SCHEDULE OF GUARANTEES
The tenderer shall guarantee the performance of the pump offered by filling up the data below.The tenderer who failed to fulfill the requirement will not be considered. Preference will be
given to the pump giving the best performance, i.e. the capacity and efficiency.
The tenderer shall also examine and ensure that the power absorbed by the pump/pumps at
Normal, Minimum and Maximum head condition running single and parallel(if required) willnot overload the motor.
1. RUMAH PAM TAMAN SRI GOMBAK 1A & 18, GOMBAK
A. Single Operation
Item Description
Offer
(a)
Case 1
Normal
Head
Cond ition
(b)
Case 2
Min im unr
Head
Cond ition
(c)
Case 3
Maximum
Head
Cond ition
1 Capacity lls
2. Static head m
3. Frictional losses m
4. Minor losses through fittings m
5. Station losses m
6. Total head (sum at 2,3, 4, and 5 ) m
7. Closed valve head m
B. Speed RPM
9. Pump efficiency olla
10.. Power Absorbed KW
i1 Motor efficiency ollo
12. Power factor of motor ollo
13. Overall efficiency of pump set ollo
14. N PSH required m
8/13/2019 Calgon Tech Spec
http://slidepdf.com/reader/full/calgon-tech-spec 2/4
Scheduie 1
Page 2 of 2
B. Parallel Operatjon
Item Description
Offer
(a)
Case '[
One Pump
(b)
Case 2
Two Pumps
(c)
Case 3
Three Pumps
1 Capacity lls
2. Static head m
3. Frictional losses m
4. Minor losses through fittings m
5, Station losses m
6. Total head (sum of 2,3, 4, and 5 ) m
7. Closed valve head m
B, Speed RPM
9. Pump efficiency allo
10. Power absorbed KW
ln accordance with the Specification we guarantee that the head, quantity, efficiency and
related to the pump offered by us shall conform to the figures given in column (a) above.
We further guarantee the figures given in column (b) and (c) that the pumps supplied by us willoperate satisfactorily throughout the duty range.
' Calculation shall be submitted by the contractor to substantiate particulars given in item 2, 3,
4,5and6above.
We hereby attached together pump characteristic curve for single and parallel operation.
Dare: : {: l^ ?
8/13/2019 Calgon Tech Spec
http://slidepdf.com/reader/full/calgon-tech-spec 3/4
Schedule I
Page I of 2
SCHEDULE OF GUARANTEES
Thetenderer shall
guaranteethe
performanceof
the pump offered by filling up the databelow.The tenderer who failed to fulfill the requirement will not be considered. Preference will be
given to the pump giving the best performance, i.e. the capacity and efficiency.
The tenderer shall also examine and ensure that the power absorbed by the pump/pumps at
Normal, Minimum and Maximum head condition running single and parallel(if required) willnot overload the motor.
2. RUMAH PAM TAMAN SRI HARTAMAS, KUALA IUMPUR
A. Single Operation
Item Description
Offer
(a)
Case 1
Normal
Head
Cond ition
(b)
Case 2
Minimum
Head
Cond ition
(c)
Case 3
Maxim unl
Head
Cond ition
1 Capacity l/s
2. Static head m
3. Frictional losses m
4. Minor losses through fittings m
5. Station losses m
6. Total head (sum of 2,3,4, and 5 ) m
7. Closed valve head m
B. Speed RPM
9. Pump efficiency ollo
10.. Power Absorbed KW
11 Motor efficiency ollo
12.. Power factor of motor olla
{')tJ. Overall efficiency of purnp set ol
lo
14. NPSH required m
8/13/2019 Calgon Tech Spec
http://slidepdf.com/reader/full/calgon-tech-spec 4/4
Scheduie 1
Page 2 cf Z
B. Parallel Operation
Item Description
Offer(a)
Case 1
One Pump
(b)
Case 2
Two Pumps
(c)
Case 3
Three Pumps
1 Capacity lls
2. Static head m
3. Frictional losses m
4. Minor losses through fittings m
5. Station losses m
6. Total head (sum o{ 2, 3, 4, and 5 ) m
7. Closed valve head m
B. Speed RPM
9. Pump efficiency allo
10. Power absorbed KW
ln accordance with the Specification we guarantee that the head, quantity, efficiency and
related to the pump offered by us shall conform to the figures given in column (a) above.
We further guarantee the figures given in column (b) and (c) that the pumps supplied by us willoperate satisfactorily throughout the duty range.
i Calculation shall be submitted by the contractor to substantiate particulars given in item 2, 3,
4,5and6above.
We hereby attached together pump characteristic curve for single and parallel operation.