CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)

17
CD4CDM CD4CDM Philippines Philippines Salvador da Bahia Salvador da Bahia Landfillgas Project Landfillgas Project (PDD Presentation) (PDD Presentation)

Transcript of CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)

Page 1: CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)

CD4CDMCD4CDM PhilippinesPhilippines

Salvador da Bahia Salvador da Bahia Landfillgas ProjectLandfillgas Project

(PDD Presentation)(PDD Presentation)

Page 2: CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)

Description of the project activityDescription of the project activity

• The Project is located in the Municipality of Salvador da Bahia, Brazil

• The Project involves installing equipment for methane destruction with capacity of 6,250 m3/hr in 2000 (expanding to 46,250 m3/hr in 2020).

• The equipment will consist of enclosed flaring with controlled burning condition.

Page 3: CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)

• Anthropogenic emission of GHG at Salvador Landfill occurs when methane produced at the landfill is not destroyed;

• The proposed project activity pretends to better the landfill gas capture and destruction efficiency by increasing the total amount of gas to be destroyed over the amount determined by the landfill concession contract.

How the anthropogenic emissions by How the anthropogenic emissions by sources are to be reduced by the sources are to be reduced by the proposed CDM project activity.proposed CDM project activity.

Page 4: CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)
Page 5: CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)

Landfill contract barriers to investment:

• The Salvador municipality established the maximum price to be paid for the landfill activity in 1999 at 16.69 R$/ton (5.6 US$/ton).

• The winning price Vega has proposed was 15.86R$/ton (5.3 US$/ton) . This includes landfill design, licensing, construction, operation and aftercare for a period of 20 years.

.

Why the emission reductions will not Why the emission reductions will not occur in the absence of the proposed occur in the absence of the proposed activity?activity?

Page 6: CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)

• There was no specific requirement on gas management. Any investment or operation to destroy more than the contractual amount is additional and will not have other form of remuneration other than the CERs.

Why the emission reductions will not Why the emission reductions will not occur in the absence of the proposed occur in the absence of the proposed activity?activity?

Page 7: CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)

National and sectoral policies

• Typical recovery of methane or biogas is minimal and there is no regulatory requirement governing its recovery.

• A conservative estimate of 20% recovery of methane gas for passive system has been considered as the best practice based on a waste management study.

Why the emission reductions will not Why the emission reductions will not occur in the absence of the proposed occur in the absence of the proposed activity?activity?

Page 8: CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)

• Baseline: Concession agreement between VEGA and the Municipal Government of Salvador da Bahia– Capture and destruction rate of 19-24% of the

methane that will be generated from the entire landfill

• CDM Project: Collection system and destruction capacity will be expanded and improved so that an estimated 75-80% of the methane will be destroyed

Project Additionality AssessmentProject Additionality Assessment

Page 9: CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)

• Procedure: Investment analysis

– Baseline has a higher NPV

• Baseline has NPV > 0– Concessionaire is paid fixed fee per ton of waste

entering the landfill covering all construction and operating cost

• Without CERs, CDM Project has NPV < 0– If there are no CER revenues, concessionaire will

not receive additional revenue (from the present contract) to improve significantly landfill capture and destruction efficiency which will be costly

Project Additionality AssessmentProject Additionality Assessment

Page 10: CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)

Project Additionality AssessmentProject Additionality Assessment

CERs

Project Contract CDM Project

No CERs

Baseline

0

NPV

Page 11: CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)

• Gas capture and flaring is not conducted in more than 90% of Brazilian landfills.

• The Salvador de Bahia Landfill as designed by VEGA is probably the only municipal landfill in Brazil that respect European technical standard in relation to bottom lining system, complete drainage layer and water management. The project is The Best Practice on the matter.

Discussion on the conservatism of Discussion on the conservatism of the baseline methodology when the baseline methodology when applied to Salvador project.applied to Salvador project.

Page 12: CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)

Description of how the definition of the Description of how the definition of the project boundary related to the baseline project boundary related to the baseline methodology is applied to the project methodology is applied to the project activity:activity:

• All of the generation of waste occurs locally, within the confines of the country.

• The Baseline Study has not found leakage since the project is a closed system.

• Two potential sources of emissions were identified and were assessed immaterial

Page 13: CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)

This methodology is applicable to landfill gas capture and flaring project activities where:

• There exists a contractual agreement to capture a certain volume of biogas from a landfill;

• The concession obligation stipulate the amounts of landfill gas to be collected by the concessionaire;

• Given the possibility of generating electricity from captured landfill gas, there should be no

electricity generation planned.

Evaluation of Meth Panel on the Evaluation of Meth Panel on the proposed new methodologyproposed new methodology

Page 14: CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)

• The project used economic or financial analysis to establish project additionality.

• The approached used in estimating the baseline emission is paragraph 48 (b) of the CDM modalities and procedures. It is assumed that the contractual obligations of the concession contract define what an “economically attractive course of action” is.

• The methods for computing the baseline emission have been clearly defined. However, several refinements were made to arrive at a more conservative calculation.

SummarySummary

Page 15: CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)

• The boundary is the whole country and there is no leakage considering that the project is a closed system.

• The project emissions has been transparently and consistently estimated because the main source of data for the determination of the baseline is the contractual agreement between the project participants and the government agency. However, it has been recommended that the contract be made publicly available.

SummarySummary

Page 16: CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)

• References were given for data and information used.]

• The PDD can be recreated in terms of baseline scenario, project boundary and sources of GHG emissions. However, it is difficult to compute for the annual baseline emission considering that the annual actual percentage of LFG to be captured is difficult to estimate. The concession contract provides for a 19-24% capture of LFG.

SummarySummary

Page 17: CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)

Marina T. MallareKlima Climate Change CenterManila ObservatoryTel. No : 426-08-37Email : [email protected]