Bunbury Outer Ring RoadSouthern Community Reference
Group
4 September 2018
![Page 2: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/2.jpg)
Prepare Ultimate Planning Design
and environmental referral
documents Obtain approvals, develop Project Case Design
and Business CaseCRG #1 JULY 2018
Project overview, planning
options criteria, key project
issues and opportunities
CRG #2 SEPTEMBER 2018
Alignment, planning options
and analysis, key project issues
CRG #3 DECEMBER 2018
Ultimate planning design
concept, landscaping, urban
design, environmental referral,
key project issues
CRG #4 MARCH 2019
Project criteria and objectives,
key project issues
CRG #5 MAY 2015
Project options and staging,
key project issues
CRG #6 AUGUST 2019
Key project issues, final
summary and next steps
![Page 3: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/3.jpg)
3
5.45 Arrival – light refreshments available
6:00 Welcome – meeting purpose and process Linton Pike
6:10 Previous Workshop Summary and actions arising All
6:25 Project update (both sections) Padraic Murphy
6:35 Questions and answers All
6:45 Southern section – main alignment, connectivity and interchange options Padraic Murphy
7:00 Questions and answers All
7:10 Consultation and engagement update Tammy Mitchell
7:20 Questions and answers All
7:30 CRG member comment CRG members
7:55 Next steps Tammy Mitchell
8:00 Close
![Page 4: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/4.jpg)
4
• Dominic Boyle
• Padraic Murphy
• Hannah Ruprecht
• Bruce Walker
• Tammy Mitchell
• Chris Mitchell
![Page 5: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/5.jpg)
Previous Workshop
Summary and
Actions Arising
![Page 6: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/6.jpg)
Project UpdatePadraic Murphy - BORR Team
Services Delivery Manager
![Page 7: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/7.jpg)
7
• Preferred northern main alignment refinement
• Network connectivity considered further
• Directly affected landowner contact
• Continued investigative work
• Met with various stakeholder groups:
– Local Government Advisory Group
– Freight and Road User Group
– Project Enabling Group
– Steering Committee
• Considered interchange options
![Page 8: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/8.jpg)
8
Geotechnical
• Completed 27 monitoring wells with data loggers
Traffic
• 25 classified traffic count sites
• 15 turning video counts
• 2 x 17 hour Origin Destination surveys at 11 key locations
Environmental
• Western Ring Tail Possum Spotlighting and Distance survey
along southern GBRS corridor (July)
• Site Investigation Management Plan completed
• Forrest Highway Cockatubes Review issued to Main Roads
![Page 9: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/9.jpg)
Sourthern Section Project Development WorkPadraic Murphy - BORR Team
Services Delivery Manager
![Page 10: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/10.jpg)
10
![Page 11: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/11.jpg)
11
EXISTING
NO BORR
EXISTING
NO BORR
2,500
14,000
6,500
24,000
4,000
20,000
13,500
31,000
4,500
19,000
19,000
45,000
7,000
16,000
18,000
53,000
N/A
18,000
N/A
8,000
4,000
14,000
13,500
39,000
4,500
7,000
19,000
37,500
7,000
15,000
6,500
15,000
18,000
54,000
2,500
14,000
N/A
34,000
N/A
9,000
![Page 12: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/12.jpg)
12
Willin
ge
Dr
Ex
tv
Willin
ge
Dr
Ex
tv
3,000
6,0003,000
13,000
16,000
40,000
3,000
13,000
21,000
36,000
29,000
40,000
2,500
14,000
2,000
14,000
7,000
8,000
16,000
34,000
EXISTING
NO BORR
EXISTING
NO BORR
16,000
37,000
7,000
9,000
2,000
2,000
3,000
6,000
29,000
30,000
21,000
25,000
16,000
36,000
2,500
14,000
NA
37,000
![Page 13: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/13.jpg)
13
• Drainage Strategy
• Material Sourcing Strategy
• Waterways Investigation
• Utility Consultation
• Freight Planning
![Page 14: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/14.jpg)
14
![Page 15: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/15.jpg)
15
Section 1: Forrest Hwy to Collie
River Crossing
Section 2: Collie River Crossing to Rail
Crossing (south of South Western Hwy)
Section 3: Rail Crossing (south of South
Western Hwy) to BORR Central
![Page 16: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/16.jpg)
16
Environmental & Ecology Community & Social Local Economy Network Efficiency & Safety Engineering/ Project Cost
Native vegetation (area and
fragmentation)Land Acquisition (area)
Property access/
connectivity
Road length (vehicle operating
costs and vehicle travel times)
Water Infrastructure (irrigation
and drainage)
Rare Flora SitesProperty severance
(fragmentation)
Resource Use (mining
tenements)Road capacity & LOS Utilities
Fauna habitat and TECs Noise and Visual Amenity Facilities developmentRoad Safety (construction and
operation)
Constructability (incl.
connectivity to other sections)
Rare Fauna Aboriginal Heritage Whole of Life Cost
Wetlands (area) Non-indigenous Heritage
Waterways (crossing impact)
![Page 17: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/17.jpg)
17
EATON
PROPOSED
WANJU FUTURE URBAN
DEVELOPMENT
Preferred Alignment
![Page 18: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/18.jpg)
18
![Page 19: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/19.jpg)
19
![Page 20: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/20.jpg)
20
• Key Objectives
– Free flow access to Bunbury
– Paris Road to be connected to Clifton Road
– Not preclude the future Perth to Bunbury Fast Rail
The interchange is treated as a split interchange between Paris
Road/Clifton Road and Raymond Road
![Page 21: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/21.jpg)
21
![Page 22: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/22.jpg)
22
![Page 23: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/23.jpg)
23
![Page 24: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/24.jpg)
24
![Page 25: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/25.jpg)
25
![Page 26: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/26.jpg)
26
ST HELENA ROAD
HARRIS ROADWIR
EL
ES
S R
OA
D
WA
TE
RL
OO
RO
AD
WA
TE
RL
OO
RO
AD
Possible future roundabout
Future connection
RIN
G R
OA
D
![Page 27: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/27.jpg)
27
![Page 28: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/28.jpg)
28
![Page 29: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/29.jpg)
29
![Page 30: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/30.jpg)
30
![Page 31: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/31.jpg)
31
![Page 32: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/32.jpg)
32
![Page 33: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/33.jpg)
33
![Page 34: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/34.jpg)
34
![Page 35: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/35.jpg)
35
![Page 36: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/36.jpg)
36
![Page 37: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/37.jpg)
37
![Page 38: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/38.jpg)
38
![Page 39: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/39.jpg)
39
![Page 40: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/40.jpg)
40
![Page 41: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/41.jpg)
41
![Page 42: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/42.jpg)
42
![Page 43: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/43.jpg)
43
![Page 44: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/44.jpg)
44
![Page 45: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/45.jpg)
45
![Page 46: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/46.jpg)
46
WOODS ROAD
CALINUP ROADLAKES ROAD
LILLYDALE ROAD
CENTENARY ROAD
JIL
EY
RO
AD
ST
RA
TH
AM
![Page 47: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/47.jpg)
47
![Page 48: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/48.jpg)
48
![Page 49: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/49.jpg)
49
![Page 50: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/50.jpg)
50
![Page 51: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/51.jpg)
Consultation and Engagement Update
Tammy Mitchell – BORR Team
Community & Stakeholder Engagement Manager
![Page 52: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/52.jpg)
52
• Initial contact for access for investigations.
• Initial landowner contact for southern alternative corridor assessment.
• Website updates.
• Reference Groups established:
– Drainage Reference Group – 1 August 2018
– Community Reference Group (2 No.) – 9 July 2018 & 10 July 2018
– Meadow Landing Working Group – 13 August 2018
– Freight and Road User Group – 22 August 2018
• Commenced initial discussions with:
– South West Development Commission
– Port of Bunbury
• Increased community interest and enquiries
• Briefings of local MP’s
• Project Enabling Group Meeting – 16 August 2018
• Local Govt Advisory Group meeting – 16 August 2018
• Steering Committee meeting – 23 August 2018
![Page 53: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/53.jpg)
53
• Next round of established group meetings
• Project Newsletter – October 2018
• Community Drop In Sessions – October 2018
• Complete landowners contact for site investigations.
![Page 54: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/54.jpg)
54
![Page 55: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/55.jpg)
55
• Liaison – personalised meetings
• Community Reference Groups
• Community information sessions
• Newsletters and electronic updates
• Project webpage
• Project information 138 138
• Surveys
![Page 56: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/56.jpg)
CRG member
comment
![Page 57: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/57.jpg)
Next Steps
Tammy Mitchell
![Page 58: Bunbury Outer Ring Road - mainroads.wa.gov.au · 3 5.45 Arrival –light refreshments available 6:00 Welcome –meeting purpose and process Linton Pike 6:10 Previous Workshop Summary](https://reader034.fdocuments.us/reader034/viewer/2022051905/5ff6ff09f4d648461d30ccc8/html5/thumbnails/58.jpg)
58
Prepare Ultimate Planning Design
and environmental referral
documents Obtain approvals, develop Project Case Design
and Business CaseCRG #1 JULY 2018
Project overview, planning
options criteria, key project
issues and opportunities
CRG #2 SEPTEMBER 2018
Alignment, planning options
and analysis, key project issues
CRG #3 DECEMBER 2018
Ultimate planning design
concept, landscaping, urban
design, environmental referral,
key project issues
CRG #4 MARCH 2019
Project criteria and objectives,
key project issues
CRG #5 MAY 2015
Project options and staging,
key project issues
CRG #6 AUGUST 2019
Key project issues, final
summary and next steps