1 Breaking Down Barriers Process Improvements for Federal Transportation Funding

Transcript of Breaking Down Barrierscdnassets.hw.net/4e/b2/fe0b5edf4b52b8d9661712322391/barriers.pdf · • $420...

Page 1: Breaking Down Barrierscdnassets.hw.net/4e/b2/fe0b5edf4b52b8d9661712322391/barriers.pdf · • $420 million to prepare for pandemic flu • $7.2 billion expand broadband to rural areas

1

Breaking Down BarriersProcess Improvements for Federal Transportation Funding

Page 2: Breaking Down Barrierscdnassets.hw.net/4e/b2/fe0b5edf4b52b8d9661712322391/barriers.pdf · • $420 million to prepare for pandemic flu • $7.2 billion expand broadband to rural areas

18,000 jobs

2

Every $1 billion invested in

highway infrastructure creates

up to 18,000 jobs.

Page 3: Breaking Down Barrierscdnassets.hw.net/4e/b2/fe0b5edf4b52b8d9661712322391/barriers.pdf · • $420 million to prepare for pandemic flu • $7.2 billion expand broadband to rural areas

3

$5.60 return

Each dollar invested in the highway

system yields a $5.60 return in

economic benefits.

Page 4: Breaking Down Barrierscdnassets.hw.net/4e/b2/fe0b5edf4b52b8d9661712322391/barriers.pdf · • $420 million to prepare for pandemic flu • $7.2 billion expand broadband to rural areas

4

11%

Transportation infrastructure

accounts for 11% of our

nation’s economic activity.

Page 5: Breaking Down Barrierscdnassets.hw.net/4e/b2/fe0b5edf4b52b8d9661712322391/barriers.pdf · • $420 million to prepare for pandemic flu • $7.2 billion expand broadband to rural areas

5

Transportation Funding FromFederal Stimulus Bill

Total Spending:$787 billion

Page 6: Breaking Down Barrierscdnassets.hw.net/4e/b2/fe0b5edf4b52b8d9661712322391/barriers.pdf · • $420 million to prepare for pandemic flu • $7.2 billion expand broadband to rural areas

6

Transportation Funding FromFederal Stimulus Bill

Total Spending:$787 billion

Transportation:$48 billion

Page 7: Breaking Down Barrierscdnassets.hw.net/4e/b2/fe0b5edf4b52b8d9661712322391/barriers.pdf · • $420 million to prepare for pandemic flu • $7.2 billion expand broadband to rural areas

7

Federal Stimulus Bill Includes:

• $750 million to enable digital TV in American households• $6.2 billion to weatherize homes• $22 billion medical technology to prevent mistakes• $2 billion advanced battery loan guarantee/grants• $420 million to prepare for pandemic flu• $7.2 billion expand broadband to rural areas• $290 million to upgrade computers at State Department• $250 million to make low-income houses energy efficient• $100 million to remove lead paint from public housing

Page 8: Breaking Down Barrierscdnassets.hw.net/4e/b2/fe0b5edf4b52b8d9661712322391/barriers.pdf · • $420 million to prepare for pandemic flu • $7.2 billion expand broadband to rural areas

BREAKING DOWN BARRIERS

MORE JOBS NOWProcess Improvements forFederal Transportation Funding

8

Page 9: Breaking Down Barrierscdnassets.hw.net/4e/b2/fe0b5edf4b52b8d9661712322391/barriers.pdf · • $420 million to prepare for pandemic flu • $7.2 billion expand broadband to rural areas

Expedite Process Create Jobs Now

Overview

Infrastructure projects generate jobs

Federal processes create barriers and delays

DelaysJobs

DelaysProgramFunding

DelaysEconomicRecovery

9

Page 10: Breaking Down Barrierscdnassets.hw.net/4e/b2/fe0b5edf4b52b8d9661712322391/barriers.pdf · • $420 million to prepare for pandemic flu • $7.2 billion expand broadband to rural areas

Project Programming

Barrier: Lengthy TIP Amendment Process

Recommendation 1: Delegate/Shorten TIP Amendment Process

JOBS ON HOLD

PROCESSING TIME

2 to 4months per amendment

MORE JOBS NOWEvery billion dollars

invested = 18,000 jobs10

Page 11: Breaking Down Barrierscdnassets.hw.net/4e/b2/fe0b5edf4b52b8d9661712322391/barriers.pdf · • $420 million to prepare for pandemic flu • $7.2 billion expand broadband to rural areas

Project Contracting

Barrier: Limited bidding options, no pre-award authority

Recommendation 2: Implement broad authority for innovative procurements

11

Page 12: Breaking Down Barrierscdnassets.hw.net/4e/b2/fe0b5edf4b52b8d9661712322391/barriers.pdf · • $420 million to prepare for pandemic flu • $7.2 billion expand broadband to rural areas

Project Development

Barrier: Environmental process

Recommendation 3: Expedite environmental process

12

PERMIT ISSUANCE

On a set time

period

DELAYS

Months to Years

Page 13: Breaking Down Barrierscdnassets.hw.net/4e/b2/fe0b5edf4b52b8d9661712322391/barriers.pdf · • $420 million to prepare for pandemic flu • $7.2 billion expand broadband to rural areas

13

Works in Concert with Federal Highway Administration “Every Day Counts”

• Identify environmental community & economic goals early in the planning stage and carry them through design and construction

• Involve attorneys early to avoid problems later

• Expand the use of programmatic agreements

• Expand use of “in lieu” fees and mitigation banking

• Flexibilities in ROW acquisition and utility relocation

• Construction Manager/General Contractor (CM/GC) project delivery method

Page 14: Breaking Down Barrierscdnassets.hw.net/4e/b2/fe0b5edf4b52b8d9661712322391/barriers.pdf · • $420 million to prepare for pandemic flu • $7.2 billion expand broadband to rural areas

Congressman Mica - ”The 437 Day Plan”Cutting Red Tape & Expediting Projects

14

• Improve efficiency of environmental reviews

• Advance pre-construction activities

• Promote integrated planning and programming

• Clarify environmental roles; eliminate duplication

Page 15: Breaking Down Barrierscdnassets.hw.net/4e/b2/fe0b5edf4b52b8d9661712322391/barriers.pdf · • $420 million to prepare for pandemic flu • $7.2 billion expand broadband to rural areas

Provide Flexibility in Design Standards

15

• Use design-build where appropriate

• Trade off short-term pain for long-term gain

-Allow partial or complete facility closures

• Combine projects to accelerate construction

• Use prefabrication / other offsite technologies

• Expand use of private funding partners

Page 16: Breaking Down Barrierscdnassets.hw.net/4e/b2/fe0b5edf4b52b8d9661712322391/barriers.pdf · • $420 million to prepare for pandemic flu • $7.2 billion expand broadband to rural areas

Recommendations Validated and Expanded by State Transportation Officials

• Review TIP & STIP concurrently• For non-expansionary projects within ROW, expedite NEPA • Address government-wide permitting mitigations during NEPA process • Expand use of qualified, short-listed consultants• As part of state funding, add metrics to State Office of Historic Preservation to

induce action• Analyze processes for emergency projects – they move faster!• Eliminate either the FEIS or the ROD to reduce duplication• Allow greater flexibility to purchase right of way ahead of the final NEPA decision• Allow greater flexibility to design at risk ahead of the NEPA decision

16

Page 17: Breaking Down Barrierscdnassets.hw.net/4e/b2/fe0b5edf4b52b8d9661712322391/barriers.pdf · • $420 million to prepare for pandemic flu • $7.2 billion expand broadband to rural areas

Summary

Your ideas are welcome to improve the Federal Process

$48.2 BillionInvested annually in transportation

programs through SAFETEA-LU.

868,000 Jobs

17