Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM...

42
MAY 18, 2020 We Build Futures ~ Communities ~ Confidence ~ We Build Your Business Bidding This Week... Builders Bulletin We’re Not The Best Because We’re the Oldest… We’re The Oldest Because We’re the Best!” Overhead Door Company of Salinas 733 Sanborn Place Salinas, CA 93901 Salinas (831) 422-3667 Monterey (831) 375-3667 Fax (831) 422-1061 Santa Cruz (831) 662-3122 Lic. #529655 Overhead Door Company of Santa Clara Valley 1266 Lawrence Station Road Sunnyvale, CA 94089 Tel (408) 734-8010 Fax (408) 734-3728 Lic. #215098 5/18/20 San Jose Windmill Springs Elementary School Portable Relocation And Shade Structure - Franklin Mckinley School District 10:00 AM 5/18/20 Paicines Bear Valley Leach Field 2:00 PM 5/18/20 * Palo Alto Fy2020 Street Resurfacing Project - City Of Palo Alto 5:00 PM 5/18/20 * Palo Alto Fy21 Streets Preventive Maintenance Project - City Of Palo Alto 3:00 PM 5/19/20 Seaside Seaside High School Sanitary Sewer Lift Station 11:00 AM 5/19/20 * Santa Cruz County Seawater Intrusion Prevention (Swip) Recharge Wells 2:00 PM 5/19/20 * Santa Cruz 2019 Citywide Sewer/Storm Drain Lining 2:00 PM 5/20/20 Marina Enroute - Marina High School - Gutters And Downspouts 2:00 PM 5/20/20 Santa Cruz 2505 Chanticleer Building Demolition 2:00 PM 5/20/20 Santa Clara County Carpentry Services Itb-Faf-Fy20-0306 - County Of Santa Clara 3:00 PM 5/20/20 * San Jose 9567 - 2020 Minor Pre-Qualification Pool - Streets - City Of San Jose 3:00 PM 5/20/20 * Soquel Heart Of Soquel Parkway And Trail Restoration 2:30 PM 5/20/20 Milpitas Hydrant Replacement - City Of Milpitas 2:00 PM 5/21/20 San Luis Obispo Cuesta College - Voip Phone 1:00 PM 5/21/20 * San Jose Dw Infrastructure - Site Utilities Andrew Hill (Fire Service) - Esuhsd 2:00 PM 5/21/20 * Saratoga Prospect High School Press Box Elevation Change - Campbell Union High School District 11:30 AM 5/21/20 Arroyo Grande Arroyo Grande High School 300 Wing Modernization Electrical Portion 2:00 PM 5/21/20 Marina Crumpton Elementary School Alterations To Parking Lot 10:00 AM 5/21/20 Aptos Building 350 Roof Replacement - Rebid 2:00 PM 5/21/20 San Jose Rfq Audiology Renovation Project - Sjsu 2:00 PM 5/21/20 Los Gatos Youth Science Institute (Ysi) Visitor Center Interior Improvements Vasona Park - County Of Santa Clara 2:00 PM 5/21/20 Morgan Hill 2020 Pavement Resurfacing - City Of Morgan Hill 2:30 PM 5/21/20 San Luis Obispo Structural Engineering Design Services 2:00 PM 5/21/20 Salinas River Road Rehabilitation (Sr-68 To Las Palmas Parkway) 2:00 PM 5/21/20 Gonzales River Road Reconstruction (Limekiln Road To Gonzales River Bridge) 2:00 PM 5/21/20 Gonzales Gloria, Iverson, Johnson Canyon Road Reconstruction 2:00 PM 5/21/20 Cayucos Cayucos Creek Road Milepost 1.2 And 2.8 - Slope Repair 3:00 PM 5/21/20 Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino 2:00 PM 5/21/20 San Luis Obispo County San Simeon Creek Road Mp 4.4, Toro Creek Road Mp 1.9, Upper Los Berros Road Mp 0.7, And Suey Creek Road Mp 1.75 - Slope Repair 3:00 PM 5/21/20 Salinas Salinas Valley Memorial Hospital Rad / Fluoro Room 3 2:00 PM 5/21/20 Paso Robles Creston Apartments (Sub Bids Only) 12:00 PM 5/22/20 Palo Alto Rfq Backflow Preventer Device Inspection - City Of Palo Alto 5:00 PM 5/22/20 Palo Alto Rfp Green Stormwater Infrastructure (Gsi) Plan Implementation Support - City Of Palo Alto 3:00 PM

Transcript of Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM...

Page 1: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

MAY 18, 2020

We Build Futures ~ Communities ~ Confidence ~ We Build Your Business

Bidding This Week...

Builders Bulletin

“We’re Not The Best Because We’re the Oldest…

We’re The Oldest Because We’re the Best!”

Overhead Door Company of Salinas 733 Sanborn Place • Salinas, CA 93901

Salinas (831) 422-3667 • Monterey (831) 375-3667 Fax (831) 422-1061 • Santa Cruz (831) 662-3122

Lic. #529655

Overhead Door Company of Santa Clara Valley 1266 Lawrence Station Road • Sunnyvale, CA 94089

Tel (408) 734-8010 • Fax (408) 734-3728 Lic. #215098

Bid Time Project Name Location Bid Date

5/18/20 San Jose Windmill Springs Elementary School Portable Relocation And Shade Structure - Franklin Mckinley School District

10:00 AM

5/18/20 Paicines Bear Valley Leach Field 2:00 PM

5/18/20 * Palo Alto Fy2020 Street Resurfacing Project - City Of Palo Alto 5:00 PM

5/18/20 * Palo Alto Fy21 Streets Preventive Maintenance Project - City Of Palo Alto 3:00 PM

5/19/20 Seaside Seaside High School Sanitary Sewer Lift Station 11:00 AM

5/19/20 * Santa Cruz County Seawater Intrusion Prevention (Swip) Recharge Wells 2:00 PM

5/19/20 * Santa Cruz 2019 Citywide Sewer/Storm Drain Lining 2:00 PM

5/20/20 Marina Enroute - Marina High School - Gutters And Downspouts 2:00 PM NEW

5/20/20 Santa Cruz 2505 Chanticleer Building Demolition 2:00 PM NEW

5/20/20 Santa Clara County Carpentry Services Itb-Faf-Fy20-0306 - County Of Santa Clara 3:00 PM

5/20/20 * San Jose 9567 - 2020 Minor Pre-Qualification Pool - Streets - City Of San Jose 3:00 PM

5/20/20 * Soquel Heart Of Soquel Parkway And Trail Restoration 2:30 PM

5/20/20 Milpitas Hydrant Replacement - City Of Milpitas 2:00 PM

5/21/20 San Luis Obispo Cuesta College - Voip Phone 1:00 PM

5/21/20 * San Jose Dw Infrastructure - Site Utilities Andrew Hill (Fire Service) - Esuhsd 2:00 PM

5/21/20 * Saratoga Prospect High School Press Box Elevation Change - Campbell Union High School District

11:30 AM

5/21/20 Arroyo Grande Arroyo Grande High School 300 Wing Modernization Electrical Portion 2:00 PM

5/21/20 Marina Crumpton Elementary School Alterations To Parking Lot 10:00 AM

5/21/20 Aptos Building 350 Roof Replacement - Rebid 2:00 PM

5/21/20 San Jose Rfq Audiology Renovation Project - Sjsu 2:00 PM

5/21/20 Los Gatos Youth Science Institute (Ysi) Visitor Center Interior Improvements Vasona Park - County Of Santa Clara

2:00 PM

5/21/20 Morgan Hill 2020 Pavement Resurfacing - City Of Morgan Hill 2:30 PM

5/21/20 San Luis Obispo Structural Engineering Design Services 2:00 PM

5/21/20 Salinas River Road Rehabilitation (Sr-68 To Las Palmas Parkway) 2:00 PM

5/21/20 Gonzales River Road Reconstruction (Limekiln Road To Gonzales River Bridge) 2:00 PM

5/21/20 Gonzales Gloria, Iverson, Johnson Canyon Road Reconstruction 2:00 PM

5/21/20 Cayucos Cayucos Creek Road Milepost 1.2 And 2.8 - Slope Repair 3:00 PM

5/21/20 Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

2:00 PM

5/21/20 San Luis Obispo County

San Simeon Creek Road Mp 4.4, Toro Creek Road Mp 1.9, Upper Los Berros Road Mp 0.7, And Suey Creek Road Mp 1.75 - Slope Repair

3:00 PM

5/21/20 Salinas Salinas Valley Memorial Hospital Rad / Fluoro Room 3 2:00 PM

5/21/20 Paso Robles Creston Apartments (Sub Bids Only) 12:00 PM

5/22/20 Palo Alto Rfq Backflow Preventer Device Inspection - City Of Palo Alto 5:00 PM NEW

5/22/20 Palo Alto Rfp Green Stormwater Infrastructure (Gsi) Plan Implementation Support - City Of Palo Alto

3:00 PM

Page 2: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Central Coast Builders Association

242 East Romie Lane (831) 758-1624 Salinas Salinas, CA 93901 (831) 423-5900 Santa Cruz Mon-Thurs 8-5 Fri 8-3 (831) 883-3933 Monterey

(831) 758-6203 Fax

[email protected]

Board of Directors

President: Kevin McIntosh, Blach Constuction Brian Kennedy, Hayward Lumber

Vice President: Miguel Bustos, MIG Electric

Secretary/Treasurer: Anka Hepper, WM. B Saleh Painting Kate Rueter, AON Risk Services

Past President: Clifford Fasnacht, Dougherty Pump & Drill Gabriel Torres, CCRB/CHISPA

Oscar Blancas, Blancas Construction

CCBA STAFFChristie Cromeenes

Executive Director

Merary Rodriguez Finance Coordinator Shelly Verba Office Planroom Manager

Rikki Montejano Public Relations Coordinator

DisclaimerAll information provided by CCBA is obtained from sources deemed to be reliable. It is the user’s responsibility to confirm the accuracy of

all facts. We assume no responsibility for errors and/or omissions.All information included is for the intended recipient only, we ask that

you do not share this information

Page 3: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To Bid

Deadline for submission of materials for our Bulletin is end of day Wednesday each week.

Weekly Projects Bidding 5/13/2020

Reasonable care is given in gathering, compiling and furnishing the information contained herein which is obtained from sources believed to bereliable, but the Planroom is not responsible or liable for errors, omissions or inaccuracies.

Name Bid Date Time Contract # EstimateLocationOPR#

Monterey County

Bidders:

Plan Issuer:

Seaside $90,000

1. REMOVE EXISTING SEPTIC SYSTEM AND REPLACE WITH NEW SS LIFT STATION AND FORCE MAIN.2. REMOVE EXISTING FLOW METER, REPLACE WITH GRAVITY PIPE AND BACKFILL METER VAULT.3. CLEAN EXISTING SEWER MAIN TO REMOVE ROOTS AND DEBRIS. VIDEO INSPECT AFTER CLEANING. REPLACE IFNEEDED.

Questions: Rick Mickey at [email protected]

MAND 5/8 @ 11am- site

20-01453

1

11:00 AM5/19/20

Addenda:SEASIDE HIGH SCHOOL SANITARY SEWER LIFT STATION

8091

Prebid Conf:

Monterey Peninsula Unified School District 831-645-1200 831-649-4175

Electrical Contractor Fax: 707-994-8504Office: 707-994-0437James Day Construction Inc. Dba CoastalMountain Electric

General Contractor Fax: 000-000-0000Office: 831-333-6910Csg Inc

General Contractor Fax: 000-000-0000Office: 831-656-1600Dmc Commercial Inc.

General Contractor Fax: 831-449-0700Office: 831-449-4273Don Chapin Co

General Contractor Fax: 925-671-7120Office: 925-671-6822Gems Environmental Mgt Services

General Contractor Fax: 831-384-5078Office: 831-384-4081Monterey Peninsula Engineering

General Contractor Fax: 831-641-0586Office: 831-905-1798Pueblo Construction , Inc.

Supplier Fax: 831-424-3381Office: 831-424-3330Ferguson Enterprise

Supplier Fax: 408-383-0750Office: 408-316-0610United Rentals Trench Safety

Plan Issuer:

Marina $120,000

*** PLANS HAVE BEEN UPLOADED. BID DOCS WILL BE UPLOADED ONCE AVAILABLE ***

Questions: Jesse Hildebrandt at 831-869-8277

MAND 5/14 @ 2pm- site

20-01485

0

2:00 PM5/20/20

Addenda:ENROUTE - MARINA HIGH SCHOOL - GUTTERS AND DOWNSPOUTS

8112

Prebid Conf:

Monterey Peninsula Unified School District 831-645-1200 831-649-4175

NEW

Page 4: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To Bid

Name Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Salinas

· The project involves equipment removal and replacement for the Rad / Fluoro Room 3 Project at Salinas Valley Memorial Hospital.· The work is phased. See phasing drawings.· The work areas include spaces in and surrounding Rad / Fluoro Room 3, the Tech Work Area, the added Accessible Toilet, theAccessible Sink, the Accessible Dressing Room, and select Toilet Rooms per the plans. Areas above and below these spaces are alsoincluded.· The project involves all activity associated with infection control, safe-off, shutdown/start-up, removal, demolition, relocation,replacement, upgrade, assembly, installation, testing & certification, and testing & air balancing of select facilities, services, utilities,and equipment.· The work includes architectural, electrical, low voltage, fire alarm/protection/suppression, HVAC, mechanical, medical gas, nurse call,plumbing, structural/seismic assemblies and systems and Owner-furnished equipment.· The work includes installation of systems supporting owner-furnished equipment, installation of owner-furnished equipment,coordination of installation with owner-furnished equipment.· The work also requires coordination drawings including seismic details and shop drawings.· The work includes coordination with Owner-designated contractors, representatives and installers, and coordination & installation ofOwner-furnished Equipment.· The work is to be performed within a live, operating hospital environment where strict, substantial and acceptable infection controlmeasures, and housekeeping cleanliness standards are to be observed to protect the hospital area.· Coordination with the Owner and timely advanced notice is required of all activities impacting hospital operations including safe-offs,shutdowns, cutovers, service interruptions, energizing, deenergizing, inspections, certifications, in-service, training, and licensing.

Questions: [email protected]

20-01263

0

2:00 PM5/21/20

Addenda:SALINAS VALLEY MEMORIAL HOSPITAL RAD / FLUORO ROOM 3

Bogard Construction, Inc. [email protected] 831-426-8191 831-426-4921

Asbestos Abatement /Hazardous Materials Contract

Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.

Casework / Millwork Contractor Fax: 000-000-0000Office: 541-884-5554Fremont Millwork Co.

General Contractor Fax: 831-422-1882Office: 831-422-8213Dilbeck & Sons

General Contractor Fax: 000-000-0000Office: 000-000-0000K.R. Wolfe Inc.

HVAC Contractor Fax: 831-754-5514Office: 831-424-1633Val's Plumbing & Heating

Bidders:

Plan Issuer:

Gonzales $7,018,000

The work to be done consists of performing full depth reclamation on the existing pavement, hot mix asphalt concrete overlay,including but not limited to cold plane asphalt, drainage culvert work, pavement delineation, adjustment of frame and cover to grade,clearing and grubbing, and traffic control.

Project Contact: Rachel EnosaranEmail: [email protected]

MAND 5/7 @ 11am- Intersection of River Road and Limekiln Road

20-01317

0

2:00 PM5/21/20

Addenda:RIVER ROAD RECONSTRUCTION (LIMEKILN ROAD TO GONZALES RIVER BRIDGE)

1168

Prebid Conf:

County of Monterey 831-755-4800 831-755-4958

General Contractor Fax: 559-274-0311Office: 559-274-0300Cal Valley Construction, Inc.

General Contractor Fax: 831-761-1042Office: 831-763-6100Granite Construction

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

General Contractor Fax: 805-473-2217Office: 805-473-3016Papich Construction Company, Inc.

Supplier Fax: 831-424-3381Office: 831-424-3330Ferguson Enterprise

Page 5: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To Bid

Name Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Gonzales $7,440,000

The work to be done consist of the reconstruction by full depth reclamation, including but not limited to clearing and grubbing, trafficcontrol, excavation and backfill, culvert installation, head walls, drainage systems, slope protection, and pavement. Such other items ordetails, not mentioned above, that are required by the Construction Plans, Standard Specifications, Standard Plans, or these SpecialProvisions, shall be performed, placed, constructed, and/or installed.

Project Contact: Rachel EnosaranEmail: [email protected]

MAND 5/7 @ 2:30pm- Easterly end of Johnson Canyon Road (2.35 miles east of US 101/5th Street Interchange)

20-01318

0

2:00 PM5/21/20

Addenda:GLORIA, IVERSON, JOHNSON CANYON ROAD RECONSTRUCTION

1575

Prebid Conf:

County of Monterey 831-755-4800 831-755-4958

General Contractor Fax: 559-274-0311Office: 559-274-0300Cal Valley Construction, Inc.

General Contractor Fax: 831-449-0700Office: 831-449-4273Don Chapin Co

General Contractor Fax: 831-761-1042Office: 831-763-6100Granite Construction

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

General Contractor Fax: 805-473-2217Office: 805-473-3016Papich Construction Company, Inc.

Bidders:

Plan Issuer:

Marina $1,300,000

RECONFIGURATION OF A PARKING LOT TO ADD STUDENT DROP-OFF AND BUS DROP-OFF ZONES PLUS ASSOCIATED SITEWORK. REFER TO "DSA ACCESS & FIRE LIFE SAFETY REVIEW ONLY" SECTION ON THIS TITLE SHEET FOR DSASTRUCTURAL REVIEW EXEMPTION.

Questions: [email protected] or [email protected]

MAND 5/7 @ 12pm- site

20-01340

2

10:00 AM5/21/20

Addenda:CRUMPTON ELEMENTARY SCHOOL ALTERATIONS TO PARKING LOT

8239

Prebid Conf:

Monterey Peninsula Unified School District 831-645-1200 831-649-4175

General Contractor Fax: 000-000-0000Office: 831-656-1600Dmc Commercial Inc.

Bidders:

Plan Issuer:

Salinas $4,829,000

The work to be done consists of performing full depth reclamation on the existing pavement, hot mix asphalt concrete overlay,including but not limited to cold plane asphalt, drainage culvert work, pavement delineation, adjustment of frame and cover to grade,clearing and grubbing, and traffic control.

Project Contact: Rachel EnosaranEmail: [email protected]

MAND 5/7 @ 8:30am- Intersection of River Road and Las Palmas Parkway

20-01349

0

2:00 PM5/21/20

Addenda:RIVER ROAD REHABILITATION (SR-68 TO LAS PALMAS PARKWAY)

1162

Prebid Conf:

County of Monterey 831-755-4800 831-755-4958

Concrete/Masonry Contractor Fax: 661-399-3812Office: 661-399-3759Cen-Cal Construction

General Contractor Fax: 559-274-0311Office: 559-274-0300Cal Valley Construction, Inc.

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

General Contractor Fax: 805-473-2217Office: 805-473-3016Papich Construction Company, Inc.

General Contractor Fax: 925-621-5799Office: 925-621-5700Teichert Construction-Sf Bay Area Branch

Sub-Contractor/SpecialtyContractor

Fax: 951-682-1094Office: 661-833-2280Pavement Recycling Systems, Inc.

Plan Issuer:

Marina $165,000

*** PLANS HAVE BEEN UPLOADED. BID DOCS WILL BE UPLOADED ONCE AVAILABLE ***

Questions: Debbie Goularte, Office 831-392-3977, Cell: 650-438-2746 or Tom Millman at [email protected], Cell: (408) 310-7447

MAND 5/13 @ 3pm- site

20-01484

0

3:00 PM5/25/20

Addenda:ENROUTE - MARINA CHILD DEVELOPMENT CENTER GUTTERS AND DOWNSPOUTS

8257

Prebid Conf:

Monterey Peninsula Unified School District 831-645-1200 831-649-4175

NEW

Page 6: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

NEW

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Marina $7,300,000

The Project consists of constructing approximately 5 miles of 8-inch diameter to 16-inch diameter ductile iron and polyvinyl chloriderecycled water and potable water pipeline in paved and non-paved roadways and easements,connecting to existing pipelines, pipeline valves and appurtenances, a guided auger bore trenchless roadway crossing, five pressurereducing stations, and roadway paving for a complete in-place operational system.

Project Contact:Don WilcoxEmail: [email protected]

MAND 2/19 @ 10AM-11 Reservation Road, Marina, CA 93933 location

20-00365

6

2:00 PM5/27/20

Addenda:REGIONAL URBAN WATER AUGMENTATION PROJECT RECYCLED WATER DISTRIBUTION PIPELINES -REBID

RW-0174

Prebid Conf:

Marina Coast Water District - Engineering Office [email protected] 831-883-5929

General Contractor Fax: 408-213-0532Office: 408-970-9900Anderson Pacific EngineeringConstruction Inc.

General Contractor Fax: 925-315-4202Office: 925-800-1845Garney Construction

General Contractor Fax: 925-373-0940Office: 925-373-8370Mountain Cascade Inc.

General Contractor Fax: 415-822-3203Office: 415-822-3700Ranger Pipelines Inc.

General Contractor Fax: 805-543-1722Office: 805-543-1706Specialty Construction

General Contractor Fax: 925-621-5799Office: 925-621-5700Teichert Construction

Sewer & Water Contractor Fax: 831-384-5078Office: 831-384-4081Monterey Peninsula Engineering

Sub-Contractor/SpecialtyContractor

Office: 559-997-9762Badger Daylighting Corporation

Sub-Contractor/SpecialtyContractor

Fax: 916-381-3703Office: 916-381-8033California Pavement Maintenance Co.,Inc. Dba Cpm

Sub-Contractor/SpecialtyContractor

Fax: 831-724-3151Office: 831-724-3013Monterey Bay Rebar, Inc.

Sub-Contractor/SpecialtyContractor

Fax: 408-848-0302Office: 408-848-0313Ruggeri-Jensen-Azar

Supplier Fax: 831-771-0109Office: 831-771-0126Keith Day Trucking

Supplier Fax: 408-383-0750Office: 408-316-0610United Rentals Trench Safety

Bidders:

Plan Issuer:

Marina $250,000

Project consists of: Restroom refinish

Questions: Jesse Hildebrandt at [email protected]

MAND 4/30 @ 2pm- site

20-01265

2

2:00 PM5/27/20

Addenda:MARINA HIGH SCHOOL RESTROOM REFINISH

8255

Prebid Conf:

Monterey Peninsula Unified School District 831-645-1200 831-649-4175

Asbestos Abatement /Hazardous Materials Contract

Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.

Electrical Contractor Fax: 831-537-9027Office: 831-524-6416Adept Electrical Services, Inc.

General Contractor Fax: 000-000-0000Office: 408-842-3355101 Builders, Inc

General Contractor Fax: 000-000-0000Office: 559-301-8201Arts Construction

General Contractor Fax: 831-372-5584Office: 831-372-5580Avila Construction

General Contractor Fax: 831-275-4188Office: 831-275-2103California Premier Restoration

General Contractor Fax: 000-000-0000Office: 831-333-6910Csg Inc

General Contractor Fax: 000-000-0000Office: 831-656-1600Dmc Commercial Inc.

General Contractor Fax: 000-000-0000Office: 831-601-4991Icon Building & Development

General Contractor Fax: 805-548-1995Office: 831-869-8100Jacob Construction & Design

General Contractor Fax: 000-000-0000Office: 916-549-6259Jpb Designs, Inc.

General Contractor Fax: 408-295-0626Office: 408-295-2182O. C. Mcdonald Co., Inc.

General Contractor Fax: 831-717-4315Office: 831-375-4777Property Restoration Services

General Contractor Fax: 831-641-0586Office: 831-905-1798Pueblo Construction , Inc.

General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc

General Contractor Fax: 000-000-0000Office: 831-920-8408Tyman Construction

Plumbing & Piping Contractor Fax: 831-754-5514Office: 831-424-1633Val's Plumbing & Heating

Page 7: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

NEW

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Carmel-by-the-Sea

The work in general consists of but is not limited to: Removal of sand, soil, debris, litter, weeds and vegetation. This removal work maybe performed by hand or mechanically with non-gas powered equipment. Work must conform to water quality best managementpractices. No herbicides may be used to control weeds and other vegetation. Pruning and shearing of shrubs and vines conforming toindustry best management practices. Gas powered equipment may be used for shearing but non-gas powered equipment is preferred.Mowing of turf and naturalized vegetation to conform to best horticultural standards. Gas powered equipment may be used formowing. Irrigation maintenance, programing of irrigation timers, and monitoring for breaks and appropriateness of irrigation rates.Bedding plant acquisition and planting. Turf aeration, re-seeding, and fertilization. Fish pond care and maintenance. Water featuremonitoring. Wood mulch installation. Work to be performed on an as needed basis at one to fifty-eight locations. This is a one yearcontract with the option for extension of two additional years.

5/12 @ 10am- CONFERENCE CALL

20-01437

0

2:00 PM5/28/20

Addenda:LANDSCAPE MAINTENANCE SERVICES

Prebid Conf:

City of Carmel-by-the-Sea 831-620-2010 831-624-2004

Bidders:

Salinas

New ground-up Fosters Freeze restaurant with drive-thru and parking, landscape and accessory shell building. Project includes interiorand exterior work, all utility connections, etc.

Project Contact: Jeremy Ortiz 505-998-7717Email: [email protected]

20-00821

2

2:00 PM6/1/20

Addenda:FOSTERS FREEZE - SALINAS, CA

General Contractor Fax: 831-422-1882Office: 831-422-8213Dilbeck & Sons

General Contractor Fax: 408-842-7275Office: 408-607-2155Walker Construction Co.

HVAC Contractor Fax: 831-754-5514Office: 831-424-1633Val's Plumbing & Heating

Plumbing & Piping Contractor Fax: 831-394-3120Office: 831-394-3100Jd's Plumbing

Roofing Contractor Fax: 831-751-3133Office: 831-751-3131Noble Pride Roofing

Sewer & Water Contractor Fax: 831-394-3120Office: 831-394-3100Jd's Plumbing

Supplier Fax: 916-381-5650Office: 916-381-4680J.J. Rebar

Supplier Fax: 831-771-0109Office: 831-771-0126Keith Day Trucking

Bidders:

Plan Issuer:

Salinas

- TEMPORARY RELOCATION OF (8) 960 SQ.FT. STOCKPILE RELOCATABLE CLASSROOM BUILDINGS.- CONSTRUCTION OF (N) WOOD FOUNDATION

PREVAILING WAGE

MAND 5/11 @ 9am- VIRTUAL

20-01393

2

1:00 PM6/1/20

Addenda:NORTH SALINAS HIGH SCHOOL 8 TEMPORARY RELOCATABLE CLASSROOMS & NEW SITE FIRE LINE& HYDRANT

Prebid Conf:

Salinas Union High School District [email protected] 831-796-7074

General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc

Plumbing & Piping Contractor Fax: 831-754-5514Office: 831-424-1633Val's Plumbing & Heating

Bidders:

Plan Issuer:

Pacific Grove

Project consists of: SITEWORK DEMOLITION AND REMOVAL; CLEARING AND GRUBBING; SITE GRADING; DECOMPOSEDGRANITE; STORM DRAINAGE; HOT-MIX ASPHALT PAVING; PAINTED TRAFFIC LINES AND MARKINGS; CONCRETE PADS,WALKS, CURBS AND GUTTERS; ROADWAY AND SITE SIGNS; HABITAT RESTORATION; TREE PROTECTION; SITECARPENTRY; PIPE AND TUBE RAILINGS.

5/21 @ 10am- CONFERENCE CALL

20-01492

0

2:00 PM6/9/20

Addenda:POINT PINOS COASTAL TRAIL

Prebid Conf:

City of Pacific Grove Public Works dgho@cityof pacificgrove.org 831-648-5722 831-375-0627

NEW

Bidder Fax: 408-848-3334Office: 408-848-3310Perma-Green Hydroseeding, Inc.

Page 8: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Bradley

In general, the scope of services includes the full range of construction management services required for a bridge project in the publicsector. Services shall include, but not limited to, engineering review, environmental compliance, inspection, material testing, projectmanagement and surveying.

20-01416

0

3:00 PM6/12/20

Addenda:RFP - NACIMIENTO LAKE DRIVE BRIDGE PROJECT

10757

County of Monterey 831-755-4800 831-755-4958

San Benito County

Bidders:

Plan Issuer:

Paicines

The Department of Forestry and Fire Protection (CAL FIRE) is soliciting services for an additional leach field installation project, at CALFIRE's Bear Valley Fire Station (FS).Awarded Contractor shall provide all materials, labor, equipment, tools, permits, taxes and fees necessary to construct an additionalleach field and distribution lines, in accordance with the plans and specifications provided in the Sample Agreement.

Project Contact: Sarah BestEmail: [email protected]

MAND 4/30 @ 10am- site

20-01345

0

2:00 PM5/18/20

Addenda:BEAR VALLEY LEACH FIELD

4CA04754

Prebid Conf:

Department of Forestry and Fire Protection [email protected] 916-324-0205

General Contractor Fax: 000-000-0000Office: 831-789-9263Top Tier Grading

Bidders:

Plan Issuer:

Hollister

*** PROJECT HAS BEEN POSTPONED. PLEASE READ ADDENDUM #2 FOR MORE INFO ***

Demolition and repair of Pacheco Pass Dam Spillway Facility.

PREVAILING WAGE

Questions: Anne HallEmail: [email protected]

MAND 5/13 @ 10am- 10031 Pacheco Pass Highway, Hollister

20-00799

2

5:00 PM6/5/20

Addenda:NORTH FORK DAM SPILLWAY REPAIR - POSTPONED

Prebid Conf:

Pacheco Pass Water District 831-801-0810

General Contractor Fax: 408-294-2920Office: 408-294-2910Brannon Corporation

General Contractor Fax: 000-000-0000Office: 650-961-2742Ferma Corp

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

General Contractor Fax: 408-727-0366Office: 408-727-5700Jos. J. Albanese, Inc.

General Contractor Fax: 661-619-6194Office: 661-398-2289Sw Construction

Supplier Fax: 000-000-0000Office: 209-862-2004Joe's Landscaping & Concrete, Inc.

Supplier Fax: 000-000-0000Office: 800-321-5550Trench Plate Rental Co.

Supplier Fax: 408-383-0750Office: 408-316-0610United Rentals Trench Safety

San Luis Obispo County

Plan Issuer:

San Luis Obispo

Installation of a VoIP telephone system for the San Luis Obispo County Community College District.

PREVAILING WAGE

Questions: JAYSON BRYANEmail: [email protected]

4/9 @ 10am- Non-Mandatory Pre-Bid Teleconference

20-01068

4

1:00 PM5/21/20

Addenda:CUESTA COLLEGE - VOIP PHONE

Prebid Conf:

Klassen Corporation [email protected] 661-912-2708 661-324-3900

Page 9: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Arroyo Grande

Provide materials and installation of electrical equipment and wiring to a building with three classrooms, a restroom, office, andelectrical/data room per plans, scope, and special instructions. Provide and install wiring and materials to connect building power, data,fire alarm to site infrastructure as noted in plans. Connect all furnaces, fans, and condensers. Make all systems complete andfunctioning. See Special Instructions under Supplementary General Conditions.

PREVAILING WAGE

MAND 4/24 @ 9am- site

20-01262

0

2:00 PM5/21/20

Addenda:ARROYO GRANDE HIGH SCHOOL 300 WING MODERNIZATION ELECTRICAL PORTION

0456 / 20-15

Prebid Conf:

Lucia Mar Unified School District 805-474-3000 805-473-5594

Bidders:

Plan Issuer:

Paso Robles

Seeking sub trades for: Countertops & Tub Surrounds; Cabinets; Flooring; Appliances; Plumbing; Owner Selected Light Fixtures.

Questions: Derek Hansen; [email protected], (805)698-5242Teresa Ortiz; [email protected] (805)698-2219

20-01309

1

12:00 PM5/21/20

Addenda:CRESTON APARTMENTS (SUB BIDS ONLY)

Towbes Group 805-962-2121 805-568-4142

Casework / Millwork Contractor Fax: 707-546-7498Office: 707-546-7462The Cabinet Outlet

Electrical Contractor Fax: 805-238-0996Office: 805-238-3502Rossi & Carr Electrical Inc

Sub-Contractor/SpecialtyContractor

Fax: 661-396-2589Office: 661-397-2121Hps Mechanical

Bidders:

Plan Issuer:

Cayucos $256,454

This project will repair two slopes and all material associated with slip-out, and other such items or detail work not mentioned hereinthat are required by the Plans, the Standard Specifications, Standard Plans, or Special Provisions.

Bid Contact: Trisha Wright(805) [email protected]

20-01331

0

3:00 PM5/21/20

Addenda:CAYUCOS CREEK ROAD MILEPOST 1.2 AND 2.8 - SLOPE REPAIR

245R12B447 and245R12B424

County of San Luis Obispo 805-781-5200 805-781-1074

Excavation/SiteWork/Irrigation/Drainage/Landscape

Fax: 661-615-2100Office: 661-776-5735Brown's Construction Service, Inc

Excavation/SiteWork/Irrigation/Drainage/Landscape

Fax: 661-615-2100Office: 661-978-8488Brown's Construction Service, Inc

Fencing Office: 661-477-8289Cardoza Fencing

General Contractor Fax: 000-000-0000Office: 831-789-9263Top Tier Grading

Page 10: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

San Luis ObispoCounty

$401,466

This project will repair slope and all material associated with slip-out, and other such items or detail work not mentioned herein that arerequired by the Plans, the Standard Specifications, Standard Plans, or Special Provisions at various locations in San Luis ObispoCounty.

Bid Contact: Trisha Wright(805) [email protected]

20-01333

0

3:00 PM5/21/20

Addenda:SAN SIMEON CREEK ROAD MP 4.4, TORO CREEK ROAD MP 1.9, UPPER LOS BERROS ROAD MP 0.7,AND SUEY CREEK ROAD MP 1.75 - SLOPE REPAIR

245R12B434,245R12B440,245R12B441, and245R12B435

Excavation/SiteWork/Irrigation/Drainage/Landscape

Fax: 661-615-2100Office: 661-776-5735Brown's Construction Service, Inc

Excavation/SiteWork/Irrigation/Drainage/Landscape

Fax: 661-615-2100Office: 661-978-8488Brown's Construction Service, Inc

General Contractor Fax: 775-267-6801Office: 775-267-6800Herback General Engineering

General Contractor Fax: 000-000-0000Office: 831-789-9263Top Tier Grading

Sub-Contractor/SpecialtyContractor

Fax: 805-925-0884Office: 805-925-1947Pacific Petroleum California Inc

Plan Issuer:

San Luis Obispo

In general, needed services consist of various structural design activities related to the City’s Capital Improvement Plan, Capital AssetManagement Plan (CAMP), or other City projects. Selected Consultants will prepare high quality construction plans and specificationsin accordance with City requirements and standards. The City intends to initially utilize selected consultants to prepare maintenanceprojects identified within the CAMP report. Consultants with similar project experience are encouraged to submit proposals.

Project Contact: Aaron Glauch at (805) 781-7055 or [email protected]

20-01347

0

2:00 PM5/21/20

Addenda:STRUCTURAL ENGINEERING DESIGN SERVICES

5009.2020.SE

City of San Luis Obispo 805-781-7200 805-781-7198

Bidders:

Plan Issuer:

San Luis Obispo $500,000

Removal and replacement of asphalt paving at the San Luis Coastal Unified Corporation Yard located at 937 Southwood Drive, SanLuis Obispo, California as per plans and specifications.

PREVAILING WAGE

MAND 5/13 @ 10am- site

20-01454

0

10:00 AM5/25/20

Addenda:SAN LUIS COASTAL UNIFIED CORPORATION YARD PAVING

305

Prebid Conf:

San Luis Coastal Unified School District [email protected] 805-549-1200

NEW

Excavation/SiteWork/Irrigation/Drainage/Landscape

Fax: 661-615-2100Office: 661-776-5735Brown's Construction Service, Inc

Excavation/SiteWork/Irrigation/Drainage/Landscape

Fax: 661-615-2100Office: 661-978-8488Brown's Construction Service, Inc

General Contractor Fax: 805-473-2217Office: 805-473-3016Papich Construction Company, Inc.

General Contractor Fax: 805-543-9341Office: 805-543-9340S. Chaves Construction, Inc.

Sub-Contractor/SpecialtyContractor

Fax: 805-925-0884Office: 805-925-1947Pacific Petroleum California Inc

Page 11: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Pismo Beach

Replace existing parking lot, with additions as noted per plan. Perform demolition, excavation, placement of concrete, asphalt, pavers,block walls, and poured walls in parking, driving, and walkway areas. Install new electrical service, water, gas, power, communications,sewer, and storm lines including drain boxes, vaults, exterior lighting and foundations, wiring, fencing, and handrails.

Project Contact: Cindy NaberEmail: [email protected]

MAND 4/21 @ 9am- site

20-01194

3

2:00 PM5/26/20

Addenda:SHELL BEACH ELEMENTARY SCHOOL PARKING LOT AND UTILITIES

0466 / 20-14

Prebid Conf:

Lucia Mar Unified School District 805-474-3000 805-473-5594

Concrete/Masonry Contractor Fax: 661-399-3812Office: 661-399-3759Cen-Cal Construction

Electrical Contractor Fax: 805-238-0996Office: 805-238-3502Rossi & Carr Electrical Inc

Excavation/SiteWork/Irrigation/Drainage/Landscape

Fax: 559-582-5017Office: 559-583-8066Westscapes, Inc.

General Contractor Fax: 805-473-2217Office: 805-473-3016Papich Construction Company, Inc.

Sub-Contractor/SpecialtyContractor

Office: 559-997-9762Badger Daylighting Corporation

Sub-Contractor/SpecialtyContractor

Fax: 805-925-0884Office: 805-925-1947Pacific Petroleum California Inc

Supplier Fax: 661-397-7429Office: 661-396-3282Ferguson Waterworks

Supplier Fax: 805-928-5294Office: 805-235-4739Hanson Aggregates

Plan Issuer:

Paso Robles

Project consists of: Selective Demo; Cutting and Patching; Concrete Reinforcement; Cast-in-place Concrete; Metal Fabrications;Rough Carpentry; Sheathing; Finish Carpentry; Thermal and Moisture Protection; Elastomeric Acrylic Wallcoating; HVAC; Electrical.

MAND 5/14 @ 12:30pm- 2501 Beechwood Drive, Paso Robles

20-01433

0

1:00 PM5/26/20

Addenda:BUTLER & PETERSON ROOFING AND HVAC REPLACEMENT

Prebid Conf:

Paso Robles Joint Unified School District 805-769-1000 805-237-3339

Plan Issuer:

Paso Robles

Project consists of: Joint Sealants; Painting & Coating; Graphics and Signage.

MAND 5/14 @ 11am- 2501 Beechwood Drive, Paso Robles

20-01434

0

12:00 PM5/26/20

Addenda:BUTLER & PETERSON PAINTING

Prebid Conf:

Paso Robles Joint Unified School District 805-769-1000 805-237-3339

Bidders:

Plan Issuer:

Paso Robles

Project consists of: Selective Demo; Cutting and Patching; Sitework Concrete; Thermal Batt Insulation; Hollow Metal Doors andFrames; Gypsum Board; Tiling; Resilient Base and Accessories; Resilient Tile Flooring-LVT; Decorative Fiberglass Reinforced WallPanels; Graphics and Signage; Plumbing; HVAC; Electrical; Earthwork; Exterior Improvements; Utilities.

MAND 5/14 @ 2pm- 2501 Beechwood Drive, Paso Robles

20-01436

0

2:00 PM5/26/20

Addenda:BUTLER, PETERSON, FLAMSON & PIFER LUNCH SHELTERS

Prebid Conf:

Paso Robles Joint Unified School District 805-769-1000 805-237-3339

Concrete/Masonry Contractor Fax: 559-290-7780Office: 510-449-6791V & G Builders, Inc.

Bidders:

Plan Issuer:

Atascadero $1,900,000 $2,300,000

Pavement rehabilitation on approximately 4.3 miles of residential roads. Work includes full depth reclamation, overlay, and cape seal.Additional work includes replacement of twelve (12) concrete curb returns and minor drainage improvements.

Project Contact: Dawn Pattersone-mail: [email protected]

20-01298

0

2:00 PM5/27/20

Addenda:2020 F-14 PAVEMENT REHABILITATION

C2019R02 to

City of Atascadero [email protected] 805-470-3180 805-470-3181

Concrete/Masonry Contractor Fax: 661-399-3812Office: 661-218-7030Cen-Cal Construction

General Contractor Fax: 805-473-2217Office: 805-473-3016Papich Construction Company, Inc.

Page 12: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Sub-Contractor/SpecialtyContractor

Fax: 805-925-0884Office: 805-925-1947Pacific Petroleum California Inc

Bidders:

Plan Issuer:

Paso Robles $1,892,100

This project involves the installation of HDPE carrier pipe inside of the existing steel pipe casing at the existing North Salinas RiverCrossing located in Paso Robles in San Luis Obispo County, California, including: furnishing and field-joining of high densitypolyethylene (HDPE) pressure pipe; installing the HDPE pipe inside of the existing steel casing using horizontal directional drilling(HDD) equipment and construction means and methods; removing, modifying and reinstalling existing steel pipe and steel pipespecials; field hydrostatic pressure testing of the HDPE carrier pipe; trench excavation, excavation support and trench protection, andplacing and compacting pipe zone and trench zone backfill materials; protecting existing facilities; furnishing temporary utilities;complying with environmental controls and requirements; other appurtenant work; and all such other items or detail work notmentioned herein that are required by the Drawings, Standard Specifications, Standard Plans, and/or Special Provisions.

Bid Contact: Trisha Wright(805) [email protected]

5/13 @ 10am- Monterey Road just east of Highway 101, north of Paso Robles

20-01413

0

3:00 PM5/28/20

Addenda:NACIMIENTO WATER PIPELINE - NORTH SALINAS RIVER CROSSING REPAIR

300641

Prebid Conf:

County of San Luis Obispo 805-781-5200 805-781-1074

Equipment Office: 661-809-6838Houchin Brother's Equipment Rentals

General Contractor Fax: 805-543-1722Office: 805-543-1706Specialty Construction

Sub-Contractor/SpecialtyContractor

Fax: 805-925-0884Office: 805-925-1947Pacific Petroleum California Inc

Bidders:

Plan Issuer:

San Luis ObispoCounty

$1,461,270

This project will place a new hot mix asphalt overlay on existing roads in the South County. Work includes cold plane asphalt concreteroad surfaces, placing hot mix asphalt overlay, digout repairs, ADA upgrades, and other such items or detail work not mentioned hereinthat are required by the Plans, the Standard Specifications, Standard Plans, or Special Provisions.

Bid Contact: Trisha Wright(805) [email protected]

20-01414

1

3:00 PM5/28/20

Addenda:2018-19 ASPHALT OVERLAY VARIOUS SOUTH COUNTY ROADS

300615

County of San Luis Obispo 805-781-5200 805-781-1074

General Contractor Fax: 805-473-2217Office: 805-473-3016Papich Construction Company, Inc.

Plan Issuer:

Oceano

Construction of single family residence, including utilities, curb, gutter and sidewalk.

Project Contact: Scott PaceEmail: [email protected]

20-01466

0

12:00 PM5/29/20

Addenda:1475 14TH STREET RESIDENCE (SUB BIDS ONLY)

Pace Homes [email protected] 805-801-5806

NEW

Plan Issuer:

Atascadero

You are invited to review and respond to this Department of State Hospitals (DSH) - Atascadero solicitation. The DSH is seeking bidsfor a contractor to perform Automatic Door Operators Maintenance and Repairs.

Project Contact: David UlibarriEmail: [email protected]

5/21 @ 9am- DSH Atascadero Main Lobby

20-01346

0

2:00 PM6/1/20

Addenda:DSH ATASCADERO AUTOMATIC DOOR OPERATORS MAINTENANCE AND REPAIRS

19-11034-000

Prebid Conf:

Department of State Hospitals - Atascadero 805-468-2000 805-468-3451

Page 13: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Arroyo Grande $131,500

In general, the project consists of the removal and replacement of lifted and/or broken sidewalks, driveway aprons and curb/guttersections, removal and replacement of trees, irrigation repairs if damaged, and slicing/grinding of existing sidewalk concrete throughoutthe City of Arroyo Grande.

PREVAILING WAGE

Questions: [email protected]

20-01372

0

2:00 PM6/2/20

Addenda:2020 CONCRETE REPAIRS

2020-03

City of Arroyo Grande [email protected] 805-473-5444 805-473-5462

Supplier Fax: 805-928-5294Office: 805-235-4739Hanson Aggregates

Bidders:

San Luis ObispoCounty

$6,500,000

In San Luis Obispo County Near Santa Margarita At Trout Creek BridgeThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-8, C-12, C-61D09.550 Working Days * DVBE participation incentive up to $250,000 *

20-00211

0

2:00 PM6/9/20

Addenda:CDOT 05-0L7234 PLACE REINFORCED STRUCTURAL CONCRETE BRIDGE AND PC PS CONCRETESLAB

05-0L7234

General Contractor Fax: 805-473-2217Office: 805-473-3016Papich Construction Company, Inc.

Bidders:

Plan Issuer:

Nipomo

The WORK includes, but is not limited to, furnishing all labor, materials, equipment, services, utilities and performing all worknecessary and incidental to furnishing and installing four 100-horsepower vertical turbine pumps, motors, coatings, and associatedpiping, valves, and appurtenances.

PREVAILING WAGE

Questions: Jon HanlonEmail: [email protected]

20-01501

0

2:00 PM6/25/20

Addenda:SUPPLEMENTAL WATER PROJECT - JOSHUA ROAD PUMP STATION PUMP #1-4 IMPROVEMENTS

Nipomo Community Services District 805-929-1133 805-929-5090

NEW

Sub-Contractor/SpecialtyContractor

Office: 559-997-9762Badger Daylighting Corporation

Santa Clara County

Bidders:

Plan Issuer:

Palo Alto

Provide asphalt concrete milling; placing asphalt concrete overlay; asphalt concrete pavement repair and replacement; mandatory useof recycled water; Portland cement concrete road base repair, removal and replacement of damaged sidewalk, curb, gutter anddriveways; installing or replacing curb ramps; installing truncated domes; tree trimming; traffic control; crack sealing; potholing;surveying; striping; placing legends and pavement markers; site preparation; lowering manholes, catch basins, utility boxes, vaults andthen raising back to grade following paving.

Project Contact For Questions: Young TranEmail: [email protected]

None

20-01321

8

5:00 PM5/18/20

Addenda:FY2020 STREET RESURFACING PROJECT - CITY OF PALO ALTO

178332

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

Consultant Fax: 916-405-4180Office: 916-230-0370Stormwater Specialists, Inc.

General Contractor Fax: 415-206-1194Office: 415-206-1192Accurate Earthworks, Inc.

General Contractor Fax: 650-777-4326Office: 650-777-4324Exaro Technologies Corp.

General Contractor Fax: 925-449-5875Office: 925-449-5764Goodfellow Bros., Inc.

Page 14: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

General Contractor Fax: 408-293-3336Office: 408-293-9516Graham Contractors, Inc.

General Contractor Fax: 408-327-7090Office: 408-327-7013Granite Construction

General Contractor Fax: 916-714-9868Office: 775-355-5271Intermountain Slurry Seal

General Contractor Fax: 650-952-6851Office: 650-952-7333Interstate Grading & Paving

General Contractor Fax: 650-966-1946Office: 650-966-1926O'Grady Paving Inc.

General Contractor Fax: 916-313-3438Office: 916-642-1751Pavement Coatings Co.

General Contractor Fax: 415-534-6692Office: 415-746-9564R&S Construction Management Inc.

General Contractor Fax: 415-449-3597Office: 415-779-5262Ronan Construction, Inc.

General Contractor Fax: 925-984-2583Office: 925-984-2581Spencon Construction Inc.

General Contractor Fax: 925-621-5799Office: 925-621-5700Teichert Construction

Professional Services Fax: 707-361-0295Office: 707-748-4300F3 & Associates

Professional Services Fax: 000-000-0000Office: 408-636-0900Sandis Civil Engineers Suveyors Planners

Sub-Contractor/SpecialtyContractor

Fax: 415-206-1711Office: 415-206-1700Cmc Traffic Control Specialists

Bidders:

Plan Issuer:

Palo Alto

Resurfacing various City streets.

Project Contact For Questions: Young TranEmail: [email protected]

None

20-01337

4

3:00 PM5/18/20

Addenda:FY21 STREETS PREVENTIVE MAINTENANCE PROJECT - CITY OF PALO ALTO

178632

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

General Contractor Fax: 415-206-1194Office: 415-206-1192Accurate Earthworks, Inc.

General Contractor Fax: 209-408-0427Office: 209-522-2277American Pavement Systems, Inc.

General Contractor Fax: 925-803-4263Office: 925-361-1380Desilva Gates Construction

General Contractor Fax: 510-783-2971Office: 510-783-2960Golden Bay Construction Inc.

General Contractor Fax: 408-293-3336Office: 408-293-9516Graham Contractors, Inc.

General Contractor Fax: 650-966-1946Office: 650-966-1926O'Grady Paving Inc.

General Contractor Fax: 916-313-3438Office: 916-642-1751Pavement Coatings Co.

General Contractor Fax: 916-373-1083Office: 916-373-1500Vss International, Inc.

Sub-Contractor/SpecialtyContractor

Fax: 415-206-1711Office: 415-206-1700Cmc Traffic Control Specialists

Bidders:

Plan Issuer:

San Jose

The Project consists of relocation of three (3) classroom modular units from district storage. All units to be completely refurbished.Install new 12x40-restroom unit. All units will be set on concrete foundations flush to grade. All units will receive stucco flex siding overexisting siding. Install new shade structure and new outdoor furniture. Ground surface under existing solar panel structure will begraded and covered with granite-crete ground cover. New DG walkway and field grading and irrigation.

Project Contact For Questions: Lou Anne CastilloEmail: [email protected]

MAND 5/5 @ 10AM

20-01379

2

10:00 AM5/18/20

Addenda:WINDMILL SPRINGS ELEMENTARY SCHOOL PORTABLE RELOCATION AND SHADE STRUCTURE -FRANKLIN MCKINLEY SCHOOL DISTRICT

2020-1662

Prebid Conf:

Franklin McKinley School District 408-283-6000 000-000-0000

Concrete/Masonry Contractor Fax: 559-290-7780Office: 510-449-6791V & G Builders, Inc.

General Contractor Fax: 000-000-0000Office: 408-842-3355101 Builders, Inc

General Contractor Fax: 415-206-1194Office: 415-206-1192Accurate Earthworks, Inc.

General Contractor Fax: 000-000-0000Office: 408-661-3599Commercial Plumbing & Building Inc

General Contractor Fax: 408-279-2044Office: 408-279-2027Guerra Construction & Engineering, Inc

General Contractor Fax: 925-398-8245Office: 925-398-8290Integra Construction Services, Inc.

General Contractor Fax: 925-398-8245Office: 925-398-8290Integra Construction Services, Inc.

General Contractor Fax: 530-899-2683Office: 530-899-1104Schreder And Brandt Mfg, Inc.

General Contractor Fax: 831-424-4401Office: 831-424-1647Ssb Construction

Supplier Office: 510-505-9595Steeler, Inc.

Page 15: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Jose

Qualify contractors to be in a pool of contractors that will compete for minor public works construction projects involving work to becompleted within the public right of way including but not limited to concrete improvements (ADA curb ramps, medians, curb & gutter),enhanced pedestrian crosswalks, street lights, traffic signal, and radar speed signs. This procurement will not result in the selection ofa single contractor to perform a specific project.

20-00983

2

3:00 PM5/20/20

Addenda:9567 - 2020 MINOR PRE-QUALIFICATION POOL - STREETS - CITY OF SAN JOSE

9567

City of San Jose - DPW 408-535-8300

Bidders:

Plan Issuer:

Milpitas

Provide Fire Hydrant Replacement services for the hydrants as assigned by task order.

Project Contact For Questions: Stephanie FongEmail: [email protected]

MAND 5/4 @ 11AM (Via Zoom Video Call)

20-01319

2

2:00 PM5/20/20

Addenda:HYDRANT REPLACEMENT - CITY OF MILPITAS

2426

Prebid Conf:

City of Milpitas Purchasing 408-586-3163

General Contractor Fax: 000-000-0000Office: 916-533-4910Fd Underground

General Contractor Fax: 925-829-7575Office: 925-829-6565Platinum Pipeline Inc.

General Contractor Fax: 650-726-9055Office: 650-726-7119Stoloski & Gonzalez Inc.

General Contractor Fax: 000-000-0000Office: 415-500-1685Subterra Construction

General Contractor Fax: 408-371-3604Office: 408-371-5510West Valley Construction

Plan Issuer:

Santa Clara County $200,000

Provide Carpentry Services on an “as needed” basis.

Project Contact For Questions: Jerry Mcghie 408-918-2707Email: [email protected]

None

20-01368

0

3:00 PM5/20/20

Addenda:CARPENTRY SERVICES ITB-FAF-FY20-0306 - COUNTY OF SANTA CLARA

ITB-FAF-FY20-0306

Prebid Conf:

County of Santa Clara Facilities & Fleet 408-993-4600 408-993-4895

Bidders:

Plan Issuer:

Saratoga

Site work, demolition, and construction to raise the existing press box.

Project Contact For Questions: Tasha Tenturier 408-371-0960 xt 2056Email: [email protected]

MAND 3/20 @ 9AM (Front of Administration Building) & Voluntary site visit 4/10 @ 12PM

20-00854

7

11:30 AM5/21/20

Addenda:PROSPECT HIGH SCHOOL PRESS BOX ELEVATION CHANGE - CAMPBELL UNION HIGH SCHOOLDISTRICT

218-970240-080

Prebid Conf:

Campbell Union High School District [email protected] 408-371-0960

Concrete/Masonry Contractor Fax: 408-279-2044Office: 408-279-2027Guerra Construction & Engineering, Inc

General Contractor Fax: 000-000-0000Office: 408-842-3355101 Builders, Inc

General Contractor Fax: 415-358-5769Office: 415-756-0945Alex Kushner General Contractor

General Contractor Fax: 000-000-0000Office: 408-650-6753Bp-Pak, Inc.

General Contractor Fax: 000-000-0000Office: 510-657-1800Calstate Construction

General Contractor Fax: 510-724-1254Office: 510-495-7020Hm Construction Inc

General Contractor Fax: 650-965-7139Office: 650-965-3430Rc Benson & Sons, Inc.

General Contractor Fax: 408-296-8814Office: 408-296-5926Ron Paris Construction

General Contractor Fax: 408-286-1288Office: 408-286-1299Strawn Construction, Inc

Supplier Office: 510-505-9595Steeler, Inc.

Page 16: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

San Jose

Installation of a new fire service water line and a new fire hydrant at Andrew Hill High School.

Voluntary 4/14 & 4/21 @ 10AM (Parking Lot)

20-01120

7

2:00 PM5/21/20

Addenda:DW INFRASTRUCTURE - SITE UTILITIES ANDREW HILL (FIRE SERVICE) - ESUHSD

B-13-19-20

Prebid Conf:

East Side Union High School District (ESUHSD) 408-347-5100

Consultant Fax: 888-840-5935Office: 916-930-6000Verux, Inc.

General Contractor Fax: 000-000-0000Office: 408-842-3355101 Builders, Inc

General Contractor Fax: 415-206-1194Office: 415-206-1192Accurate Earthworks, Inc.

General Contractor Fax: 408-279-2044Office: 408-279-2027Guerra Construction & Engineering, Inc

General Contractor Fax: 408-925-0240Office: 408-925-0220Lewis & Tibbitts Inc.

General Contractor Fax: 831-630-1009Office: 831-630-1747Manzo Construction Inc.

General Contractor Fax: 408-977-1659Office: 408-977-1655Pacific Underground Construction

General Contractor Fax: 408-371-3604Office: 408-371-5510West Valley Construction

Supplier Fax: 000-000-0000Office: 206-725-25003600Steeler, Inc.

Bidders:

Plan Issuer:

Los Gatos $185,000

This project will require upgrades to its interior, and to provide safety and code upgrades which will provide improvements that willmodernize its appearance, function and meet new safety and code requirements. Scope of work for this project includes the following:Accessible Restroom Remodel, Upgrades to the Kitchenette, Circulation Improvements, lighting, plumbing, and electrical work,painting, flooring, carpentry, and miscellaneous improvements.

Project Contact For Questions: Tom Mclauchlan 408- 355-2208Email: [email protected]

Non-Mandatory 5/7 @ 10AM (Vasona Park)

20-01301

1

2:00 PM5/21/20

Addenda:YOUTH SCIENCE INSTITUTE (YSI) VISITOR CENTER INTERIOR IMPROVEMENTS VASONA PARK -COUNTY OF SANTA CLARA

710-DWP-D173-YSIINT

Prebid Conf:

County Of Santa Clara- Parks & Recreation Department 408-355-2200

Asbestos Abatement /Hazardous Materials Contract

Fax: 000-000-0000Office: 209-602-8575Marfield Co. Inc

Consultant Fax: 000-000-0000Office: 408-449-7791Sae Consulting

Demolition Contractor Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.

General Contractor Fax: 000-000-0000Office: 408-832-8150Itech Solution

General Contractor Fax: 408-296-8814Office: 408-296-5926Ron Paris Construction

General Contractor Fax: 000-000-0000Office: 209-416-9375Shellco, Inc

Plan Issuer:

Cupertino

Basic services will consist of working with the city to formulate and execute a schematic design for the entire trail that is definedenough to undergo evaluation under CEQA and NEPA; and thereafter developing construction documents for a first segment of thetrail from the west side of Wolfe Road eastward, paralleling the Junipero Serra channel to Calabazas Creek, and continuing southalong the west bank of Calabazas Creek to Vallco Parkway. Expected tasks include Preliminary Investigation, Conceptual Design andSchematic Design.

Project Contact For Questions: Gail SeedsEmail: [email protected].

20-01332

0

2:00 PM5/21/20

Addenda:RFQ DESIGN AND ENGINEERING SERVICES FOR JUNIPERO SERRA TRAIL - CITY OF CUPERTINO

City of Cupertino DPW 408-777-3354

Page 17: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Morgan Hill $3,500,000

Pavement milling and micro-milling, cold in-place recycling (CIR) pavement rehabilitation, hot mix asphalt concrete (AC) overlay, fulldepth AC pavement repairs, slurry sealing, crack sealing, replacement of all existing traffic delineation and markings, utilityadjustments, traffic signal loop restorations, and all related work on various streets within the City limits.

Project Contact For Questions: Lynette KongEmail: [email protected]

20-01405

0

2:30 PM5/21/20

Addenda:2020 PAVEMENT RESURFACING - CITY OF MORGAN HILL

519000

City of Morgan Hill, DPW 408-778-6480

General Contractor Fax: 916-381-3703Office: 916-381-8033California Pavement Maintenance Co.,Inc. Dba Cpm

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

Bidders:

San Jose

Provide an audiology program renovation. The project will consist of the following components:

* Architectural and engineering services* Construction and installation for turnkey interior tenant improvement, furniture and related modifications, including, but not limited to,demolition, hazardous material remediation, carpentry, finishes, ADA upgrades, mechanical, plumbing and, electrical installation.* Approximate gross square feet is 4,355, excluding the path of travel modifications.* The project completion is estimated for January 2021.

Project Contact For Questions: Kimberly Webb 408-924-1642Email: [email protected]

Optional 5/7 @ 8AM (Via Zoom Video Conference)

20-01418

2

2:00 PM5/21/20

Addenda:RFQ AUDIOLOGY RENOVATION PROJECT - SJSU

SJSU - 382

Prebid Conf:

General Contractor Office: 510-755-4032Best Contracting Services, Inc

Bidders:

Plan Issuer:

Palo Alto

Provide assistance over the course of five years (from the effective date of the contract) to move forward with implementation of its GSIPlan. This RFP addresses various items that have been identified as necessary for successful GSI Plan implementation. The Cityrequests that the CONSULTANT present a unique, innovative approach in its proposal with regards to how the workplan will be carriedout and how all products will be created. The City also requests that each Scope item be thought of as a piece of a puzzle to create anoptimal GSI Program. Thus, the CONSULTANT is expected to consider task overlap and relationships of product components whenproposing a project schedule and budget.

Contact For Questions: Pamela Boyle Rodriguez 650-329-2421Email: [email protected]

MAND 5/8 @ 3PM (Via Teleconference)

20-01400

1

3:00 PM5/22/20

Addenda:RFP GREEN STORMWATER INFRASTRUCTURE (GSI) PLAN IMPLEMENTATION SUPPORT - CITY OFPALO ALTO

178559

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

General Contractor Fax: 925-937-9010Office: 925-937-9010Brown & Caldwell

General Contractor Fax: 000-000-0000Office: 510-836-3034Geosyntec Consultants

General Contractor Fax: 000-000-0000Office: 707-528-4848Schaaf & Wheeler

General Contractor Fax: 925-627-4101Office: 925-627-4102Woodard & Curran

Plan Issuer:

Palo Alto

City intends to issue a General Services agreement for Backflow Preventor Device Inspection Services on as-requested andauthorized basis.

Project Contact For Questions: Dennis Huebner 650-496-6970Email: [email protected]

20-01497

0

5:00 PM5/22/20

Addenda:RFQ BACKFLOW PREVENTER DEVICE INSPECTION - CITY OF PALO ALTO

177654

City of Palo Alto - DPW 650-329-2271

NEW

Page 18: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Milpitas

Contractor to provide daytime staff to go between the City’s facilities wiping and disinfecting high touch surfaces such as the following:Sink counter tops, towel and toilet paper dispensers, restroom stall doors, restroom fixtures, handicap bars, door handles/knobs, pushplates, light switches, tables, hard surface chairs, trash lids, elevator buttons-handrails, stair rails, entrance doors, drinking fountains,kitchen appliance exteriors and other high-contact surfaces.

Project Contact For Questions: Tony Ndah 408-586-2602Email: [email protected]

20-01487

0

2:00 PM5/25/20

Addenda:RFP DAYTIME CUSTODIAL SERVICES - CITY OF MILPITAS

2442

City of Milpitas Purchasing 408-586-3163

NEW

Bidders:

Plan Issuer:

Palo Alto $975,000

Remove and replace existing gymnasium heating system with new Ownerf furnished TRANE air conditioning units, make temporaryaccess road provisions for delivery and hoisting of new equipment, fabricate and install new structural steel mechanical platforms,misc. metal ductwork supports, perform selective demolition of existing ductwork, exterior stucco wall, interior mechanical mezzanineframed gyp board walls, protect existing gymnasium hardwood floor. Patch and repair existing PVC roofing for removal of old andinstallation of new work. Modify high roof to receive new gravity hoods. Pull new cross-campus electrical conductors, furnish & installnew MSB breaker and gym distribution panel. Modify existing Honeywell Silent Knight fire alarm system for new HVAC devices, test.Perform controls, test & balance, commissioning per Owner Allowance.

Project Contact For Questions: Royce RippereEmail: [email protected]

MAND 5/12 @ 10AM (Meet @ Campus Administration Office to sign in) & 5/13 @ 9AM

20-01293

3

2:00 PM5/26/20

Addenda:GUNN HIGH SCHOOL TITAN GYM AC RETROFIT - PALO ALTO UNIFIED SCHOOL DISTRICT

GT-20

Prebid Conf:

ARC (San Carlos) 650-631-2310

Demolition Contractor Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.

Demolition Contractor Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.

General Contractor Fax: 650-965-7139Office: 650-965-3430Rc Benson & Sons, Inc.

General Contractor Fax: 650-965-7139Office: 650-965-3430Rc Benson & Sons, Inc.

General Contractor Fax: 510-280-6087Office: 510-579-7382S & H Construction, Inc

General Contractor Fax: 510-280-6087Office: 510-579-7382S & H Construction, Inc

General Contractor Fax: 408-286-1288Office: 408-286-1299Strawn Construction, Inc

General Contractor Fax: 408-286-1288Office: 408-286-1299Strawn Construction, Inc

HVAC Contractor Fax: 408-920-6171Office: 408-315-8808Performance Air Service, Inc

HVAC Contractor Fax: 408-920-6171Office: 408-315-8808Performance Air Service, Inc

Supplier Fax: 000-000-0000Office: 206-725-25003600Steeler, Inc.

Supplier Fax: 000-000-0000Office: 206-725-25003600Steeler, Inc.

Page 19: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Gilroy

The project consists of on-site improvements and amenities; as well as the construction of 158 apartments and community commonareas on an approximately 9.575 acre site. Of the 158 apartments, there are 80 multi-family dwelling units and 78 senior dwellingunits. In addition to the 158 to the 158 apartments housed in 10 buildings, there is a community building and a laundry and bike repairbuilding, both of which service the multi-family units.

The 80 multi-family dwelling units are contained in three different 2 story building plan types. These 7 buildings contain (40) 2-bedroom and (40) 3-bedroom dwelling units.

The 78 senior dwelling units are contained in three different plan types including (1) 3 story building, and (2) 1 story buildings. These 3buildings contain (61) 1-bedroom and (17) 2-bedroom dwelling units.

Project Contact For Questions: Jody WilsonEmail: [email protected]

20-01367

0

5:00 PM5/26/20

Addenda:GLEN LOMA RANCH SENIOR & MANOR HOUSING TOWN CENTER DEVELOPMENT (REQUEST FORSUB BIDS)

Pacific West Builders 208-461-0022 208-461-0033

Casework / Millwork Contractor Fax: 707-546-7498Office: 707-546-7462The Cabinet Outlet

Excavation/SiteWork/Irrigation/Drainage/Landscape

Fax: 408-846-9501Office: 408-846-9511Alpine Landscapes

General Contractor Fax: 408-848-3334Office: 408-848-3310Perma-Green Hydroseeding, Inc.

Plan Issuer:

San Jose

Installation of Audio Video Conference equipment at the Julian Campus: Auditorium.

Project Manager: Zachary Pardo 669-250-9420Email: [email protected]

Contractors who are interested in scheduling a project site walkthrough are responsible for contacting Zachary Pardo,Operations Aide, at (669) 250-9420 or [email protected] no later than Friday, May 8, 2020 to schedule anappointment time

20-01407

1

3:00 PM5/26/20

Addenda:ITB-FAF-FY20-0293 - AV EQUIPMENT INSTALLATION AT THE JULIAN CAMPUS: AUDITORIUM - COUNTYOF SANTA CLARA

ITB-FAF-FY20-0293

Prebid Conf:

County of Santa Clara Facilities & Fleet 408-993-4600 408-993-4895

Plan Issuer:

San Jose

Installation of Audio Video Conference equipment at the Julian Campus: Training Rooms.

Project Contact For Questions: Zachary Pardo 669-250-9420Email: [email protected]

Contractors who are interested in scheduling a project site walkthrough are responsible for contacting Zachary Pardo,Operations Aide, at (669) 250-9420 or [email protected] no later than Fridayy, May 8, 2020 to schedule anappointment time

20-01408

2

3:00 PM5/26/20

Addenda:ITB-FAF-FY20-0356 - AV EQUIPMENT INSTALLATION AT THE JULIAN CAMPUS: TRAINING ROOMS -COUNTY OF SANTA CLARA

ITB-FAF-FY20-0356

Prebid Conf:

County of Santa Clara Facilities & Fleet 408-993-4600 408-993-4895

Plan Issuer:

San Jose

Installation of Audio Video Conference equipment at the Julian Campus: Pepperdine Room.

Project Manager: Zachary Pardo 669-250-9420Email: [email protected]

Contractors who are interested in scheduling a project site walkthrough are responsible for contacting Zachary Pardo,Operations Aide, at (669) 250-9420 or [email protected] no later than Friday, May 8, 2020 to schedule anappointment time

20-01410

1

3:00 PM5/26/20

Addenda:ITB-FAF-FY20-0358 - AV EQUIPMENT INSTALLATION AT THE JULIAN CAMPUS: PEPPERDINE ROOM -COUNTY OF SANTA CLARA

ITB-FAF-FY20-0358

Prebid Conf:

County of Santa Clara Facilities & Fleet 408-993-4600 408-993-4895

Page 20: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Jose

Installation of Audio Video Conference equipment at the Julian Campus: Simulation Lab.

Project Manager: Zachary Pardo 669-250-9420Email: [email protected]

Contractors who are interested in scheduling a project site walkthrough are responsible for contacting Zachary Pardo,Operations Aide, at (669) 250-9420 or [email protected] no later than Friday, May 8, 2020 to schedule anappointment time

20-01411

1

3:00 PM5/26/20

Addenda:ITB-FAF-FY20-0357 - AV EQUIPMENT INSTALLATION AT THE JULIAN CAMPUS: SIMULATION LAB -COUNTY OF SANTA CLARA

ITB-FAF-FY20-0357

Prebid Conf:

County of Santa Clara Facilities & Fleet 408-993-4600 408-993-4895

Bidders:

Plan Issuer:

Santa Clara

*** Bid documents available after 5/12/2020***

New play structures and related site improvements at Bowers Elementary, Sutter Elementary, Washington Open Elementary andMontague Elementary Schools.

Project Contact For Questions: C.R. Hodgson, Strawn CMEmail: [email protected]

MAND 5/14 & 5/15 @ 10AM (Via web conferencing; Email: [email protected] for conference links)

20-01446

0

10:00 AM5/26/20

Addenda:ENROUTE - KINDERGARTEN PLAYGROUND IMPROVEMENTS FOUR SCHOOLS - SANTA CLARAUNIFIED SCHOOL DISTRICT

1099

Prebid Conf:

Strawn Construction Management [email protected] 408-206-2055 000-000-0000

General Contractor Office: 408-661-3599Commercial Plumbing & Building Inc

Bidders:

Plan Issuer:

Santa Clara

The Work consists of design, fabricate, deliver, install and commission a complete photovoltaics (PV) system.

Project Contact For Questions: Evelyn Liang 408-615-3013Email: [email protected]

Non-Mandatory 5/12 @ 11AM

20-00645

2

3:00 PM5/27/20

Addenda:NORTHSIDE BRANCH LIBRARY PHOTOVOLTAICS SYSTEM - CITY OF SANTA CLARA

CE 18-19-11

Prebid Conf:

City of Santa Clara - DPW 408-615-3000 408-985-7936

Electrical Contractor Fax: 000-000-0000Office: 510-579-5293Elecco, Llc

Bidders:

Plan Issuer:

Sunnyvale $14,550,000

Demolition of some existing park features, installation of underground utilities and site grading followed by construction of new sitewalkways, new synthetic turf field with lighting, baseball and softball backstops and dugouts, a new basketball court with fencing, anew all inclusive playground area, a new restroom/concession building, picnic areas with tables and barbeques, a new parking lot offBritton Avenue with trash enclosure, expansion of the existing maintenance building, construction of dog park area, and site landscapeimprovements, followed by installation of site furnishings.

Project Contact For Questions: Lisa Vo (408) 730-7608Email: [email protected]

Optional 5/7 @ 10AM

20-01308

1

3:00 PM5/27/20

Addenda:FAIR OAKS PARK RENOVATION & ENHANCEMENT AND MAGICAL BRIDGE PLAYGROUND - CITY OFSUNNYVALE

PR-16-04

Prebid Conf:

City of Sunnyvale DPW 408-730-7403 000-000-0000

Concrete/Masonry Contractor Fax: 000-000-0000Office: 209-862-2004Joe's Landscaping & Concrete, Inc.

Fencing Fax: 559-575-8244Office: 559-260-4699California Commercial Fence

Fencing Fax: 916-631-8989Office: 916-631-9191Crusader Fence Co., Inc.

Professional Services Fax: 415-282-1603Office: 415-282-1602Vintage Contractors

Sub-Contractor/SpecialtyContractor

Office: 925-580-8350Brightview Landscape Development

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Supplier Fax: 408-977-0375Office: 408-287-1400Reed & Graham, Inc.

Page 21: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Gilroy

Provide professional engineering services for the design and construction engineering support for the Fuel Station SecondaryContainment Components Repairs at the City of Gilroy Corporation Yard.

Project Contact For Questions: Eric Argamaso 408-846-0217Email: [email protected]

20-01353

0

2:00 PM5/27/20

Addenda:RFP FUEL STATION SECONDARY CONTAINMENT COMPONENTS REPAIRS FUEL STATIONSECONDARY CONTAINMENT COMPONENTS REPAIRS CORPORATION YARD - CITY OF GILROY

20-RFP-PW-441

City of Gilroy - DPW 408-846-0234

General Contractor Fax: 831-475-8249Office: 831-475-8141Remediation Risk Management, Inc. DbaTriton Construction

Bidders:

Plan Issuer:

San Jose

Modify the existing US 101/Blossom Hill Road interchange in south San Jose.

Project Contact For Questions: Ehab Azab (408)321-5835Email: [email protected]

4/29 @ 10AM (Via Online Microsoft Teams)

20-01004

13

2:00 PM5/28/20

Addenda:US 101/BLOSSOM HILL ROAD INTERCHANGE IMPROVEMENT - SCVTA

C20004

Prebid Conf:

SCVTA -Santa Clara Valley Transportation Authority 408-321-7189

Consultant Fax: 888-733-1360Office: 510-220-9017S. Kwok Engineers, Inc.

Consultant Fax: 000-000-0000Office: 408-832-2534Stormwater Management Llc

General Contractor Fax: 925-687-2122Office: 925-687-6666Bay Cities Paving & Grading, Inc.

General Contractor Fax: 925-803-4263Office: 925-361-1380Desilva Gates Construction

General Contractor Fax: 650-259-9651Office: 650-259-9545Disney Construction Inc.

General Contractor Fax: 707-746-0849Office: 707-742-6000Flatiron West, Inc.

General Contractor Fax: 925-625-5783Office: 925-754-6633Foundation Constructors

General Contractor Fax: 707-585-1601Office: 707-585-1221Ghilotti Construction Company, Inc.

General Contractor Fax: 925-838-5915Office: 925-838-5675Gordon N. Ball, Inc.

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

General Contractor Fax: 916-757-6499Office: 916-757-6400Teichert Construction

General Contractor Fax: 925-944-9860Office: 925-627-1700Walsh Construction

Professional Services Fax: 707-361-0295Office: 707-748-4300F3 & Associates

Professional Services Fax: 000-000-0000Office: 408-636-0900Sandis Civil Engineers Suveyors Planners

Sub-Contractor/SpecialtyContractor

Fax: 415-508-1801Office: 415-508-1800Bay Line Cutting & Coring, Inc.

Sub-Contractor/SpecialtyContractor

Fax: 707-789-9542Office: 707-778-8316Pacific Coast Drilling Co., Inc.

Supplier Fax: 209-466-4571Office: 209-466-0988Cal-Sierra Pipe, Llc

Supplier Office: 925-557-8165Pace Supply Corp.

Supplier Fax: 408-977-0375Office: 408-287-1400Reed & Graham, Inc.

Bidders:

Plan Issuer:

San Jose

Installation and/or repair to the existing sewer line running along the Building 1200 (Gym) and the existing sewer line running alongexisting Building 400, both connect directly to the city’s sewer line on North White Road.

4/15 & 4/22 @ 10AM (Front of Administration Building) Note- conferences are NON-MANDATORY

20-01048

5

2:00 PM5/28/20

Addenda:DW INFRASTRUCTURE - SITE UTILITIES (SEWER) JAMES LICK HIGH SCHOOL - ESUHSD

B-12-19-20

Prebid Conf:

East Side Union High School District (ESUHSD) 408-347-5100

General Contractor Fax: 925-215-2434Office: 925-449-4249Dpi General Contractor Inc

General Contractor Fax: 408-279-2044Office: 408-279-2027Guerra Construction & Engineering, Inc

General Contractor Fax: 415-468-1359Office: 415-759-0506K J Woods Construction, Inc.

General Contractor Fax: 831-638-9372Office: 831-638-9370Manzo Const.

General Contractor Fax: 000-000-0000Office: 415-825-5000Mk Pipelines Inc.

General Contractor Fax: 408-977-1659Office: 408-977-1655Pacific Underground Construction

Page 22: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Supplier Fax: 408-383-0750Office: 408-316-0610United Rentals Trench Safety

Bidders:

Santa Clara County $2,710,000

In Santa Clara County At Various LocationsThe Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-12.45 Working Days * 12% DBE Requirement *

20-00229

0

2:00 PM5/28/20

Addenda:CDOT 04-3Q4804 COLD PLANE ASPHALT CONCRETE PAVEMENT AND OVERLAY WITH RHMA-G

04-3Q4804

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

Bidders:

Plan Issuer:

Santa Clara

*** Bid documents available after 5/14/2020***

New play structures and related site improvements at Hughes Elementary, Ponderosa Elementary and Scott Lane ElementarySchools.

Project Contact For Questions: C.R. Hodgson, Strawn CMEmail: [email protected]

MAND 5/14 & 5/19 @ 10AM (Via web conferencing; Email: [email protected] for conference links)

20-01447

0

10:00 AM5/28/20

Addenda:ENROUTE - KINDERGARTEN PLAYGROUND IMPROVEMENTS THREE SCHOOLS - SANTA CLARAUNIFIED SCHOOL DISTRICT

1101

Prebid Conf:

Strawn Construction Management [email protected] 408-206-2055 000-000-0000

General Contractor Fax: 408-629-1617Office: 408-661-3599Commercial Plumbing & Building Inc

Bidders:

Plan Issuer:

Santa Clara

*** Bid documents available after 5/14/2020***

New play structures, fencing and gates and related site improvements at Hughes Elementary, Ponderosa Elementary and Scott LaneElementary Schools.

Project Contact For Questions: C.R. Hodgson, Strawn CMEmail: [email protected]

5/14 & 5/19 @ 10AM (Via web conferencing; Email: [email protected] for conference links)

20-01449

0

10:30 AM5/28/20

Addenda:ENROUTE - UPPER GRADE PLAYGROUND IMPROVEMENTS THREE SCHOOLS - SANTA CLARAUNIFIED SCHOOL DISTRICT

1102

Prebid Conf:

Strawn Construction Management [email protected] 408-206-2055 000-000-0000

General Contractor Office: 408-661-3599Commercial Plumbing & Building Inc

Bidders:

Plan Issuer:

San Jose

Install and supply food service equipment.

Project Contact For Questions: Tasha Tenturier 408-371-0960 xt 2056Email: [email protected]

Non-Mandatory 5/14 @ 11AM

20-01467

0

11:00 AM5/28/20

Addenda:DEL MAR HIGH SCHOOL KITCHEN MODERNIZATION - FOOD SERVICE EQUIPMENTSUPPLIER/INSTALLER - CAMPBELL UNION HIGH SCHOOL DISTRICT

218-980011-030

Prebid Conf:

Campbell Union High School District [email protected] 408-371-0960

NEW

Supplier Fax: 000-000-0000Office: 206-725-25003600Steeler, Inc.

Supplier Fax: 000-000-0000Office: 510-505-9595Steeler, Inc.

Page 23: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Santa Clara County

Removal and installation of thermoplastic striping, resurfacing County roads with Type II micro-surfacing and all work needed tocomplete application.

Project Contact For Questions: Kim Coffin 408-573-2481Email: [email protected]

None

20-01468

0

2:00 PM5/28/20

Addenda:2020 MICRO-SURFACING OF COUNTY ROADS AT VARIOUS LOCATIONS - COUNTY OF SANTA CLARA

RFB-RDS-FY20-0371

Prebid Conf:

County of Santa Clara - Roads & Airports 408-573-2440

NEW

Plan Issuer:

Santa Clara County

Provide cooling tower cleaning services on an as needed basis.

Project Contact For Questions: Jaslin Yu 408-491-7484Email: [email protected]

Optional 5/13 @ 10AM (Via Teleconferene)

20-01469

0

2:00 PM5/28/20

Addenda:COOLING TOWER CLEANING SERVICES - COUNTY OF SANTA CLARA

ITB-PRC-FY20-0362

Prebid Conf:

County Of Santa Clara, Procurement 408-491-7400

NEW

Bidders:

Plan Issuer:

Milpitas

The project consists of rehabilitating various streets.

Project Contact For Questions: Fanny YuEmail: [email protected]

20-00781

3

2:00 PM5/29/20

Addenda:STREET RESURFACING 2020 - CITY OF MILPITAS

4296

City of Milpitas - DPW 408-586-3300

Consultant Fax: 707-471-0318Office: 707-693-1926Tully Consulting Group

Consultant Fax: 707-471-0318Office: 707-693-1926Tully Consulting Group

General Contractor Fax: 925-803-4263Office: 925-361-1380Desilva Gates Construction

General Contractor Fax: 925-803-4263Office: 925-361-1380Desilva Gates Construction

General Contractor Fax: 408-327-7090Office: 408-327-7013Granite Construction

General Contractor Fax: 408-327-7090Office: 408-327-7013Granite Construction

General Contractor Fax: 650-952-6851Office: 650-952-7333Interstate Grading & Paving

General Contractor Fax: 650-952-6851Office: 650-952-7333Interstate Grading & Paving

General Contractor Fax: 408-727-0366Office: 408-727-5700Jos. J. Albanese, Inc.

General Contractor Fax: 408-727-0366Office: 408-727-5700Jos. J. Albanese, Inc.

General Contractor Fax: 925-957-9292Office: 925-957-9200Mck Services, Inc.

General Contractor Fax: 925-957-9292Office: 925-957-9200Mck Services, Inc.

General Contractor Fax: 650-966-1946Office: 650-966-1926O'Grady Paving

General Contractor Fax: 650-966-1946Office: 650-966-1926O'Grady Paving

General Contractor Fax: 925-621-5799Office: 925-621-5700Teichert Construction

General Contractor Fax: 925-621-5799Office: 925-621-5700Teichert Construction

Sub-Contractor/SpecialtyContractor

Fax: 916-381-3703Office: 916-381-8033California Pavement Maintenance Co.,Inc. Dba Cpm

Sub-Contractor/SpecialtyContractor

Fax: 916-381-3703Office: 916-381-8033California Pavement Maintenance Co.,Inc. Dba Cpm

Sub-Contractor/SpecialtyContractor

Fax: 916-313-3438Office: 916-642-1751Pavement Recycling Systems, Inc.

Sub-Contractor/SpecialtyContractor

Fax: 916-313-3438Office: 916-642-1751Pavement Recycling Systems, Inc.

Page 24: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Santa Clara County $690,000

In Santa Clara County In San Jose And Santa Clara At Various LocationsThe Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-61D21.85 Working Days * 5% DVBE Requirement

20-00224

1

2:00 PM5/29/20

Addenda:CDOT 04-3Q8304 UPGRADE ELECTRICAL SYSTEM AND CONTROL

04-3Q8304

General Contractor Fax: 530-221-7038Office: 530-223-5937Cal Electro Inc.

Plan Issuer:

Los Altos

Developing and implementing a Los Altos Safe Routes to School (SRTS) Program, which should incorporate the SRTS best practicesof other communities into the Los Altos SRTS Program.

Project Contact For Questions: Aida Fairman 650-947-2603Email: [email protected]

20-01470

0

4:00 PM6/1/20

Addenda:RFP SAFE ROUTES TO SCHOOL - CITY OF LOS ALTOS

City of Los Altos - Engineering 650-947-2780

NEW

Bidders:

Plan Issuer:

Los Altos

The project includes, but is not limited to, mobilization, traffic control, microsurfacing, sidewalk construction, curb and gutter installation,speed hump installation, miscellaneous signage and striping, and all other items or details not mentioned above that are required bythe contract Drawings and Specifications to repair and enhance the project corridors outlined in plan-set within the City of Los Altos.

None

20-01439

0

2:00 PM6/2/20

Addenda:CUESTA DRIVE TRAFFIC CALMING PROJECT - CITY OF LOS ALTOS

TS0102220

Prebid Conf:

City of Los Altos - Engineering 650-947-2780

General Contractor Fax: 510-792-1728Office: 510-792-1727Redgwick Construction Company

Plan Issuer:

Saratoga

Rehabilitate curb and gutter at McFarland Avenue.

20-01482

0

11:00 AM6/2/20

Addenda:MCFARLAND AVENUE CURB AND GUTTER REHABILITATION PHASE 2 - CITY OF SARATOGA

City of Saratoga, DPW [email protected] 408-868-1239

NEW

Plan Issuer:

Saratoga

The Work consists of construction of new paved ADA accessible parking areas on the eastern side of campus. The work will include,but is not limited to, demolition of existing paved areas, grading, and new paving and striping for two new parking areas. The work willalso include demolition and relocation of existing utilities, and site lighting.

Non-Mandatory 5/19 @ 11AM (Via Zoom Conference)

20-01488

0

11:00 AM6/4/20

Addenda:ADA BARRIER REMOVAL WEST VALLEY COLLEGE (WVC)

CA16-1920

Prebid Conf:

West Valley -Mission College District 408-741-2187

NEW

Bidders:

Plan Issuer:

San Jose $32,000,000 $33,000,000

Rehabilitation of the Filtration Process and associated improvements to the Filter Influent Pump Station and Disinfection facility, andother work at the site.

Project Contact For Questions: Tina Pham 408-635-2099

Postponed Non-Mandatory 4/6 @ 1PM (Administration Building, Conference Room A)

20-00865

4

3:00 PM6/18/20

Addenda:7448-FILTER REHABILITATION PROJECT SAN JOSE-SANTA CLARA REGIONAL WASTEWATERFACILITY - CITY OF SAN JOSE

7448 to

Prebid Conf:

City of San Jose, Environmental Services 408-535-8550

Asbestos Abatement /Hazardous Materials Contract

Fax: 510-654-8447Office: 510-654-8441Asbestos Management Group OfCalifornia

General Contractor Fax: 707-439-7301Office: 707-439-7300Kiewit Infrastructure West Co

General Contractor Fax: 510-777-5099Office: 707-759-6858Shimmick Construction Co., Inc.

General Contractor Fax: 925-944-9860Office: 925-627-1700Walsh Construction

Page 25: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Sewer & Water Contractor Fax: 925-679-2839Office: 925-697-2803Rain For Rent

Bidders:

Plan Issuer:

San Jose

Construction of an approximately 140,000 square foot Behavioral Health Services Center comprised of a 66-bed acute psychiatrichospital for children, adolescents and adults, a 50-bed Emergency Psychiatric Facility, a Mental Health Urgent Care Facility,associated support areas and the construction of a 230,000 square foot parking structure. Project will include a tunnel connection tothe Receiving and Support Center, and a bridge connection to the Main Hospital. Project will include demolition of existing structures toinclude a two story parking garage and other minor structures. Project will include the demolition of the Barbara Arons and Don LowePavilions upon completion of the Behavioral Health Services Center and conversion of underlying parcels to surface parking. Thisproject will be on a fast track with multiple package submission to OSHPD, e.g. foundation, structural framing, etc.

Project Contact For Questions: Kamaljit SodhiEmail: [email protected]

MAND 5/21 @ 1:30PM (Via virtual teleconference)

20-01342

2

2:00 PM6/18/20

Addenda:CMAR FOR BEHAVIORAL HEALTH SERVICES CENTER - COUNTY OF SANTA CLARA

RFP-FAF-FY20-0315

Prebid Conf:

County of Santa Clara - FAF/Capital Programs 408-993-4600

Glass & Glazing Contractor Fax: 707-792-2476Office: 707-665-2852Progress Glass Company, Inc.

Supplier Office: 510-505-9595Steeler, Inc.

Bidders:

Plan Issuer:

Santa Clara

Construction of a new 1600 student high school. The District intends to construct the Project by awarding multiple prime contracts tomultiple prime contractors each who are in direct privity of contract with the District for a specific scope of work.

Project Contact For Questions: Angie WooEmail: [email protected]

Non-Mandatory 5/5 & 5/7 @ 10AM (Via web conference)

20-01496

1

2:15 PM6/18/20

Addenda:GROUP 1 BID PACKAGES AGNEWS HIGH SCHOOL - SANTA CLARA UNIFIED SCHOOL DISTRICT

1096

Prebid Conf:

Swinerton Builders- Santa Clara Unified School District 408-590-0474

NEW

Glass & Glazing Contractor Fax: 707-792-2476Office: 707-665-2852Progress Glass Company, Inc.

Bidders:

Plan Issuer:

Milpitas

Provide HVAC maintenance services.

Project Contact For Questions: Zachary Devine 408- 586-3163Email: [email protected]

MAND 4/29 @ 9AM (Virtual Pre-Proposal Meeting via Zoom; Pre-registration is required to receive the meeting ID andpassword. Email [email protected] to register.) Mandatory job walk 6/4 @ 8:30AM (Building ConfereceRoom - Milpitas City Hall 455 E. Calaveras Blvd. Milpitas)

20-01255

4

2:00 PM6/25/20

Addenda:RFP CITYWIDE HVAC MAINTENANCE SERVICES - CITY OF MILPITAS

2411

Prebid Conf:

City of Milpitas Purchasing 408-586-3163

General Contractor Fax: 415-399-1549Office: 415-399-1549Acco Engineered Systems

General Contractor Fax: 510-670-1698Office: 510-670-1690Emcor Energy Services

General Contractor Fax: 408-980-0714Office: 408-980-1711Environmental Systems, Inc.

General Contractor Fax: 925-459-9220Office: 925-890-1077Matrix Hg, Inc.

General Contractor Fax: 916-788-2530Office: 916-626-0153Pride Industries

General Contractor Fax: 000-000-0000Office: 877-938-7059Sitelogiq

HVAC Contractor Fax: 510-264-5806Office: 510-264-5800A & B Mechanical Inc

HVAC Contractor Fax: 000-000-0000Office: 707-653-4344Dormatech Mechanical Systems Inc.

HVAC Contractor Fax: 408-920-6171Office: 408-315-8808Performance Air Service, Inc

Sub-Contractor/SpecialtyContractor

Fax: 000-000-0000Office: 510-686-1111American Chiller Service

Page 26: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

San Jose

Provide design-build services.

Project Contact For Questions: Thomas Clarke 916/854-3690Email: [email protected]

Non-Mandatory 5/26 @ 10AM

20-01493

0

2:00 PM6/26/20

Addenda:RFQ DESIGN BUILD ARMORY RENOVATION - NATIONAL GUARD ARMORY

16413

Prebid Conf:

State of California Office of the Adjutant General State MilitaryDepartment [email protected]

916-854-3681

NEW

General Contractor Fax: 619-325-0711Office: 619-230-1904Pacific West Builders, Inc.

Santa Cruz County

Bidders:

Plan Issuer:

Santa Cruz County $1,850,000

This is a Pure Water Soquel Groundwater Recharge project. The scope of work includes the furnishing of all materials, labor,equipment, fuel, tools, transportation, and services for the following, as described in the Contract Documents:- Redevelopment and testing of the Twin Lakes Church SWIP well,- Destruction of the Monterey Production well,- Drilling, construction, development, testing, and completion of the Monterey SWIP well,- Drilling, construction, development, testing, and completion of the Willowbrook SWIP well.

PREVAILING WAGE

Questions: Bill LeeverEmail: [email protected]

MAND Mondays thru Fridays, between 9 AM until 4 PM from April 13th thru May 1st

20-01147

3

2:00 PM5/19/20

Addenda:SEAWATER INTRUSION PREVENTION (SWIP) RECHARGE WELLS

CWO 20-3000

Prebid Conf:

Soquel Creek Water District [email protected] 831-475-8500 831-475-4291

Sub-Contractor/SpecialtyContractor

Fax: 805-925-0884Office: 805-925-1947Pacific Petroleum California Inc

Supplier Fax: 408-383-0750Office: 408-316-0610United Rentals Trench Safety

Bidders:

Plan Issuer:

Santa Cruz $400,000

The work to be done consists in general of rehabilitating the existing sanitary sewer and storm drain pipes with cured-in-place-pipe.

Project Contact: Dan CabrerosEmail: [email protected]

20-01233

1

2:00 PM5/19/20

Addenda:2019 CITYWIDE SEWER/STORM DRAIN LINING

City of Santa Cruz 831-420-5160 831-420-5161

General Contractor Fax: 530-406-7991Office: 530-406-1199Michels Corporation

Bidders:

Plan Issuer:

Soquel $1,550,000

This project is for licensed contractors with a Type ‘A’ California General Engineering Contractor license to construct a parkway trail inthe “Heart of Soquel”.

PREVAILING WAGE

Questions: [email protected]

MAND 4/28 @ 10am- site

20-01218

1

2:30 PM5/20/20

Addenda:HEART OF SOQUEL PARKWAY AND TRAIL RESTORATION

19C1-002

Prebid Conf:

County of Santa Cruz 831-454-2210 831-454-2710

Electrical Contractor Fax: 831-761-2285Office: 831-761-2288 Darrel Varni Electric Inc.

Electrical Contractor Fax: 209-464-2615Office: 209-464-4878Bockmon & Woody Electric Company, Inc.

Electrical Contractor Fax: 831-758-9638Office: 831-422-7819Jm Electric

General Contractor Fax: 408-213-0532Office: 408-970-9900Anderson Pacific EngineeringConstruction Inc.

Page 27: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

General Contractor Fax: 831-336-9514Office: 831-588-9738Confluence Restoration

General Contractor Fax: 831-466-9597Office: 831-426-0743Crw Industries

General Contractor Fax: 000-000-0000Office: 209-957-9797F Loduca Company

General Contractor Fax: 831-761-1042Office: 831-763-6100Granite Construction

General Contractor Fax: 408-727-0366Office: 408-727-5700Joseph J. Albanese

General Contractor Fax: 408-925-0240Office: 408-925-0220Lewis & Tibbitts Inc.

General Contractor Fax: 831-384-5078Office: 831-384-4081Monterey Peninsula Engineering

General Contractor Fax: 000-000-0000Office: 818-451-0870Prime Point Contracting

General Contractor Fax: 000-000-0000Office: 650-796-1193Td Builder Llc

General Contractor Fax: 415-459-0665Office: 415-456-8972Thompson Builders Corp

Bidders:

Plan Issuer:

Santa Cruz $96,000

The work will consist of the total demolition of all buildings and/or other structures designated and the subsequent removal of allhazardous materials and debris from the site. Demolition and disposal of abandoned septic tank and perimeter fencing as shown onthe plan.

5/13 @ 1pm- 5180 Soquel Drive, Soquel

20-01457

0

2:00 PM5/20/20

Addenda:2505 CHANTICLEER BUILDING DEMOLITION

20-4011

Prebid Conf:

Soquel Creek Water District [email protected] 831-475-8500 831-475-4291

NEW

Demolition Contractor Fax: 510-654-8447Office: 510-654-8441Asbestos Management Group OfCalifornia

Demolition Contractor Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.

Bidders:

Plan Issuer:

Aptos $150,000

Removal of existing roofing and any damaged materials. Replacement of roofing and materials and products necessary for a properand complete roofing job.

MAND 5/6 @ 10am- Zoom Meeting

20-01384

1

2:00 PM5/21/20

Addenda:BUILDING 350 ROOF REPLACEMENT - REBID

B20-06

Prebid Conf:

Cabrillo College 831-477-5613

Asbestos Abatement /Hazardous Materials Contract

Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.

General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc

Bidders:

Plan Issuer:

Aptos $74,000

This project is for licensed contractors with a Type ‘A’ California General Engineering Contractor license to install a restroom at “SeacliffVillage Park” in Seacliff.

PREVAILING WAGE

Questions: [email protected]

5/12 @ 10am- site

20-01412

0

2:30 PM5/26/20

Addenda:SEACLIFF VILLAGE PARK PRE-FAB RESTROOM INSTALLATION

19C1-003

Prebid Conf:

County of Santa Cruz 831-454-2210 831-454-2710

Concrete/Masonry Contractor Fax: 209-599-0881Office: 209-599-8722David Hall Masonry, Inc.

Electrical Contractor Fax: 707-994-8504Office: 707-994-0437James Day Construction Inc. Dba CoastalMountain Electric

Page 28: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Santa Cruz

The Santa Cruz Metropolitan Transit District (Santa Cruz METRO) is requesting sealed bids for a fixed-price contract to construct andinstall a Fire Egress at the Santa Cruz METRO Maintenance Facility. This public work shall include the furnishing of all supervision,labor, materials, freight, transportation, equipment, supplies, tools, services and other work as defined in the Invitation For Bid (IFB)No. 20-17 for this Project.

*** Contact CCBA at [email protected] to view the video clips.

5/7 @ 9:30am- site

20-01278

0

2:00 PM5/28/20

Addenda:FIRE EGRESS PROJECT

20-17

Prebid Conf:

Santa Cruz Metro Transit District [email protected] 831-426-0199 831-469-1958

General Contractor Fax: 831-449-0700Office: 831-449-4273Don Chapin Co

Bidders:

Plan Issuer:

Watsonville $100,000

The work to be completed consists of, generally, the saw cutting, excavation, use of sheeting, shoring and bracing (when required byCalOSHA requirements and actual soil conditions encountered, removal of existing manhole base and barrel, installation of newconcrete manhole base, precast manhole barrel, and frame and cover, slurry backfill, placement of concrete collar around manholeframes, and restoration of asphalt pavement at various locations throughout the City of Watsonville, California, as shown on the plansand such other items or details. Attachment A includes the current list of manhole locations that require replacement. Additionallocations may be identified by the City after award.

Project Contact: Robert SchneiderEmail: [email protected]

20-01452

1

2:00 PM5/28/20

Addenda:SANITARY SEWER MANHOLE REHABILITATION

20-SS-01

City of Watsonville 831-768-3100 831-763-4065

Supplier Fax: 408-383-0750Office: 408-316-0610United Rentals Trench Safety

Bidders:

Plan Issuer:

Santa Cruz $26,300,000

Renovation and expansion of the existing dining hall and kitchen facilities at Rachel Carson College, on the campus of University ofCalifornia, Santa Cruz. The existing building is comprised of three distinct pieces; a dining hall, and kitchen with a partial second floorfor classrooms and offices, and a link connecting the dining hall to the kitchen volume.Project proposes a full demolition of the existing dining hall and link. In the existing kitchen volume, the project proposes retaining thestructure (foundation, columns, exterior walls, trusses, flat and gable roof, partial second floor framing), renovating the layout andintroducing new systems. Alterations to the southern portion of the kitchen volume structure will be needed to connect the proposednew construction. There is an existing seismic separation in the kitchen volume which will remain. No changes are proposed on thepartial second floor, which is home to classrooms and other miscellaneous academic uses. New construction consists of a Type V-Bstructure, with two flat roofs and a gable roof volume. The new structures will include serving platforms, dishwashing, bathrooms,dining areas, and other miscellaneous circulation areas. Project also proposes site renovations, including permeable and non-permeable construction and stormwater control measures. New utility connections are proposed as well.

Project Contact: Tanya GuerreraEmail: [email protected]

MAND 5/13 @ 10am- VIRTUAL

20-01461

0

3:00 PM5/28/20

Addenda:CARSON DINING HALL EXPANSION

5303-037

Prebid Conf:

UCSC Physical Planning & Construction 831-459-2366 831-459-5540

NEW

Asbestos Abatement /Hazardous Materials Contract

Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.

Asbestos Abatement /Hazardous Materials Contract

Fax: 916-773-2747Office: 916-726-0304Jm Environmental, Inc.

Supplier Fax: 000-000-0000Office: 510-505-9595Steeler, Inc.

Page 29: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Santa Cruz $835,000

The project mainly consists of excavating approximately 75,000 cubic yards of onsite material and constructing the existing mainaccess road along the east perimeter of the landfill to its final grade. Other tasks will include land surveying, clearing and grubbing,cold planing, grading, paving, and installing erosion control measures.

Project Contact: Hoi YuEmail: [email protected]

20-01462

0

2:00 PM5/28/20

Addenda:LANDFILL EAST PERIMETER ROAD EXTENSION

c401909

City of Santa Cruz 831-420-5160 831-420-5161

NEW

Bidders:

Plan Issuer:

Santa Cruz $990,000

*** BID DOCS WILL BE UPLOADED ONCE AVAILABLE ***

This construction project includes renovation of existing labs D330 and D336 (Total Approx.1150 SF), including new fume hoods,modifications to interior partitions and casework, HVAC, HVAC controls, plumbing and electrical modifications, and ADA improvementsto nearby restrooms.

Project Contact: Mark FirestoneEmail: [email protected]

MAND 5/21 @ 10am- VIRTUAL

20-01458

0

11:00 AM6/5/20

Addenda:ENROUTE - EARTH & MARINE SCIENCES - LABS D330 & D336 RENOVATIONS

5200-040

Prebid Conf:

UCSC Physical Planning & Construction 831-459-2366 831-459-5540

NEW

Asbestos Abatement /Hazardous Materials Contract

Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.

General Contractor Fax: 831-459-9297Office: 831-459-9270Cen-Con, Inc.

Plan Issuer:

Watsonville

The City of Watsonville Public Works and Utilities Department Water and Wastewater Divisions have recently performed asystem-wide condition assessment of the existing water system infrastructure, wastewater treatment plant, and sewer pump stations.The department’s engineering division will have several projects which the City will need to engage engineering consulting firms toperform design services specifically related to existing water and wastewater facility upgrades and replacements planned for the nextthree to five years. The City is requesting qualifications statements from engineering firms experienced with the design of potablewater wells, pump stations, reservoirs, wastewater treatment plant facility improvements, sewer pump stations, and other water andwastewater related infrastructure. The majority of these projects will be City funded, though some larger projects may require State andFederally funded grants and/or loans. The City will be hiring engineering firms on an on-call basis to provide the design services forthese water and wastewater Capital Improvement projects. The City will establish a list of consultants pre-qualified for design services.Projects will be assigned to firms from the appropriate list. There is no guarantee that a particular firm will be called upon to performservices during the life of the contract. Consultants may submit general statements of qualifications and/or qualifications for specificprojects.

20-01440

0

4:00 PM6/9/20

Addenda:RFQ - ON-CALL WATER AND WASTEWATER PROFESSIONAL DESIGN SERVICES

City of Watsonville 831-768-3100 831-763-4065

Plan Issuer:

Santa Cruz $497,000

Base Bid: Replacement of the existing gravel driveway and pathway with a combination of Truegrid Pro Plus pavers and Granitecretepermeable paving or approved equals. An accessible pathway will be constructed from the existing accessible parking stalls to theTerrace Point Overlook (also referred to as Overlook B), including a new accessible sidewalk ramp. Work includes a new storm draininlet and perforated drainage pipe and other miscellaneous items as shown on the drawings.Add Alternate 1 - Safety Bollards: Provide labor and material to install bollard sleeves, bollards, and rope barrier around metal caissonat Overlook B as shown on the drawings.

Project Contact: Zachary TeskeEmail: [email protected]

MAND 5/20 @ 9am- VIRTUAL

20-01459

1

2:00 PM6/11/20

Addenda:COASTAL SCIENCE CAMPUS - OVERLOOK B PATH REPAIR AND REPLACEMENT

4900-047

Prebid Conf:

UCSC Physical Planning & Construction 831-459-2366 831-459-5540

NEW

Page 30: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino
Page 31: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

SERVING MONTEREY COUNTY, SANTA CRUZ & BENITO COUNTY

Page 32: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

G R A N I T E R O C K C O N S T R U C T I O N D I V I S I O N

CO

NS

TR

UC

TI

ON

D

IV

IS

IO

N

ALL OF YOUR CONSTRUCTION NEEDS - FROM DRIVEWAYS TO FREEWAYS • Asphalt and Concrete Driveways

• Parking Lots

• Site Work

• Seal Coating and Striping

• Underground Utilities (Water, Sewer, Storm Drain)

• Chip Sealing

• Culverts and Walls

• Golf Cart Path Work

• Concrete Curb and Gutters

• Concrete Flatwork

• Asphalt Grinding

• Subdivision Site Work Development

• Structures

General Engineering Contractor - LIC#22 • For an estimate call 831.768.2789 • Fax 831.768.2701

Page 33: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

I will ‘test’ the shock value of adding low voltage curtains! Another contractor helps us learn it’s easier to get into business than it may be to get out and answer to questions about changes, delays and restrictions under Covid-19 rules… Q: Our company currently has a “C-7” (Low Voltage) Contractor’s License in California. I am a Window Covering specialist and have been for over 25 years. The company hired me to be their Responsible Managing Employee (RME) for the “C-61”/”D52” (Window Coverings) classification to be added to the license. Can you tell me how this works? Do I need to obtain my own license first and then add it to the Company license? I’m aware there is no trade exam for this classification, so if I can automatically add it to the license without obtaining my own license first, will I be able to waive the law portion of the exam based on the fact the Company already passed that portion? A: You do not need to obtain your own license prior to adding the classification to the Company license. All Qualifying Individuals who have not been a Qualifier on a license within the previous five years need to take and pass the law exam. The fact the Company has a Qualifier who has passed the law exam does not exclude additional Qualifiers from the need to take the law exam.

Q: We are an Oregon company and we got a CA Contractor’s License several years ago to do a couple of projects. We no longer do business so we need to shut down the company. I found out we are Suspended with the Secretary of State and was informed that we needed to file and pay our back taxes, even though we haven’t done business there for several years. The Franchise Tax Board sent me the filing requirements and they included a Certificate of Revivor form. Why would we

need to submit a Revivor form if our intent is to close down the corporation?

A: To close a corporation in CA, foreign corporations are required to file a Certificate of Surrender with the Secretary of State. One of the requirements to surrender is to file and pay all taxes owed. Also, for the Secretary of State to process the surrender, your corporation must be active and in good standing. You will need to file the Certificate of Revivor with the Franchise Tax Board for the Secretary of State to lift your “suspended” status and put you back to Active/Good Standing.

To Reschedule a Cancelled Exam: [email protected] Be sure to include your name and application number. Please note that CSLB is waiving the rescheduling fee for cancelled exams. For Enforcement Questions/Issues: [email protected] Be sure to include your phone number and other relevant information, such as a complaint number, license number, citation or case number. Who can work? You should refer to the state’s COVID-19 website: https://covid19.ca.gov/stay-home-except-foressential-needs/, which includes a “List of Critical Infrastructure Workers.” Be aware that the list can change as the situation dictates.”

With print space limits some government delays, Capitol Services is open and ready to assist contractors with any additional questions or issues, as we have for more than 30 years as your expert resource.

While knowledge is power, knowing where to go for the answers is half the battle. Get expert assistance immediately when you call 866-443-0657, email [email protected], or write us at Capitol Services, Inc., 3609 Bradshaw Rd, Ste H, #343, Sacramento, CA 95827. Research past columns at www.cutredtape.com.

Page 34: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

What's In It For You:How the homesphereprogram works:

bundle and earn more

[email protected] | (650) 793-8432CONTACT Lorri Lasley to enroll

CONNECT Choose from 80+ Preferred Partner brands across 23 product categories to earn rebates. Continue to purchase products locally.

TRACK Your local HomeSphere expert will help you efficiently track your closings by community, lot and block.

COLLECT HomeSphere bundles your rebate incentives together across all products and brands in a single check.

It’s Easy to Get Started! Set a 10-minute meeting with your local HomeSphere Expert who will walk you through:1. Your Builder Profile & Latest Closed Homes2. Your Enrollment Form3. Your W-9 Form

•Get access to Single-Familyand Multi-Family Rebates

•Bundle all your rebates intoone monthly check

•Continue to increase yourrebate check through HomeSphere’s network ofbuilding product manufacturers

Your cash back can grow. Tap in to HomeSphere's network of 80 manufacturers and brands to increase your rebate check, including:

Over 80+ Partners offer builder incentives exclusively through HomeSphere's national rebate program. Start collecting rebates on building essentials today!

Earn cash back on each productyou install

Page 35: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

What's In It For You:How the homesphereprogram works:

bundle and earn more

[email protected] | (650) 793-8432CONTACT Lorri Lasley to enroll

CONNECT Choose from 80+ Preferred Partner brands across 23 product categories to earn rebates. Continue to purchase products locally.

TRACK Your local HomeSphere expert will help you efficiently track your closings by community, lot and block.

COLLECT HomeSphere bundles your rebate incentives together across all products and brands in a single check.

It’s Easy to Get Started! Set a 10-minute meeting with your local HomeSphere Expert who will walk you through:1. Your Builder Profile & Latest Closed Homes2. Your Enrollment Form3. Your W-9 Form

•Get access to Single-Familyand Multi-Family Rebates

•Bundle all your rebates intoone monthly check

•Continue to increase yourrebate check through HomeSphere’s network ofbuilding product manufacturers

Your cash back can grow. Tap in to HomeSphere's network of 80 manufacturers and brands to increase your rebate check, including:

Over 80+ Partners offer builder incentives exclusively through HomeSphere's national rebate program. Start collecting rebates on building essentials today!

Earn cash back on each productyou install

Page 36: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Employer Sponsored Options Products you can get through your employer. Enrolling is easy! Your company receives a single, consolidated bill and participating employees have the convenience of payment through payroll deductions. Both Group and Voluntary options are available.

Medical – All CA Carriers & Covered CA MetLife Dental – Group and Voluntary VSP Group Vision Anthem Blue View Voluntary Vision Landmark Chiropractic & Acupuncture MetLife Term Life - Group and Voluntary CADR+ Telemedicine - 24/7 Doctors on Call LifeLock Identity Theft Protection

Colonial Life Optional Benefits Accident Insurance Critical Illness Insurance Short Term Disability Insurance Hospital Confinement Insurance Whole Life with LTC Rider

LegalShield Pre-Paid Legal Services Legal Shield Identity Theft Shield

Build a Better Benefits Package!

Through the California Builders Exchanges (CBX), the Central Coast Builders Association now offers a highly competitive benefits program to our member firms and their employees.

Want More Information?

Go to www.cbxbenefits.com

Or contact our local Benefits Consultant!

Tina Nelson Q&A Insurance Marketing, CA Lic. 0B17048 Cecy Insurance Services, CA Lic. 0802215 (831) 477-1730 [email protected]

Individual Options Valuable products, services and discounts that your employees can get directly from one of our contracted providers because you are a member of the Association.

Health Insurance for Individuals and Families Nationwide Pet Insurance LifeLock Identity Theft Protection MetLife Home & Auto Insurance Working Advantage Employee Perks Program LegalShield Pre-Paid Legal Services LegalShield Identity Theft Shield

Great Voluntary Benefits!

No Minimum Participation Low Rates Consolidated Billing Guarantee Issue Options

CONSTRUCTION ESTIMATING

Material quantity takeoffs for residential/commercial. Foundation,excavation, forms, reinforcing, concrete. Rough and finish carpentry. Lumber lists. Experienced.

Contact email: [email protected]

A&R Corporation, Inc is seeking a Project Manager, Project En-gineer and Superintendents to staff a mul-tifamily apartment project located in Paso Robles. Please send resumes to Neil Mil-

ler at the following email address, [email protected]

Construction Project Manager / Estimator Monterey CA $80,000-$90,000 a year General Contractor specializing in Prevailing Wage Projects seeks experienced Project Manager for California. Must have a minimum of 10 years hands-on abilities to handle the planning, coordination, and control of a project from inception through comple-tion. Strong estimating skills a must. Our projects are fast paced and require immedi-ate response to field personnel and customer requirements. The position will require job walks and client meetings throughout Central and Northern California. In addition to the required experience above, the right candidate will have natural leadership abilities, be able to work independently, and is organized and detail-oriented. It is criti-cal that you have the ability to communicate effectively and appropriately with clients, colleagues and coworkers, as well as the ability to recognize a potential problem and resolve immediately and effectively. Must have experience supervising field staff in-cluding sub-contractors. Responsibilities Include: Bidding and estimating TI projects throughout California, performing prevailing wage projects. Selecting, negotiating and coordinating the work of sub-contractors Adhering to proper administration of construction contracts with knowledge of and the experience with AIA documents Reporting/updating to owners the progress of projects including any changes needed Preparing transmittals, submittals, contracts and daily logs Preparing and processing change orders timely and accurately Supervising and supporting field staff Timely preparing of monthly invoicing for the accounting department Maintaining data and cost of projects Travel will be required Strong verbal and written communication skills Advanced computer skills including MS Project, Word, Excel and Outlook MUST be able to read plans and be willing to work as a Team member to ensure the success and timely completion of all projects Email resume to [email protected] Job Type: Full Time Salary: $80,000-$90,000 & Federal Holidays + 2 weeks of Vacation Experience: Construction: 5 years minimum

Construction Project Management: 5 years minimum

Architectural Photography

Harold Gomes Email:

[email protected] Cell: 831-227-1942

For Sale: DriWater time-release water replacement gel pacs, 100+/- cases, 20/case.

Contact Kim O'Bryan at KCI Environmental, Inc. [email protected] or 805 431-1168.

Page 37: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

CONSTRUCTION ESTIMATING

Material quantity takeoffs for residential/commercial. Foundation,excavation, forms, reinforcing, concrete. Rough and finish carpentry. Lumber lists. Experienced.

Contact email: [email protected]

A&R Corporation, Inc is seeking a Project Manager, Project En-gineer and Superintendents to staff a mul-tifamily apartment project located in Paso Robles. Please send resumes to Neil Mil-

ler at the following email address, [email protected]

Construction Project Manager / Estimator Monterey CA $80,000-$90,000 a year General Contractor specializing in Prevailing Wage Projects seeks experienced Project Manager for California. Must have a minimum of 10 years hands-on abilities to handle the planning, coordination, and control of a project from inception through comple-tion. Strong estimating skills a must. Our projects are fast paced and require immedi-ate response to field personnel and customer requirements. The position will require job walks and client meetings throughout Central and Northern California. In addition to the required experience above, the right candidate will have natural leadership abilities, be able to work independently, and is organized and detail-oriented. It is criti-cal that you have the ability to communicate effectively and appropriately with clients, colleagues and coworkers, as well as the ability to recognize a potential problem and resolve immediately and effectively. Must have experience supervising field staff in-cluding sub-contractors. Responsibilities Include: Bidding and estimating TI projects throughout California, performing prevailing wage projects. Selecting, negotiating and coordinating the work of sub-contractors Adhering to proper administration of construction contracts with knowledge of and the experience with AIA documents Reporting/updating to owners the progress of projects including any changes needed Preparing transmittals, submittals, contracts and daily logs Preparing and processing change orders timely and accurately Supervising and supporting field staff Timely preparing of monthly invoicing for the accounting department Maintaining data and cost of projects Travel will be required Strong verbal and written communication skills Advanced computer skills including MS Project, Word, Excel and Outlook MUST be able to read plans and be willing to work as a Team member to ensure the success and timely completion of all projects Email resume to [email protected] Job Type: Full Time Salary: $80,000-$90,000 & Federal Holidays + 2 weeks of Vacation Experience: Construction: 5 years minimum

Construction Project Management: 5 years minimum

Architectural Photography

Harold Gomes Email:

[email protected] Cell: 831-227-1942

For Sale: DriWater time-release water replacement gel pacs, 100+/- cases, 20/case.

Contact Kim O'Bryan at KCI Environmental, Inc. [email protected] or 805 431-1168.

Page 38: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Position Offering: CORPORATE CONTROLLER

The Don Chapin Company, Inc. is seeking qualified applicants for the position of CORPRATE CONTROLLER. The corporate controller is a dynamic position whose key functions include the management and oversight of all administrative, accounting, and financial activities of our general engineering construction company. Direct responsibilities include preparation of financial statements, budgeting, forecasting and other accounting functions, as well as cash and risk management. This position will report to the Executive Vice President and the President of the company.

Minimum qualifications are:

• Bachelor’s degree in Accounting , Finance, or Business Administration. Master’s degree and/or CPA preferred.

• Ideal candidate would have a minimum of 10 years of experience in the Accounting and Finance fields. Preferred experience in the construction industry, Percentage of Completion Accounting, Job Cost Reporting, Prevailing Wage, and a strong background in the use of accounting software operating systems.

• Must have excellent computer skills; experience in accounting software (Spectrum a plus) and Microsoft Office Suites, Access, database or similar system knowledge.

• Excellent written and verbal communication and management skills • Knowledge of accounting best practices, legal standards, and state and Federal regulations. • Analytical ability to develop and implement improvements or recommendations. • Attention to detail and organized; self motivated leader • Able to work well with senior executives, department heads and managers, as well as

mentor/lead other team members.

Excellent compensation and benefits package. We are an equal opportunity employer.

Please print an application from our website at www.donchapin.com and send your resume to:

Attn: Human Resource Manager

560 Crazy Horse Canyon Rd.

Salinas, CA 93907

Page 39: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino
Page 40: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Safety Tip of the WeekHazard Communication (Right to Know)

Right-to-know refers to your "right to know" what hazardous chemicals and materials you may be exposed to on the jobsite. You should be aware of the potential hazards in order to properly prepare yourself to work with the materials. We cannot eliminate hazardous substances, but we can greatly reduce the danger in dealing with them. Every hazardous substance that has been identified has a Material Safety Data Sheet or M.S.D.S., which tells you what the substance is, what possible dangers you might encounter while using the product and how to properly protect yourself from the substance. The MSDS will list any personal protective equipment required with use of that particular substance. Each project manager has a set of MSDS's. Do you know where they are located at? Have you ever opened them up and pulled out the MSDS for the substances you use in your particular task each day? If you have not, do it today. Read over the description and make sure that you are using the proper protective equipment. Maybe you do not think that you use hazardous substances. Here are some common items that are considered hazardous and may be found on a jobsite: Welding and Cutting Gases Adhesives Solvents Fuels Concrete and related compounds Many items may not seem hazardous, but become hazardous when handled improperly. Think about the substances you use and check for an MSDS so that you really know how to use that substance and what equipment you need to make sure you are not exposed to a hazard. If you are not sure what you are working with, ASK. Be safe and not sorry. The "right to know" about the substances we work with is yours. Safety Recommendations:________________________________________________________________________________ Job Specific Topics:_____________________________________________________________________________________ M.S.D.S Reviewed:_____________________________________________________________________________________ Attended By: _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ _______________________________________________________________________________________________________

Page 41: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino

Tip de Seguridad en EspañolComunicación Sobre Peligros De Quimicas (El Derecho de Saber)

El derecho a saber nos habla de quimicos los cuales puedes estar expuesto. Y debes de estar al tanto para poder trabajar con estos materiales. No podemos eliminar estos quimicos pero si podemos reducir el peligro de manejar los. Estas substancias peligrosas han sido identificadas y tenemos una hoja llamada M.S.D.S. la cual nos habla sobre los peligros que puedes encontrar cuando usas este producto y como cuidarte de el la hoja del M.S.D.S. habla tambien del equipo protector que debes usar con el producto. Cada trabajo tiene el M.S.D.S. ¿Sabes donde estan? ¿Alguna ves a leido alguno por algun producto que has usado? Sino lo has hecho haslo hoy y fijate si estas usando el equipo protector correcto. Probablemente crees que no usas estas substancias peligrosas. Estas substancias son unas de las mas comunes que encuentras en el trabajo. Gases para soldar o cortar Pegamentos Solveantes Combustibles Concreto y compuestos relacionados Estos productos Probablemente se te hacen comunes pero pueden ser peligrosos si los tratas de una manera inapropiada. Piensa en las substancias que usas y revisa el M.S.D.S. para estar seguro que estas usando el equipo protector adecuado y no estas expuesto. Recuerda sino estas seguro de con que estas trabajando pregunta. Vale mas prevenir que lamantar. “ El derecho a saber es el tuyo” sobre substancias con las que trabajamos. Safety Recommendations:________________________________________________________________________________ Job Specific Topics:_____________________________________________________________________________________ M.S.D.S Reviewed:_____________________________________________________________________________________ Attended By: _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ _______________________________________________________________________________________________________ _______________________________________________________________________________________________________

Page 42: Builders Bulletin - CCBA · 733 Sanborn Place • Salinas, CA 93901 Salinas ... 5/21/20 2:00 PM Cupertino Rfq Design And Engineering Services For Junipero Serra Trail - City Of Cupertino