UST CLOSURE CONSULTING SERVICES BUILDING 1011 CAMP LEJEUNE, NORTH CAROLINA CONTRACT #N62470-93-B-0286 GEOSCIENCES JOB NO. MC-94-177A PREPARED FOR OMEGA ENVIRONMENTAL SERVICES, INC. 4661 HAMMERMILL ROAD SUITE B TUCKER, GEORGIA 30084 PREPARED BY GEOSCIENCES, INC. 5021 MERCER UNIVERSITY DRIVE SUITE D-2 MACON, GEORGIA 31210

Transcript of CD03: 3/6/1995: CLOSURE REPORT: UST CLOSURE CONSULTING ...

Page 1: CD03: 3/6/1995: CLOSURE REPORT: UST CLOSURE CONSULTING ...

UST CLOSURE CONSULTING SERVICES BUILDING 1011

CAMP LEJEUNE, NORTH CAROLINA CONTRACT #N62470-93-B-0286

GEOSCIENCES JOB NO. MC-94-177A

PREPARED FOR OMEGA ENVIRONMENTAL SERVICES, INC.

4661 HAMMERMILL ROAD SUITE B

TUCKER, GEORGIA 30084

PREPARED BY GEOSCIENCES, INC.

5021 MERCER UNIVERSITY DRIVE SUITE D-2

MACON, GEORGIA 31210

Page 2: CD03: 3/6/1995: CLOSURE REPORT: UST CLOSURE CONSULTING ...

GeosciencesInC. GEOTECHNICAL, ENVIRONMENTAL & CONSTRUCTION MATERIALS CONSULTANTS

March 6, 1995

Mr. Doug Driver Omega Environmental Services, Inc. 4661 Hammermill Road Suite B Tucker, Georgia 30084

SUBJECT: UST Closure Consulting Services, Building 1011 Camp Lejeune, North Carolina Contract #N62470-93-B-0286 Geosciences Job No. MC-94-177A

Dear Mr. Driver:

Geosciences, Inc. is pleased to present this report of the Underground Storage Tank (UST) Closure consulting services at the above referenced site. At the discretion of the Camp Lejeune Environmental Management Division (EMD), a copy of this report may be submitted to the North Carolina Department of Environment, Health and Natural Resources, Wilmington Regional Office, 127 Cardinal Drive Extension, Wilmington, NC 28405-3845. North Carolina Form GW/UST2 (Appendix II) should also be signed by the UST owner or the owner's authorized representative.

Geosciences, Inc. greatly appreciates the opportunity to provide these services to you. If you have any questions, or need further assistance, please do not hesitate to call.

Very Truly Yours,

Environmental Health Specialist

F omas E. Driver, P.E. Senior Engineer NC. Reg. I+19125

TAS!TED/mkl

3202 Gillionville Road I Albany, CA 31707 / (912) 432-5805 i Fax 432.7018 5021 Mcrccr University Dr., Suite D2 / Macon, GA 31210 I(912) 757-l(306 / I:ax 757-160X

5731 Miller Court, Suite C/Columbus, CA 31909 / (706) 569-000X / Fax 569-0940

Page 3: CD03: 3/6/1995: CLOSURE REPORT: UST CLOSURE CONSULTING ...

TABLE OF CONTENTS

1.0 PROJECT INFORMATION

2.0 UST SITE LOCATION

3.0 UST REMOVAL

4.0 SOIL SAMPLING/SCREENING PROCEDURES 4.1 QUALITY CONTROL MEASURES

5.0 SAMPLE RESULTS

6.0 FINAL DESTINATION OF UST AND CONTENTS

pAQ3 #

1

1

2

2 2

2

3

APPENDIX I

FIGURE 1: U.S.G.S. QUADRANGLE MAP, SITE LOCATION FIGURE 2: SCALE MAP OF THE UST SITE

APPENDIX II

NORTH CAROLINA FORM GW/UST-2

APPENDIX III

UST CERTIFICATE OF DESTRUCTION UST CONTENTS MANIFEST

APPENDIX IV

PHOTOGRAPHS

Page 4: CD03: 3/6/1995: CLOSURE REPORT: UST CLOSURE CONSULTING ...

1.0 PROJECT INFORMATION

Omega Environmental Services, Inc., (OES) of Tucker, Georgia performed the removal of Underground Storage Tanks (USTs) at the Marine Corps Base, Camp Lejeune, North Carolina, and the Marine Corps Air Station, New River, Jacksonville, North Carolina. A base map and scale map of the subject UST site is included in Appendix I. The work described in this report was undertaken adjacent to building 1011. The work was conducted in general accordance with Contract N62470-93-B-0286 and subsequent amendments to the specifications or special instructions from the contracting office.

Omega Environmental's senior project manager for the work is Doug Driver, (404) 621-9414. The Installation Contracting Officer assigned to the project is LTJG Kevin Bartoe, (910) 451-5821. Additional contact information is provided on Form GW-UST-2 in Appendix II.

OES retained Geosciences, Inc. to monitor the site assessment portion of the UST Closures, perform soil/groundwater sampling as instructed by the Contracting Office, and upon completion of the project, submit UST Site Closure Reports to the Camp Lejeune Contracting Officer.

UST status determinations as "Regulated" or "Nonregulated" were made solely by the Contract Specifications or the Camp Lejeune Contracting Office. This report details the close-out of a site which the specifications defined as Nonregulated.

Where possible, this report meets the general UST Closure information requirements of North Carolina Administrative Code 15A NCAC 2N .0800, and The Groundwater Section Guidelines For The Investigation and Remediation of Soils and Groundwater, Section 11.3, Site Closure. However, analytical testing of soil and/or groundwater was conducted only by the direction of the Contracting Office, and Geosciences was not instructed to submit samples for analytical testing at this UST site.

Close-out of Nonregulated sites may be approved by the North Carolina Department of Environment, Health, and Natural Resources when documentation is provided that indicates no contaminated soils remain in excess of the appropriate cleanup level (Site Sensitivity Evaluation - SSE). Establishing the appropriate SSE action levels for the subject UST site was beyond the scope of Geosciences services.

2.0 UST SITE LOCATION

The general vicinity of the UST at Building 1011 can be found on the Camp Lejeune, N.C. U.S.G.S. Quadrangle Map, Appendix I, Figure 1. A detailed scale map of the excavation area is also provided in Appendix I, Figure 2.

PAGE -l-

Page 5: CD03: 3/6/1995: CLOSURE REPORT: UST CLOSURE CONSULTING ...

3.0 LJST REMOVAL

OES removed the UST at Building 1011 on January 6, 1995. The removal began by draining the UST piping into the tank. Product was then removed from the UST. A backhoe was used to excavate down to the tank top. All lines were then capped except the fill and vent. The UST was purged of practically all product and sludge by a vacuum truck and a compressor driven barrel vacuum. Vapors were purged with an eductor-type air mover driven by compressed air. After essentially all product, sludge and vapors were removed, all accessible tank openings were capped except for a l/8 inch vent hole, and the tank was lifted from the excavation with a backhoe and chains.

4.0 SOIL SAMPLING/SCREENING PROCEDURES

Geosciences used a Mini RAE Systems, Inc. Professional Photoionization Detector (PID) to screen excavated soils and soils at the excavation limits for petroleum hydrocarbon vapors. The PID was calibrated before each use in the field as Per the manufacturer's instructions.

The soil contamination headspace analysis technique consists of filling a 16 ounce jar half full with soil and tightly sealing it with foil. After the temperature of the jar and its contents has equilibrated, the probe of the PID is inserted through the foil seal to measure the concentration of organic vapors in the space between the soil and the foil seal (headspace).

Every effort was made to collect soils which were representative samples, with as little debris as possible. Samples were collected from the excavated soils and from the base of the excavation, or from the lower one third of the excavation area.

4.1 QUALITY CONTROL MEASURES

Soil samples were transferred directly to the 16 ounce jar from a stainless steel hand auger or from the backhoe bucket with a stainless steel spoon. Sampling equipment was cleaned between sample locations with a laboratory grade detergent, isopropanol, and tap water rinse. The soil jars were also washed between samples and allowed to air dry. Disposable sampling gloves were worn when obtaining the soil samples.

5.0 SAMPLE RESULTS

Several soil contamination headspace analyses were performed during the UST removal. The range of the highest headspace readings encountered in the excavated soils and from the base of the excavation is provided below:

PAGE -2-

Page 6: CD03: 3/6/1995: CLOSURE REPORT: UST CLOSURE CONSULTING ...

Headspace samples were not taken from the capillary fringe (transition zone from the soil column to the water table) or below the water table.

Based on the PID screening results, f all excavated soils were returned to the excavation.

6.0 FINAL DESTINATION OF UST AND CONTENTS

The removed UST was cleaned and scrapped by OES in accordance with American Petroleum Institute (API) Recommended Practices 1604, 2015, and 2015A.

A Certificate of Destruction signed by John Fleming (OES) is provided in Appendix III. Further information regarding the destruction and destination of the UST can be obtained from Doug Driver (OES) at (404) 621-9414.

All UST contents, including sludges, were removed by Noble Oil Services, 5617 Clyde Rhyne Dr., Sanford, NC 27330. Approximately 300 gallons were removed from the UST at Building 1011. A copy of the Noble Removal Manifest is included in Appendix III. Please note that the manifest may include the UST contents from other UST closure sites.

PAGE -3-

Page 7: CD03: 3/6/1995: CLOSURE REPORT: UST CLOSURE CONSULTING ...

APPENDIX I

Page 8: CD03: 3/6/1995: CLOSURE REPORT: UST CLOSURE CONSULTING ...

Foul

FARNELL

BA Y

Figure 1 Site Location Map, U.S.G.S. camp Lejeune, NC Geosciences Job No. MC-94-177A 4s

Geoscienceslnc

Page 9: CD03: 3/6/1995: CLOSURE REPORT: UST CLOSURE CONSULTING ...

PARKING

\ NORTH

RASSED REA

~~GULATED UST - HEATING !?UEL DIMENSIONS = 5.91'L x 4' DIA.

BUILDING 1011 UST VOLUME = 550 gallons UST EOITOiY DEPTH = 3 feet

STORAGE BUILDING ->

Page 10: CD03: 3/6/1995: CLOSURE REPORT: UST CLOSURE CONSULTING ...

APPENDIX 11

Page 11: CD03: 3/6/1995: CLOSURE REPORT: UST CLOSURE CONSULTING ...

nal Office according to the county of the facility’s location.

IDE OF OWNER’S COPY (PINK) FOR REGIONAL

Date Received

Complete ad return within (30) days following completion of site investigation

Facility Name: W@INl? CORPS BASE

, k~~;b')~ (if available): NC 61 70022580

Street Address (Of S1a1e noa CQunw; 6 NSllBl CityCamp b&WI&Co,&; 78542

T&m 910 1 451-5063

I Name- JOESEPH McLEZRNAN

Closure Contractor: OME&X ElNVIROmAL

Job Title: )?NvIRm AL ENGINEER Tel.N0.(:9'10) 451-5063

Address. 4661 JUUS4

HAMMERMILL m,sm Brm- GAqel.~~.: (404) 621-941l

Pnmary Consultant GEXXCIENCES, LNC. Address: 5021 MERCER UNIV. DR,S!I'E D-2,MACfXJ, 210 No.: (912) 757-160C

i

Tank Stze in Tank Last Ercavauon PfCdL”3 Vafbb Sal Chntamtnalon

No Gallons Dimensions _

Conlents Yes No Yes No Yes No See reverse side of pink copy (owner’s copy) for additional

1011 550 5.91'1~4' dia Heating Fuel X X X information required by N.C. - DEM

____-- in the written report and sketch.

NOTE: The wrtion of the tank closure must be con-

ducted under the supervision of a Professional Engineer or Licensed

Geologist. Atter Jan.1, 1994. all closure si?e assessment reports

T CLQSUPF (For WbAbandonjnQ _ _

[Ic3 Contact local fire marshal

D Notify DEM R egional Office before abandonment (XJ Drain 8 llush piping into tank. a Remove all product and residuals from tank a Excavate down to tank. [x? Cl kc1 A

ean and Inspect tank emove drop tube, fill pipe, gauge prpe. vapor recovery lank connectIons

submersible pumps and other tank flxfures EJ Cap or plug all ltnes except the vent and 1111 lrncs EIj Purge tank 01 ail product & flammable vapors [x-l Cur one or more large holes In Ihc tanks Ix-1 Dackllll rhe arc,?

IN PI ACF

m II

Fill tank unbl material overflows tank opening Plug or cap all openings

n 0. Isconnect and cap or remove vent line a Sokd Inert material used specify _ ___.---~~ :

- . . : , , ,

: . ,

Page 12: CD03: 3/6/1995: CLOSURE REPORT: UST CLOSURE CONSULTING ...

APPENDIX III

Page 13: CD03: 3/6/1995: CLOSURE REPORT: UST CLOSURE CONSULTING ...

. . ‘. , ‘:.

__ .

-__ OMEGA ENWRONMENTAL SERVICES, INC.

(661~~ suite6 TaC~30084 Tck (404) 6214414 Fax (404) %-us1

OFFICER IN CHARGE OF CONSTRUCTION Jacksonville North Carolina Area 1005 Michael Road Camp LeJcunc, North Carolina 28547-2521

Subjeci: Underground Storage Tank (UST) Certification of Destruction Contract N62470-93-B-0286

The undersigned certifies that the UST(s) listed below were removed, transported, cleaned and scrapped in general accordance with the following:

American Petroleum Institute (API) API RI’ 1604 API PUBL 2015

Code of Federal Regulation 29 CFR 1910 40 CFR 280

Corps of 13ngineer-s (COE) COE EM-3S.51-l

The US?‘ was received from: Camp LeJeune Building 1011

For destruction, the UST was delivered to: __

- Jacksonville Scrap Iron and Metal Company, Inc.

UST ID,+‘: 1011 -_~

Place of Origin: Camp Lejeune, North Carolina

Datc:.m January 6, 1995

Page 14: CD03: 3/6/1995: CLOSURE REPORT: UST CLOSURE CONSULTING ...

FACILITY OIL SERVICES -13iM9 INdUSTRlAL SERVICES DIVISION

l-800-662-5364 5617 CLYDE RHYNE DR. SANFORD, N.C. 27330

FOR EMERGENCY RESPONSE: EPA ID# NCD 9861-72476 DATE ,i - ,? 0 /- /” ;i’

4 Spill, Leak, Fire, Accident

24 HRS. PER DAY, 7 DAYS PER WEEK TRUCK#+yi: I/

GENERATOR BILL TO:

CUSTOMER

PHONE( )

START TIME STOP TIME

PHONE( )

P.O.#

DRUMS,

GAL

UNIT s R v

PRICE CHARGE TOTAL

PfTHOLEUM OIL MIX:IJYL b. 0 S (USED cllt v,ATtR MIXTUREI C:OblB~~S~lii~t LlC~tilD UN 12i0 F’G 111

T- ~~ SLUDGE/NON-HAZARDOUS SOLIDS

-_~- ----- ,

, GASOLINE, CLASS 3 UI; 1203 PG II (GASOLINtl FOR RECOVERY/HtCYCLIN<; ~~ -.~--~ --- ~~~ ~- -I-..-- ~--~.~~_

GASOLINE/MIXTURE CLASS 3 UN 1203. PG II (GASOLINE/WATER MIXTUREI FROM LJ S T S OR EXEMPT ! ~~ i--

. ~~-~- i ~-c_ ~-~~..-~_~ ~. ~_~_ racy _

; FUEL OIL MIXTURE COMRUSTIBLE LIOUID NA 1993, PG III (FUEL OIL/WATER E?IIXJ I

TERMS PAYABLE UPON RtCElPT TOTAL DUE

Generators Certification: PROFILE NUMBER

I certrfy that the materials above are accurately described, classrfred, packaged, marked and labeled, and are in proper

condltlon for transport accordrng to applicable state, EPA, and D.0 T, regulatrons. Furthermore, I have no knowledge of any

hazardous waste contained or mlxed with the matenat that IS to be transported, I, the generator, expressly agree and promtst?

to hold Noble Oil Services, Inc. and all its officers and employees free from and otherwise tndemnrfy the same agatnst any and

all penaltIes and other lrabillty resulting from the transfer of such materials under this manifest

Auttlorlred Customer Agent (Sign) x ” .*- / (Print) _-~

.Joble Oil Servces Agent (Sign) x ’ c _ . ,. p ’ i (Print) 1

JOi,

-----

Page 15: CD03: 3/6/1995: CLOSURE REPORT: UST CLOSURE CONSULTING ...

APPENDIX IV

Page 16: CD03: 3/6/1995: CLOSURE REPORT: UST CLOSURE CONSULTING ...

PHOTOGRAPH 1 WT. BUILDING 1011