CASE HISTORYMILAN-LINE BLUE

-VERIFICATION IN EXECUTION OF SYSTEM PERFORMANCE

OF CONNECTION AND GASKET Issue Date Check Project Rev.

S.LUPI 10/09/2014 G. BOMBEN METRO BLUE 1

Page 2: Case history   milan line m4 route expo en rev.1

CASE HISTORY

INTRODUCTION

Fama Spa is an Italian company operating since 1988 in design, certification, manufacture of products for precast lining of tunnels. Fama Spa is specialized  in  the development of sealing systems and a wide range  of  accessories  for  the  connection,  lifting  and  anchoring  systems  for the construction of tunnels with TBM. 

For the excavation of the line M4 - Route EXPO, FAMA SpA provided gaskets and connection systems.

To complete a strategic path that began with the design and continued with the  certification  through  laboratory  tests,  with  a  campaign  of measurements,  it  was  possible  to document the performance of these products in exercise.

Page 3: Case history   milan line m4 route expo en rev.1

CASE HISTORY

METRO MILAN - LINE M4 – Section EXPODESIGN OF THE PRECAST RING

- UNIVERSAL RING 5+1- KEY 1/3 OTHER SEGMENT- EX. DIAMETER 6.060 mm- IN. DIAMETER 5.500 mm- THICKNESS OF SEGMENT 280 mm- LENGTH OF SEGMENT 1.400 mm

- GASKET 29 x 14 mm- 16 CONNECTORS FOR RING (3 FOR EACH SEGMENT, 1 FOR THE KEY)- GUIDE ROD ON THE RADIAL JOINT

Page 4: Case history   milan line m4 route expo en rev.1

CASE HISTORY

METRO MILAN - LINE M4 – Section EXPOHYDROGEOLOGICAL PROFILE

- FULL TRACK UNDER THE WATER TABLE - MAXIMAL WATER PRESSURE 2.1 BAR

Page 5: Case history   milan line m4 route expo en rev.1

CASE HISTORY

EPDM SEALING GASKET

- UG022A- 29 x 14 GLUED- SPECIFICATIONS REQUIRED TO

CONTRACT PRESSURE 13 bar GAP 4 mm OFFSET 12 mm

Page 6: Case history   milan line m4 route expo en rev.1

CASE HISTORY

CONNECTION SYSTEM

- SMARTBLOCK 60-180/300-80- PULL OUT 60 KN- SHEAR STRENGTH 160 KN- LENGTH 300 mm- DIAMETER OF CENTERING 80 mm

Page 7: Case history   milan line m4 route expo en rev.1

CASE HISTORY

1.  We want  to  calculate  the  current  state of misalignment  and  separation  of  the  joints between  the segments in the gallery; 2.  The  relief  is  performed  with  the  use of  two  measurement  gauges:  one  for  the depth,  with which recalculate the offsets and one for the width of the slots for the recalculation of the gap; 3. The joints are first classified according to the orientation angle to the progress of the excavation; 4. Usually the relief is performed on a continuous succession of five joints, reached by the operator that runs through the tunnel by foot. In case of severe anomalies  the relief  can be conducted on the entire ring with the aid of suitable lifting equipment. The measuring block 5 of  joints may, at the operator's discretion, be repeated several times; 5. The sequence of measurements, if necessary, can be performed on the right side and on the left side of the tunnel with reference to the direction of advance of the excavation; 6. May be conducted punctual detections  in the presence of water  infiltration,  in order to evaluate  if this  is  generated  by  an  excessive  misalignment,  or  spreading  of  the  coupling  or,  finally,  from  other causes; 7.  If  necessary  measurements  can  be  performed  on  the  blocks,  facing  the  opposite  of  progress  to compare with those initial misalignment stabilized along the tunnel.

PROCEDURE FOR DETECTION GAP AND OFFSET OF THE JOINTS BETWEEN THE SEGMENTS INTO THE TUNNEL

Page 8: Case history   milan line m4 route expo en rev.1

CASE HISTORY

PROCEDURE FOR DETECTION GAP AND OFFSET OF THE JOINTS BETWEEN THE SEGMENTS INTO THE TUNNEL

The  measurements  of  gap  and  offset  are  performed  at  approximately  20 mm from the T joint, where the deviations from nominal are maximums.

Measurement scheme of 

GAP

Measurement scheme of 

OFFSET

Page 9: Case history   milan line m4 route expo en rev.1

CASE HISTORY

PROCEDURE FOR DETECTION GAP AND OFFSET OF THE JOINTS BETWEEN THE SEGMENTS INTO THE TUNNEL

In the diagrams below are identified types of angles between segments of a same ring adjacent each other refer to the direction of excavation.

Page 10: Case history   milan line m4 route expo en rev.1

CASE HISTORY

PRESENTATION OF RESULTSMEASURES OF GAP IN THE CIRCUMFERENTIAL JOINTS

Page 11: Case history   milan line m4 route expo en rev.1

CASE HISTORY

PRESENTATION OF RESULTSMEASURES OF GAP IN THE LONGITUDINAL JOINTS

Page 12: Case history   milan line m4 route expo en rev.1

CASE HISTORY

PRESENTATION OF RESULTSMEASURES OF OFFSET IN THE CIRCUMFERENTIAL JOINTS

Page 13: Case history   milan line m4 route expo en rev.1

CASE HISTORY

PRESENTATION OF RESULTSMEASURES OF OFFSET IN THE LONGITUDINAL JOINTS

Page 14: Case history   milan line m4 route expo en rev.1

CASE HISTORY

PRESENTATION OF RESULTSPICTURES OF THE TUNNEL

Page 15: Case history   milan line m4 route expo en rev.1

CASE HISTORY

ANALYSIS OF THE RESULTSASSESSMENT OF THE EFFICIENCY OF THE CONNECTION SYSTEMThere have been 205 measurements of gap and offset. 

The average weigth gain of the gap is 0.5 mm, the offset of 1.4 mm.

The  requirements  of  the  specifications  of  the  project  M4  Milan  provide  a mounting tolerance of 4 mm on the opening of the joint (gap) and 12 mm on the misalignment of the joint (offset). The connection system SmartBlock allowed a mounting error is much lower than expected.

The connection system SmartBlock has minimized the effect of the divergence of the longitudinal and circumferential joints generated by the thrust of the gasket.

The performance of  the pull-out and  shear of  the SmartBlock are  suited  to  the conditions of employment, ensuring the correct dimensioning of the system.

Page 16: Case history   milan line m4 route expo en rev.1

CASE HISTORY

ANALYSIS OF RESULTSASSESSMENT OF THE EFFICIENCY OF THE SEALING GASKET

The gallery of the Milan line M4 is dry.

The gasket sealing UG022A has been tested at the University “Tor Vergata” in Rome – Department of Civil Engineering – Structures and Material Tests Laboratory - for the hydraulic performance requirements in the specifications of the project M4 in Milan.

The gasket UG022A requires a  load of 42 KN/m for its complete compression facilitating, in fact, the permanence of the closed joint.

The geometry of UG022A well balanced between width and height and angles conformed to the geometry of the segment allow, during assembly of the ring, to remain in its seat.

Page 17: Case history   milan line m4 route expo en rev.1

CASE HISTORY

THANK YOU FOR YOUR ATTENTION

www.famaspa.it