BRENT D FULMAR GAS LINE -...

2
FULMAR GAS LINE FULMAR GAS LINE The Fulmar Gas Line connects a number of fields in the Central North Sea to the St. Fergus Gas Terminal. TO FORTIES CATS (BP) SEAL ST FERGUS ABERDEEN BRAEFOOT BAY TEESSIDE HOWE NELSON SOUTH ANASURIA GUILLEMOT TEAL SOUTH TEAL COOK NELSON GOLDENEYE GANNET CURLEW CURLEW HAEWENE BITTERN TRITON SHEARWATER SCOTER ETAP PIERCE STARLING MERGANSER SKUA EGRET HERON KEY FACTS Sector Length Material Central North Sea 290km (180m) API-5L-X60 Corrosion Coating: 6mm asphalt enamel with 60mm concrete coating Hydrocarbons Produced Export Method Operated / Non Operated Gas The FGL Pipeline runs from the Fulmar Platform to the St. Fergus Gas Terminal Operated FULMAR GAS LINE Graphics, Media & Publication Services (Aberdeen) ITV/UZDC : Ref. 021799 January 2015

Transcript of BRENT D FULMAR GAS LINE -...

FULMAR GAS LINE

FGL

FULMAR GAS LINEThe Fulmar Gas Line connects a number of fields in the Central North Sea to the St. Fergus Gas Terminal.

TO FORTIES

CATS

(BP)

FLAG

S

SEA

L

INTERC

ON

NEC

TOR

BBL

LAN

GEL

ED

ST FERGUS

ABERDEEN

BRAEFOOT BAY

BACTON

STANLOW

TEESSIDE

ORKNEY ISLANDS

SHETLAND ISLANDS

SULLOM VOETERMINAL

DEN HELDER

BERGEN

PARIS

LONDON

MOSSMORRAN

THE HAGUE

SEAN FIELD

INDE FIELD

SCHIEDAM

STAVANGER

GRIJPSKERK

LANGELO/NORG

EMMEN

ZEEBRUGGE

BALGZANDGREAT YARMOUTH

EASINGTON

HOWE

NELSON SOUTH

BRENT A

BRENT BBRENT C

BRENT D

ANASURIA

GUILLEMOTTEAL SOUTHTEALCOOK

NELSON

GOLDENEYE

GANNET

CURLEW

CURLEW

HAEWENE BRIM

BITTERN

TRITON

SHEARWATER

SCOTER

BARQUE

BRIGANTINECLIPPER

GALLEON

SKIFF

INDE

SEAN

LEMAN

CORVETTE

AMELAND

ETAP

CARAVEL

SHAMROCK

PIERCE

STARLING

MERGANSER

SKUA

EGRETHERON

KEY

KEY FACTS Sector

Length

Material

Central North Sea

290km (180m)

API-5L-X60Corrosion Coating: 6mm asphalt enamel with 60mm concrete coating

Hydrocarbons Produced

Export Method

Operated / Non Operated

Gas

The FGL Pipeline runs from the Fulmar Platform to the St. Fergus Gas Terminal

Operated

FULMAR GAS LINE

Graphics, Media & Publication Services (Aberdeen) ITV/UZDC : Ref. 021799 January 2015

INFRASTRUCTURE INFORMATION

HIGH LEVEL CAPACITY INFORMATION

Entry Specification:

Exit Specification:

Shipper Gas shall be technically free from objectionable odours and dust or other matters (whether in a solid, liquid or gaseous state orother physical state), waxes, gums, gum forming constituent which might cause injury to or interference with the operation of the lines,meters, regulators or other appliances through which it flows.CO2: 1.6 %vol maxH2S: 2.5 ppmv maxTotal Sulphur: 15 ppmv (as H2S) maxWater: 35 ppmv maxCricondenbar: 105 bara maxOxygen: 10 ppm maxMercury: 0.01 µg/m3 maxC3+ : 5.5% mol minSpecs on several other trace contaminants

Not applicable

Disclaimer: All the above information is provided by Shell U.K. Limited (for itself, and other Shell group companies including Enterprise Oil U.K. Limited);- In good faith and without any liability- Without warranty, implied or express to its accuracy or relevance of use to any other party- That in any agreement or arrangement with Shell U.K. Limited its use shall be “Subject to Contract” Shell U.K. Limited reserves the right to update and change the data at any time

The basic capacity information is portrayed by colour coded 'traffic lights' that reflect thresholds of availability over the next 5 years

Available Capacities

Capacity

Gas capacity

2015 2016 2017 2018 2019

>25% 5% to 25% <5% Unknown

Gra

phic

s, M

edia

and

Pub

licat

ion

Serv

ices

(Abe

rdee

n)

ITV

/UD

: Re

f. 99

209

: M

AY 2

012

SUBSEA SATELLITE NON OPERATED

NON OPERATED FPSO

FULMAR GAS LINE

12 million sm³/d wet gas Due to the integrated nature ofthe SEGAL System, this capacityinformation needs to be read in conjunction with that of the St Fergus Gas Terminal and the FNGL Plant.

CommentsDescription Ullage as % of system capacity

CONTACT INFORMATION

Shell For further enquiries regarding the above please contact Charles Cole +44 1224 88 2606 [email protected]

Last update: January 2015

Subject to the availability of relevant capacity, each of Shell and Esso is capable of independently providing transportation and processing services using its own proportionate share of available capacity in the Segal System (“Divided Rights”). Please contact either the Shell or Esso representative for further information:

For further enquiries regarding the above please contact Marc Bong-Schmidt +44 1372 412 354 [email protected]

Esso