![Page 1: Cabras 3 Recovery Project Updateftpcontent.worldnow.com/kuam/custom/news/GPA C3R Update 0320… · C3R Schedule Milestone Start Date Finish Date Notice to Proceed (NTP) issued 1/30/2013](https://reader033.fdocuments.us/reader033/viewer/2022051510/60024e7ef34af061ae5ac0fd/html5/thumbnails/1.jpg)
Cabras 3 Recovery
Project Update
March 20, 2013
![Page 2: Cabras 3 Recovery Project Updateftpcontent.worldnow.com/kuam/custom/news/GPA C3R Update 0320… · C3R Schedule Milestone Start Date Finish Date Notice to Proceed (NTP) issued 1/30/2013](https://reader033.fdocuments.us/reader033/viewer/2022051510/60024e7ef34af061ae5ac0fd/html5/thumbnails/2.jpg)
Cabras 3
• Cabras 3
Generator
produces 39
Megawatts of
power
Cabras 3 Engine
![Page 3: Cabras 3 Recovery Project Updateftpcontent.worldnow.com/kuam/custom/news/GPA C3R Update 0320… · C3R Schedule Milestone Start Date Finish Date Notice to Proceed (NTP) issued 1/30/2013](https://reader033.fdocuments.us/reader033/viewer/2022051510/60024e7ef34af061ae5ac0fd/html5/thumbnails/3.jpg)
Cabras 3 Generator
• Cabras 3 is
one of
GPA’s most
modern
and
efficient
generators.
![Page 4: Cabras 3 Recovery Project Updateftpcontent.worldnow.com/kuam/custom/news/GPA C3R Update 0320… · C3R Schedule Milestone Start Date Finish Date Notice to Proceed (NTP) issued 1/30/2013](https://reader033.fdocuments.us/reader033/viewer/2022051510/60024e7ef34af061ae5ac0fd/html5/thumbnails/4.jpg)
Issue Assessment Cabras 3
Recovery Plan
• In late 2012
a problem
was
discovered
with the
shaft of the
generator
![Page 5: Cabras 3 Recovery Project Updateftpcontent.worldnow.com/kuam/custom/news/GPA C3R Update 0320… · C3R Schedule Milestone Start Date Finish Date Notice to Proceed (NTP) issued 1/30/2013](https://reader033.fdocuments.us/reader033/viewer/2022051510/60024e7ef34af061ae5ac0fd/html5/thumbnails/5.jpg)
Issue Assessment Cabras 3
Recovery Plan
• The extent and the consequences of
the problem were not apparent.
– The appropriate response was to:
• Shut down Cabras 3 to avoid further damage
• Establish a recovery plan
• Determine the cause
• Make sure that Cabras 4 is not affected
• Take immediate steps to bring Cabras 3 back
online as soon as possible
![Page 6: Cabras 3 Recovery Project Updateftpcontent.worldnow.com/kuam/custom/news/GPA C3R Update 0320… · C3R Schedule Milestone Start Date Finish Date Notice to Proceed (NTP) issued 1/30/2013](https://reader033.fdocuments.us/reader033/viewer/2022051510/60024e7ef34af061ae5ac0fd/html5/thumbnails/6.jpg)
The Action Plan Is Underway
• The necessary dismantling of Cabras
3 has been completed
• Replacement of the cracked shaft is
underway
• An overhaul of the engine has
begun
• Completion of project is scheduled
for September 16th.
– On Budget
– Within Scope
– On time
![Page 7: Cabras 3 Recovery Project Updateftpcontent.worldnow.com/kuam/custom/news/GPA C3R Update 0320… · C3R Schedule Milestone Start Date Finish Date Notice to Proceed (NTP) issued 1/30/2013](https://reader033.fdocuments.us/reader033/viewer/2022051510/60024e7ef34af061ae5ac0fd/html5/thumbnails/7.jpg)
C3R Schedule
Milestone Start Date Finish Date
Notice to Proceed (NTP) issued 1/30/2013 1/30/2013
Disassembly 2/20/2013 3/14/2013
Begin Lloyd’s third-party inspection 3/5/2013 3/14/2013
Prepare & submit manufacturer’s report 3/13/2013 4/15/2013
Material testing & preparation of report by Lloyd’s 3/15/2013 4/30/2013
Overhaul of engine 12/27/2012 6/7/2013
Installation, assembly, and balancing 7/22/2013 9/16/2013
Completion 9/16/2013 9/16/2013
![Page 8: Cabras 3 Recovery Project Updateftpcontent.worldnow.com/kuam/custom/news/GPA C3R Update 0320… · C3R Schedule Milestone Start Date Finish Date Notice to Proceed (NTP) issued 1/30/2013](https://reader033.fdocuments.us/reader033/viewer/2022051510/60024e7ef34af061ae5ac0fd/html5/thumbnails/8.jpg)
Cabras 3 Recovery Team
![Page 9: Cabras 3 Recovery Project Updateftpcontent.worldnow.com/kuam/custom/news/GPA C3R Update 0320… · C3R Schedule Milestone Start Date Finish Date Notice to Proceed (NTP) issued 1/30/2013](https://reader033.fdocuments.us/reader033/viewer/2022051510/60024e7ef34af061ae5ac0fd/html5/thumbnails/9.jpg)
Step 1 Disassembly: Remove the
Stator Housing
• Remove the Poles
• Stator Winding cut and
removed Feb. 22 - 26
• Each Stator Winding
Consists of three sets of
copper bars wound
around the housing
• Remove the Housing
![Page 10: Cabras 3 Recovery Project Updateftpcontent.worldnow.com/kuam/custom/news/GPA C3R Update 0320… · C3R Schedule Milestone Start Date Finish Date Notice to Proceed (NTP) issued 1/30/2013](https://reader033.fdocuments.us/reader033/viewer/2022051510/60024e7ef34af061ae5ac0fd/html5/thumbnails/10.jpg)
Upper Stator Major Lift #1
February 27
![Page 11: Cabras 3 Recovery Project Updateftpcontent.worldnow.com/kuam/custom/news/GPA C3R Update 0320… · C3R Schedule Milestone Start Date Finish Date Notice to Proceed (NTP) issued 1/30/2013](https://reader033.fdocuments.us/reader033/viewer/2022051510/60024e7ef34af061ae5ac0fd/html5/thumbnails/11.jpg)
Upper Stator Major Lift #1
Completed February 27th
• The upper stator assembly weight = 59 tons.
![Page 12: Cabras 3 Recovery Project Updateftpcontent.worldnow.com/kuam/custom/news/GPA C3R Update 0320… · C3R Schedule Milestone Start Date Finish Date Notice to Proceed (NTP) issued 1/30/2013](https://reader033.fdocuments.us/reader033/viewer/2022051510/60024e7ef34af061ae5ac0fd/html5/thumbnails/12.jpg)
Remove the Upper Rotor Disk
• Twenty-four (24) bolts connected the two rotor
disc halves.
• The rotor disc is attached to
the shaft connecting flange,
with another twenty-four (24)
bolts.
![Page 13: Cabras 3 Recovery Project Updateftpcontent.worldnow.com/kuam/custom/news/GPA C3R Update 0320… · C3R Schedule Milestone Start Date Finish Date Notice to Proceed (NTP) issued 1/30/2013](https://reader033.fdocuments.us/reader033/viewer/2022051510/60024e7ef34af061ae5ac0fd/html5/thumbnails/13.jpg)
Upper Rotor Disc Removal
Major Lift #2 March 9
![Page 14: Cabras 3 Recovery Project Updateftpcontent.worldnow.com/kuam/custom/news/GPA C3R Update 0320… · C3R Schedule Milestone Start Date Finish Date Notice to Proceed (NTP) issued 1/30/2013](https://reader033.fdocuments.us/reader033/viewer/2022051510/60024e7ef34af061ae5ac0fd/html5/thumbnails/14.jpg)
Upper Rotor Disc Removal
Major Lift #2 Mar. 9 On Schedule
![Page 15: Cabras 3 Recovery Project Updateftpcontent.worldnow.com/kuam/custom/news/GPA C3R Update 0320… · C3R Schedule Milestone Start Date Finish Date Notice to Proceed (NTP) issued 1/30/2013](https://reader033.fdocuments.us/reader033/viewer/2022051510/60024e7ef34af061ae5ac0fd/html5/thumbnails/15.jpg)
Upper Rotor Disc Removal
Weight 102 Tons
![Page 16: Cabras 3 Recovery Project Updateftpcontent.worldnow.com/kuam/custom/news/GPA C3R Update 0320… · C3R Schedule Milestone Start Date Finish Date Notice to Proceed (NTP) issued 1/30/2013](https://reader033.fdocuments.us/reader033/viewer/2022051510/60024e7ef34af061ae5ac0fd/html5/thumbnails/16.jpg)
Shaft & Lower Disc Exposed
![Page 17: Cabras 3 Recovery Project Updateftpcontent.worldnow.com/kuam/custom/news/GPA C3R Update 0320… · C3R Schedule Milestone Start Date Finish Date Notice to Proceed (NTP) issued 1/30/2013](https://reader033.fdocuments.us/reader033/viewer/2022051510/60024e7ef34af061ae5ac0fd/html5/thumbnails/17.jpg)
• Generator shaft and
lower rotor disc are
chained together for the
final lift.
• The shaft and lower rotor
disc weigh 155 tons
– 102 tons for lower disc half
– 53 tons for shaft
Step 3: Lower Rotor Disc and
Generator Shaft Removal March 13
![Page 18: Cabras 3 Recovery Project Updateftpcontent.worldnow.com/kuam/custom/news/GPA C3R Update 0320… · C3R Schedule Milestone Start Date Finish Date Notice to Proceed (NTP) issued 1/30/2013](https://reader033.fdocuments.us/reader033/viewer/2022051510/60024e7ef34af061ae5ac0fd/html5/thumbnails/18.jpg)
Lower Rotor Disc and Generator Shaft
Removal Lift #3 March 13 On
Schedule
![Page 19: Cabras 3 Recovery Project Updateftpcontent.worldnow.com/kuam/custom/news/GPA C3R Update 0320… · C3R Schedule Milestone Start Date Finish Date Notice to Proceed (NTP) issued 1/30/2013](https://reader033.fdocuments.us/reader033/viewer/2022051510/60024e7ef34af061ae5ac0fd/html5/thumbnails/19.jpg)
Next Steps
• Now that the generator is disassembled, the
connecting area of the two rotor disc
halves will be inspected for cracks and any
damage.
• After inspection and analysis, a
determination will be made whether a new
rotor disc will be needed.
• A full report of the findings will be made to
the PUC in late April
![Page 20: Cabras 3 Recovery Project Updateftpcontent.worldnow.com/kuam/custom/news/GPA C3R Update 0320… · C3R Schedule Milestone Start Date Finish Date Notice to Proceed (NTP) issued 1/30/2013](https://reader033.fdocuments.us/reader033/viewer/2022051510/60024e7ef34af061ae5ac0fd/html5/thumbnails/20.jpg)