Learning from a Near Miss Incident Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013

Transcript of Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators...

Page 1: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.

Learning from a Near Miss Incident

Bruce Meaker, PEPrincipal Engineer

PUD No.1 of Snohomish CountyEverett, WA

NW Hydro Operators ForumBellevue, WAMay 8, 2013

Page 2: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.

Near Miss IncidentsThe disaster avoided:

usually ignored or buriedrarely talked about

Page 3: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.

Near Miss Incidents

Opportunity to learn from experiencezero-cost learning tools for safety

Established error reduction techniqueAviation Industry – 65% drop in fatal accidentsFire Rescue ServicesHealth careRail - UK

Page 4: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.

Storytelling

Page 5: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.
Page 6: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.

Jackson Hydroelectric Project1,150 ft of head (500 psi)111.8 MW2 Pelton (48.5 MW)2 Francis (8.4 MW)

Page 7: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.

Shutdown of 2003Valve seat replacement on Francis UnitsComplete dewatering of penstock

Page 8: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.

Access door

Page 9: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.
Page 10: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.

Wednesday July 2, 2003Preparing for shutdown on MondayMechanical Supervisor and 2 summer hiresSummer hire - “Do the lights go inside the

TSV on Unit 2?”Supervisor - “Yes”

Page 11: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.

What does “Yes” mean?Mechanical Supervisor: Yes, we will put the lights in through the TSV

on Monday when we have the unit shut down.

Summer hire: Yes, go ahead and do it now.

Page 12: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.
Page 13: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.

Summer hire: “Something we were taking apart for the supervisor started leaking!”

Page 14: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.
Page 15: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.
Page 16: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.
Page 17: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.

Potential losses – $15-20 MLives

2 students3 contractors 5 Powerhouse employees

Damage to power house equipment Lost power revenue Environmental damage (oil cleanup)

Page 18: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.

Lessons LearnedClearly mark access-

doors

DANGER

CONFINED SPACEENTER BY PERMIT ONLY

Page 19: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.

Lessons LearnedAll staff (including summer hires) are

to attend daily “tailgate” and pre-construction meetings.

All summer hires will sign a safety agreement when hired.

Staff will review what is and is not appropriate use of summer hires annually.

Staff will clearly communicate expectations and assignments.

Page 20: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.

Lessons LearnedWithout training and experience, we

are blind to some aspects of this technology.

The Baby Boomers are retiring in droves.

More Gen X and Gen Y age staff will be coming on site to take their place.

Getting them the training and experience to function safely is paramount.

Page 21: Bruce Meaker, PE Principal Engineer PUD No.1 of Snohomish County Everett, WA NW Hydro Operators Forum Bellevue, WA May 8, 2013.

What near-miss stories do you have?Do you share them?