LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'Hansa Tractomotive Ltd.' :
fter completion of manufacturing, Jay Jee took following actions:-
Correct Answer Dispatched the consignment by Express Roadlines by truck ,Raised the Hundi for the invoiced amount , Did not send theconsignment by Hansa's designated carrier
Your Answer Did not send the consignment by Hansa's designated carrier ,Dispatched the consignment by Express Roadlines by truck ,Raised the Hundi for the invoiced amount
Multiple Choice Single AnswerQuestion This Question refers to the case of 'Universal Fasteners Ltd.' :
During the meeting with G.M (Mr. Kaul) Store Keeper Mr. Bapatinformed that purchases were made from :-
Correct Answer Several sources
Your Answer Several sources
Multiple Choice Single AnswerQuestion This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
One of the following is not a variable overhead:-Correct Answer Space
Your Answer Space
True/FalseQuestion This Question refers to 'Uday Electroplating Shop' : As per cost
igures collected, Expected volume of work on special equipmentnext year is 10,000 Nos.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion This Question refers to the case of Narmada Electricals Ltd.: In
the existing method, the scarp generated in processes likemachining was stored in :-
Correct Answer Scrap yard
Your Answer Scrap yard
Match The FollowingQuestion Correct Answer Your Answer
DocuCom
PDF T
rial
www
.pdfwizard
.com
-
8/7/2019 Case op Mgmt
2/22
Anonymous letterreceived by M.D.
Need to justify Need to justify
This question refers to thecase of 'NorthernMachinery Ltd.' : Seniorbuyers
Seen in top hotels withsuppliers No material facts tosupport the arguments
Reason for failure toconvince the Board ofDirectors
No material facts tosupport the arguments
No confidence in Materialmanager and Seniorbuyers
Lot of items on theagenda
Need to be concise and tothe point
Need to be concise and tothe point
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'Divgi Metalwares Private
Limited' : The new items contracted by the company are handledby the development department for :-
Correct Answer Submission of samples , Manufacture of one or two productionlots , Transfer to manufacturing department for regularproduction, after successful development
Your Answer Submission of samples , Manufacture of one or two productionlots , Transfer to manufacturing department for regularproduction, after successful development
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'Classic Engineering
Components Ltd.' : The company has well established machine
shop having more than 150 machines and :-Correct Answer A heat treatment shop , Metrology section , Packing section
Your Answer A heat treatment shop , Metrology section , Packing section
Multiple Choice Single AnswerQuestion This Question refers to the case of 'The Gujrat Engineering
company Limited' : The company also executes :-Correct Answer Rush orders
Your Answer Rush orders
Select The BlankQuestion This Question refers to 'Uday Electroplating Shop' :The owner
finds it ________ to get part time employees when there isheavy work load.
Correct Answer Difficult
Your Answer Difficult
Multiple Choice Single Answer
DocuCom
PDF T
rial
www
.pdfwizard
.com
-
8/7/2019 Case op Mgmt
3/22
Question The question refer to the case on 'Kalpak Engineers' :KalpakEngineers have contracted from a boiler company manufacturingof 500 nos of stay bolt. In the manufacturing process grindingoperation is carried out on following machine :-
Correct Answer Cylindrical grinder
Your Answer Cylindrical grinder
Multiple Choice Single AnswerQuestion This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
Process sheet for exhaust manifold provides followinginformation:-
Correct Answer Jigs and fixtures required
Your Answer Jigs and fixtures required
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'Classic Engineering
Components Ltd.' : The company supplies components to :-Correct Answer Automobile industries , Printing machines , Machine tool &
process equipment industriesYour Answer Automobile industries , Printing machines , Machine tool &
process equipment industries
True/FalseQuestion This Question refers to the case of 'Classic Engineering
Components Ltd.' : Mr. Sen noticed that each worker wasprovided with the drawing of the component.
Correct Answer False
Your Answer False
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'Eagle Machine Company' :
Cost of running Sally's department is Rs 3,70,000 per year. Thisis on account of :-
Correct Answer Salaries , Fringes , Expenses
Your Answer Salaries , Fringes , Expenses
Select The BlankQuestion This Question refers to t e case 'Quality Gauges Pvt. Ltd.' : After
the introduction of scheme, shop floor manager has complainedof pressure from workmen for ________.
Correct Answer Overtime
Your Answer Overtime
DocuCom
PDF T
rial
www
.pdfwizard
.com
-
8/7/2019 Case op Mgmt
4/22
-
8/7/2019 Case op Mgmt
5/22
Your Answer Low
Select The BlankQuestion This Question refers to the case of 'Artwood Products' : The
_______ furniture is sold through distributors.Correct Answer Standard
Your Answer Standard
Multiple Choice Single AnswerQuestion This Question refers to the case of 'Divgi Metalwares Private
Limited' : It is a :-Correct Answer Light engineering company
Your Answer Light engineering company
True/FalseQuestion This question refers to c se on 'Uma Tools Pvt Ltd (UTPL)' : The
average efficiency on the other components currently beingproduced is around 75%.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion This Question refers to the case 'Suyog Udyog' : The processinvolves the use of :-
Correct Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill
Your Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill
Select The BlankQuestion his question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Jigs
and fixtures once provided will be able to maintain accuracy upto about ________ pieces.
Correct Answer 20000
Your Answer 20000
True/FalseQuestion This question refers to case on 'Morbay Engineering Works
(MEW)' : "It is difficult to install an incentive scheme and easy toithdraw when desired."
Correct Answer False
Your Answer True
DocuCom
PDF T
rial
www
.pdfwizard
.com
-
8/7/2019 Case op Mgmt
6/22
True/FalseQuestion This Question refers to the case 'Suyog Udyog' : The operation
time for C' sunk 14 dia holes on both sides is 0.50 per piece.Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'The Geer Company' :
Problems got created due to :-Correct Answer Added work load in purchasing , Divided buying responsibilities ,
Number of inexperienced buyersYour Answer Added work load in purchasing , Divided buying responsibilities ,
Number of inexperienced buyers
Multiple Choice Single AnswerQuestion This Question refers to the case 'Indus Foundries Ltd.': The
company is faced with following problems :-Correct Answer Choice of Location
Your Answer Choice of Plant machinery
Multiple Choice Multiple AnswerQuestion This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Following is the information requirement for using CPM/PERTtechniques:-
Correct Answer List of activities , Activity duration , Precedent relationship of theactivities
Your Answer List of activities , Activity duration , Person responsible foractivity completion
Multiple Choice Single AnswerQuestion This question refers to case on 'Morbay Engineering Works
(MEW)' : The success of an incentive plan to a large extentdepends on the following factor:-
Correct Answer Quality of performance standard
Your Answer Production Planning and Control system
Multiple Choice Multiple AnswerQuestion This question refers to case on 'Morbay Engineering Works
(MEW)' : Following systems are prerequisites for an incentivescheme:-
Correct Answer Good production planning and control system , Good Inspectionand quality control system , Sound system of accountingoperators daily output
Your Answer Good production planning and control system , Good Inspectionand quality control system , Sound system of accounting
DocuCom
PDF T
rial
www
.pdfwizard
.com
-
8/7/2019 Case op Mgmt
7/22
operators daily output
Select The BlankQuestion This Question refers to the case of 'K.T Gears' : The problem
envisages determining the rate of ________ before and afterimprovement in the existing method.
Correct Answer Production
Your Answer Speed
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'The Geer Company' : The
problems reported are :-Correct Answer Delays in placing orders , Frequently late deliveries , Incorrect
ordering quantitiesYour Answer Delays in placing orders , Frequently late deliveries , Incorrect
ordering quantities
Multiple Choice Single AnswerQuestion This question refers to case on 'Morbay Engineering Works
(MEW)' : Following practice if prevalent, must be eliminated toguarantee success of wage incentive scheme :-
Correct Answer Overtime
Your Answer Encashment of leave
True/FalseQuestion This Question refers to the case of 'Universal Fasteners Ltd.' :
The organization has reputation for poor deliveries.Correct Answer False
Your Answer False
Multiple Choice Single AnswerQuestion This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Use of Network Techniques beside computing project durationalso helps in the following :-
Correct Answer Possibilities of reducing project duration
Your Answer Computing manpower requirement
Multiple Choice Single AnswerQuestion The question refer to the case on 'Kalpak Engineers' : This case
is concerned with following element of production planning:-Correct Answer Routing
Your Answer Scheduling
DocuCom
PDF T
rial
www
.pdfwizard
.com
-
8/7/2019 Case op Mgmt
8/22
Multiple Choice Single AnswerQuestion This Question refers to the case of 'Hansa Tractomotive Ltd.' :
The machines were completed by Kay Jee :-Correct Answer Within the stipulated delivery period
Your Answer Within the stipulated delivery period
Select The BlankQuestion This Question refers to the case of 'Kerson Automobiles' : The
pedestal grinder mounted on the huge work table, gives out_______ and blows out dust.
Correct Answer Sparks
Your Answer Sparks
Select The BlankQuestion This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : In
machining Exhaust Manifold, no cutting oil is required as thematerial is ________.
Correct Answer Cast iron
Your Answer Plastic
Select The Blank
Question This question refers to case on 'Morbay Engineering Works(MEW)' : Success of wage incentive plans to a large extentdepends on the ________ of performance standards.
Correct Answer Quality
Your Answer Quality
True/FalseQuestion This uestion refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The
cost of foundry reject is borne by the company.Correct Answer True
Your Answer True
True/FalseQuestion This question refers to the case of 'Northern Machinery Ltd' : As
per summary of purchases of the last year, Material cost as aproportion of sales is 26%.
Correct Answer False
Your Answer True
DocuCom
PDF T
rial
www
.pdfwizard
.com
-
8/7/2019 Case op Mgmt
9/22
True/FalseQuestion This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The
executives were entitled for incentive bonus.Correct Answer True
Your Answer True
Select The BlankQuestion his Question refers to the case 'Suyog Udyog' : Number of work
stations are to be decided based on assumption that monthly offtake is ________ numbers.
Correct Answer 8000
Your Answer 8000
DocuCom
PDF T
rial
www
.pdfwizard
.com
-
8/7/2019 Case op Mgmt
10/22
1
CASES OF OPERATIONS MANAGEMENT
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The BlankQuestion This Question refers to the case of 'Narmada Electricals Ltd.' : The disposal of
material was done on ________ basis.Correct Answer Weight
Your Answer Weight
Select The BlankQuestion This Question refers to the case of 'National Engineering Co.' : GM commented
that every department in this company competes with others in matter of_______.
Correct Answer Inefficiency
Your Answer Inefficiency
Select The BlankQuestion This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays in
execution of project leads to cost ________.Correct Answer Overrun
Your Answer Overrun
True/FalseQuestion This Question refers to the case of 'Artwood Products' : It is necessary to keep
stock of standard furniture to cater to sudden requirement of the customers.Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion This Question refers to 'Automotive Gears Private Limited' : The company, for its
various items, has recently introduced the concept of :-Correct Answer Economic lot size
Your Answer Economic lot size
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'Narmada Electricals Ltd.' : Other material
considered to be scrap/obsolete is :-Correct Answer Packing material , Maintenance spares , Parts/components
Your Answer Packing material , Maintenance spares , Parts/components , Electric motors
True/FalseQuestion This Question refers to the case of 'Kerson Automobiles' : MD has agreed to carry
out modification of existing plant.Correct Answer True
Your Answer True
-
8/7/2019 Case op Mgmt
11/22
2
Multiple Choice Single AnswerQuestion This Question refers to the case of Narmada Electricals Ltd.: G.M. recruited a
senior purchase manager, Mr. Sajid Durrani in the purchased department :-Correct Answer In view of need to procure parts/components for development in time
Your Answer In view of need to procure parts/components for development in time
Multiple Choice Single AnswerQuestion This question refers to case on 'Morbay Engineering Works (MEW)' : Followingas the solution conceived by the Production Manager to the need of increasing
production:-Correct Answer Introduction of incentive scheme
Your Answer Introduction of incentive scheme
Select The BlankQuestion This question refers to case on 'Morbay Engineering Works (MEW)' : Overtime
must be ________ to guarantee the success of the wage incentive scheme.Correct Answer Eliminative
Your Answer Eliminative
Multiple Choice Multiple AnswerQuestion This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust
Manifold is manufactured in house, following costs wll increase:-Correct Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant
Your Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant , Fixedoverheads
Multiple Choice Single AnswerQuestion This Question refers to the case of 'The Geer Company' : The purchase of steel
as done exclusively by :-Correct Answer One buyer
Your Answer One buyer
Multiple Choice Single AnswerQuestion This Question refers to the case of 'Kerson Automobiles' : Cars are manually
pushed over the wooden stand placed in the major repairs section because of :-Correct Answer Absence of the underground pit
Your Answer Absence of the underground pit
True/FalseQuestion This question refers to case on 'Morbay Engineering Works (MEW)' : Under
Scanlon Plan employee is paid incentive bonus based on individual efforts andadditional output.
Correct Answer True
Your Answer True
True/FalseQuestion This Question refers to the case of 'The Geer Company' : During the period of
rapid expansion, it became necessary to subcontract a significant volume of
-
8/7/2019 Case op Mgmt
12/22
3
machining operations.
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion This Question refers to the case of 'K.T Gears' : The groove cutting operation is
performed at the :-Correct Answer Capston lathe
Your Answer Capston lathe
Multiple Choice Single AnswerQuestion This question refer to the case on "Allied Industries Pvt Ltd" : Following cost
element is considered while calculating total cost of buying :-Correct Answer Transport cost
Your Answer Transport cost
Multiple Choice Multiple AnswerQuestion his Question refers to the case 'Indus Foundries Ltd.' :Following items are readily
available at all the three locations :-Correct Answer Raw materials , Scrap , Foundry chemicals
Your Answer Raw materials , Scrap , Foundry chemicals , Manpower
Match The FollowingQuestion Correct Answer Your Answer
Capacity cost Unabsorbed overheads Unabsorbed overheads
This question refers to case on'Uma Tools Pvt Ltd (UTPL)' :Power cost
Variable over head Variable over head
Setup cost Fixed labour cost Marginal cost
Material cost Direct cost Direct cost
Multiple Choice Multiple AnswerQuestion his Question refers to the case of 'Northern Machinery Limited' : As per Materials
Manager basis of awarding contract is :-Correct Answer Justified in each case , All Purchase orders above Rs. 10,000/- are counter signed
by him , All Purchase orders above Rs. 50,000/- are signed by V.P.Your Answer Justified in each case , All Purchase orders above Rs. 10,000/- are counter signed
by him , All Purchase orders above Rs. 50,000/- are signed by V.P. , Case to casebasis
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'Divgi Metalwares Private Limited' : As per the
Activity description given in the table, Preparation of operational layout activityaffects following activities :-
Correct Answer Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge
Your Answer Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge ,Manufacture hobbing fixture
-
8/7/2019 Case op Mgmt
13/22
-
8/7/2019 Case op Mgmt
14/22
5
Question Correct Answer Your Answer
Mechanics going to clerk withrequisition
Get the replacementsauthorization
Get the replacementsauthorization
This Question refers to the caseof 'Kerson Automobiles' : Lossof productive time
Obtaining replacement ofspares from stores
Obtaining replacement of sparesfrom stores
Transfer of parts from work
table to a hand trolley andpushing it out to the service bay
Blowing off parts clean with
compressed air
Blowing off parts clean with
compressed air
Space for storage of seatsinside the workshop
Avoid wasteful movements Avoid wasteful movements
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'The Irate Vendor' : The old supplier :-
Correct Answer Has been supplying for over 30 years , Does not understand why he has been cutoff , Does not understand why no chance has been given to him to discuss his bid
Your Answer Has been supplying for over 30 years , Does not understand why he has been cutoff , Does not understand why no chance has been given to him to discuss his bid, Is always asked his opinion about quantity to be ordered
True/FalseQuestion This Question refers to the case of 'K.T Gears' : The activities performed by the
operator are listed on the practitioner's data sheet.Correct Answer True
Your Answer True
True/FalseQuestion This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr.
Sen noticed that each worker was provided with the drawing of the component.Correct Answer False
Your Answer False
Select The BlankQuestion This Question refers to the case of 'Northern Machinery Limited' : The V.P.
instructed Materials Manager to collect ________ information and evidence toclarify that their system is foolproof.
Correct Answer Relevant
Your Answer Relevant
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'Autogears Private Limited' : Work elements
performed by a gear shaving operator are :-Correct Answer Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to
mesh with cutter teeth , Unlock nut and remove gear from the mandrelYour Answer Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to
mesh with cutter teeth , Unlock nut and remove gear from the mandrel , Raise oilguard and switch on the machine
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'Artwood Products' : The cost of manufacturinghas increased due to :-
-
8/7/2019 Case op Mgmt
15/22
6
Correct Answer Blockage of funds in inventory , Longer manufacturing cycle time , Poor quality ofproducts
Your Answer Blockage of funds in inventory , Longer manufacturing cycle time , Poor quality ofproducts , Non availability of skilled labour
Select The BlankQuestion This Question refers to the case of 'K.T Gears' : The cycle time per piece to
perform the set of activities listed adds up to ________.Correct Answer 2.30 minutes
Your Answer 2.30 minutes
Select The BlankQuestion This Question refers to the case of 'Universal Fasteners Ltd.' : Personnel Officer
Mr. Sinha informed Mr. Kaul that Employee ________ is very high.Correct Answer Turnover
Your Answer Turnover
Multiple Choice Single AnswerQuestion This Question refers to the case of 'National Engineering Co.' : As per GM, the
route cause of this non-sensical situation is lack of :-Correct Answer Co-ordination
Your Answer Co-ordination
Multiple Choice Single AnswerQuestion This Question refers to the case of 'The Geer Company' : The company had a
small foundry until 1946. This was subsequently closed and the purchase offerrous castings were handled by :-
Correct Answer A man who had been a supervisor in the foundry
Your Answer A man who had been a supervisor in the foundry
Multiple Choice Multiple AnswerQuestion This question refers to case on 'Morbay Engineering Works (MEW)' : An incentive
plan can be considered as a tool for following:-Correct Answer Increase productivity , Create more capacity , Reduce manufacturing costs
Your Answer Increase productivity , Create more capacity , Reduce manufacturing costs ,Increase sales
True/FalseQuestion This question refers to 'Automotive Gears Private Limited' : The table given in the
case study gives approximate machine hour rate for each indicated machine.Correct Answer True
Your Answer True
Select The BlankQuestion This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : To manufacture
exhaust Manifild in-house additional capacity is required. Extra capacity can begenerated at UTPL by additional ________.
Correct Answer ShiftYour Answer Shift
-
8/7/2019 Case op Mgmt
16/22
7
True/FalseQuestion This Question refers to the case of 'Universal Fasteners Ltd.' : Mr. Sharma,
Production Engineer informed Mr. Kaul that Hardening & Tempering was the lastoperation.
Correct Answer True
Your Answer True
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'K.T Gears' : The firm is :-
Correct Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged inmanufacture of helical gear
Your Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged inmanufacture of helical gear , Engaged in manufacture of cutting gears
Multiple Choice Multiple AnswerQuestion This question refer to the case on "Allied Industries Pvt Ltd" : Following are cost
elements of make indicator :-
Correct Answer Transport cost , Tooling cost , Indirect Employee costYour Answer Transport cost , Tooling cost , Indirect Employee cost , Power cost
True/FalseQuestion This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr.
Sen was informed by Mr. Ravikant, Materials Manager that counting is notnecessary at every stage as they count at the initial stage and since their workersand supervisors are experienced, they can easily identify the components at eachstage of production.
Correct Answer True
Your Answer True
True/FalseQuestion This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Project duration
can always be reduced by deploying additional recourses.Correct Answer False
Your Answer False
2 ND COPY
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/FalseQuestion This Question refers to the case of 'Divgi Metalwares Private Limited' :
The order has been finalized from a leading engineering firm.Correct Answer False
Your Answer True
True/FalseQuestion This Question refers to the case of 'Autogears Private Limited' : It takes
0.2 minutes to measure dimensions and set aside gear into the trolley.
-
8/7/2019 Case op Mgmt
17/22
8
Correct Answer True
Your Answer True
Multiple Choice Single AnswerQuestion This Question refers to the case of 'Eagle Machine Company' : The
President demands that in the remaining quarter the firm should :-Correct Answer Break even
Your Answer Break even
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'Narmada Electricals Ltd.' : Production
or Quality department decide when these become surplus/obsolete :-Correct Answer Part , Component , Item
Your Answer Part , Component , Item , Material
Multiple Choice Multiple AnswerQuestion This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : While making
Make or Buy decisions, Buy indicator includes following costs :-Correct Answer Raw material cost , Purchase cost , Fixed overhead cost
Your Answer Raw material cost , Variable overhead cost , Purchase cost , Fixedoverhead cost
Multiple Choice Multiple AnswerQuestion This question refer to the case on "Allied Industries Pvt Ltd" : Following
are cost elements of make indicator :-Correct Answer Transport cost , Tooling cost , Indirect Employee cost
Your Answer Transport cost , Tooling cost , Indirect Employee cost , Power cost
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'The Gujrat Engineering company
Limited' : The forged cylinder ordered on new vendor :-Correct Answer Was received on schedule , Was priced 15 % lower than the price of the
previous supplier , Had missed out carrying out some machiningoperations
Your Answer Was received on schedule , Was priced 15 % lower than the price of theprevious supplier , Had missed out carrying out some machiningoperations , Was of sub standard quality
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'Divgi Metalwares Private Limited' :
The new items contracted by the company are handled by thedevelopment department for :-
Correct Answer Submission of samples , Manufacture of one or two production lots ,Transfer to manufacturing department for regular production, aftersuccessful development
Your Answer Submission of samples , Manufacture of one or two production lots ,Transfer to manufacturing department for regular production, aftersuccessful development , Transfer to sales department for sales, aftersuccessful development
Multiple Choice Multiple Answer
-
8/7/2019 Case op Mgmt
18/22
9
Question This Question refers to the case 'Indus Foundries Ltd.' :Following itemsare readily available at all the three locations :-
Correct Answer Raw materials , Scrap , Foundry chemicals
Your Answer Manpower , Raw materials , Scrap , Foundry chemicals
Multiple Choice Multiple AnswerQuestion This Question refers to the case 'Indus Foundries Ltd.':The location of
plant has been narrowed down to following locations :-Correct Answer Kolhapur , Ahmedabad , Coimbatore
Your Answer Kolhapur , Ahmedabad , Coimbatore , Nasik
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'Universal Fasteners Ltd.' : Mr
Banerjee, Manager Quality informed Mr.Kaul that :-Correct Answer Raw Material received was without test certificate and was not inspected
by the inspector , Laid down procedure for processes of heat treatment,painting etc. are not followed due to heavy labour turnover and frequentwork allocation , Management has been requested to get the crackdetection machine repaired.
Your Answer Raw Material received was without test certificate and was not inspectedby the inspector , Laid down procedure for processes of heat treatment,painting etc. are not followed due to heavy labour turnover and frequentwork allocation , Management has been requested to get the crackdetection machine repaired. , Broken studs were not hardened
Match The FollowingQuestion Correct Answer Your Answer
Machine shop congested with
semi- rocessed material keptin the bins and componentslying on the floors all around.
Shortage of space Shortage of space
This Question refers to thecase of 'Classic EngineeringComponents Ltd.' :Measuring instruments likevernier calipers, micrometersor gauges
Shared by operators Shared by operators
Unispected lots Processed Identifiable by tags andmarkings
Responsibility of oiling/greasing Maintenance department Maintenance department
Select The BlankQuestion This Question refers to the case of 'Kerson Automobiles' : The pedestal
grinder mounted on the huge work table, gives out ________ and blowsout dust.
Correct Answer Sparks
Your Answer Sparks
Multiple Choice Single AnswerQuestion This Question refers to the case of 'Classic Engineering Components Ltd.': This company was acquired by Das Group of Industries. Mr. MohitSen,(head of Business planning function in the corporate office) was
-
8/7/2019 Case op Mgmt
19/22
10
visiting the factory as its :-
Correct Answer Turn over was stagnating
Your Answer Turn over was stagnating
Multiple Choice Single AnswerQuestion This Question refers to the case of 'Divgi Metalwares Private Limited' :
The company is manned by :-Correct Answer Professional managers
Your Answer Professional managers
Multiple Choice Multiple AnswerQuestion This question refers to case on 'Morbay Engineering Works (MEW)' :
Following systems are prerequisites for an incentive scheme:-Correct Answer Good production planning and control system , Good Inspection and
quality control system , Sound system of accounting operators dailyoutput
Your Answer Good production planning and control system , Good Inspection andquality control system , Sound system of accounting operators dailyoutput , Efficient wage payment system
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'K.T Gears' : The firm is :-
Correct Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged inmanufacture of helical gear
Your Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged inmanufacture of helical gear , Engaged in manufacture of cutting gears
Select The BlankQuestion This Question refers to the case 'Suyog Udyog' : Number of work stations
are to be decided based on assumption that monthly off take is ________numbers.
Correct Answer 8000
Your Answer 8000
Multiple Choice Single AnswerQuestion This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : The basic
management problem of WIPL in context of the project is following :-Correct Answer On which date the project will be completed
Your Answer On which date the project will be completed
Multiple Choice Multiple AnswerQuestion his question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust
Manifold is to be manufactured in house, following are the requirements:-Correct Answer New jigs and fixtures , Additional shift , Additional manpower
Your Answer New jigs and fixtures , Additional shift , Additional manpower , Additionalmachinery
Select The BlankQuestion his question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays incompletion of ________ would increase Project cost.
-
8/7/2019 Case op Mgmt
20/22
11
Correct Answer Project
Your Answer Project
Multiple Choice Single AnswerQuestion This Question refers to the case of 'Kerson Automobiles' : Distance
traveled every day, by a mechanic to get replacement from stores is :-Correct Answer 4 to 6 miles
Your Answer 4 to 6 miles
Select The BlankQuestion This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : To
manufacture exhaust Manifild in-house additional capacity is required.Extra capacity can be generated at UTPL by additional ________.
Correct Answer Shift
Your Answer Shift
Multiple Choice Single AnswerQuestion This question refers to case on 'Morbay Engineering Works (MEW)':
Following is not the prerequisite for sound incentive scheme:-Correct Answer Existence of union
Your Answer Reporting System for daily production of workers
Multiple Choice Multiple AnswerQuestion This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust
Manifold is manufactured in house, following costs wll increase:-Correct Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant
Your Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant, Fixed overheads
Select The BlankQuestion This Question refers to the case of 'The Geer Company' : The volume of
growth tripled due to ________ management.Correct Answer Aggressive
Your Answer Aggressive
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'The Irate Vendor' : The President'smemorandum says :-
Correct Answer We have treated this supplier unfairly , He would like to see if hiscomplaint is justified , The Vendor's letter suggests that we do not have apolicy on evaluating our vendors
Your Answer We have treated this supplier unfairly , He would like to see if hiscomplaint is justified , The Vendor's letter suggests that we do not have apolicy on evaluating our vendors , The vendor always quotes high price of finished goods
Select The Blank
Question This Question refers to the case of 'Divgi Metalwares Private Limited' :The company has finalized the order for manufacture of a ________driven gear.
-
8/7/2019 Case op Mgmt
21/22
12
Correct Answer Speedmeter
Your Answer Speedmeter
Select The BlankQuestion This question refers to case on 'Morbay Engineering Works (MEW)' :
Success of wage incentive plans to a large extent depends on the________ of performance standards.
Correct Answer QualityYour Answer Quality
True/FalseQuestion This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The average
efficiency on the other components currently being produced is around75%.
Correct Answer True
Your Answer True
True/FalseQuestion This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : It is
economical to continue subcontracting the machining of Exhaust Manifoldto vendors.
Correct Answer False
Your Answer False
Select The BlankQuestion his question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays in
execution of project leads to cost ________.Correct Answer Overrun
Your Answer Overrun
Multiple Choice Single AnswerQuestion This Question refers to the case 'Quality Gauges Pvt. Ltd.' : With the
introduction of the scheme :-Correct Answer The sales picked up
Your Answer The sales picked up
Select The BlankQuestion This Question refers to the case of 'National Engineering Co.' : GM
commented that every department in this company competes with othersin matter of ________.
Correct Answer Inefficiency
Your Answer Productivity
Multiple Choice Multiple AnswerQuestion This Question refers to the case of 'The Irate Vendor' : The old supplier :-
Correct Answer Has been supplying for over 30 years , Does not understand why he hasbeen cut off , Does not understand why no chance has been given to him
-
8/7/2019 Case op Mgmt
22/22
to discuss his bid
Your Answer Has been supplying for over 30 years , Does not understand why he hasbeen cut off , Does not understand why no chance has been given to himto discuss his bid , Is always asked his opinion about quantity to beordered