CA Industrial Storm Water Program Brainslam
An intensive overview of the program, its key principles, and likely future –slammed into a 20 minute format.
Greg Gearheart, PECA State Water Board
916.341.5892
The view ahead….
Grand Slam Game Plan
• Two main concepts to take home from this:
1. Effluent Limitations are not the same as Receiving Water Limitations (dually enforceable under current scheme)
2. Numerics come in 4 basic varieties, but we have the technology to make new hybrids or varieties.
SW Permits
• National Pollutant Discharge Elimination System (NPDES) Permit
• Effluent Limitations – Provisions– Prohibitions– SWPPP (by extension)– Technology-based standards, mostly
• Receiving Water Limitations– Water Quality Standards (WQS)
Technology Based Standards
• Industrial and construction: BAT/BCT
• Permits may require best management practices (BMPs)
• In establishing requirements, permit writers use best professional judgment (BPJ)
• NRDC v USEPA: states establish BMP requirements
Water Quality Standards
• Water Quality Standards are made up of:– Beneficial Uses (designated to specific waterbodies),
plus– water quality criteria; and– an antidegradation policy.
• Beneficial Uses (BUs) are:• often not directly related to key water resource uses
valued by communities (it might take a suite of them to protect wetlands and streams, for example)
• Narrative or Numeric
Humboldt BayBUs:
• REC1• REC2• NAV• WILD• EST• MAR• MIGR• SPWM• SHELL
SW Effluent Limitations
Receiving Water Limitations
Narrative: reduce pollutants using BAT/BCT - technology-based standard
Do not cause or contribute to anExceedance of a water quality standard (WQS).
Numeric: could be technology- (TBEL) or water quality-based (WQBEL)
ExampleStorm Water (SW) Dischargesfrom an industrial facility toHumboldt Bay
Humboldt BayBUs:
• REC1• REC2• NAV• WILD• EST• MAR• MIGR• SPWM• SHELL
ExampleStorm Water (SW) Dischargesfrom an industrial facility toHumboldt Bay
SW Effluent Limitations
Technology-based BMPs:• Covering waste piles• Sweeping/cleaning of open areas• Treatment (basins) of solids• Etc.
Receiving Water Limitations
Numbers – TSS < 100 mg/LNarrative – “no toxics in toxic amounts”
Humboldt BayBUs:
• REC1• REC2• NAV• WILD• EST• MAR• MIGR• SPWM• SHELL
ExampleStorm Water (SW) Dischargesfrom an industrial facility toHumboldt Bay
SW Effluent Limitations
Technology-based BMPs:• Covering waste piles• Sweeping/cleaning of open areas• Treatment (basins) of solids• Etc.
Receiving Water Limitations
Numbers – TSS < 100 mg/LNarrative – “no toxics in toxic amounts”
(1) Enforce ELs
(2) Enforce RWLs
Compliance Scenarios
• ELs are violated and RWLs are fine• ELs are violated and RWLs are violated• ELs are fine and RWLs are fine• ELs are fine and RWLs are violated
• TBALs and WQBALs indicators for ELs and RWLs
• TBELs and WQBELs direct compliance measures for ELs (in the case of WQBELs these also should ensure RWL compliance)
The Challenge of Numerics
• Effluent limitations can either be “narrative” or “numeric”
• Numeric effluent limitations can either be “technology-based” or “water quality-based”
• Benchmark values are being used my many as training wheels for NELs– And just to be different, CA calls these
“Numeric Action Levels” - NALs
NELs and NALs
Water Quality Technology
Numeric Effluent Limitations
WQBELs TBELs
Numeric Action Levels WQBALs TBALs
WQBELs
• Derived from water quality standards
• Apply to the effluent at the point of discharge
• Could include mixing zone or dilution credit
• If NELs are met, water quality standards (WQS) would be met (in theory)
• Site specific!
TBELs
• Using the BAT/BCT approach, these are derived from performance data on specific BMPs (probably treatment control, but could be others, too)
• Apply to the effluent at the point of discharge
• Probably somewhat sector specific, but otherwise generally applicable
Action Levels
• aka Benchmark values in the MSGP
• These are typically a hybrid of technology- and water quality-based values
• MSGP values are derived from water quality criteria, however not site specific (nor are they CA specific)
• If exceeded these generally do not constitute a violation of the permit
CA Expert Panel on Numerics
• Recommended differentiating between TMDL based NELs and the rest of the pack
• Recommended a specific approach to setting TBALs and TBELs
• Technology-based numbers should be based on effluent characterization data – mean plus one or two standard deviations
• Panel went on to say our data was not acceptable
More on TBALs, TBELs, WQBALs and WQBELs
• Effluent data is only helpful in setting technology-based numbers if there is more known about the relationship to BAT/BCT implementation
• Some individual NPDES permits for industrial storm water have WQBELs – Boeing SSFL, refineries, etc.
Charts and graphs.
Industrial Facilities Inspected FY10/11
Industrial Facilities Inspected FY10/11
Industrial Facilities Submitting Annual Reports FY10/11
Industrial Facilities Submitting Annual Reports FY10/11
Next steps.
IGP - Next Steps
• Release new IGP draft (early November)
• Public, staff workshops (outreach) in November and December
• Public Hearing in December
• Comment period ends
• Staff digests and puts out FINAL draft for adoption
• Adoption in Spring 2012
Greg Gearheart | 916-341-5892 | [email protected]