Buro Happold HotelsIntroduction

Buro Happold has first-hand knowledge of the hotel sector – our design skills have been applied to a wide range of projects around the world. We have worked on all hotel types, from travelodges and resort apartments through to prestigious five-star ‘designer’ hotels and spectacular mixed-use developments.

We strive to raise the benchmark for the standard of hotel design. A successful hotel should exceed guests’ expectations of quality, comfort and convenience and have a measurable impact on profitability. Our expertise in hotel design and construction has been gained over many years of involvement with this type of building.

Buro Happold’s engineers work closely with architects, interior designers, caterers, datacomms specialists and hotel management to provide multi-disciplinary solutions that afford best value and lowest capital cost. We recognise that as a business a hotel must make the most efficient use of materials, energy systems and staffing resources.

Ultimately, a hotel exists to deliver service to its guests, so ease of access to rooms and front-of-house areas is critical. Our flexible designs take into account a hotel’s unique zonal layout, where a honeycomb of bedrooms co-exists with public spaces, receptions, bars, restaurants, sports and conference facilities.

An integrated approach to the design process means that our hotels, in common with all the best hotels, are fully co-ordinated, fusing hotel functionality with construction and engineering features that improve the performance of the building – for example, the right facade should enhance guest comfort by regulating the internal environment.

Buro Happold’s detailed understanding of technical and procurement options enables us to add value to both the initial project and to the operational life

of the hotel. With superb engineering based on a clear understanding of our clients’ needs, we bring unrivalled know-how and a wealth of experience to innovative hotel design.

Buro Happold works in conjuction with G&H Group for Verbus Systems developing modular construction projects. The Verbus System is a proven globally deployed patented technology which allows high quality modular accommodation to be produced at low cost and delivered to any site in the world.

Page 4: Buro Happold - Hotel Capability Statement 2010

4

Hot

el C

apab

ility

Images copyright: Buro Happold/Mandy Reynolds

Clerkenwell HotelLondon, UK

Located on Clerkenwell Road, one of London’s most fashionable neighbourhoods, the Zetter Restaurant & Rooms is conveniently situated on the edge of the city just a ten-minute ride from the West End. This new four-star designer hotel was constructed within a refurbished warehouse and is comfort cooled, with 59 bedrooms, 7 penthouse suites, conference facilities, bars and a high-class restaurant.

The key issues for the project were:

Sustainability - the services installations were designed for energy efficiency, utilising a borehole cooling system and heat pumps to heat and cool the building. The borehole water was also utilised for hotel flushing.

Fire engineering - a comprehensive fire engineering solution was developed to enable the building to be designed with only a single staircase. Computational fluid dynamics modelling was undertaken to analyse the smoke control within the atrium. The atrium smoke vents also facilitate natural ventilation of the smoke during the summer periods.

Acoustics - the listed facade and close vicinity to a very large inner city roads created a challenging acoustic environment. Secondary glazing, internal twin wall partitions and airtight seals on the bedroom doors were specified to minimise noise transmission.

Plant space - to maximise the number of headroom within the constrained roofline, sectors of the roof were designed to be removed to facilitate maintenance. The use of borehole cooling and heat pumps alleviated the need to provide rooftop chillers.

Key project information

Client Urban Hotel Group Architect Chetwood Associates Project value £10mDates Completed 2003

Services provided by Buro Happold

Building services engineering, fire engineering, acoustic engineering, sustainability consultancy

Page 5: Buro Happold - Hotel Capability Statement 2010

Buro Happold

5

Buro Happold is collaborating with Foster and Partners on this new build, 10- storey hotel in the heart of London. The hotel is situated at the east end of the Strand, on the site of Marconi House, the historic building where the first public radio broadcast took place in 1922. The new building will combine the restoration of the listed facade of Marconi House with a new Portland stone building, and will correspond perfectly with the adjacent apartment buildings.

The hotel is aiming for a five-star rating and will provide 170 bedrooms and 90 apartments. Restaurants, bars, a rooftop terrace and a central atrium will also be provided.

The client is based in Spain and has a history of producing high-quality hotels. Among their most recent initiatives was their highly publicised decision to choose four architects to complete single floors of the same hotel.

Key project information

Client Grupo Urvasco S.A. Architect Foster and PartnersProject value £90mDate 2004 - 2007

Services provided by Buro Happold

Structural engineering, ground engineering, fire engineering design & risk assessment (FEDRA), infrastructure (drainage), health & safety/planning supervision.

Copyright: Foster and Partners

Silken HotelLondon

Page 6: Buro Happold - Hotel Capability Statement 2010

6

Hot

el C

apab

ility

Greenwich Peninsula - AEG HotelLondon, UK

The project is a 65,000m2 Hotel with banqueting, exhibition, swimming pool, health spa and serviced residential units, located next the Millenium Dome on Londons Greenwich Peninsula. Buro Happold provided all major engineering design up to concept stage, the project is currently on hold.

The design was based on a generic Marriott specification for the Renaissance tailored to suit local building codes and market standards. MEP engineering strategy included Combined Heat and Power plant, remote central cooling plant, DC motor driven fan coils and low energy controls. The project had a design target of BREEAM ‘Excellent’ and was set to achieve very low carbon emissions rating (50% less than building code minimum), due in part to the link up of central plant between the hotel and the entertainment facilities housed within the Millenium Dome.

Key project information

Client Anschutz Entertainment GroupArchitect Lifschutz Davidson SandilandsProject value £120m

Services provided by Buro Happold

Structures, Building Services, Infrastructure, COSA, Facilities Management, CDM Co-ordination and FEDRA

Page 7: Buro Happold - Hotel Capability Statement 2010

Buro Happold

7

The Lowry HotelManchester

Commissioned by Rocco Forte Hotel, this five-star contemporary hotel has 165 rooms including a presidential suite, bar, restaurant, banqueting and health spa facilities. Basement and ground floor accommodation includes servicing and A3 retail and leisure units with access to the river walk.

Site constraints influenced development of an irregular floor plate layout, making the best use of the surrounding area.

Complementing the elegant architectural design and internal space planning, Buro Happold used concrete to create a non-uniform layout and optimise the size of the columns and floor slab thickness. The acoustics of the reinforced concrete frame were carefully detailed to ensure sound integrity.

The internal space planning required a large column free banqueting suite. A steel-truss, long-span solution was integrated to support the eight storeys of concrete frame above. This innovative solution provided a 25m column-free area with integral acoustic separation to the bedrooms above.

Adjacent to the River Ure, the basement was designed with waterproofed external bonding to ensure no water ingress through the service yard. Excavated contaminated material was graded to optimise disposal rates.

Key project information

Client The Rocco Forte CollectionArchitect Consarc Design LtdProject value £27mDates Completed 2001

Services provided by Buro Happold

Building services engineering, structural engineering, infrastructure and environment, facade engineering, fire engineering design and risk assessment, ground engineering, asset management

Images copyright Mandy Reynolds

Page 8: Buro Happold - Hotel Capability Statement 2010

8

Hot

el C

apab

ility

Malmaison HotelsUK

Malmaison, Birmingham

Situated in the Mailbox, once a 1960’s Royal Mail sorting office, this Malmaison Hotel is at the heart of Birmingham city centre. It has 189 Rooms and boasts a brasserie bar, conference facilities and a mini spa.

Services provided by Buro Happold:

Building Services

Malmaison, Manchester

The former Joshua Hoyle warehouse building, with its red brick and terracotta exterior, has been converted into a 167- room Malmaison hotel. The hotel stands at the heart of Manchester city centre, and incorporates Conference and Banqueting facilities and a Health club.

Services provided by Buro Happold:

Building Services and Structures

Malmaison, Leeds

The 100-room Malmaison Leeds stands at the heart of Leeds city centre, in the business district. Formerly offices, facilities includes, meeting facilities, bar and restaurant.

Services provided by Buro Happold:

Building Services

Malmaison, Newcastle

The Newcastle Malmaison standsproudly on the quayside. With 120 rooms, it was the first hotel in the chain to incorporate Café Mal, a deli-style café, in addition to conference and banqueting facilities including two large purpose built meeting rooms and a health club.

Services provided by Buro Happold:

Building Services and Buro Happold Management

Page 9: Buro Happold - Hotel Capability Statement 2010

Buro Happold

99

At the beginning of the project, the site comprised seven Victorian two-storey houses with basements, five of which had at one time been combined into a hotel. These had subsequently become dilapidated and work had been started, but not completed, to convert them into flats. The other two houses had been gutted by fire and only the shells remained. As a result, the seven houses together offered an ideal opportunity for redevelopment over a site area of 1,540m2.

In common with a lot of inner city developments, the financial viability of the scheme depended on the provision of a high percentage of money-earning floor area. In this case 159 bedrooms and suites, with a total floor area of 6,200m2, a restaurant and conference and leisure facilities over 2,800m2 were planned. Like similar developments, the physical planning constraints were very tight - the main criteria being that the site was part of a terrace, and the building could not be increased in height beyond the existing roof line 25m above road level. Furthermore, the Cromwell Road facade was to be retained.

The brief was to design services to a standard commensurate with three or four-star hotel and within performance guidelines provided by Holiday Inn. Most significantly the hotel was to be fully air conditioned and a standby generator was to be provided.

The mechanical services element of the building includes heating, ventilation, cooling, relative humidity control, water services, natural gas service, drainage and fire fighting systems.

Key project information

Client Naaz InvestmentProject value £11.5m (mechanical & electrical

£3.1m)Dates Completed 1988

Services provided by Buro Happold

Structural engineering, building services engineering

Buckingham Hotel, KensingtonLondon, UK

Page 10: Buro Happold - Hotel Capability Statement 2010

10

Hot

el C

apab

ility

Claridge’s Hotel RefurbishmentLondon, UK

Buro Happold provided structural engineering design services for the refurbishment work of the Grade II Listed Claridge’s Hotel, one of the oldest and most exclusive hotels in London. Working closely with US architects, the works included major alterations to the existing ground floor and mezzanine level of the hotel such as removing load bearing walls. The work also included site supervision of the works during the removal of the structural elements.

The innovative technical solutions offered ensured that the existing Listed ceiling levels was maintained and no downstand beams or transfer structure were required despite the removal of a number of major supporting elements. All structural work was carried out while the hotel remained occupied. The work areas were sealed by the contractor acoustically and against dust from the rest of the hotel by temporary decorative hoardings.

As part of this development, Buro Happold also provided structural engineering services for the removal of a laundry chute running to the basement due to the refurbishment and the creation of a number of new suites. The refurbishment covered six floors of this magnificent five-star hotel.

Key project information

Client Claridge’s HotelArchitect Thierry W Despont Architects, USAProject value £5m

Services provided by Buro Happold

Structural engineering, project management.

All images courtesy of Claridge’s Hotel

Page 11: Buro Happold - Hotel Capability Statement 2010

Buro Happold

11

Cumberland HotelLondon, UK

Built in the 1930s, the Cumberland Hotel is a 1,000-bed hotel in the heart of London. Originally a three-star hotel, the hotel building and adjoining staff annex were recently refurbished and upgraded to a five-star establishment.

Similar to most 1930s buildings, the Cumberland Hotel is a masonry and stone-clad steel-framed building, with a combination of filler joists and beam and pot floors. To facilitate the proposed refurbishment of the hotel, we quickly established a detailed understanding of the configuration of the frame, particularly the location of the transfer beams at the lower levels. This enabled us to provide clear direction to the architects in developing the reconfiguration of the public area at ground and below.

The ground floor and the three sub-basements of the main hotel were completely remodelled to provide new facilities including a new entrance lobby/foyer, food court, fine dining restaurant, kitchens, conference areas and plant areas below. New lifts were provided as well as a glassed feature lift with glazed stairs to serve the entrance lobby and basement meeting/function rooms.

The existing staff accommodation building was remodelled to provide hotel bedrooms and suites to the ground and upper floors with conference areas to the basement and plant areas below. A new core was built in the existing light well area and penetrated down through the existing ground floor and basements where new staircases, lifts, lobbies and shafts were provided. The core was a primary steel structure fixed back to the existing structure with composite profile metal deck and insitu concrete floor slabs.

Key project information

Client The Cumberland HotelArchitect Reardon SmithProject value £100mDates Completed 2004

Services provided by Buro Happold

Facade engineering, structural engineering, disability design consultancy, fire engineering, infrastructure and transport engineering.

Page 12: Buro Happold - Hotel Capability Statement 2010

12

Hot

el C

apab

ility

Macdonald St Paul’s HotelSheffield, UK

Located next to the soaring arches of the Sheffield Winter Gardens - another major Buro Happold project - the Macdonald St Paul’s Hotel represents the very best in contemporary hotel design. As Sheffield’s first four-star City Centre hotel it makes a stylish contribution to the current revitalisation of the City’s urban fabric. Buro Happold played a key role in developing the scheme and identifying functional and economic solutions to its many complex challenges.

A key parameter for the development was that it should not overshadow the Winter Gardens or be higher than the adjacent Town Hall. This created the problem of how to fit enough bedrooms and public facilities on the site to make it economically viable. Following detailed spatial planing and co-ordination between the architect, structural and services engineers, the solution was to fit mezzanine floors in the back of house areas which added three additional storeys within the fixed height of the building.

Pre-cast construction for the bedroom block was key to the success of the project, the slender load bearing walls and slabs helping the structure to meet the tight massing limits. To ensure a smooth, aesthetic transition to the adjoining Winter Gardens, the hotel’s Pavilion - which houses its bars and restaurants - has simple but striking curved valley roof which picks up the sweeping line of the neighbouring building. A simple glazed facade allows guests to enjoy ‘borrowed’ views of the adjacent lush plantlife.

Key project information

Client Macdonald HotelsArchitect Weintraub Associates Project value £17mDates Completed 2005

Services provided by Buro Happold

Structural engineering, building services engineering, infrastructure and environment, ground engineering

Images copyright Angus McDonald

Page 13: Buro Happold - Hotel Capability Statement 2010

Buro Happold

13

Savoy Hotel London, UK

The Savoy Hotel was built in 1890 and is a Grade II Listed building. In 1910 the south facade was extended outwards by some 2.5m using an innovative arrangement of steel roof trusses and hangers. This produced larger rooms on this riverfront elevation but had the drawback of having large sections of the original facade walls within the internal space. Buro Happold was appointed to undertake a feasibility study and to produce detailed design for removing these load bearing intrusions so that the rooms could be remodelled and upgraded.

New lift shafts, staircases, along with a new striking ornate steel and glass dome over the River Restaurant also formed part of our detailed design brief.

In addition, the ornate south facade is clad in terracotta faience, which is in poor condition due to corrosion of the underlying structural steelwork. Buro Happold was appointed to survey and report on the condition of this face of the building, and to advise on how best to undertake repairs. Our recommendations included the installation of cathodic protection to overcome the problem of corrosion, along with local repairs to the faience and other cladding elements. We also supervised all of the site works to completion.

Key project information

Client Fairmont Hotels and ResortsArchitect Reardon SmithProject Value £100mDate Completed 2006

Services provided by Buro Happold

Structural engineering

Page 14: Buro Happold - Hotel Capability Statement 2010

14

Hot

el C

apab

ility

Verbus HotelsUKThe Verbus System is a proven globally deployed patented technology which allows high quality modular accommodation to be produced at low cost and delivered to any site in the world. Verbus modular accommodation is robust, easy to assemble and can be adapted to suit any planning or end user needs. In particular the Verbus System is especially suited to moderate to high rise, three to sixteen storey self supporting construction from factory produced volumetric modules. The factory produced system allows consistant predictability, rapid construction at lower costs than traditional methods.

Modular Construction

Modular technology is able to reduce construction times by up to half, as well as being a safer, cleaner, more environmentally friendly method of construction than traditional “brick and block” techniques.

The Verbus System

The Verbus System utilises established production

techniques and capacity to manufacture top quality accommodation solutions at high volume. It represents a viable alternative to traditional methods of construction as well as outperforming other methods of modular construction currently available.

Robustness

Verbus steel modules are extremely robust and of higher structural quality than other modular products on the market. Modules can be stacked up to sixteen storeys high, and using specially developed locking mechanisms, can be easily, but securely, connected. Using the Verbus system, it is possible to assemble the structure of a three hundred bed hotel, student accommodation or housing in a few weeks.

Cost-effectiveness

The Verbus System, brings a considerable lower completed building cost when compared with other modular system derived buildings. This makes it an ideal solution commercial projects such as hotels.

Page 15: Buro Happold - Hotel Capability Statement 2010

Buro Happold

15

Travelodge UxbridgeVerbus Systems have developed this 120 bed hotel in London. The Verbus system works by using prefabricated bedroom modules which arrive partially or fully fitted-out. When on site the modules are locked together and the internal fit-out is completed. Once all modules are in place the building is finished with a traditional brickwork, render or cladding exterior and a pitched or flat roof.The Verbus system offers numerous benefits for hoteliers. It is more robust that traditional timber frame, more immune to defects caused by shrinkage and settlement, and has better fire and acoustic ratings.

Tulip Hotel, North EastVerbus are presently developing this hotel in North East England. The Verbus system works by using prefabricated bedroom modules which arrive partially or fully fitted-out. When on site the modules are locked together and the internal fit-out is completed. Once all modules are in place the building is finished with a traditional brickwork, render or cladding exterior and a pitched or flat roof.

Page 16: Buro Happold - Hotel Capability Statement 2010

16

Hot

el C

apab

ility

Verbus Travelodge HeathrowLondon, UK

A six storey, 310 bed 3 star Travelodge near Heathrow Airport construction from modified steel shipping containers.

The project was completed in 58 weeks this included demolition of the existing buildings on the site, foundation piling and construction of the primary support frame. The Verbus modules were lifted into place over a period of eight weeks, the remaining time was spent finishing off the corridors, fitting out the ancillary areas and installing the cladding.

Heathrow

Site logistics were further complicated as the site was located under one of the primary flight paths into Heathrow. Deliveries of modules were coordinated with flight patterns and available space on site. Notwithstanding the project was delivered on programme and within budget.

Using 3D Modelling software, we modelled the steel structure for the Heathrow Travelodge. By using the Verbus module layouts coupled with the 3D structure, we were able to identify any potential issues or clashes and design additional connections where the frame would not facilitate the standard connections.

The main reason we used 3D Modelling was to reduce time in drafting and therefore increase efficiency. All future modular projects we intend to use 3D modelling to set out the structure and also to design and detail the units. Again this will save us time in the long run and improve accuracy.

Acoustics: Due to the proximity of the site with Heathrow Airport, the site was subjected to high external noise levels. The noise levels were significantly higher than a typical building of this nature. Traditional buildings have been refused planning permission for considerations to the influence of external noise on the building. However, the design team engineered a solution to mitigate the aircraft noise and maintain the hotel operator’s high standards for the hotels internal environment. The design team has the necessary knowledge to provide solutions for future noise sensitive projects, like hotels, in sites that are subjected to high external noise levels. The hotel commenced trading in January 2009.

Key Project Information

Client TravelodgeArchitect JWAProject value £15millionDates Jan 2009

Services Provided by Buro Happold

Structural engineering, ground engineering, fire, acoustics, infrastructure, building services

Page 17: Buro Happold - Hotel Capability Statement 2010

Buro Happold

17

Lucknam Park New Spa is a £10m project to refurbish an existing spa and provide new spa extension, along with new staff facilities building, hotel kitchen refurbishment and site infrastructure works, all within the grounds of the exclusive Grade II listed Lucknam Park Hotel. The spa will include three pools, eight treatment rooms, thermal cabins, gym, restaurant, lounge, bar and kitchen.

Buro Happold provided building services, structural and civil engineering full design duties, pool performance specification, thermal analysis and acoustic advice. The building is highly serviced and the engineering design has been closely integrated with the architecture, interior designer and other specialists for feature lighting and kitchens.

The spa extension has a dramatic glazed roof with external brise soleil spanning indoor pool and indoor-outdoor pool. The glazed roof provides daylight all year, passive solar heating in winter, and solar control in summer. At nighttime the brise soleil close as a background for lighting effects.

Key project information

Client Lucknam Park Hotel LtdArchitect Holder Mathias ArchitectsProject value £10mDate Completed Dec 2008

Services provided by Buro Happold

Building services engineering and structural engineering, energy strategy.

Luckham Park Hotel and SpaChippenham, Wiltshire, UK

Page 18: Buro Happold - Hotel Capability Statement 2010

18

Hot

el C

apab

ility

Kilternan Hotel and Country Club Dublin, Ireland

The project comprises the upgrade and renovation of the existing hotel and country club to a 4/5-star standard.

The hotel will comprise 200 bedrooms, a new banquet hall, conference facilities, a spa and treatment centre and a fitness centre. There will also be a a golf course together with a clubhouse and apart hotel accommodation.

Sustainability and energy efficiency have informed the environmental and building services strategy. The design response to the brief has included comprehensive analysis of the building envelope to minimise the need for air conditioning. Energy efficient controls, heat recovery and variable speed drives have also been incorporated into the building services scheme.

The interior lights solutions have focused on providing subtle pools of light to create charm and mood.

Key project information

Client Hugh O’ReganArchitect Heneghan Peng ArchitectsProject value €80mDates Ongoing

Services provided by Buro Happold

Building services engineering, fire engineering, lighting, acoustic engineering, IT, security, audiovisual, sustainability engineering

Images courtesy of heneghan.peng.architects

Page 19: Buro Happold - Hotel Capability Statement 2010

Buro Happold

19

Radisson Edwardian HotelManchester, UK

The conversion of this listed building, originally the Free Trade Hall, one of Manchester’s most famous buildings, to a 5* hotel.

The building’s listed Italianate facade had a number of implications on the design of the hotel, including height restrictions imposed at planning stage.

A sensitive retention and enhancement programme was undertaken which included the construction of a contemporary 16 storey building constructed as in situ cross-wall construction using tunnel forms all within the retained listed facade.

Key project information

Client McAlpine Laing Joint VentureArchitect Stephenson BellProject value £30mDates Completed 2004

Services provided by Buro Happold

Structural engineering, ground engineering, fire engineering design, inclusive design

Copyright: Buro Happold/Daniel Hopkinson

Page 20: Buro Happold - Hotel Capability Statement 2010

20

Hot

el C

apab

ility

Hotel America project is a signature Hotel Resort and Spa complex within the Bawadi Strip which lies within the Dubailand area of Dubai. The client is Zabeel Properties, and the project is intended to be a landmark, high specification, themed and branded entertainment facility based on the Jumeirah group specification.

The development comprises the following main elements:

• 300 key five star hotel tower

• 2000 fixed seating theatre

• Spa, pool and fitness facilities

• Multi Purpose Venue – sized to accommodate various events.

• 6 luxury Cinemas with a seating capacity of 30 to 40 people in each

• Themed restaurants

Hotel AmericaDubai, Abu Dhabi

• Sky Bar

• Retail outlets

• Condominium towers separated from the main Hotel Tower

• Basement car parking over three levels

The project has been designed to Schematic stage and is currently on hold.

Key project information

Architect GraftClient Zabeel PropertiesProject value £11mDates Currently on hold

Services provided by Buro Happold

Project management, building services, structural engineering, infrastructure

Page 21: Buro Happold - Hotel Capability Statement 2010

Buro Happold

21

Al FaisaliahRiyadh, Saudi Arabia

The massive 245,000m2 mixed-use Al Faisaliah development in Riyadh is one of the most striking buildings in the Middle East. Its landmark office tower rises 270m over the city, soaring to a tapered point in one smooth giant arc. At its pinnacle the tower narrows to a brightly lit lantern topped with a decorative stainless steel finial.

The complex contains 30 floors of office space, a five-star hotel with 224 bedrooms, residential accommodation, a shopping centre with 120 stores, a banqueting/exhibition hall for 4,000 guests, two levels of underground car parking for 1,700 cars – and the highest restaurant in the Kingdom. At ground level of the office tower, a five-storey lobby with a petal roof links the hotel to the apartments and shopping mall. The lobby features a spectacular coloured glass wall which is the largest artwork of its kind ever created. The wall design is intended to reflect the natural environment of Saudi Arabia.

The harsh climate in Riyadh presented a major challenge for Buro Happold’s engineers. In particular there was a sharp focus on energy conservation. Our design makes extensive use of passive energy control methods: a combination of carefully chosen glass in the facade, various external shading systems and an air-conditioning plant which uses ice in the cooling process serves to minimise the amount of energy drawn from the supply grid.

A Building Management System (BMS) controls all engineering processes, monitoring and adjusting individual elements to enhance operating efficiency and living conditions.

Key project information

Client King Faisal FoundationArchitect Foster + PartnersDate Completed May 2000

Services provided by Buro Happold

Structural engineering, building services engineering, civil engineering, quantity surveying, project management, fire engineering design and risk assessment

Page 22: Buro Happold - Hotel Capability Statement 2010

22

Hot

el C

apab

ility

Le Royal Amman HotelAmman, Jordan

Le Royal Amman is a landmark five-star hotel, integrated within a mixed use development. Located in the heart of Amman, Le Royal is surrounded by spectacular land, gardens, waterfalls, and seascapes of the Mediterranean Sea.

Inspiration for the building design has come from the Great Mosque of Samara in Iraq. Built between 848-852 AD it is the largest mosque of Islam.

The 31 level development comprises 232-key hotel over 12 levels, high end convention and banqueting facilities, commercial offices, retail mall, cinemas, heath spa and indoor swimming pools.

Buro Happold carried out the structural and building services engineering design, as well as a monitoring role associated with the building services installation and commissioning.

Key project information

Client General Mediterranean HoldingsArchitect Richard MartinetDates Completed 2002

Services provided by Buro Happold

Structural engineering, building services engineering, fire engineering design and risk assessment, M&E quantity surveying

Page 23: Buro Happold - Hotel Capability Statement 2010

Buro Happold

23

Tuwaiq Palace, Diplomatic ClubRiyadh, Saudi Arabia

Located in the Diplomatic Quarter in the north-west of Riyadh, stands Tuwaiq Palace a complex originally designed as a diplomatic club but now used by the Saudi Government as a hospitality centre.

The facilities include a swimming pool, lounge area, bowling alley, top quality restaurant and banqueting rooms, with a gate house and ample parking. The 24,000m2space also includes a number of hotel rooms, garden areas and a creche. The building was awarded an Aga Khan Award.

Key project information

Client Arriyadh Development AuthorityArchitect Frei Otto/OmraniaProject value £24m

Services provided by Buro Happold

Multi-disciplinary engineering services including: structural engineering, building services engineering, fire engineering and civil engineering.

Buro Happold

Page 24: Buro Happold - Hotel Capability Statement 2010

24

Hot

el C

apab

ility

Grand Hyatt HotelIslamabad, Pakistan

The site is situated in the government enclave of Constitution Avenue. The area is located at the southern end of the main Kashmir highway.

The existing development to the west takes the form of a modern convention centre whilst the eastern area is likely to become a small car park serving the adjacent natural woodland area.

The hotel is a 45-storey hotel and apartment tower complete with 2 basement levels. There are 27 levels of hotel accommodation, function suites, two lower rise blocks of residential apartments, offices planned over the basement car parking and retail facility, management offices, energy centre and back of house accommodation.

The scope of this significant project is planned on a site footprint of approximately 48,000sm with a 195,000sm.

There is also an extensive undulating hard and soft landscaped podium and infrastructure that responds to the urban setting of the site.

Also included is a two storey retail podium.

Key project information

Client BNP GroupArchitect HOK ArchitectsProject value $150m

Services provided by Buro Happold

Infrastructure and environment, IT consulting, security consulting, building service engineering, structures, ground engineering, acoustic consulting, facade engineering, fire engineering design and risk assessment, sustainability and alternative technologies

Page 25: Buro Happold - Hotel Capability Statement 2010

Buro Happold

25

With its visually impressive design, the tower is a spectacular addition to the riverfront area of Abandoibarra. Situated between the Guggenheim Museum and the Euskalduna Palace Complex this work adds to the further regeneration of this former industrial riverside site.

The 165m high tower is mostly Office space with a Hotel taking up the first 10 of 35 floors providing a total of 50,000m2 of floor space. The building design meets very high sustainability standards having been awarded a LEED platinum pre-certification by the USGBC.

Features include a double skin mechanically ventilated façade, VRV connected to a common heat rejection circuit (or energy loop) which optimises energy consumption, variable fresh air rates to take advantage of seasonal free cooling. The design was based on the specification provided by the Spanish hotel operator, ABBA Hotels.

Buro Happold, together with the architects, is providing environmental, building services and structural design for the tower before handing over the design to local engineers. Buro Happold will retain a client advisory role, together with full appointments and facade and LEED consultancy.

Key project information

Client Iberdrola and Parc AssociatesArchitect Pelli Clarke Pelli Architects Project value £200mDates Ongoing

Services provided by Buro Happold

Building services, structural engineering, facade engineering, environmental engineering, LEED Consultancy

Torre IberdrolaBilbao, Spain

Page 26: Buro Happold - Hotel Capability Statement 2010

26

Hot

el C

apab

ility

Holiday Inn RefurbishmentMunich, Germany

Originally built for the 1972 Munich Olympic Games, the hotel complex underwent a complete refurbishment in time for the 2006 FIFA World Cup Championship.

The refurbishment was carried out while the hotel continued to function. The work addressed technical plants and facilities which defined the direction the building activity would take.

The planning, which would incorporate the four buildings of the complex, was chosen in a way that allowed the refurbishment to take place within vertical sections.

To guarantee successful planning the climatic system needed to be changed from a centralised system to a decentralised one. Decentralized supply units on top of each building realise the energy supply from top to bottom. This offered a separation of services between the hotel rooms and the public areas of the ground floor.

Also included in the refurbishment were the provision of fire protection and the complete refurbishment of the technical assets of the 8,000m² underground parking areas. These were additional services requested by the client during the construction process and were completed within a two-month period.

Key project information

Client InterContinental Hotels GroupArchitect ArcadisProject value €35m Dates Completed 2006

Services provided by Buro Happold

Building services

Images copyright Buro Happold/Adam Wilson

Page 27: Buro Happold - Hotel Capability Statement 2010

Buro Happold

27

Located in the city of Barcelona, this stunning new development comprises 100m tall a 4-star hotel offices, feature roof-top restaurant, glazed central atrium, conference centre, sports complex and basement parking.

Buro Happold provided structural engineering support to Richard Rogers Partnership, eventually working with local partners Alonso - Balaguer + Obiol & Brufau to deliver the project in Spain.

The design incorporated efficient layouts for the hotel floors including innovations on the servicing strategies, as well as some innovative structural engineering in various parts of the building. Distinguishing aspects include the ‘bubble’ restaurant, feature external hotel circulation cores, exoskeleton pre-cast frame and suspended mezzanines within the office areas of the main tower, volumetric structure atrium design, a tensioned wire glazed end-wall to the swimming pool hall and the combined use of timber & steel for the conference hall roof.

The restaurant bubble roof includes a single layer steel spherical grid-shell which was lifted as one piece into position.

Key project information

Client Antonio Castro Hotel Group Architect Richard Rogers Partnership Date 2004

Services provided by Buro Happold

Structural Engineering

Hotel Antonio CastroBarcelona, Spain

Page 28: Buro Happold - Hotel Capability Statement 2010

28

Hot

el C

apab

ility

This is a significant project of a speculative high quality mid rise building totalling 66,600m2 with mixed use consisting of speculative office space and a four level hotel. The plot is situated on the intersection of the city’s third ring road and a main arterial route between Sheremetyevo International airport and the city centre.

The development contains Grade A office space and a four level hotel in the mid rise building, multiple levels of basement for 581 car parking spaces

The buildings fully glazed façade will provide an impressive landmark from the adjacent roads and act as a gateway to the city centreKey project information

Key project information

Client Horus CapitalArchitect Kohn Pedersen Fox Associates Project value $160-$200m TBCDates Ongoing

Services provided by Buro Happold

MEP Building Services

BegovayaMoscow, Russia

Page 29: Buro Happold - Hotel Capability Statement 2010

Buro Happold

29

OVOWrocław, Poland

The sleek, curvy, contemporary and complex form of the OVO, which will house a luxury Hilton Hotel and service apartments, aims to be an iconic landmark at the heart of plans to regenerate the city of Wroclaw into a commercial and cultural centre. It has already won the Retail & Leisure category at the 2008 Mipim AR Future Projects Awards in Cannes.

The five-star, 420 room hotel will occupy the first three floors of the OVO, providing guests with luxurious facilities including speciality restaurants, a leisure spa with swimming pool, a jazz club and ample parking. Studio and penthouse apartments will occupy the upper three storeys, which will be fitted out to a very high standard. The garden will fill in the ground floor. The building’s facade will be made from material which will allow to keep its curved forms.

Key project information

Client Wings Properties Architect Gottesman-Szmelcman and Broadway Malyan PolskaProject value Euro80mDates Due to be completed 2011

Services provided by Buro Happold

Structural engineering, building services engineeringThe garden will fill in the ground floor / Studio Aiko

Page 30: Buro Happold - Hotel Capability Statement 2010

30

Foot

er h

ere

BathBelfastBirminghamDublinEdinburghGlasgowLeedsLondonManchesterNewcastle

BostonNew YorkToronto

BerlinMunich

MoscowCopenhagen Warsaw

Abu DhabiDubai

JeddahKuwaitCairo Riyadh PuneLos Angeles Hong Kong

Page 31: Buro Happold - Hotel Capability Statement 2010

31All images reproduced with the kindpermission of the copyright owners

Buro Happold OfficesAbu Dhabi

Bath Belfast Berlin

Birmingham Boston

Cairo Copenhagen

Dubai Dublin

Edinburgh Glasgow

Hong Kong Jeddah Kuwait

Leeds London

Los Angeles Manchester

Moscow Munich

New York Pune

Riyadh Toronto Warsaw

Buro Happold

Buro Happold 17 Newman Street

London W1T 1PD

Telephone: +44 (0)207 927 9700 e-mail: [email protected]

www.burohappold.com

BathBelfastBirminghamDublinEdinburghGlasgowLeedsLondonManchesterNewcastle

BostonNew YorkToronto

BerlinMunich

MoscowCopenhagen Warsaw

Abu DhabiDubai

JeddahKuwaitCairo Riyadh PuneLos Angeles Hong Kong

Page 32: Buro Happold - Hotel Capability Statement 2010

The engineering of excellence

Structural Engineering Building Services / MEP EngineeringGround Engineering Civil Engineering Specialist Consullting

www.burohappold.com

The engineering of excellence