C122-OVE-A-DDD-CR148_SD013_Z-51501

1
+114.268 TOS + 113.500 +113.879 +114.268 TOS + 113.500 + 115.000 Top of Parapet +114.700 www.crossrail.co.uk Rev : E14 5LQ London Canary Wharf 25 Canada Square Crossrail Limited Notes Originator : Location : Scale : Drawing and CAD file No : Title : Suitability : Date Rev. Description By Chkd App ' Crossrail $Pby$ By : Auth : Contract : @ A1 Chk : App : Auth using an approved safe method of working. and competent contractors carrying out the work These notes are based on the use of experienced Diii. Dii. Di. Dismantling/Demolition (Future) Miii. Mii. Mi. Maintenance Oiii. Oii. Oi. Operations Ciii. Cii. Ci. Construction normally associated with this type of work: Notes below are additional to hazards/risks Safety, Health and Environmental Information REST RI CTED P01.1 Envelope Details Accommodation Building 1:5 P01.1 Ove Arup & Partners Limited Plumstead Sidings C122-OVE-A-DDD-CR148_SD013_Z-51501 --- --- - - SM S0 W o r k i n p r og r e ss Bored Tunnels (Alignment and Track) --- - Floor Detail D 1:10 A - Floor Detail F 1:10 A - Sp o r t sGr o un d Si e n n a De p o t Fac t o r y Ce n t r e Co mmu n i t y Al l o t me n t Ga r d e n s Si e n n a N 0 500mm 100mm 200mm 300mm 400mm 100mm S.MCCLYMONT First Issue 06/03/2015 A - B - D C Air tight sealing strip or membrane Waterproof sealing strip or membrane Top of Paver with opening vent EWS-203 Curtain wall EWS-101 Insulated metal sill AM-104 Secondary steel angle 2 Layers plasterboard IWS-201 Metal partition system IWS-220 Insulated metal cladding panels EWS-301 Outside to Inside Primary steel structure 150 610 140 470 50 500 150 metal panels EWS-301 Insulated cladding Metal parapet copping AM-102 Metal trim AM-101 Concrete slab on profiled metal deck Vapour control layers RFS-101 Insulation RFS-101 Roofing membrane RFS-101 Paving slab on spacers EXT-101 Top to Bottom D C B A

Transcript of C122-OVE-A-DDD-CR148_SD013_Z-51501

+114.268

TOS + 113.500

+113.879

+114.268

TOS + 113.500

+ 115.000

Top of Parapet

+114.700

www.crossrail.co.uk

Rev :

E14 5LQ

London

Canary Wharf

25 Canada Square

Crossrail Limited

Notes

Originator :

Location :

Scale : Drawing and CAD file No :

Title :

Suitability :

DateRev. Description By Chkd App

' Crossrail

$P

by

$

By :

Auth :

Contract :

@ A1

Chk :

App :

Auth

using an approved safe method of working.

and competent contractors carrying out the work

These notes are based on the use of experienced

Diii.

Dii.

Di.

Dismantling/Demolition (Future)

Miii.

Mii.

Mi.

Maintenance

Oiii.

Oii.

Oi.

Operations

Ciii.

Cii.

Ci.

Construction

normally associated with this type of work:

Notes below are additional to hazards/risks

Safety, Health and Environmental Information

RE

ST

RIC

TE

D

P01.1

Envelope Details

Accommodation Building

1:5 P01.1

Ove Arup & Partners Limited

Plumstead Sidings

C122-OVE-A-DDD-CR148_SD013_Z-51501

---

---

-

-

SM

S0

Work in pro

gress

Bored Tunnels (Alignment and Track)

---

-

Floor Detail D

1:10

A

-

Floor Detail F

1:10

A

-

1413121110090807060504030201

15161718192022 21232425262728

1413121110090807060504030201

15161718192022 21232425262728

3

Ps

Ps

1

65

Bowling Green

Sports Ground

El Sub Sta

WHITE H

ART AVENUE

67 to 70

El Sub Sta

Tanks

5

Posts

Ps

Ps

65

7

P

Sienna

Ps

89a 91 91a 93 93a 95 95a

95b95c

97 97a 99 99a

2

133

1

49

92

MARMADON ROAD

104

59

63

83

83a

79

79a

81

68

81a

85

69

85a

87

87a

89

69a 71 71a

73

73a 75

82

75a 77 77a 79 79a 81 81a

35

83 83a 85

2.3m

85a 87

40

87a

110

89

Depot

NORTH ROAD

WHITE HART AVENUE

Timber Yard

Timber Yard

Factory

El Sub Sta

Centre

Community

136

Sports Ground

1.6m

Allotment Gardens

Posts

Sienna

65.4

22600 N

0 500mm100mm 200mm 300mm 400mm100mm

S.MCCLYMONT

First Issue06/03/2015

A

-

B

-

D C

Air tight sealing strip or membrane

Waterproof sealing strip or membrane

Top of Paver

with opening vent EWS-203

Curtain wall EWS-101

Insulated metal sill AM-104

Secondary steel

angle

2 Layers plasterboard IWS-201

Metal partition system IWS-220

Insulated metal cladding panels EWS-301

Outside to Inside

Primary steel

structure

150

610

140470

50500150

metal panels EWS-301

Insulated cladding

Metal parapet copping AM-102

Metal trim AM-101

Concrete slab on profiled metal deck

Vapour control layers RFS-101

Insulation RFS-101

Roofing membrane RFS-101

Paving slab on spacers EXT-101

Top to Bottom

D

C

B

A