Cairo vision 2050The Strategic Urban Development Plan of Greater Cairo Region
Why Cairo Vision?
Why Should we Develop a Vision for Cairo? –
Problems and Challenges
Community’s Opinion –
What People Want for Cairo
Community Participation in Formulating the Vision
Developing Sectors that realize the Vision
Prioritized Projects Realizing the Vision
Main Concept of the Vision
Why a Vision for Cairo Should be Developed?
The capital of Egypt (80 million inhabitants)
Cairo was among the top capitals in the Middle East, has declined as a result of several problems:
1-
High density in inner-city
2-
Traffic congestion
3-
Environmental deterioration
4-
Informal development
GCR encompasses: 22% of overall population of Egypt
43% of overall urban population
2006
16 million inhabitants2020
23 million inhabitants2050
30 million inhabitants (targeted)
Problems and Challenges
Current and Projected Population Growth in GCR
Remark: the projected population number in GCR in 2050 is 38 milRemark: the projected population number in GCR in 2050 is 38 million inhabitants, according to current growth rates. The target lion inhabitants, according to current growth rates. The target is not to exceed 30 million in Cairo 2050.is not to exceed 30 million in Cairo 2050.
20 km
30 km
40 km
50 km
75% of the GCR’s
population is condensed within a 20 km‐diameter circle
The problem is not the size of GCR but the maldistribution
of population
Tokyo 33 million Greater Cairo 16 million
Mexico City 16 million New York 13 million
Paris 11 million
Greater Seoul 22.5 million
GCR and
Global
Cities: a
Comparison
of Sizes
Problems and Challenges
Community’s Opinion –
What People Want for Cairo?
Why Should we Develop a Vision for Cairo? –
Problems and Challenges
Community’s Opinion –
What People Want for Cairo
Community Participation in Formulating the Vision
Developing Sectors that realize the Vision
Prioritized Projects Realizing the Vision
Main Concept of the Vision
Citizens’
Aspirations
It has good work opportunitiesA city that is fair to all social classes..
Developed residential districts
A clean city …… Having many gardens ……
Offering opportunities of breadwinning ……
Community’s Vision for the Solutions of Problems and Obstacles in Different Districts
Results of surveys conducted
by more than one source
across more than 5000
families in GCR
Community Requirements and Needs
تحسين Rest of Cairo
Monumental Areas
Nazlet
Al-Semman
El-Matareyah
Boulaq
Al-Dakrour
Providing Basic
Services
Providing New
and Developed
Housing
Improving UtilitiesCleanliness
Providing New and Developed
Housing
Road and Transportation Network to Connect with New
Cities
Improving UtilitiesCleanliness
Road and Transportation
Network
Main Concept of the Vision
Why Should we Develop a Vision for Cairo? –
Problems and Challenges
Community’s Opinion –
What People Want for Cairo
Community Participation in Formulating the Vision
Developing Sectors that realize the Vision
Prioritized Projects Realizing the Vision
Main Concept of the Vision
6th
of Octobet
6th
of October Governorate
The Regional Ring Road
Agricultural Lands
El-Amal
15th
of May
Helwan
Physical Development Directions
New Cairo
El-Shorouq
El-Obour
Helwan
Governorate
Physical Development Directions
Agricultural Development
Directions
GizaCairo
Roads and Transportation
Drinking Water and Sanitation
Improvement of Environment and Increasing Green Areas
Housing and Slums
Better Administration of the Region
Raising living standards to an international level
Redistribution of
population allover
the region
Main Concept of the VisionMain Concept of the Vision
Different Strategies Dealing with Districts of GCR
80075070065060055050045040035030035020015010050
Strategy 3 Strategy 2 Strategy 3Strategy 1
Attracting Population to New Cities
(housing –
jobs) and Increasing
Connectivity
Decreasing Population
Density
Attracting Population to New Cities (housing –
jobs) and
Increasing Connectivity
Decreasing Population
Density
Profiting from the inner city values and
its Constituents
Strategy 2
Ain
ShamsBoulaq
Al-
DakrourDowntown6th of October New Cairo
Density person/
feddan
Current DensitiesProjected Densities
Core of the VisionCore of the Vision
Settlement of New Major Projects outside Cairo and Giza
Duration of Trip: 60 minutes
Solving Cairo’s Problems by Rapid modes of Transportation with the increase connectivity
Cairo 2020
Cairo 2009
Cairo 2030
Ain
SokhnaEl-Amal
Upper EgyptEl-Fayoum
Helwan
Alexandria
Delta
Ismailia
Belbeis
El-Shorouk
Airport
El-Obour
Cairo
Giza
Heliopolis
6 OctoberEl-MaadiPyramids
Suez
Cairo 2050 Vision
To Cairo Vision 2050
Community Participation in Formulating the Vision
Community Participation in Formulating the Vision
Why Should we Develop a Vision for Cairo? –
Problems and Challenges
Community’s Opinion –
What People Want for Cairo
Community Participation in Formulating the Vision
Developing Sectors that realize the Vision
Prioritized Projects Realizing the Vision
Main Concept of the Vision
2 conferences: 300 participants 2 conferences: 300 participants of key officials, thinkers, of key officials, thinkers, media figures, investors, members of media figures, investors, members of PeoplePeople’’s Assembly and s Assembly and ShuraShura
CouncilCouncil28 specialized workshops28 specialized workshops: : 1000 participants 1000 participants of experts and of experts and
executive officialsexecutive officials4 symposium4 symposium
with NGOs and associations: 400 expert with NGOs and associations: 400 expert participantsparticipants
4 surveys 4 surveys covering covering more than 3000 families more than 3000 families in GCRin GCR
The Participation of 1800 of Key Officials, Planners, and ThinkeThe Participation of 1800 of Key Officials, Planners, and Thinkers in rs in Formulating the Vision in 2009Formulating the Vision in 2009
Cairo Vision 2050Cairo Vision 2050Cairo: Global Cairo: Global ––
Green Green ––
ConnectedConnected
GlobalGlobal
GreenGreen
ConnecteConnecte
dd
Components of the Cairo Vision 2050
••
Resuming the cityResuming the city’’s physical and architectural splendor and s physical and architectural splendor and elimination of slumselimination of slums
••
Achieving the international standards of the individualAchieving the international standards of the individual’’s share in s share in open green areasopen green areas
••
Having pedestriansHaving pedestrians’’
paths, open areas and public plazaspaths, open areas and public plazas
••
AfricaAfrica’’s gate and the best Middle Eastern capitals gate and the best Middle Eastern capital••
A regional and global focal point of politics, administration, A regional and global focal point of politics, administration, culture, tourism and economyculture, tourism and economy
••
A global heritage capital, for all the historical heritage it poA global heritage capital, for all the historical heritage it possessesssesses
•• Socially connectedSocially connected•• physically Connected by efficient road networks and public physically Connected by efficient road networks and public transportationtransportation•• Technologically connectedTechnologically connected
Vision: a Global, Green and Connected CityVision: a Global, Green and Connected City
Developing Sectors Realizing the Vision
Why Should we Develop a Vision for Cairo? –
Problems and Challenges
Community’s Opinion –
What People Want for Cairo
Community Participation in Formulating the Vision
Developing Sectors that realize the Vision
Prioritized Projects Realizing the Vision
Main Concept of the Vision
First TargetRaising living condition to the international level
Second TargetIncreasing the competitiveness of the Egyptian Capital
Roads and Transportation sector
Drinking Water and Sanitation sector
Environment sector
Housing and shelter sector
Better Administration of the Region Culture and Media Sector
Trade and Industry Sector
Tourism Sector
Education Sector
Health Sector
Financial Sector
Telecommunications and Information Technology Sector
Sectors Realizing the Cairo Vision 2050
Results of citizens’
Surveys
Raising living standards to an international level Not
specified
%
Disagree
%Agree
%
7.222.870.0Specifying borders for Cairo as an administrative capital within
GCR
7.523.768.8Issuing a special law for the capital, that is independent from the
Municipalities Law
6.523.570.0Establishing a supreme council for the administration of the
Greater Cairo Area and implementing the strategic plan
Better Administration of the Region
Results of Citizens’
SurveysJune 2009
Raising living condition to the international level
To Cairo Vision 2050
Housing and shelter issuesHousing and shelter issues
Raising living condition to the international level
The urban mass in Cairo
The main urban mass of GCR is categorized into three types:The main urban mass of GCR is categorized into three types:
Planned AreasPlanned Areas
Unsafe AreasUnsafe Areas
Unplanned AreasUnplanned Areas
•
Preserving the planned areas
in Cairo and Giza by setting building conditions•
Dealing with unsafe
and unplanned areas through an detailed plan for upgrading and a specified time frame
Roads and Transportation
Drinking Water and Sanitation
Improvement of Environment and Increasing Green Areas
Housing and Slums
Better Administration of the Region
Raising living standards to an international level
UnsafePlannedUnplanned
Raising living condition to the international level
Four Levels of un-safety (as set by IDSF 2008)Areas that are extremely dangerous to souls of its inhabitants
Residential areas that are structurally unsafe
Area that are dangerous to health of its dwellers
Areas with no tenure documents
GCR includes 116 unsafe areas, which encompass 63000 units
Unsafe areas : Non secure houses for the lives of its dwellers and need to be redeveloped
Unsafe Areas
Raising living condition to the international level
Ring Road
Giza Pyramids
Ismailia
Road
Giza
Ain
Sokhna
Road
Cairo
The strategy for Unsafe areas
Strategy towards these areas is to provide safe alternatives for residents whether at the same areas or other location based on consultation with affected groups
Unsafe Areas1st
Degree2nd
Degree3rd
Degree4th
Degree
Degree of Danger
Surface Area
in Feddan
Number of Residential Units
1st
Degree 148.45 85112nd
Degree 518.42 349583rd
Degree 32.98 55714th
Degree 18.23 1081
Unsafe Areas
Raising living condition to the international level
Unplanned Areas
The Northern Giza Development Project Represents the First StageThe Northern Giza Development Project Represents the First Stage
Unplanned Areas: Unplanned Areas: Illegally planned by inhabitants and suffer from Illegally planned by inhabitants and suffer from very high density, and lack of basic urban services and accessibvery high density, and lack of basic urban services and accessibility or ility or connectivity with formal fabric connectivity with formal fabric
Raising living condition to the international level
The strategy towards these areas is:The strategy towards these areas is:--••Increase accessibility of these areas through opening main roadsIncrease accessibility of these areas through opening main roads and and corridors with minimum demolitioncorridors with minimum demolition••Provide alternative housing units for affected groups from openiProvide alternative housing units for affected groups from opening roads ng roads within the same area or nearby or direct compensation based on cwithin the same area or nearby or direct compensation based on consultation.onsultation.••No eviction for affected groups before providing alternatives.No eviction for affected groups before providing alternatives.••Regularizing properties and enabling security of tenure. within Regularizing properties and enabling security of tenure. within these areas these areas based on detailed development plan.based on detailed development plan.••Provide basic services on vacant plots/pockets within the areas.Provide basic services on vacant plots/pockets within the areas.
Project of Project of TahzeemTahzeem
(containment) of unplanned (containment) of unplanned areas in Greater Cairoareas in Greater Cairo
More than 4000 feddan
are to be planned in order to prevent the formation of new
unplanned urban onto the intervals agricultural lands,
The projects will accommodate 0,6 million person and will provide more than 25 thousand job opportunities through th
e creation of new activities
The project will ensure tenure security and will protect the GCR from establishing extra informal settlements
Preventing the formation of new unplanned areas in GCRPreventing the formation of new unplanned areas in GCR
Improving the Environment and Increasing Green Areas
• Establishing an integrated system of cleanliness
•Establishing of a group of public parks and a local park for each district
•Moving polluting activities (cement factories and foundries) out
of GCR
Raising living condition to the international level
Priority Projects
For Realizing the Vision
Why Should we Develop a Vision for Cairo? –
Problems and Challenges
Community’s Opinion –
What People Want for Cairo
Community Participation in Formulating the Vision
Developing Sectors that realize the Vision
Prioritized Projects Realizing the Vision
Main Concept of the Vision
GLOBALA Global Cairo
Khedival Cairo
Ramses Square
Abdeen
Palace
Current Ministerial Quarter
Tahrir
Square
Maspiro
Triangleسسي رمرعشا
Attaba
Square
Increasing the competitiveness of the
Egyptian Capital
Culture and Media Sector
Industry Sector
Tourism Sector
Education Sector
Health Sector
Financial Sector
Telecommunications and Information Technology Sector
Better Region Administration
Housing and Slums
Improvement of Environment and Increasing Green Areas
Roads and Transportation
Drinking Water and Sanitation
Raising living standards to an Raising living standards to an
international level international level
A Global CairoHow to Achieve the Vision?
Developing Khedival Cairo
• Transforming some streets and routes into pedestrians paths• Developing the main squares in the area•
Reutilizing the ministerial quarter as gardens and cultural venues• Establishing a number of underground multi-storey garages
An International Competition to be Delivered by End of
March 2010
A Global CairoHow to Achieve the Vision?
Khufu Plaza Parks
A Global CairoHow to Achieve the Vision?
Increasing the competitiveness of the
Egyptian Capital
Culture and Media Sector
Industry Sector
Tourism Sector
Education Sector
Health Sector
Financial Sector
Telecommunications and Information Technology Sector
Better Region Administration
Housing and Slums
Improvement of Environment and Increasing Green Areas
Roads and Transportation
Drinking Water and Sanitation
Raising living standards to an Raising living standards to an
international level international level
••
Upgrading informal urban areas Upgrading informal urban areas surrounding the cultural heritage, surrounding the cultural heritage, (pyramids of Giza(pyramids of Giza…….).)
••
Reusing of nonReusing of non--adequate activities and adequate activities and encourage tourist and recreational encourage tourist and recreational activitiesactivities
••
Providing underground garagesProviding underground garages••
Providing adequate vistas and seenProviding adequate vistas and seen
نطاق الدراسة و يشمل شارع جامعة الدول العربية بداية من ميدان آم2.4سفنكس حتي شارع السودان بطول
رع ميدان سفنكسشا
دانسوال
وزارة االسكان و المرافق و التنمية العمرانيةالهيئة العامة للتخطيط العمرانى
General Organization for Physical Planning
محافظة الجيزة - المهندسين - تطوير شارع جامعة الدول العربية
مشكالت الوضع الراهن لمنطقة الدراسة
لكثافات مشكلة االمرورية و عدم وجود
خدمات آافية
مشكالت الوضع الراهن للدراسةميدان سفنكس
ميدان مصطفي محمود
مشكالت الوضع الراهن لمنطقة الدراسة
وزارة االسكان و المرافق و التنمية العمرانيةالهيئة العامة للتخطيط العمرانى
General Organization for Physical Planning
محافظة الجيزة - المهندسين - تطوير شارع جامعة الدول العربية
تخطيط شارع جامعة الدول العربية طبقا لشارع الشانزليزيه بفرنسا
وزارة االسكان و المرافق و التنمية العمرانيةالهيئة العامة للتخطيط العمرانى
General Organization for Physical Planning
محافظة الجيزة - المهندسين - تطوير شارع جامعة الدول العربية
Dimensions
75m
Concept Existing
وزارة االسكان و المرافق و التنمية العمرانيةالهيئة العامة للتخطيط العمرانى
General Organization for Physical Planning
محافظة الجيزة - المهندسين - تطوير شارع جامعة الدول العربية
Concept
Current Configurations
Main vehicular circulation (8 lanes) 28.0 m
Service lanes 6.5 m Pedestrian & green 15.0 m
Service lanes 6.5 m Pedestrian & green 15.0 m
Proposal
وزارة االسكان و المرافق و التنمية العمرانيةالهيئة العامة للتخطيط العمرانى
General Organization for Physical Planning
محافظة الجيزة - المهندسين - تطوير شارع جامعة الدول العربية
4.0 m
6.5 m
15.0 m
Pedestrian Green
Services & Bus lane
4 lanes
Cafes open areas
15.0 m4 lanes
2.0 m
6.0 m2.0 m
6.0 m
75.0
m
2.0 m2.0 m
6.0 mCafes with greens
Commercial
Cafes Cafes
Exits from
Parking areas
Entry To
Parking areas
2.0 m
Commercial path
Green
Green
Green
Services & Bus lane
Commercial Commercial path
Pedestrian Cafes with greens Cafes Cafes
Cafes
2.0 m
4.0 m
دراسة تفصيلية الستعماالت القطاع النمطى للطريق
m 900 القطاع الثانى
وزارة االسكان و المرافق و التنمية العمرانيةالهيئة العامة للتخطيط العمرانى
General Organization for Physical Planning
محافظة الجيزة - المهندسين - تطوير شارع جامعة الدول العربية
قطاع نمطي في شارع جامعة الدول العربية 65.0 m –
basement Borders
120,000 m2
4000 cars
4000 cars
عبور المشاة خالل المرآز التجارى
Parking Level 2
Commercial Level
Parking Level 1
4.0 m6.0 m4.0 m6.5 m2.0 m15.0 m15.0 m2.0 m6.5 m4.0 m6.0 m4.0 m
Com
mer
cial
wal
kway
Caf
es w
ith g
reen
s
Ped
estri
an ,
gree
n B
us &
taxi
par
king
Ser
vice
Roa
d –
2 la
nes
Gre
en
Mai
n R
oad
–on
e di
rect
ion
-4 la
nes
Mai
n R
oad
–on
e di
rect
ion
-4 la
nes
Gre
en
Ser
vice
Roa
d –
2 la
nes
Ped
estri
an ,
gree
n B
us &
taxi
par
king
Com
mer
cial
wal
kway
Caf
es w
ith g
reen
s
Commercial
75.00 m37.50 m
وزارة االسكان و المرافق و التنمية العمرانيةالهيئة العامة للتخطيط العمرانى
General Organization for Physical Planning
محافظة الجيزة - المهندسين - تطوير شارع جامعة الدول العربية
وزارة االسكان و المرافق و التنمية العمرانيةالهيئة العامة للتخطيط العمرانى
General Organization for Physical Planning
محافظة الجيزة - المهندسين - تطوير شارع جامعة الدول العربية
القاهرة مدينة عالمية؟ .... .آيف تتحقق الرؤية
حدائق خوفو بالزا المرحلة الثانية
القاهرة مدينة عالمية؟ .... .آيف تتحقق الرؤية
Developing the District of Nazlet
El-Semman
A Global CairoHow to Achieve the Vision?
Increasing the competitiveness of the
Egyptian Capital
Culture and Media Sector
Industry Sector
Tourism Sector
Education Sector
Health Sector
Financial Sector
Telecommunications and Information Technology Sector
Better Region Administration
Housing and Slums
Improvement of Environment and Increasing Green Areas
Roads and Transportation
Drinking Water and Sanitation
Raising living standards to an Raising living standards to an
international level international level
NathletNathlet El El SammanSamman Area Area It is an Unplanned Areas, It is an Unplanned Areas, Illegally planned Illegally planned by inhabitants upon cultural heritage old by inhabitants upon cultural heritage old pharaonicpharaonic temple beside pyramids , and lack temple beside pyramids , and lack of basic urban servicesof basic urban servicesThe strategy towards these areas isThe strategy towards these areas is::--
••Provide alternative housing units for Provide alternative housing units for inhabitants within the same area or inhabitants within the same area or nearby or direct compensationnearby or direct compensation based on based on consultation,. considering the principle consultation,. considering the principle of : of : No eviction for affected groups before No eviction for affected groups before providing alternatives.providing alternatives.••Regularizing properties and enabling Regularizing properties and enabling security of tenure. within these areas security of tenure. within these areas based on detailed development plan.based on detailed development plan.••Adequate reuse of this area considering Adequate reuse of this area considering its nature of recreational and cultural its nature of recreational and cultural aspectsaspects
The New Governmental District
2000 feddans
Ring Road
Ezbet
Al-
Haggana
New Cairo
Ain
Sokhna
Road5700
feddans
Moving a number of ministries and governmental institutions out of the inner city of CairoEstablishing a new 1800-feddan finance and business center east of CairoEstablishing a 200-feddan public parkConnecting the district to Downtown with an express tram line and to the subway
A Global CairoHow to Achieve the Vision?
Increasing the competitiveness of the
Egyptian Capital
Culture and Media Sector
Industry Sector
Tourism Sector
Education Sector
Health Sector
Financial Sector
Telecommunications and Information Technology Sector
Better Region Administration
Housing and Slums
Improvement of Environment and Increasing Green Areas
Roads and Transportation
Drinking Water and Sanitation
Raising living standards to an Raising living standards to an
international level international level
The major projects to be implemented in new cities in GCR to attract investments and create new job opportunities
A Global CairoHow to Achieve the Vision?
Establishing a number of technologica
l universities
•
Establishing of joint international universities
•
Establishing three technological poles in GCR, located on the main development corridors
•
They are to be provided in new cities in GCR (according to strategies of governorates)
A Global CairoHow to Achieve the Vision?
Increasing the competitiveness of the
Egyptian Capital
Culture and Media Sector
Industry Sector
Tourism Sector
Education Sector
Health Sector
Financial Sector
Telecommunications and Information Technology Sector
Better Region Administration
Housing and Slums
Improvement of Environment and Increasing Green Areas
Roads and Transportation
Drinking Water and Sanitation
Raising living standards to an Raising living standards to an
international level international level
Increasing the Number of Hotel Rooms to reach 50,000 Rooms
Establishing an International Library in Cairo
A Global CairoHow to Achieve the Vision?
Increasing the competitiveness of the
Egyptian Capital
Culture and Media Sector
Industry Sector
Tourism Sector
Education Sector
Health Sector
Financial Sector
Telecommunications and Information Technology Sector
Better Region Administration
Housing and Slums
Improvement of Environment and Increasing Green Areas
Roads and Transportation
Drinking Water and Sanitation
Raising living standards to an Raising living standards to an
international level international level
Increasing the competitiveness of the Egyptian Capital
Culture and Media Sector
Industry Sector
Tourism Sector
Education Sector
Health Sector
Financial Sector
Telecommunications and Information Technology Sector
tter Region Administration
using and Slums
provement of Environment and Increasing Green Areas
ads and Transportation
nking Water and Sanitation
Raising living standards to an Raising living standards to an international level international level
Project of Establishing a Tourism Center with a Capacity of 3200
Hotel
Rooms
A Global CairoHow to Achieve the Vision?
Project of Establishing a Tourism Oasis with a Capacity of 2000 Hotel Rooms
A Global CairoHow to Achieve the Vision?
Marabet
Project (City of Arabian Horses)
On a 2500-feddan area, including all sports and activities related to Arabian horses
A Global CairoHow to Achieve the Vision?
Establishing of Two International Medical Cities for Tertiary Health Care
A Global CairoHow to Achieve the Vision?
Increasing the competitiveness of the
Egyptian Capital
Culture and Media Sector
Industry Sector
Tourism Sector
Education Sector
Health Sector
Financial Sector
Telecommunications and Information Technology Sector
Better Region Administration
Housing and Slums
Improvement of Environment and Increasing Green Areas
Roads and Transportation
Drinking Water and Sanitation
Raising living standards to an Raising living standards to an
international level international level
Targeted Districts in Cairo• Wholesale Textiles (Al-Azhar Street)
• Car spare parts (Al-Tawfeqeyah)
• Household appliances (Abdel Aziz Street)• Wholesale (Port Said Street)
• Stationary (Al-Faggala)• Bath and Toilet Appliances (Al-Faggala)
•
Light Appliances and Chandeliers (Darb
Al
Barabra)
• Wholesale (Al-Mosky Street)• Wholesale (Al-Mo’ez Street)• Furniture (Muhammed Ali Street and Al-
Manasra District)
• Wood, Paper and Accessories (Al-Roue’y and Haret Al-Yahoud)
• Electrical Appliances and Heavy Equipments (Naguib Al-Reehany Street
Moving Wholesale Centers out of Cairo
Al-Azhar
Al-Tawfeqeyah
Abdel Aziz
Port
Said
Al-Faggala
Al-Mosky
Al-M
o’ez
St.
Al-Manasra
Muham
med
Ali St.
Al-Roue’y
Naguib
Al-Reehany
Al-Gomhoureyah
St.
Al-Barabra
A Global CairoHow to Achieve the Vision?
Project of Establishing a Service-Integrated Trade Area for Wholesale and Retail Traders (Egyptian
Investments)
Wholesale Centers and a Group of OutletsA Global CairoHow to Achieve the Vision?
Implementation Period / YearJob Opportunities by thousandsInvestment ValueArea/feddanCategoryProject NameIndirectDirect
7 years1006015 billion1500CommercialWholesale Area
Components of VisionGREEN
A Green Cairo
How to Achieve the Vision?
A Green Cairo
Proposed Projects –
Axis of Green Cairo
Projects that add to the total green areas
Existing green and entertainment areas
Cairo Vision 2050Greater Cairo Physical Survey
ProjectAtlas of Greater Cairo
Green Area
Development Proposal خضراءCairo محور –المشروعات المقترحة
Creating a pedestrian promenade along the Nile and prohibit inadequate activities
Upgrading surrounded areas and Rechanneling vehicles into a one-way route
Allowing for the establishment of administrative, services and tourism (Adding 2000 hotel rooms)
Setting adequate planning and building regulation that not permit that the foot print exceed 20%, and the remaining area consists of gardens and parks Developing and upgrading Nile Cornice
How to Achieve the Vision?
A Green Cairo
Increasing the competitiveness of the
Egyptian Capital
Culture and Media Sector
Industry Sector
Tourism Sector
Education Sector
Health Sector
Financial Sector
Telecommunications and Information Technology Sector
Better Region Administration
Housing and Slums
Improvement of Environment and Increasing Green Areas
Roads and Transportation
Drinking Water and Sanitation
Raising living standards to an Raising living standards to an
international level international level
Developing and upgrading Nile Cornice
Ramses Station
Business Corniche
Parks
Maspiro
Business Center
حدائق شارع رمسيس
Suspended Ramses Gradens
Khedival Cairo
Zamalek
Market
Ramses Square
Al-Warraq
Entertainment Parks
Hotel Palace Parks
Muhammad Ali Palace
Palace Bridge
Projected Layout
Business Corniche
Parks
Business Corniche
Parks
Hotel Corniche
Parks
Developing the Nile Corniche
(the Nile View) –
a 1200-feddan Tourism, Entertainment and Administration Center
Developing the Nile Cornice (the Nile View
Developing the Nile Cornice (the Nile View)
الوراق والدهب –تطوير الجزر النيلية
Dealing with Nile islands:•
Utilizing state-owned lands on Nile islands by turning them into well-
managed public parks•
Legalizing the tenure of the inhabitants of Nile islands, providing them with necessary services and adapting their economic activities to serve the new entertainment and tourism needs
•
Allowing (for a maximum of 10%) for entertainment and services activities
Development of Nile Islands
How to Achieve the Vision?
A Green Cairo
Increasing the competitiveness of the
Egyptian Capital
Culture and Media Sector
Industry Sector
Tourism Sector
Education Sector
Health Sector
Financial Sector
Telecommunications and Information Technology Sector
Better Region Administration
Housing and Slums
Improvement of Environment and Increasing Green Areas
Roads and Transportation
Drinking Water and Sanitation
Raising living standards to an Raising living standards to an
international level international level
Developing Korsaya
Island and Giza Corniche
1.
Establishing of El-Moneeb
Park 18 feddans
2.
Establishing of Korsaya
Island Park 80 feddans
3.
Moving Giza’s marinas to the island
4.
Developing the residential area to become a featured residential district, and allowing residents to establish restaurants and cafes
Korsaya
Island
Developing Residential Area
Developing Korsaya
Island and Giza Corniche
Developing Korsaya
Island and Giza Corniche
Imbaba
Airport Park(38 feddan)
Inauguration: end of 2010
How to Achieve the Vision?
A Green Cairoupgrading North of El Gizaupgrading North of El Giza
Cairo Central Park
Utilizing the southern part of the cemeteries’
area, which currently suffers from underground water, in establishing Cairo Central Park:
Providing new areas for cemeteries’(10000 feddans) east and west of GRC and relocation of old cemeteries’
Preserving monuments and unique historical buildings within the cemeteries’area and establishing a center for reviving traditional crafts
Building alternative housing units for current inhabitants of cemeteries (2000 families) and for dilapidated houses (1500 units)
Establishing Cairo Central Park (600 feddans)
How to Achieve the Vision?
A Green Cairo
Increasing the competitiveness of the
Egyptian Capital
Culture and Media Sector
Industry Sector
Tourism Sector
Education Sector
Health Sector
Financial Sector
Telecommunications and Information Technology Sector
Better Region Administration
Housing and Slums
Improvement of Environment and Increasing Green Areas
Roads and Transportation
Drinking Water and Sanitation
Raising living standards to an Raising living standards to an
international level international level
Area (fd)Area (m2)Name of DistrictName4.0617053.6Masr Al-QadeemaAin Al-Seera Cemeteries48.6204145.9Al-KhaleeefaSeedy Oqba Cemeteries114.6481607.9Al-KhaleeefaImam Leithy Cemeteries49.85209398.1Al-KhaleeefaBasateen Cemeteries157.2660558.3Al-KhaleeefaImam Shaf'y Cemeteries
Cairo Central Park
Sayeda
Nafeesa
Cemeteries
Imam Shaf'y
Cemeteries
Ain
Al-Seera
Cemeteries
Seedy Oqba
Cemeteries
Imam Leithy
Cemeteries
Basateen
Cemeteries
Groundwater Level –
1.5 mBurial Level –
2.5 m
How to Achieve the Vision?
A Green Cairo
Plan of Cairo Central Park Basateen
Cemeteries –
Ain
El-Seera
Plan of Cairo Central Park
Plan of Cairo Central Park
How to Achieve the Vision?
A Green CairoDegla
Safari Park
An area of 800 feddans
south of Qattameya-Ain
Sokhna
Road
Components of Vision
A Connected Cairo
CONNECTED
Issues on Development of Transportation Services in Greater Cairo until 2020
The number of vehicles in 2007 exceeded 2 million with an increase within the past three years by about 120,000 vehicles/year.
The number of transportation journeys by all means of transport within the GCR is expected to exceed 25 million by 2022.
The average speed per vehicle will drop from 18km/hour to 11.6 km/hour (unless the projects recommended in the 2002 Master Plan and the GCR 2050 vision are executed).
Informal passenger transportation constitutes 54% of the overall
current collective means of transportation.
Execution of the JICA Transportation Master Plan in GCR and Accelerating Connecting New Cities with Collective Transportation Network
Development Vision of Means of Transportation in GCR until 2020Accelerated expansion of scope of collective means of transportation providing individuals
with comfort and saving the time of the journey:•
Constructing a 350 km network of subway lines (four lines) (and
the supertram
and tramcar) until 2022 with a total cost of EGP 71 billion, over 12 years (EGP 51 billion of which will be allocated for subway lines 3 and 4).
•
Extending the destination of the existing and currently under progress four subway lines, scheduled to be executed in 2022, to reach the Ring Road.
•
Managing high capacity 9 collective bus lines on the Ring Road, and number of key Axis connected to destination subway stations on the Ring Road.
•
Ending railway trips from the north to the south at the Shobra
El-Khayma, Imbaba
and El-
Moneeb
destination subway stations, together with constructing interchangeable stations, waiting areas, and supplementary services at the suburbs of the GCR.
•
Connecting cities and new urban communities through public bus lines in the first phase, until supertram
lines or electrified railway lines are constructed.
This will eventually put an end to informal transportation
Proposed GCR Collective Transportation Types
Metro1
Network
Proposed GCR Metro Network
GCR Target in 205015 lines 600 km –
20km/mln capitaGradual implementation until 2022 , reaching the
rate of 15 km/mln
capita
Berlin
ParisMoscow
Subway and supertram
Lines in 2050©
Ashr
afAb
del M
ohse
n20
09
No. of linesKm/mlnSubway24Cairo
20Bangkok
31Sao Paolo
16150Paris
950Berlin
1230Moscow
3
-
1
3
-
1
9
7 3
-
12
7
1
7
7
3
-
2
7
(Existing 74) 2020 Metro 149 km
3
2
4
1
3
1
4
Roads and Transport : Subway and Supertram
Lines
3
-
37
3
-
2
4
-
1
5
3
3
-
2
New Business and Finance Center
Moving cemetries
from
Urban Expansion –
North-west
Imbaba
and North Giza
Geziret
El-Warak
Gardens
Tourist and Recreational Centre -
Corniche
Down-town clear-out
Urban Expansion
South-West
El-
Moneib
District Geziret
El Dahab
Gardens
Physical Expansion North 2020
2020 SUPERTRAM 130 km 2020 BUSWAY 157 km
3
-
1
8
9
7 3
-
12
7
1
7
3
-
5
7
3
-
27
73
2
4
1
3
1
Roads and Transport: Increasing Subway Lines
3
-
3
5
3
-
3
3
-
4
3
-
4
3
-
2
3
Cairo Mega Projects
2030
Rarefaction of Ain
Shams & Mataria
Areas
Rarefaction of Dar El-Salam & Basateen
Areas
New Governmental Qurarter
Parks
Airport parks
Khofo
Plaza Axis Road
Open Sphinx Museum
Al-Azhar
Central Parks
Fostat
Parks
2030 Metro 49 km4
-
1
2020 Metro 149 km
2020 supertram
130 km
2020 BUSWAY 157 km2030 supertram
50 km
5
5
4
Network
GCR Proposed Bus Network
Bus 2
Providing express public transit service through:1-
dedicated lanes allocated within the Freeways Network connecting GCR.2-
Allocating specific roads for this service.
Key Axises
& connecting Cairo to new cities
•
Modern dual-mode buses connecting GRS districts.
•
E-payment systems.•
Promotional commercials on the bus chasse•
Flat rate•
Central and subordinate stops and parks (land ports)
Introducing Bus Rapid Transit System
©As
hraf
Abde
l Moh
sen
2009
Capacity 150-200 passengers.
GCR Collective Transport Development Project
Cairo Bus
ALL Line -
km
القاهرة الكبرى–مشروع تطوير النقل الجماعى Greater Cairo Transit systems
Line 1
Line 2
Line 2Line 3
Line 4
Metro (4)
Line 5
Line 6
Line 6
Line 5
Line 7
Line 7
ALL Lines –
9 L
The dual-mode bus network connecting main roads, metro and tram lines and
railway stations before 2020
Line 8
Line 9
Road El-Farag
Axis
26 July Axis Ring Road
Eِl-Obour
New Cairo
To Helwan
Shobra
El-
Khayma
New Cairo
El-
Mohandeseen
Boulaq
El-
Dakroor
Heliopolis
El-Sayideah
Eisha
Upper Egypt Railway lines
North railway lines
Road El-Farag
Tram
tober Tram
Heliopolis Tram
Ain Shams
Tram
Line 4
Metro (3)
Metro (2
Metro 4
Metro 3
Metro 1
Metro 1Greater Cairo Transit systems
8585
Development of the Ring Road to cover the service and track roads of the single-
decker bus
8686
Development of the Ring Road to cover the service and track roads of the single-decker bus
GCR Proposed Freeways Network
Freeways 2Network
Construction of Freeways Network in GCR
•
The Freeways Network length was 156 km in 2009 (covering the Ring Road, El-Maryouteyah
Axis and Saft
El-Laban).
•
GCR per capita share of the Freeways network in 2009 was 10km/mln capita.
•
Total length of the Freeways network required for GCR until 2030
is 750 km long.
•
The northern arch of the Regional Ring Road (148 km) and the southern arch (48 km) are currently underway (total length of 350 km).
•
Road El-Farag
Axis is currently being prepared for tender to be executed within three years extending for 39 km.
•
The GCR per capita share of the Freeways network in 2030 will reach 32 km/mln
capita.
Current and Projected Lengths of the Freeways Network
A 250 km long regional Ring Road
Existing urban Ring Road number 1 of 120 km long
Existing Freeways 36 km.
Freeways requested before 2020 80 km.Freeways requested before 2030 in 90 km long
Ring Road number 2 in 2020 with 25 km longRing Road number 3 in 2020 in the length of 34 km.Ring Road number 4 in 2030 in the length of 48 km.
Lengths of existing, currently underway and planned freeways and
urban Ring Roads amount to 206 km.
Lengths of freeways and Ring Roads requested before 2020 amount to 260 km.
Lengths of freeways and Ring Roads requested before 2030 amount to 138 km.
Lengths of regional freeways currently underway amount to 350 km.
Regional exits are requested to be developed and constructed in the length of 180 km for 15 roads.
Enterances
to regional roads requested before 2015 of 200 km long
p
El-
Obour
6 October Hadabet
El-Ahram
مصر الجد يدة
القاه رة
Airport
Maadi
Sokhna
Suez
Ismailia
Cairo/Belb
eis
Cairo/Fayoum
Delta
Upper Egypt
El-Shorouk
Helwan
El-
Amal
Ring Road 2
Ring Road 4
Oasis
Ring Roads around New Cairo (55 km)
6 of October and Zayed
(70 km) in 2020.
Road El-Farag
Axis
Ring Road
Ale
xand
ria
agric
ultu
ral r
oad
Ismailia desert
road
Cairo/Suez
Qatameyah/Sokhna
Alexandria desert
road
Cai
ro/A
swan
Ring Road to 6 of
October city
New C
airo
Ring
Roa
d
Ring Road 3
آم32
آم27
The Regional Ring Road 380 KmPart 1 –
in progress (Ministry of Transportation) 164 km.Part 2 –
in progress (Ministry of Housing) 48 km.Part 3 –
(Ministry of Housing/Ministry of Defense) 108 km.
Alexandria Desert Crossroad km. 98
Oasis Crossroads at km 70
Ring Road bridgeFayoum
Crossroad km.43
ر
تقاطع اسكندرية الزراعي
Ismailia Desert Crossroad
Suez cross road
October Airport
El-Sadat city
October city
Qatameyahر
Crossroad
El-Asher City
New Cairo city
Road El-Farag
Axis
Part 3 –
under consideration (Ministry of Defense) 60 km.
Connecting new cities without permeating Cairo urban block
Connecting new cities and the Delta governorates.
Opens development horizons in the Eastern and Western Deserts.
Facilitation of communication between the Canal cities, Sinai and middle Delta governorates.
Connecting New Cities with GCR
Rapid Transit 4Supertram
–
Monorail
2
7
3
2
4 1
5
New business centre
نقل المقابر من وسط المدينة
Urban expansion northern
west
Imbaba
and northern Giza
Hadayek
Gezeiret
El-
Warraq
The tourist entertainment
centre -
courniche
Vacating down town
Physical Expansion –
South-west
El-Moneeb
district
Hadayek
Gezeiret
El-
Dahab
Rapid metro Ain
Shams/El-Asher city (in
progress)
Heliopolis/New Cairo Metro –
in progress
2-1
2-2
2-3
2-4
1-3
1-11-4
1-2
1-2
1-4
1-1
1-3Road El-Farag Axis
and railway lines –
under
commissioning
26 July Axis
Oasis Axis
First metro line (existing)
Second metro line (existing)
Third metro line (in progress)
Fourth metro line (under design)
TramlineBus lines
Connecting new cities via the Ring Road and the metro, supertram
and isolated bus lines
Railway and Land Connection Projects with 6th
of October City
Gaff Industrial Port
26 july
Axis
Road El-Farag
Axis
مصر/
اسكندرية
Oasis
road
يوم الفيقطر
اآتوبر6مدينة
El-Sheikh Zayeddistrict
El-Manashy
Railway
October tunnel km 39
Toll station29
خط سكك حديد الواحات
Ring Road
October station
The desert station
Imbaba
station
El-Wahat
Station
Road El-Farag
Axis, 34 km long and 65 m wide
Phase 3 of the third metro line 2007/2012
Isolated track for buses
Phase 1 of the fourth metro line
Track for rapid tram or metro
Second existing metro line
El-Bohooth
station
Second metro line
Third metro line
Ring Road to
October city
Road El Farag
Crossroad with Ring Road
1 12
Course of Road El-Farag
Axis
First sector: (from Alexandria Desert Road until the Ring Road)Developing of track 20 km in length and full breadth of 52.20 m (4 lanes in every direction + railway bridges)
Second sector: (from the ring road until Corniche
El-NilTotal length of 4.2 km and full breadth of 45m/4 lanes in every
Connecting New Cairo to the Ministries Quarter via 21 km Rapid Tram
Stadium station
End of the curent
line
New Cairo
etro line
Women’s College Station
Connecting El-Asher City and the new Cities located on Ismailia Road via rapid
metro line with the first and third subway lines and the bus lines.
Dry port station2
El Asher 4 station
Dry port 1 station
Cairo/Ismailia desert r
oad
El Asher 1 station
/proposed industrial
site/400 feddans
El-Robeiky
city 3 stationBadr
city 1 stationHeliopolis station
El-Shorouk
city stationDarb
El-Hag stationEl-Obour
city station
El-Salam city station
Ain
Shams station
Developers lands
Cairo /Giza Proposed Underground Garages
Underground 5Garages
Expansion of construction of multi-story garages in Greater Cairo Region until 2020
•
A group of sites are allocated in each of Cairo and Giza governorates and connecting same to the economic activities to generate lucrative revenues to be channeled into constructing garages in high-profit areas
Construction of a group of multi-story garages in the heart of the city and districts suffering from shortage of parking areas:
•
New buildings should be bound to provide parking areas pursuant to the new building law and to open the existing garages.
Exchange Terminals and Stations
Exchange Stations 6
Expansion of the construction of transportation and Transit Centres
in Greater Cairo Region until 2020
•
Encouraging citizens to use collective means of transportation interconnected via exchange stations.
•
Distribution of the heavy density of citizens flowing into Cairo
over more than one point instead of Ramses station.
•
Limiting the entry of private cars into the heart of Greater Cairo
•
Financing these stations in collaboration with the private sector and realizing an economic revenue for the governorate through the accompanying commercial and administrative activities
Objectives:
Proposed land stations and terminals:•
Qalyoub
and Aboud
in Shobra
El-Kheima
-
Qalyoubeyah
•
El-Torgoman
–
Cairo
•
El-Moneeb
-
Giza
•
Helwan
land terminal –
Helwan
station
•
Western Imbaba
–
6 October
Transportation and Transit Centre in GCR
El-Ataba
station
Ghamra
stationNasr City station
El-
Bohooth
station
External transportation and transmit stopsInternal transportation and transmit stops
El-Tahrir
station
Qalyoub
Imbaba
station
El-MargEl-Salam
New CairoEl-Ramayah
station
El-
Moneeb
station
Awel
Helwan
station
Aboud
station
El-Torgoman
station Ring R
oad
Road El-Farag
Axis, tram and bus
26th
July Axis and Bus
Transportation and Transit Centre at El-Moneeb
Ring Road
Upper Egypt
road
Proposed transportation and transmit centre
Second
metro
line
El-
Moneeb
metro station
Collective transportation stop
Upper
Egypt
raiway
lines
El-Moneeb
land terminal project:1-
Collective transportation stops–Central train station–The city bus 50 passengers–Governorate bus 200 passengers–Microbus 2500 passengers–Taxi and private cars 2500 passengers–Subway
2-
Mall with a surface area of 25000m23-
administrative building4-
landscape with a surface area of 1.5 feddans.
ة Moneeb
District Vision-
Giza
Surface and underground bus stops
VIP entry to the terminal
Moneeb
land terminal project3D Zoning3D Zoning
©As
hraf
Abde
l Moh
sen
2009
Imbaba
terminal project for transportation and transmit
موقع الورشة المقترحة
2 م165000 بمساحة ) 2بديل (
محطة مترو
Ring Road
El-B
oohy
stre
et
El-Sudan street
The exchange station and terminal site includes:
The third subway line terminal
Road El-Farag
Axis
Road El-Farag
Axis, tram and bus line
Rapid train station between Alexandria/Cairo/Aswan
Itay
El-B
aroo
dra
ilway
sta
tion
Rapid train station
Third metro line terminal
Road El-Farag
Axis, tram and bus line
GCR Urban Transport Services and Traffic Management
Urban Transport 7Management
The executive procedures for the establishment of the Urban Transportation Projects Planning and Administration Authority at the GCR level
Coordination with the governorates to connect main collective transportation services to internal lines to serve the districts of every governorate
Standardization of the transportation ticket of the various means of transportation within the GCR and to link it to integrate the service
The institutional framework of the planning and management of the urban transportation services at the GCR level
Thank You
Cairo Transit systems 2050