1424

    No. of Community Septic

    tanksNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Community toilets NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    % of population Open

    defecationNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Dust bins NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 4

    City Profile (Ward Wise)

    2

  • Ward # Ward 1 Ward 2 Ward 3 Ward 4 Ward 5 Ward 6 Ward 7 Ward 8 Ward 9 Ward 10 Ward 11 Ward 12 Ward 13 Ward 14 Ward 15 Total

    Name of ward

    City Profile (Ward Wise)

    Wardwise Waste generated

    (Kgs)333.5 186 211.75 200 239 369 310 285.5 212 190 321.5 256.5 194.25 215.25 193.5 3717.75

    Road sweeping (1 time or 2

    times)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Total no. of sanitary

    workers in the wardNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Length of Pucca road

    (Mts)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 16.34 km

    Length of Kuccha road

    (Mts)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 5.43 km

    Length of State Highway NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Length of National

    HighwayNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 7.45 km

    Length of Road side drains

    Pucca (Mts)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Length of Natural drains

    (Nallah)

    Pucca/Channelized (Mts)

    0 0 224 925 1166 1329 665 520 1124 2344 615 0 0 0 0 8912

    Length of Natural drains

    (Nallah) Kuttcha (Mts)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Streetlights NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 300

    No. of Electricity

    connections NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA in 1867 HHs

    Name of Tourist site if any NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Name of Heritage site if

    anyNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Bus stop (No.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Bus stand(No.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Parks (No.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Playground(No.) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Residential

    propertiesNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    No. of Commercial

    propertiesNA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Total Property tax

    collection (in Rs.)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Property tax coverage(in

    %)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Available Government

    land (Sq kms)NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

    Remarks

    Note

    Population data has been given as per the Census-2001. As per the discussion with RGI Census Data for 2011 has not published, which will publish by July 2013.

    * Mark shows ward with slum population.

    3

  • SourceTubewell /

    HandpumpWell River/Lake/Talab

    No. of Tubewell / River / Well NA NA NA

    Water Supplied by Tubewell /

    River / Well in MLDNA NA 60% of HHs are using Hand pumps

    0.19 MLD

    30 lpcd

    Rs 60 /- per household per month

    NA

    No

    No

    0.15 MLD

    No

    1424

    NA

    1

    NA

    NA

    Amaiya Nallah and Naiya Nallah

    NA

    NA

    NA

    NA

    NA

    No

    59.22 grams

    37.18 Tons

    NA

    25%

    No

    No

    NA

    dumping site can be in ward no. 3, 7 & 12

    NA

    NA

    Tractor 1 / Trolley 2 / Hand-pull cart 4

    yes

    SW

    M

    Ultimate disposal point of nallah

    If site for Scientific disposal is not allotted then whether

    formally requested by the ULB

    Total water supply in the town (MLD)

    Existing Supply rate (LPCD) considering distribution

    losses

    Water Charges per household per month (Rs.)

    Flat/Metered

    Whether any treatment plant exists (Y/N), If yes mention

    capacity (MLD)

    Proposed source (Surface)

    Total sewage generation (MLD)

    Whether any treatment plant exists (Y/N),If yes mention

    capacity

    Total no. of individual septic tanks

    Wa

    ter S

    up

    ply

    Sew

    era

    ge

    Dra

    ina

    ge

    Sectoral Analysis

    Frequency of SW collection by the ULB (1 time per day/2

    times per day)

    Collection efficiency of the ULB (%)

    Any initiative for DTDC (Yes /No)

    Any initiative for scientific disposal of waste

    Name of dumping/ landfill site

    Distance of the Dumping site/landfill site from main

    settlement area (Kms)

    Length of road side drain (Kms)

    Coverage of road side drainage w.r.t roads (%)

    Ultimate disposal point of Road side drains

    Any treatment plant/procedure adopted

    Per capita Solid waste generation (Considering

    Standards) (in gms)

    Total SW generation (in Tons)

    Existing Source

    Frequency of Cleaning Individual Septic tanks

    % Coverage under paid water supply

    Is the existing site Dumping site or allotted site for

    Scientific disposal

    Area of allotted landfill site for Scientific disposal

    No. of Tractor trolleys/vehicles available with the ULB for

    carrying Solid waste to the LF site

    Total no. of community septic tanks

    Total no. of Sewage/Mud pumps available with the ULB

    Frequency of Cleaning Community Septic tanks

    Name of natural nallah (Storm water drain)

    Length of natural nallah (Storm water drain) Kms

    Ph

    ysi

    cal

    Infr

    ast

    ruct

    ure

    4

  • Sectoral Analysis

    NH 7 (passing through)

    NA

    NA

    NA

    CC

    WBM 16.34 km

    Total (kms) 16.34 km

    (kms) 5.43 km

    (kms) 19.83 km by 2035

    around 1500 (1000 bicycle, 400 two

    wheeler, 100-150 four wheeler)

    NA

    NA

    1 NA

    2 NA

    3 NA

    NA

    300

    300

    NA

    150

    NA

    NA

    150

    NA

    33/11KV NA

    132 kv 1

    NA

    1867 HHs

    NA

    No

    NA

    No. of Streetlights having Sodium lights

    Ro

    ad

    s

    No. of Streetlights under working condition

    No. of Streetlights having Tubes

    No. of Streetlights having CFL

    No. of Streetlights having Incandescent bulbs

    No. of Streetlights having LED

    Any subsidy for BPL (Y/N)

    Tra

    ffic

    & t

    ran

    spo

    rta

    tio

    nS

    tree

    t li

    gh

    tin

    gP

    ow

    er

    Distance of State Highway if nearby from the town (SH-

    XYZ) in Kms

    Total length of Pucca roads (Kms)

    Total length of Kuccha roads (kms)

    Gap w.r.t Standards

    Total no. of vehicles in the town

    No. of Streetlights having LPS

    Location of Substation

    http://www.mptransco.nic.in

    Total no. of residential connections

    Total no. of Commercial connections

    Total no. of street lights

    Any intracity mass transport mode (yes/no)

    Name of locations facing major traffic issues

    Name of the street beautified as per the

    instructions of UADD

    Bus stand (yes/No)

    Name of National Highway passing from or nearby from

    the town (NH-XYZ)

    Distance of National Highway if nearby from the town

    (NH-XYZ) in Kms

    Name of State Highway passing from or nearby from the

    town (SH-XYZ)

    Ph

    ysi

    cal

    Infr

    ast

    ruct

    ure

    Duration of Electricity supply per day (in Hrs)

    5

  • Sectoral AnalysisNA

    NA

    NA

    NA

    NA

    NA

    NA

    NA

    NA

    NA (but one CHC with 30 beds is there)

    Government NA

    Beds NA

    Private NA

    Beds NA

    NO

    Name of

    townMirzapur

    Distance

    (Kms)51 km

    7

    2

    0 NA

    0 NA

    NA

    NA

    NA

    NA

    NA

    The social security pension scheme

    Her

    ita

    ge

    & t

    ou

    rism

    Her

    ita

    ge

    & t

    ou

    rism

    En

    vir

    on

    men

    t

    Name of Heritage site/s

    Ownership/agency

    Prevailing Heritage Act/s

    Name of Tourist site/s

    Hea

    lth

    Ed

    uca

    tio

    n

    No. of Beneficiaries under SJSRY (Street Vendor)

    No. of Beneficiaries under Haath thela/Rickshaw chalak

    yojna

    So

    cia

    l In

    fra

    stru

    ctu

    re

    So

    cia

    l se

    curi

    ty s

    chem

    es

    No. of Rain Basera/Night Shelter

    No. of Beneficiaries under Gharelu Kamkaji Mahila

    Yojana

    Ownership of Rain Basera (with ULB/Rental)

    Name of other Social security schemes

    No. of ITI

    No. of Hospitals

    Multispeciality hospital if any (Y/N)

    Name of Nearby town reffered for Treatment

    No. of Primary schools

    No. of Secondary/High schools

    No. of Colleges

    Ownership/agency

    Total no. of Pilgrims/ Tourists visiting town per day

    Name of River/Lake/Forest range/Any specific species

    Prevailing Environmental Act/s

    Areas facing threats

    No. of Primary Health centres/Dispensary

    6

  • Components 2015 2025 2035City specific

    Strategies

    Preliminary

    estimateImplementing agency Mode of Implementation (PPP etc.)

    Network coverage to households 40% 100% 100% HNP, UADD, Govt. of M.P. Contract basis

    Per capita supply as per norms (135

    lpcd)135 135 135 HNP, UADD, Govt. of M.P.

    24/7 water supply 40% 100% 100% HNP, UADD, Govt. of M.P.

    Quality of waterAs per WHO

    Standards

    As per WHO

    Standards

    As per WHO

    StandardsHNP, UADD, Govt. of M.P.

    Non revenue water 25% 15% 5% HNP, UADD, Govt. of M.P.

    Consumer metering 80% 100% 100% HNP, UADD, Govt. of M.P. Contract basis

    Cost recovery 100% 100% 100% HNP, UADD, Govt. of M.P.

    Roof water harvesting 40% 80% 100% HNP, UADD, Govt. of M.P.

    Private sector participation 10% 70% 100% Yes

    Development of a fresh drainage

    system in the town100% 100% 100% HNP, UADD, Govt. of M.P. PPP

    Rehabilitation of existing pucca drains 100% 100% 100% HNP, UADD, Govt. of M.P. PPP

    Rehabilitation of existing primary

    nallahs and water bodies100% 100% 100% HNP, UADD, Govt. of M.P. PPP

    Flood prone areas - - - HNP, UADD, Govt. of M.P.

    Sewer network coverage to

    households

    60% 100% 100%HNP, UADD, Govt. of M.P. PPP

    Sewage Treatment and disposal

    arrangements

    80% 100% 100%HNP, UADD, Govt. of M.P. PPP

    Sewage Recycling and reuse 60% 80% 100% HNP, UADD, Govt. of M.P. PPP

    Cost recovery (as a % of O&M )As per WHO

    Standards

    As per WHO

    Standards

    As per WHO

    StandardsHNP PPP

    Safe sanitation facilities (with focus on

    Urban poor)

    80% 100% 100%HNP, UADD, Govt. of M.P. PPP

    Door-to-door collection system 80% 100% 100% HNP

    Source segregation 100% 100% 100% HNP

    Improve waste collection efficiency100% 100% 100%

    HNP

    Mechanized waste handling Partial Full Full HNP

    Scientific waste disposal Partial Full Full HNP

    Landfill site adequacy Partial Full Full HNP

    Cost recovery of O&M 80% 100% 100% HNP

    Private sector participation 70% 100% 100% HNP, PWD

    PPP

    SECTORIAL GOALSYEAR

    PH

    YSI

    CA

    L IN

    FRA

    STR

    UC

    TUR

    E

    WA

    TER

    SU

    PP

    LYD

    RA

    INA

    GE

    SEW

    ERA

    GE

    & S

    AN

    ITA

    TIO

    NSW

    M

    By 2035, 24x7

    hours water

    supply as per the

    standard and full

    network coverage,

    water harvesting,

    consumer

    metering and low

    cost water

    treatment plant

    (Rapid Sand

    filteration).

    To provide 100%

    sewerage system

    with low cost

    sanitation

    projects, proper

    treatment before

    disposal with Root

    zone treatment

    system and

    DEWATS.

    Preparation of

    master plan,

    rehabilitation and

    improvement

    programmes.

    Implementation of

    Integrated waste

    management

    system.

    374 Lakhs

    Including slum

    area

    190 Lakhs

    Including slum

    area

    344 Lakhs

    Including slum

    area

    226 Lakhs

    Including slum

    area

    7

  • New road formations - 100% 100% HNP, PWD BOOT

    Road upgradations 50% 100% 100% HNP, PWD PPP

    Widening/ strengthening 50% 100% 100% HNP, PWD PPP

    ROBs/flyovers - - - HNP, PWD -

    Development of bus terminus 60% 100% 100% HNP, PWD BOOT

    Development of truck terminus 70% 100% 100% HNP, PWD BOOT

    Junctions and traffic signal

    improvements- - - HNP, PWD PPP

    Mass transit system - - - HNP, PWD BOOT

    Parking facilities 100% 100% 100% HNP, PWD Contract

    New Installation 30% 70% 100% HNP Contract

    Upgradation 100% 100% 100% HNP Contract

    Underground cabling - 70% 100% HNP Contract

    Energy savings 70% 100% 100% HNP Contract

    24/7 electricity supply HNP

    100 % electricity supply HNP

    Development of alternative energy

    sources- - - HNP PPP

    100% Fire safety coverage 100% 100% 100% HNP

    Fully equipped fire station 100% 100% 100% HNP

    Identify archaeological resources in

    the city (Heritage listing)- - - HNP, State tourism Dept., HNP & State Tourism Dept.

    Development of green areas as per

    normsHNP, State tourism Dept., PPP

    Water bodies

    preservation/ConservationHNP, State tourism Dept., PPP

    Tourist accommodation adequacy HNP, State tourism Dept.,

    Tourist attraction and circuits regional

    and city levelHNP, State tourism Dept., PPP

    Clean and healthy environment HNP

    Conserved natural environment -

    water bodiesPPP

    Eco-friendly vehicles HNP, GoMP PPP

    Disposal of treated sewage in nallahs HNP

    Desilting of nallahs HNP PPP

    Incineration of bio-medical waste HNP PPP

    Implementation of norms/standards

    for pollution controlHNP HNP

    HNP

    State dovt.

    PH

    YSI

    CA

    L IN

    FRA

    STR

    UC

    TUR

    E

    RO

    AD

    S &

    TR

    AFF

    IC M

    AN

    AG

    EMEN

    TST

    REE

    T

    LIG

    HT

    NIN

    GP

    OW

    ER

    100% *

    100% *

    FIR

    E

    FIG

    HT

    IN

    G

    HER

    EITA

    GE

    & T

    OU

    RIS

    M HER

    ITA

    GE

    & T

    OU

    RIS

    MEN

    VIR

    ON

    MEN

    T

    -

    -

    -

    -

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    Road upgradation

    and development,

    development of

    bus & truck

    terminal,

    signalised

    junctions,

    provision of

    parking facilities

    and strenthening

    Public transport.

    Installation of

    solar street lights

    with CFL & LED

    lights to save

    energy.

    Development of

    underground

    cabling.

    provision of well

    equipped fire

    station.

    -

    Development of

    water bodies,

    plantation,

    checking of

    pollution level, use

    of eco-friendly

    vehicles,

    treatment facilities

    for wastes etc.

    365 Lakhs

    Including slum

    area

    150 Lakhs

    -

    1770 Lakhs

    Including slum

    area

    8

  • 100% doctor-patient ratio HNP, health dept. Recruitment

    100% patient-bed ratio HNP, health dept. Contract

    Effective implementation of health

    programmes and related services in

    the slum areas of the city

    HNP, health dept. Contract

    Regular checks for water

    contamination in all water bodies of

    the city

    HNP, health dept. Contract

    Literacy rates

    Ensure 100% enrollment in primary

    schoolsEdu. Dept of M.P. and HNP

    100% Teacher student ratio Edu. Dept of M.P. and HNP Recruitment

    Technical, engineering & medical

    education in the cityEdu. Dept of M.P. and HNP PPP

    Developed existing parks HNP Contract / PPP

    Area coverage under recreational

    facilitiesHNP

    Playing facilities HNP

    Provision for green-belts in future

    development plansHNP

    Sufficient infrastructure at

    mela/exhibition groundHNP contract

    Security of tenure for urban poor MPHB, HNP

    Inclusion of 100% urban poor

    population under various central and

    state govts social sectors schemes like

    old-age pension schemes, Scheme for

    handicapped persons, deen-dayal

    antyoday yojana, mid-day meals

    schemes, etc

    - -

    Pucca housing for urban poor PPP

    Access to water connection HNP

    Access to public toilets and urinal

    facilities for all slum householdsHNP Contract / PPP

    Access to dustbins and secondary

    storage pointsHNP Contract / PPP

    Upgradation of kutcha roads to PCC

    roads in slumsHNP PPP

    Improved drainage systems HNP PPP

    Adequate street lighting facilities HNP PPP

    Education facilities HNP PPP

    Community halls etc. HNP PPP

    Adequate health facilities HNP PPP

    SLU

    MS

    & U

    RB

    AN

    PO

    OR

    SLU

    MS

    & U

    RB

    AN

    PO

    OR

    SOC

    IAL

    INFR

    AST

    RU

    CTU

    RE

    HEA

    LTH

    EDU

    CA

    TIO

    NR

    ECR

    EATI

    ON

    AL

    Soci

    al s

    ecu

    rity

    sch

    emes

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    2166.5 Lakhs for

    housing only

    100% *

    100% *

    100% *

    Provision of Land

    ownership,

    improvement

    schemes,

    relocation of

    hazardous slums,

    pucca drain

    network, financial

    support for the

    construction of

    houses

    Strenthening

    infrastructures in

    health centers and

    to run health

    initiative

    programs.

    Provision of co-

    education,

    strengthning of

    education

    infrastructures

    and opening of

    vocational training

    centres.

    Development of

    water bodies, mini-

    stadium, exibition

    ground,

    community halls,

    public library etc.

    200 Lakhs

    Including slum

    area

    740 Lakhs

    Including slum

    area

    Included in

    tourism

    --100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    9

  • Security of tenure for urban poor MPHB, HNP

    Note:

    SLU

    MS

    & U

    RB

    AN

    PO

    OR

    SLU

    MS

    & U

    RB

    AN

    PO

    OR

    100% *

    * Marks - project has to be done till year 2035 by HNP, depending upon city need and available resources.

    2166.5 Lakhs for

    housing only

    Provision of Land

    ownership,

    improvement

    schemes,

    relocation of

    hazardous slums,

    pucca drain

    network, financial

    support for the

    construction of

    houses

    10

  • Components 2015 2025 2035 City specific StrategiesPreliminary

    estimateImplementing agency Mode of Implementation (PPP etc.)

    Network coverage to households 40% 100% 100% HNP, UADD, Govt. of M.P. Contract basis

    Per capita supply as per norms (135

    lpcd)135 135 135 HNP, UADD, Govt. of M.P.

    24/7 water supply 40% 100% 100% HNP, UADD, Govt. of M.P.

    Quality of waterAs per WHO

    Standards

    As per WHO

    Standards

    As per WHO

    StandardsHNP, UADD, Govt. of M.P.

    Non revenue water 25% 15% 5% HNP, UADD, Govt. of M.P.

    Consumer metering 80% 100% 100% HNP, UADD, Govt. of M.P. Contract basis

    Cost recovery 100% 100% 100% HNP, UADD, Govt. of M.P.

    Roof water harvesting 40% 80% 100% HNP, UADD, Govt. of M.P.

    Private sector participation 10% 70% 100% Yes

    Development of a fresh drainage

    system in the town100% 100% 100% HNP, UADD, Govt. of M.P. PPP

    Rehabilitation of existing pucca drains 100% 100% 100% HNP, UADD, Govt. of M.P. PPP

    Rehabilitation of existing primary

    nallahs and water bodies100% 100% 100% HNP, UADD, Govt. of M.P. PPP

    Flood prone areas - - - HNP, UADD, Govt. of M.P.

    Sewer network coverage to

    households

    60% 100% 100%HNP, UADD, Govt. of M.P. PPP

    Sewage Treatment and disposal

    arrangements

    80% 100% 100%HNP, UADD, Govt. of M.P. PPP

    Sewage Recycling and reuse 60% 80% 100% HNP, UADD, Govt. of M.P. PPP

    Cost recovery (as a % of O&M )As per WHO

    Standards

    As per WHO

    Standards

    As per WHO

    Standards HNP PPP

    Safe sanitation facilities (with focus

    on Urban poor)

    80% 100% 100%HNP, UADD, Govt. of M.P. PPP

    Door-to-door collection system 80% 100% 100% HNP

    Source segregation 100% 100% 100% HNP

    Improve waste collection efficiency100% 100% 100%

    HNP

    Mechanized waste handling Partial Full Full HNP

    Scientific waste disposal Partial Full Full HNP

    Landfill site adequacy Partial Full Full HNP

    Cost recovery of O&M 80% 100% 100% HNP

    Private sector participation 70% 100% 100% HNP, PWD

    PPP

    SECTORIAL GOALSYEAR

    PH

    YSI

    CA

    L IN

    FRA

    STR

    UC

    TUR

    E

    WA

    TER

    SU

    PP

    LYD

    RA

    INA

    GE

    SEW

    ERA

    GE

    & S

    AN

    ITA

    TIO

    NSW

    M

    By 2035, 24x7 hours water

    supply as per the standard

    and full network coverage,

    water harvesting,

    consumer metering and

    low cost water treatment

    plant (Rapid Sand

    filteration).

    To provide 100%

    sewerage system with low

    cost sanitation projects,

    proper treatment before

    disposal with Root zone

    treatment system and

    DEWATS.

    Preparation of master

    plan, rehabilitation and

    improvement

    programmes.

    Implementation of

    Integrated waste

    management system.

    374 Lakhs

    Including slum

    area

    190 Lakhs

    Including slum

    area

    344 Lakhs

    Including slum

    area

    226 Lakhs

    Including slum

    area

    11

  • New road formations - 100% 100% HNP, PWD BOOT

    Road upgradations 50% 100% 100% HNP, PWD PPP

    Widening/ strengthening 50% 100% 100% HNP, PWD PPP

    ROBs/flyovers - - - HNP, PWD -

    Development of bus terminus 60% 100% 100% HNP, PWD BOOT

    Development of truck terminus 70% 100% 100% HNP, PWD BOOT

    Junctions and traffic signal

    improvements- - - HNP, PWD PPP

    Mass transit system - - - HNP, PWD BOOT

    Parking facilities 100% 100% 100% HNP, PWD Contract

    New Installation 30% 70% 100% HNP Contract

    Upgradation 100% 100% 100% HNP Contract

    Underground cabling - 70% 100% HNP Contract

    Energy savings 70% 100% 100% HNP Contract

    24/7 electricity supply HNP

    100 % electricity supply HNP

    Development of alternative energy

    sources- - - HNP PPP

    100% Fire safety coverage 100% 100% 100% HNP

    Fully equipped fire station 100% 100% 100% HNP

    Identify archaeological resources in

    the city (Heritage listing)- - - HNP, State tourism Dept., HNP & State Tourism Dept.

    Development of green areas as per

    normsHNP, State tourism Dept., PPP

    Water bodies

    preservation/ConservationHNP, State tourism Dept., PPP

    Tourist accommodation adequacy HNP, State tourism Dept.,

    Tourist attraction and circuits regional

    and city levelHNP, State tourism Dept., PPP

    Clean and healthy environment HNP

    Conserved natural environment -

    water bodiesPPP

    Eco-friendly vehicles HNP, GoMP PPP

    Disposal of treated sewage in nallahs HNP

    Desilting of nallahs HNP PPP

    Incineration of bio-medical waste HNP PPP

    Implementation of norms/standards

    for pollution controlHNP HNP

    HNP

    State dovt.

    PH

    YSI

    CA

    L IN

    FRA

    STR

    UC

    TUR

    E

    RO

    AD

    S &

    TR

    AFF

    IC M

    AN

    AG

    EMEN

    TST

    REE

    T

    LIG

    HTN

    ING

    PO

    WER

    100% *

    100% *

    FIR

    E

    FIG

    HTI

    N

    G

    HER

    EITA

    GE

    & T

    OU

    RIS

    M

    HER

    ITA

    GE

    & T

    OU

    RIS

    MEN

    VIR

    ON

    MEN

    T

    -

    -

    -

    -

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    Road upgradation and

    development,

    development of bus &

    truck terminal, signalised

    junctions, provision of

    parking facilities and

    strenthening Public

    transport.

    Installation of solar street

    lights with CFL & LED lights

    to save energy.

    Development of

    underground cabling.

    provision of well equipped

    fire station.

    -

    Development of water

    bodies, plantation,

    checking of pollution level,

    use of eco-friendly

    vehicles, treatment

    facilities for wastes etc.

    365 Lakhs

    Including slum

    area

    150 Lakhs

    -

    1770 Lakhs

    Including slum

    area

    12

  • 100% doctor-patient ratio HNP, health dept. Recruitment

    100% patient-bed ratio HNP, health dept. Contract

    Effective implementation of health

    programmes and related services in

    the slum areas of the city

    HNP, health dept. Contract

    Regular checks for water

    contamination in all water bodies of

    the city

    HNP, health dept. Contract

    Literacy rates

    Ensure 100% enrollment in primary

    schoolsEdu. Dept of M.P. and HNP

    100% Teacher student ratio Edu. Dept of M.P. and HNP Recruitment

    Technical, engineering & medical

    education in the cityEdu. Dept of M.P. and HNP PPP

    Developed existing parks HNP Contract / PPP

    Area coverage under recreational

    facilitiesHNP

    Playing facilities HNP

    Provision for green-belts in future

    development plansHNP

    Sufficient infrastructure at

    mela/exhibition groundHNP contract

    Security of tenure for urban poor MPHB, HNP

    Inclusion of 100% urban poor

    population under various central and

    state govts social sectors schemes like

    old-age pension schemes, Scheme for

    handicapped persons, deen-dayal

    antyoday yojana, mid-day meals

    schemes, etc

    - -

    Pucca housing for urban poor PPP

    Access to water connection HNP

    Access to public toilets and urinal

    facilities for all slum householdsHNP Contract / PPP

    Access to dustbins and secondary

    storage pointsHNP Contract / PPP

    Upgradation of kutcha roads to PCC

    roads in slumsHNP PPP

    Improved drainage systems HNP PPP

    Adequate street lighting facilities HNP PPP

    Education facilities HNP PPP

    Community halls etc. HNP PPP

    Adequate health facilities HNP PPP

    Security of tenure for urban poor MPHB, HNP

    Note:

    SLU

    MS

    & U

    RB

    AN

    PO

    OR

    SLU

    MS

    & U

    RB

    AN

    PO

    OR

    SOC

    IAL

    INFR

    AST

    RU

    CTU

    RE

    HEA

    LTH

    EDU

    CA

    TIO

    NR

    ECR

    EATI

    ON

    AL

    Soci

    al s

    ecu

    rity

    sch

    emes

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    * Marks - project has to be done till year 2035 by HNP, depending upon city need and available resources.

    100% *

    100% *

    100% *

    100% *

    2166.5 Lakhs for

    housing only

    100% *

    100% *

    100% * Provision of Land

    ownership, improvement

    schemes, relocation of

    hazardous slums, pucca

    drain network, financial

    support for the

    construction of houses

    Strenthening

    infrastructures in health

    centers and to run health

    initiative programs.

    Provision of co-education,

    strengthning of education

    infrastructures and

    opening of vocational

    training centres.

    Development of water

    bodies, mini-stadium,

    exibition ground,

    community halls, public

    library etc.

    200 Lakhs

    Including slum

    area

    740 Lakhs

    Including slum

    area

    Included in

    tourism

    --100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    100% *

    13

  • 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11

    Rates and Tax Revenue NA NA NA NA NA NA

    Assigned Revenues & Compensation NA NA NA NA NA NA

    Rental Income from Municipal Properties NA NA NA NA NA NA

    Fees & User Charges NA NA NA NA NA NA

    Sale & Hire Charges NA NA NA NA NA NA

    Revenue Grants, Contribution and Subsidies NA NA NA 4398355 1724900 16995941Income from Investments NA NA NA NA NA NA

    Interest Earned NA NA NA NA NA NA

    Tax NA NA NA 173292 152447 600016Non-Tax NA NA NA 12088447 15998035 5046287Other Income NA NA NA NA NA NA

    NA NA NA 16660094 17875382 22642244

    Grants, Contribution for specific purposes NA NA NA NA NA NA

    Secured Loans NA NA NA NA NA NA

    Unsecured Loans NA NA NA NA NA NA

    Deposits NA NA NA NA NA NA

    Deposit works NA NA NA NA NA NA

    NA NA NA NA NA NA

    Establishment Expenses NA NA NA 2626914 4204984 5561437Administrative Expenses NA NA NA NA NA NA

    Operations & Maintenance NA NA NA 8093999 6043405 3536482Interest & Finance Charges NA NA NA 226950 1399337 3330931Programme Expenses NA NA NA NA NA NA

    Revenue Grants, Contribution and Subsidies NA NA NA NA NA NA

    Miscellaneous Expenses NA NA NA NA NA NA

    Transfer to Fund NA NA NA NA NA NA

    Other NA NA NA 7212038 4882212 9759670NA NA NA 18159901 16529938 22188520

    Fixed Assets NA NA NA NA NA NA

    Capital Work-in-Progress NA NA NA NA NA NA

    Investments -General Fund NA NA NA NA NA NA

    Investments-Other Funds NA NA NA NA NA NA

    Stocks/Inventory NA NA NA NA NA NA

    Loans, Advances and Deposits NA NA NA NA NA NA

    Other Assets NA NA NA NA NA NA

    Miscellaneous Expenditure NA NA NA NA NA NA

    NA NA NA NA NA NA

    NA NA NA NA NA NA

    NA NA NA NA NA NA

    Note: Refer Madhya Pradesh Municipal Accounting Manual for further details. Can be downloaded from "Download" Section of www.mpurban.gov.in.

    Year

    Municipal Finance (Should be filled carefully and it should be checked whether the capital income is factual or based on assumption

    Rev

    enu

    e In

    com

    e

    Total - Revenue Income

    Total Income

    Total Expenditure

    Ca

    pit

    al

    Rec

    eip

    ts

    Total Capital Receipts

    Rev

    enu

    e E

    xp

    end

    itu

    re

    Total - Revenue Expenditure

    Cap

    ital

    Exp

    end

    itu

    res

    Total Capital Expenditure

    14

  • Reforms Achieved (Y/N)

    Any City specific

    Strategies

    adopted

    Preliminary

    estimate (if any)

    for

    implementation

    Implementing

    agency

    2012-13 2013-14 2014-15 2015-16

    Full migration of double accounting

    System

    N25% 50% 75% 100% No Not Available UADD

    Property tax reforms, 85% coverage

    ratio and 90% collection ratio

    N25% 50% 75% 100% No Not Available Nagar Parishad

    Levy of user charges : full recovery of O

    & M charges for sewerage, water supply

    and SWM

    N

    25% 50% 75% 100% No Not Available Nagar Parishad

    Internal earmarking of basic services to

    urban poor

    N25% 50% 75% 100% No Not Available

    Nagar Parishad &

    UADD

    E-governance & Capacity Building N - 67% 33% 100% No 40 lakh UADD

    Provision of basic services to urban poor

    including security of tenure at affordable

    prices, improved existing housing, water

    supply, sanitation

    N

    25% 50% 75% 100% No Not AvailableNagar Parishad &

    UADD

    Reforms Action Plan

    Timeline to achieve reforms till 2015

    15

  • City Development Plan

    DMG Consulting Pvt. Ltd., Noida Page i

    CITY DEVELOPMENT PLAN

    HANUMANA, Madhya Pradesh

    SUBMITTED TO

    Urban Administration and Development

    Department, GoMP

    PROJECT CO-ORDINATION:-

    City Managers' Association Madhya Pradesh

    CONSULTANT:-

    DMG Consulting Pvt. Ltd.

    A-81, Sector- 65, NOIDA (UP)

    Chief Municipal Officer Sub Engineer

    Hanumana Hanumana

  • HANUMANA CITY DEVELOPMENT PLAN

    DMG Consulting Pvt. Ltd., Noida Page ii

    Table of Contents

    LIST OF TABLES ------------------------------------------------------------------------------------------------------------------------ VII

    LIST OF FIGURES------------------------------------------------------------------------------------------------------------------------- X

    LIST OF MAPS -------------------------------------------------------------------------------------------------------------------------- XII

    EXECUTIVE SUMMARY ---------------------------------------------------------------------------------------------------------------- 1

    1. INTRODUCTION ------------------------------------------------------------------------------------------------------- 10

    1.1 BACKGROUND ------------------------------------------------------------------------------------------------------------- 10

    1.2 CONCEPT AND PRINCIPLE OF CITY DEVELOPMENT PLAN --------------------------------------------------------------- 10

    1.3 OBJECTIVE OF THE ASSIGNMENT ----------------------------------------------------------------------------------------- 11

    1.4 UNDERSTANDING OF TERMS OF REFERENCE VIS A VIS METHODOLOGY OF THE STUDY ------------------------------ 11

    1.5 APPROACH AND METHODOLOGY FOR PREPARATION OF CDP --------------------------------------------------------- 11

    1.6 SCOPE OF WORK ---------------------------------------------------------------------------------------------------------- 12

    2. INTRODUCTION TO HANUMANA --------------------------------------------------------------------------------- 20

    2.1 ADMINISTRATIVE BOUNDARY -------------------------------------------------------------------------------------------- 20

    2.2 LOCATION AND CONNECTIVITY ------------------------------------------------------------------------------------------- 20

    2.3 STUDY AREA --------------------------------------------------------------------------------------------------------------- 21

    2.4 PHYSICAL CHARACTERISTICS ---------------------------------------------------------------------------------------------- 21

    2.4.1 TOPOGRAPHY & GEOLOGY ---------------------------------------------------------------------------- 21

    2.4.2 CLIMATE ---------------------------------------------------------------------------------------------- 22

    2.5 AGRICULTURE, INDUSTRY, MINERALS, FLORA& FAUNA --------------------------------------------------------------- 22

    2.6 SWOT ANALYSIS --------------------------------------------------------------------------------------------------------- 23

    3. DEMOGRAPHIC PROFILE OF THE TOWN ------------------------------------------------------------------------ 25

    3.1 BACKGROUND ------------------------------------------------------------------------------------------------------------- 25

    3.2 POPULATION TREND AND URBANIZATION ------------------------------------------------------------------------------ 25

    3.3 POPULATION DENSITY ---------------------------------------------------------------------------------------------------- 26

    3.4 POPULATION PROJECTIONS ---------------------------------------------------------------------------------------------- 27

    3.5 METHODOLOGY ADOPTED TO ESTIMATE POPULATION ---------------------------------------------------------------- 28

    3.5.1 ARITHMETIC PROGRESSION METHOD ------------------------------------------------------------------- 28

    3.5.2 GEOMETRICAL PROGRESSION METHOD ----------------------------------------------------------------- 28

    3.5.3 INCREMENTAL INCREASE METHOD --------------------------------------------------------------------- 29

    3.6 SUMMARY OF POPULATION PROJECTION THROUGH VARIOUS METHODS -------------------------------------------- 30

    3.7 SCHEDULE CASTE & SCHEDULE TRIBE POPULATION -------------------------------------------------------------------- 30

    3.8 LITERACY RATE ------------------------------------------------------------------------------------------------------------ 30

  • HANUMANA CITY DEVELOPMENT PLAN

    DMG Consulting Pvt. Ltd., Noida Page iii

    3.9 SEX RATIO ----------------------------------------------------------------------------------------------------------------- 32

    4. SOCIO-ECONOMIC PROFILE OF THE TOWN -------------------------------------------------------------------- 35

    4.1 BACKGROUND ------------------------------------------------------------------------------------------------------------- 35

    4.2 SEX RATIO ----------------------------------------------------------------------------------------------------------------- 35

    4.3 LITERACY RATE ------------------------------------------------------------------------------------------------------------ 35

    4.4 AVERAGE HOUSEHOLD SIZE ---------------------------------------------------------------------------------------------- 35

    4.5 WORKFORCE PARTICIPATION -------------------------------------------------------------------------------------------- 36

    4.6 WORKFORCE DISTRIBUTION---------------------------------------------------------------------------------------------- 36

    4.7 DEPENDENCY RATIO ------------------------------------------------------------------------------------------------------ 37

    4.8 INDUSTRIAL ACTIVITIES --------------------------------------------------------------------------------------------------- 38

    4.8.1 INFORMAL BUSINESS AND LOCAL ECONOMY (TRADE & COMMERCE) ------------------------------------ 39

    4.8.2 WHOLESALE TRADE ----------------------------------------------------------------------------------- 39

    4.9 HERITAGE AND TOURISM ------------------------------------------------------------------------------------------------- 41

    4.10 SWOT ANALYSIS --------------------------------------------------------------------------------------------------------- 42

    4.11 ISSUES --------------------------------------------------------------------------------------------------------------------- 43

    5. PHYSICAL PLANNING AND GROWTH MANAGEMENT ------------------------------------------------------ 45

    5.1 BACKGROUND ------------------------------------------------------------------------------------------------------------- 45

    5.2 SPATIAL GROWTH TRENDS ----------------------------------------------------------------------------------------------- 45

    5.3 SPATIAL DISTRIBUTION OF POPULATION -------------------------------------------------------------------------------- 45

    5.4 LANDUSE ANALYSIS ------------------------------------------------------------------------------------------------------- 46

    5.5 HOUSING SCENARIO ------------------------------------------------------------------------------------------------------ 48

    5.5.1 INTRODUCTION --------------------------------------------------------------------------------------- 48

    5.5.2 HOUSING STOCK -------------------------------------------------------------------------------------- 48

    5.5.3 PRESENT AND FUTURE HOUSING DEMAND ------------------------------------------------------------- 51

    5.6 FUTURE GROWTH POSSIBILITIES ----------------------------------------------------------------------------------------- 52

    5.7 SWOT ANALYSIS --------------------------------------------------------------------------------------------------------- 53

    5.8 CITY SPECIFIC STRATEGIES AND ACTION PLAN -------------------------------------------------------------------------- 53

    6. URBAN INFRASTRUCTURE SERVICES ---------------------------------------------------------------------------- 55

    6.1 INTRODUCTION------------------------------------------------------------------------------------------------------------ 55

    6.2 PHYSICAL INFRASTRUCTURE ---------------------------------------------------------------------------------------------- 55

    6.2.1 WATER SUPPLY --------------------------------------------------------------------------------------- 55

    6.2.2 SEWERAGE AND SANITATION -------------------------------------------------------------------------- 63

    6.2.3 DRAINAGE SYSTEM ------------------------------------------------------------------------------------ 74

    6.2.4 SOLID WASTE MANAGEMENT -------------------------------------------------------------------------- 77

    6.2.5 TRAFFIC AND TRANSPORTATION ----------------------------------------------------------------------- 85

    6.2.6 STREET LIGHTING AND FIRE FIGHTING ---------------------------------------------------------------- 92

    6.2.7 URBAN POOR AND THEIR ACCESSIBILITY TO BASIS SERVICES ------------------------------------------- 96

    6.3 SOCIAL INFRASTRUCTURE ---------------------------------------------------------------------------------------------- 102

  • HANUMANA CITY DEVELOPMENT PLAN

    DMG Consulting Pvt. Ltd., Noida Page iv

    6.3.1 HEALTH -------------------------------------------------------------------------------------------- 102

    6.3.2 EDUCATION ----------------------------------------------------------------------------------------- 103

    6.3.3 RECREATION AND ENTERTAINMENT ------------------------------------------------------------------ 104

    6.3.4 FIRE FIGHTING SERVICES ---------------------------------------------------------------------------- 104

    6.3.5 EXISTING AND PROPOSED SOCIAL INFRASTRUCTURE -------------------------------------------------- 105

    6.3.6 COMPARATIVE ANALYSIS WITH THE UDPFI GUIDELINES ---------------------------------------------- 105

    6.3.7 SWOT ANALYSIS------------------------------------------------------------------------------------ 109

    6.3.8 ISSUES ---------------------------------------------------------------------------------------------- 110

    6.3.9 CITY SPECIFIC STRATEGIES AND ACTION PLAN ------------------------------------------------------- 110

    6.4 ENVIRONMENT ---------------------------------------------------------------------------------------------------------- 112

    6.4.1 FLORA AND FAUNA ---------------------------------------------------------------------------------- 112

    6.4.2 POLLUTION LEVELS (AIR, WATER AND SOIL) -------------------------------------------------------- 112

    6.4.3 CITY GREEN SPACES -------------------------------------------------------------------------------- 113

    6.4.4 WATER FRONT DEVELOPMENT AND CONSERVATION -------------------------------------------------- 113

    6.4.5 SWOT ANALYSIS------------------------------------------------------------------------------------ 113

    6.4.6 ISSUES ---------------------------------------------------------------------------------------------- 113

    6.4.7 CITY SPECIFIC STRATEGIES AND ACTION PLAN ------------------------------------------------------- 113

    6.5 HERITAGE AND CONSERVATION ---------------------------------------------------------------------------------------- 114

    6.5.1 IDENTIFICATION OF TOURIST SPOTS AT LOCAL LEVEL ------------------------------------------------ 114

    6.5.2 EXISTING REGULATIONS/HERITAGE GUIDELINES AT THE ULB AND STATE LEVEL --------------------- 117

    6.5.3 HERITAGE ISSUES ----------------------------------------------------------------------------------- 117

    6.5.4 TOURISM POTENTIAL OF THE TOWN ----------------------------------------------------------------- 117

    6.5.5 POSSIBILITY OF TOURISM CIRCUITS ------------------------------------------------------------------ 117

    6.5.6 COMPARATIVE ANALYSIS WITH THE UDPFI & UNESCO GUIDELINES --------------------------------- 118

    6.5.7 SWOT ANALYSIS------------------------------------------------------------------------------------ 118

    6.5.8 ISSUES ---------------------------------------------------------------------------------------------- 119

    6.5.9 CITY SPECIFIC STRATEGIES AND ACTION PLAN ------------------------------------------------------- 119

    7. SPECIAL PAPER ON LOCAL TOURIST CIRCUIT UPGRADATION ------------------------------------------ 121

    7.1 BACKGROUND ----------------------------------------------------------------------------------------------------------- 121

    7.2 MADHYA PRADESH TOURISM AND HERITAGE POLICY ---------------------------------------------------------------- 121

    7.3 PLACES OF TOURIST INTEREST IN AND AROUND THE CITY ------------------------------------------------------------ 122

    7.4 ARTS & CRAFTS --------------------------------------------------------------------------------------------------------- 124

    7.5 ASSESSMENT OF TOURISM SUPPORTED INFRASTRUCTURE ----------------------------------------------------------- 125

    7.6 RECOMMENDED TOURISM DEVELOPMENT PROPOSALS -------------------------------------------------------------- 128

    7.7 BEST PRACTICE ---------------------------------------------------------------------------------------------------------- 130

    7.8 SUMMARY OF PROJECTS ----------------------------------------------------------------------------------------------- 130

    8. EXISTING INSTITUTIONAL FRAMEWORK FOR DEVELOPMENT ----------------------------------------- 133

    8.1 URBAN LOCAL BODY STRUCTURE -------------------------------------------------------------------------------------- 133

    8.2 TOWN AND COUNTRY PLANNING DEPARTMENT --------------------------------------------------------------------- 134

    8.3 DEVELOPMENT AUTHORITY -------------------------------------------------------------------------------------------- 134

    8.4 PUBLIC HEALTH ENGINEERING DEPARTMENT ------------------------------------------------------------------------- 134

  • HANUMANA CITY DEVELOPMENT PLAN

    DMG Consulting Pvt. Ltd., Noida Page v

    8.5 MADHYA PRADESH HOUSING BOARD --------------------------------------------------------------------------------- 135

    8.6 MADHYA PRADESH POLLUTION CONTROL BOARD ------------------------------------------------------------------- 135

    8.7 ROLE OF PRIVATE SECTOR IN INFRASTRUCTURE SERVICE PROVISION------------------------------------------------ 136

    8.8 ISSUES ------------------------------------------------------------------------------------------------------------------- 136

    8.9 CITY SPECIFIC STRATEGIES AND ACTION PLAN ------------------------------------------------------------------------ 136

    9. INVESTMENT PLAN AND FINANCING STRATEGIES --------------------------------------------------------- 138

    9.1 REVENUE ACCOUNT ---------------------------------------------------------------------------------------------------- 138

    9.1.1 KEY ASSUMPTIONS ---------------------------------------------------------------------------------- 138

    9.1.2 NON TAX SOURCES --------------------------------------------------------------------------------- 138

    9.2 REVENUE INCOME ------------------------------------------------------------------------------------------------------ 138

    9.3 GROWTH IN INCOME --------------------------------------------------------------------------------------------------- 139

    9.4 OBSERVATIONS --------------------------------------------------------------------------------------------------------- 139

    9.5 REVENUE EXPENDITURE ------------------------------------------------------------------------------------------------ 140

    9.6 CAPITAL ACCOUNT ------------------------------------------------------------------------------------------------------ 140

    9.6.1 CAPITAL INCOME ------------------------------------------------------------------------------------ 140

    9.6.2 CAPITAL EXPENDITURE ------------------------------------------------------------------------------ 141

    9.7 KEY FINANCIAL INDICATORS -------------------------------------------------------------------------------------------- 141

    9.7.1 REVENUE INDICATORS ------------------------------------------------------------------------------- 141

    9.7.2 EXPENDITURE INDICATORS -------------------------------------------------------------------------- 142

    9.8 INCOME, EXPENDITURE AND SURPLUS DEFICIT: ANALYSIS ----------------------------------------------------------- 142

    9.8.1 FINANCIAL STATUS AT A GLANCE -------------------------------------------------------------------- 142

    9.9 KEY ISSUES AND CONCLUSION ----------------------------------------------------------------------------------------- 143

    9.10 CITY SPECIFIC STRATEGIES AND ACTION PLAN ------------------------------------------------------------------------ 144

    10. INVESTMENT PRIORITIZATION PLAN -------------------------------------------------------------------------- 146

    10.1 PROJECT IDENTIFICATION ----------------------------------------------------------------------------------------------- 146

    10.1.1 PHYSICAL INFRASTRUCTURE ------------------------------------------------------------------------- 146

    10.1.2 SOCIAL INFRASTRUCTURE --------------------------------------------------------------------------- 148

    10.1.3 HERITAGE AND TOURISM ---------------------------------------------------------------------------- 149

    10.2 BASIS FOR PROJECT IDENTIFICATION ---------------------------------------------------------------------------------- 149

    10.3 PROJECTS FOR SYSTEM AND INFRASTRUCTURE AUGMENTATION ---------------------------------------------------- 150

    10.4 PROJECTS FOR SYSTEM AND INFRASTRUCTURE REFURBISHMENT ---------------------------------------------------- 151

    10.5 OTHER DEVELOPMENT PROJECT --------------------------------------------------------------------------------------- 151

    10.6 SECTOR WISE PROJECT IDENTIFICATION AND COSTING -------------------------------------------------------------- 151

    10.6.1 PHYSICAL INFRASTRUCTURE ------------------------------------------------------------------------- 151

    10.6.2 SOCIAL INFRASTRUCTURE --------------------------------------------------------------------------- 154

    10.6.3 TOURISM -------------------------------------------------------------------------------------------- 155

    10.6.4 OTHER COMPONENTS ------------------------------------------------------------------------------- 156

    10.6.5 URBAN REFORMS & CAPACITY BUILDING ------------------------------------------------------------ 156

    10.6.6 SECTOR WISE TOTAL COST ------------------------------------------------------------------------- 156

    10.7 CITY INVESTMENT PLAN ------------------------------------------------------------------------------------------------ 157

    10.7.1 CITY INVESTMENT PLAN FOR 2012- 2015 (PHASE I) ------------------------------------------------ 157

  • HANUMANA CITY DEVELOPMENT PLAN

    DMG Consulting Pvt. Ltd., Noida Page vi

    10.7.2 CITY INVESTMENT PLAN FOR 2016- 2020 (PHASE II) ----------------------------------------------- 158

    10.7.3 CITY INVESTMENT PLAN FOR 2021- 2025 (PHASE III) ---------------------------------------------- 160

    10.7.4 CITY INVESTMENT PLAN FOR 2026- 2030 (PHASE IV) ---------------------------------------------- 160

    10.7.5 CITY INVESTMENT PLAN FOR 2031- 2035 (PHASE V) ----------------------------------------------- 161

    10.8 FINANCING PLAN: ------------------------------------------------------------------------------------------------------- 161

    11. URBAN REFORMS --------------------------------------------------------------------------------------------------- 165

    11.1 BACKGROUND ----------------------------------------------------------------------------------------------------------- 165

    11.2 OBJECTIVES OF REFORMS: ---------------------------------------------------------------------------------------------- 165

    11.3 NEED FOR REFORM INITIATIVES ---------------------------------------------------------------------------------------- 165

    11.4 STRUCTURE OF REFORMS ----------------------------------------------------------------------------------------------- 165

    11.5 MANDATORY REFORMS: ------------------------------------------------------------------------------------------ 166

    11.6 OPTIONAL REFORMS (STATE AND ULB/PARA-STATAL LEVEL) --------------------------------------------------- 167

    11.7 STATUS OF MANDATORY & OPTIONAL REFORMS: -------------------------------------------------------------------- 167

    11.8 ISSUES ------------------------------------------------------------------------------------------------------------------- 170

    11.9 TOWN SPECIFIC STRATEGIES AND ACTION PLAN ---------------------------------------------------------------------- 170

    12. TOWN VISION -------------------------------------------------------------------------------------------------------- 173

    12.1 SUMMARY OF SECTORAL STRATEGIES: -------------------------------------------------------------------------------- 173

    12.2 TOWN VISION: ---------------------------------------------------------------------------------------------------------- 183

    12.3 TOWN POSITIONING: --------------------------------------------------------------------------------------------------- 184

    ANNEXURE

  • HANUMANA CITY DEVELOPMENT PLAN

    DMG Consulting Pvt. Ltd., Noida Page vii

    List of Tables

    Table 2-1: Study Area ------------------------------------------------------------------------------------------------------------ 21

    Table 2-2: Average Annual Rainfall in Hanumana ------------------------------------------------------------------------- 22

    Table 3-1: Comparative Assessment of Urban Population -------------------------------------------------------------- 25

    Table 3-2: Population Growth Trends ---------------------------------------------------------------------------------------- 26

    Table 3-3: Population Density Trends ---------------------------------------------------------------------------------------- 26

    Table 3-4: Demographics of the Town - Hanumana ---------------------------------------------------------------------- 26

    Table 3-5: Trend of Population Growth in Hanumana Town ----------------------------------------------------------- 28

    Table 3-6: Projected Population Arithmetic Progression Method -------------------------------------------------- 28

    Table 3-7: Projected Population Geometrical Progression Method------------------------------------------------ 29

    Table 3-8: Calculation of Population Projection Incremental Increase Method -------------------------------- 29

    Table 3-9: Projected Population Incremental Increase Method ---------------------------------------------------- 30

    Table 3-10: Comparative Assessment of Urban SC & ST Population ------------------------------------------------- 30

    Table 3-11: Comparative Assessment of Literacy Rate Hanumana, M.P. ----------------------------------------- 31

    Table 3-12: Ward Wise Comparative Assessment of Literacy Rate Hanumana, M.P. ------------------------- 31

    Table 3-13: Comparative Assessment of Sex Ratio ----------------------------------------------------------------------- 32

    Table 3-14: Ward Wise Comparative Assessment of Sex Ratio Hanumana, M.P.------------------------------- 33

    Table 4-1: Comparative Assessment of Household Size ----------------------------------------------------------------- 35

    Table 4-2: Comparative Assessment of WFPR ----------------------------------------------------------------------------- 36

    Table 4-3: Ward Wise Comparative Assessment of WFPR & Work Force Distribution -------------------------- 37

    Table 4-4: Comparative Assessment of Non-working Population ----------------------------------------------------- 37

    Table 4-5: Ward Wise Comparative Assessment of Dependent Population & Dependency

    Ratio ---------------------------------------------------------------------------------------------------------------------------------- 38

    Table 4-6: List of Important Industries in Rewa District and in its surrounding Districts ----------------------- 38

    Table 4-7: List of Important Centres/Spots for Tourists in Town and in its Proximity --------------------------- 41

    Table 5-1: Ward Wise Distribution of Population Density -------------------------------------------------------------- 46

    Table 5-2: Existing Landuse Distribution; 2011 Hanumana ----------------------------------------------------------- 46

    Table 5-3: Comparative Assessment of Household Size ----------------------------------------------------------------- 48

    Table 5-4: Ward Wise Present Housing Demand and Gap -------------------------------------------------------------- 51

    Table 6-1: Projected Future demand Water Supply -------------------------------------------------------------------- 57

    Table 6-2: Present and Future Requirement/Demand and Gap Assessment Water Supply ----------------- 57

    Table 6-3: Performance Indicators Water Supply----------------------------------------------------------------------- 58

    Table 6-4: Present and Future Demand and Supply Gaps Sewerage System ------------------------------------ 65

  • HANUMANA CITY DEVELOPMENT PLAN

    DMG Consulting Pvt. Ltd., Noida Page viii

    Table 6-5: Performance Indicators Sewerage System ----------------------------------------------------------------- 66

    Table 6-6: Goals & Services Outcomes for different Horizon Years -------------------------------------------------- 68

    Table 6-7: Length of Drains in Town ------------------------------------------------------------------------------------------ 74

    Table 6-8: Present and Future Demand and Supply Gaps for Drainage System ----------------------------------- 75

    Table 6-9: Goals & Services Outcomes for different Horizon Years -------------------------------------------------- 76

    Table 6-10: Solid waste generation in different wards. ----------------------------------------------------------------- 78

    Table 6-11: Vehicles required for solid waste handling. ----------------------------------------------------------------- 80

    Table 6-12: Performance Indicators Solid Waste Management----------------------------------------------------- 80

    Table 6-13: Goals & Services Outcomes for different Horizon Years ------------------------------------------------- 81

    Table 6-14: Number of vehicles by types. ----------------------------------------------------------------------------------- 85

    Table 6-15: Types of Roads and Lengths in Hanumana Town ---------------------------------------------------------- 87

    Table 6-16: Present and Future Demand and Supply Gaps Traffic and Transportation ----------------------- 89

    Table 6-17: Space Standards of Roads --------------------------------------------------------------------------------------- 89

    Table 6-18: Desirable of Footpaths ------------------------------------------------------------------------------------------- 89

    Table 6-19: Goals & Services Outcomes for Different Horizon Years ------------------------------------------------ 91

    Table 6-20: Present and Future Demand and Supply Gaps Street Lighting -------------------------------------- 93

    Table 6-21: Performance Indicators Street Lighting ------------------------------------------------------------------- 93

    Table 6-22: Sources of Lighting at Household Level in Hanumana --------------------------------------------------- 94

    Table 6-23: Type of Cooking Fuel Used at Household Level in Hanumana ----------------------------------------- 94

    Table 6-24: Goals & Services Outcomes for Different Horizon Years ------------------------------------------------ 95

    Table 6-25: Comparative Assessment of Literacy Rate ---------------------------------------------------------------- 103

    Table 6-26: Ward Wise Comparative Assessment of Literacy Rate - Hanumana -------------------------------- 103

    Table 6-27: Comparative Analysis with UDPFI Guidelines Social Infrastructure ------------------------------ 105

    Table 6-28: Present and Future Demand and Supply Gaps Social Infrastructure ----------------------------- 106

    Table 6-29: List of Important Tourist/Destination Spots at Regional Level --------------------------------------- 115

    Table 7-1: Assessment of tourist destination in & around the city ------------------------------------------------- 124

    Table 7-2: Key Concern Areas and related issues ----------------------------------------------------------------------- 126

    Table 7-3: list of main projects and sub-projects. ----------------------------------------------------------------------- 130

    Table 8-1: Power and Functions of Hanumana Nagar Parishad ----------------------------------------------------- 133

    Table 9-1: Year wise Income from Various Sources -------------------------------------------------------------------- 140

    Table 9-2: Year wise Expenditure of Hanumana------------------------------------------------------------------------- 141

    Table 9-3: Income and Expenditure Status of Hanumana------------------------------------------------------------- 142

  • HANUMANA CITY DEVELOPMENT PLAN

    DMG Consulting Pvt. Ltd., Noida Page ix

    Table 10-1: Proposed project, project cost and their implementing departments. ---------------------------- 151

    Table 10-2: Proposed project, project cost and their implementing departments. ---------------------------- 152

    Table 10-3: Proposed project, project cost and their implementing departments. ---------------------------- 152

    Table 10-4: Proposed project, project cost and their implementing departments. ---------------------------- 153

    Table 10-5: Proposed project, project cost and their implementing departments. ---------------------------- 153

    Table 10-6: Proposed project, project cost and their implementing departments. ---------------------------- 154

    Table 10-7: Proposed project, project cost and their implementing departments. ---------------------------- 154

    Table 10-8: Proposed project, project cost and their implementing departments. ---------------------------- 154

    Table10-9: Proposed project, project cost and their implementing departments. ----------------------------- 155

    Table 10-10: Proposed project, project cost and their implementing departments. -------------------------- 155

    Table 10-11: Proposed project, project cost and their implementing departments. -------------------------- 156

    Table 10-12: Proposed project, project cost and their implementing departments. -------------------------- 156

    Table 10-13: Proposed project, project cost and their implementing departments. -------------------------- 156

    Table 10-14 Sector wise Project cost and Yearly Schedule of Expenditure (Phase I) --------------------------- 157

    Table 10-15 Sector wise Project cost and Yearly Schedule of Expenditure (Phase II) -------------------------- 159

    Table 10-16 Sector wise Project cost and Yearly Schedule of Expenditure (Phase III) ------------------------- 160

    Table 10-17: Sector wise Project cost and Yearly Schedule of Expenditure (Phase I) -------------------------- 160

    Table 10-18 Sector wise Project cost and Yearly Schedule of Expenditure (Phase V) -------------------------- 161

    Table 10-19: Overall financing plan of investment plans -------------------------------------------------------------- 166

    Table 10-20 Revenue Collection from 2008-2035 at Normal Growth rate of 10% ------------------------------ 178

    Table10-21 Revenue Collection from 2008-2035 at Normal Growth rate of 12% ------------------------------ 178

  • HANUMANA CITY DEVELOPMENT PLAN

    DMG Consulting Pvt. Ltd., Noida Page x

    List of Figures

    Figure 1-1: Specific Objectives of CDP .......................................................................................................... 12

    Figure 1-2: Stage 1: Inception....................................................................................................................... 14

    Figure 1-3: Stage 2: Sector Assessment and City Profile .............................................................................. 15

    Figure 1-4: Stage 3: City Vision and Development Objectives ..................................................................... 16

    Figure 1-5: Stage 4: Draft CDP ...................................................................................................................... 17

    Figure 1-6: Schematic Diagram for Methodology of City Development Plan Preparation .......................... 18

    Figure 4.4-1: Informal Business Activities along the Major Roads of the Town .......................................... 39

    Figure 4-2Major Markets/Commercial and Wholesale Trading Areas of the Town .................................... 40

    Figure 6-1: Hand Pump: Major source of water supply ............................................................................... 55

    Figure 6-2: Water Supply Distribution Arrangements .................................................................................. 56

    Figure 6-3: A typical rapid sand filter water treatment with components. The filter is

    contained within a filter box, usually made of concrete. Inside the filter box are layers of

    filter media and gravel. ................................................................................................................................ 62

    Figure 6-4Main DEWATS modules for physical and biological wastewater treatment: .............................. 70

    Figure 6-5: Use of the biogas generated from the DEWAT .......................................................................... 71

    Figure 6-6: Pour flush single pit and twin pit toilet ...................................................................................... 72

    Figure 6-7: A simple diagram of a septic tank .............................................................................................. 73

    Figure 6-8: Open Drain along the NH ........................................................................................................... 74

    Figure 6-9Open Dumping of Solid Waste along road ................................................................................... 77

    Figure 6-10Traffic jam on Sidhi Road ........................................................................................................... 85

    Figure6-11: Bus boarding and deboarding along road ................................................................................. 86

    Figure 6-12Street Light ................................................................................................................................. 92

    Figure 6-13: Community Health Centre ..................................................................................................... 102

    Firuge 6-14: Secondary School ................................................................................................................... 102

    Figure 6-15: Famous Hanuman Temple ..................................................................................................... 114

    Figure 6-16: Lord Shiva's Temple................................................................................................................ 115

    Figure 7-1 Hanuman Temple ...................................................................................................................... 122

    Figure 7-2 Pardeshwar Mahadev Temple .................................................................................................. 122

    Figure 7-3 Rani Gujarat Talab ..................................................................................................................... 122

    Figure 7-4 Bahuti water fall ........................................................................................................................ 123

    Figure 7-5 Rewa Fort .................................................................................................................................. 123

    Figure 7-6 Pili Kothi..................................................................................................................................... 124

    file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Hanumana\Hanumana_Draft%20Report%20_edited_AH_30-10-2012.docx%23_Toc340913812file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Hanumana\Hanumana_Draft%20Report%20_edited_AH_30-10-2012.docx%23_Toc340913813file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Hanumana\Hanumana_Draft%20Report%20_edited_AH_30-10-2012.docx%23_Toc340913814file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Hanumana\Hanumana_Draft%20Report%20_edited_AH_30-10-2012.docx%23_Toc340913815file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Hanumana\Hanumana_Draft%20Report%20_edited_AH_30-10-2012.docx%23_Toc340913821file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Hanumana\Hanumana_Draft%20Report%20_edited_AH_30-10-2012.docx%23_Toc340913822file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Hanumana\Hanumana_Draft%20Report%20_edited_AH_30-10-2012.docx%23_Toc340913823file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Hanumana\Hanumana_Draft%20Report%20_edited_AH_30-10-2012.docx%23_Toc340913824file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Hanumana\Hanumana_Draft%20Report%20_edited_AH_30-10-2012.docx%23_Toc340913825file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Hanumana\Hanumana_Draft%20Report%20_edited_AH_30-10-2012.docx%23_Toc340913826file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Hanumana\Hanumana_Draft%20Report%20_edited_AH_30-10-2012.docx%23_Toc340913827file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Hanumana\Hanumana_Draft%20Report%20_edited_AH_30-10-2012.docx%23_Toc340913830file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Hanumana\Hanumana_Draft%20Report%20_edited_AH_30-10-2012.docx%23_Toc340913831file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Hanumana\Hanumana_Draft%20Report%20_edited_AH_30-10-2012.docx%23_Toc340913832file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Hanumana\Hanumana_Draft%20Report%20_edited_AH_30-10-2012.docx%23_Toc340913833file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Hanumana\Hanumana_Draft%20Report%20_edited_AH_30-10-2012.docx%23_Toc340913834file:///C:\Users\dmg\Desktop\Updated_Reports_CDP\CDP%20nitish\Hanumana\Hanumana_Draft%20Report%20_edited_AH_30-10-2012.docx%23_Toc340913835

  • HANUMANA CITY DEVELOPMENT PLAN

    DMG Consulting Pvt. Ltd., Noida Page xi

    Figure 7-7: Major Tourist circuits around the Hanumana city ................................................................... 127

    List of Graphs Graph 3-1: Population Hanumana, M.P 25

    Graph 4 1: Gender Wise Work Force Distribution in Different Sectors of Economy. 36

    Graph: 4-2 Gender Wise Dependency Ratio Hanumana, M.P.. 37

    Graph: 5-1 Landuse Distribution Municipal Area.. 47

    Graph: 5-2 Landuse Distribution Developed Area. 47

    Graph: 5-3 Housing Types in Hanumana Nagar Parishad. 49

    Graph: 5 4 Distribution of Houses by Predominant Material of Wall.. 49

    Graph: 5-5 Distribution of Houses by Predominant Material of Roof. 50

    Graph: 5-6 Distribution of Houses by Predominant Material of Floor. 50

    Graph: 5-7 Housing Ownership Status Hanumana Nagar Parishad.. 51

    Graph: 6-1 Distribution of Houses by Sources of Water 56

    Graph: 6-2 Distribution of Houses by Location of Tapped Water.. 57

    Graph: 6-3 Facility and Types of Latrines. 63

    Graph: 6-4 Demand for Types of Facility for Toilet . 64

    Graph: 6-5 Willingness to Pay for Development of Facility. 64

    Graph: 6-6 Willingness to Pay for Operation & Maintenance of Services. 64

    Graph: 6-7 Distance of Places from Households for Waste Disposal 77

    Graph 6.8: Ward Wise Distribution of Literacy Rate Hanumana, M.P. 100

    Graph 9-1 Year wise Total Income, Hanumana 135

    Graph 9-2 Growths in Income, Hanumana. 135

    Graph 9-3 Total Expenditure, Hanumana 136

    Graph 9-4 Incomes from Various Sources, Hanumana.. 137

    Graph 9-5 Incomes, Expenditure & Surplus, Hanumana.. 139

    Graph 10.1: Financing Option- Water Supply.. 158

    Graph 10.2: Financing Option- Sewerage & Sanitation. 158

    Graph 10.3: Financing Option- Solid Waste Management.. 158

    Graph 10.4: Financing Option-Strom water Drainage. 159

    Graph 10.5: Financing Option-Traffic & Transportation 159

    Graph 10.6: Financing Option: Street Lighting & Fire Fighting. 159

    Graph 10.7: Financing Option- Urban Poor 160

    Graph 10.8: Financing Option- Health facility.. 160

    Graph 10.9: Financing Option- Education Sector 160

  • HANUMANA CITY DEVELOPMENT PLAN

    DMG Consulting Pvt. Ltd., Noida Page xii

    Graph 10.10: Financing Option- Tourism 161

    Graph 10.11: Financing Option- Other Components 161

    Graph 10.12: Financial options: - urban reforms and capacity building...... 161

    List of Maps

    Map: 2-1Location of Hanumana (maps not to scale .................................................................................... 21

    Map: 2-2Regional Connectivity Hanumana, M.P. ..................................................................................... 20

    Map: 2-3Study Area Hanumana Nagar Parishad ....................................................................................... 21

    Map: 3-1Ward Wise Population Density Hanumana, M.P. ....................................................................... 27

    Map: 3-2Ward Wise Literacy Rate Hanumana, M.P. ................................................................................. 31

    Map: 3-3Ward Wise Sex Ratio Hanumana, M.P. ....................................................................................... 33

    Map: 4-1Major Markets/Commercial and Wholesale Trading Areas of the Town ...................................... 40

    Map: 4-2 Tourism in and around Hanumana Town ..................................................................................... 42

    Map: 5-1Urban Growth Scenario Hanumana, M.P. .................................................................................. 45

    Map: 5-2Existing Landuse Map; 2011 Hanumana Nagar Parishad ........................................................... 48

    Map: 5-3Hanumana: Future Growth Possibilities ........................................................................................ 52

    Map: 6-1Existing and Proposed Water Supply Network .............................................................................. 56

    Map: 6-2Drainage Map - Hanumana ............................................................................................................ 75

    Map: 6-3Existing and Proposed Road Network in Town .............................................................................. 87

    Map: 6-4Location of clusters of Urban Poor in the town ............................................................................. 97

    Map: 6-5Existing and Proposed Social Infrastructure of the town ............................................................ 105

    Map: 6-6 Tourism in and around Hanumana Town ................................................................................... 115

    Map: 6-7 Proposed Tourism Circuits at Regional Level .............................................................................. 118

    Figure 7-1: Major Tourist circuits around the Hanumana city ................................................................... 127

  • City Development Plan

    DMG Consulting Pvt. Ltd., Noida Page 1

    Executive Summary Introduction Government of India (GoI) and Government of Madhya Pradesh (GoMP) have made several initiatives through various programmes to meet the growing demands of infrastructure and service delivery. Subsequently, the GoI and GoMP executed various program such as City Development (a) Urban Infrastructure Development Scheme for Small and Medium Towns (UIDSSMT), (b) Integrated Housing and Slum Development Programme (IHSDP), (c) the GoMP initiated DFID funded MPUSP, which links reform with investment in infrastructure for the poor, etc. Other than this, there are several programmes that have been initiated by the GoI and GoMP. This is the Phase-II assignment of GoMP where they are preparing City Development plans (CDP) for

    258 towns. In the phase-I stage they already done CDPs for 258 towns. In this Phase DMG Consulting

    Pvt. Ltd did CDPs for 7 towns out of the 258 towns.

    Based on this programme, GoMP launched Mukhyamantri Sahari Adhusanrachna Bikas Yojana, which

    is going to be, funded all the projects proposed in the CDPs to the respective ULB.

    Objectives and scope of the Assignment: The objective of the assignment is to prepare a City Development plan (CDP) with the vision of a desired future perspective for the city and formulate a strategic framework and interventions through sectoral plans translated into actions that define on how the ULB, together with other stakeholders, intends to work towards achieving their long-term vision in the next five years. The above foremost objective is to achieve and translate into developmental outputs in the form of projects, programme and implementation process which intend to cover the following:

    The CDP will scale up existing urban development and poverty alleviation schemes within a comprehensive and coherent strategic planning framework in order to ensure optimal benefit from available resources for the citizens of the Urban Local Body.

    The CDP should aim to catalyze new thinking and provoke debate through a consultative stakeholder driven process and vision.

    Strategic thrusts of the CDP will be built around the lessons and findings of a comprehensive and rigorous stakeholder consultation and documentation process.

    It is expected that the CDP will serve the requirements of the UIDSSMT and IHSDP programmes as well as JNNURM and other development schemes.

    The CDP will generate specific priority actions and projects that can be the basis for mobilizing funding from diverse sources.

    The scope of work include: (a) Inception Report covering Current status, systems and procedures, reconnaissance and kick off workshop, b) Sector Analysis Report on the economic opportunity and potential for local/regional economic development with special reference to the poor, transport study with emphasis on low cost public transport and livelihoods, heritage conservation and tourism, environmental sustainability, access to housing, employment and social and environmental services by the poor, health and education services gap in the town, sectoral issues addressed under the Master Plan . C) City Profile covering assessment of the existing situation in all the sectors identified, emerging issues, SWOT analysis and projection of the present gaps and future requirements. This will be done within the framework of parameters relating to demography, economic base, finance, physical and environmental issues, infrastructure, institutions and universalisation of services especially for the poor, d) Evolving City Objectives and formulate sectoral strategies based on the stakeholders consultation f) Development strategy and Action Plan g) Evaluation of Sectoral vision and Action Plan in consultation with the stakeholders h) Analysis of Governance Framework & Reform Action Plans, i) Preparation of a City Investment Plan (CIP) and a Financing Strategy (Financial Operating Plan):

  • HANUMANA CITY DEVELOP