YEAR:2008-09 Block Village Approved Revised(if available) 1 2 3 4 5 6 7 8 9 10 A SINGHAT BLOCK i) General a) Communication (IVR) 1 Constn. Of IVR from Lanchah to Mongjang SGT Lanchah 4.00 4.00 4.00 4.00 Completed 2 Constn. Of IVR from Theigotang to Hiangtam (V) do Theogotang 3.00 3.00 3.00 3.00 Completed 3 Constn. Of IVR from Hengjang to Hiangtam (K) do Hengjang 4.00 4.00 4.00 4.00 Completed 4 Constn. Of IVR from Suangdai to Ngaljang do Suangdai 4.00 4.00 4.00 4.00 Completed 5 Impvt. Of Link Road between L. Kanan & Behiang do L. Kanan 3.00 3.00 3.00 3.00 Completed 6 Constn. Of IVR from Hengjang to Songjang do Hengjang 4.00 4.00 4.00 4.00 Completed 7 Cosntn. Of IVR from Suangdoh to Sialbu via Chingai Suangdoh 10.00 10.00 10.00 10.00 Completed b) BRIDGES 8 Constn. of S/Bridge over Tuilak river between Lungthul(L)& Sialbu SGT Lungthul (L) 7.32 7.32 7.32 7.32 Completed 9 Constn. of S/Bridge over Tuivel river between Pakmual and Behiang (V) SGT Pakmual & Behiang 6.00 6.00 6.00 6.00 Completed 10 Constn. of S/Bridges over Kangkap river between Kangkap and Ngaljang SGT Kangkap & Ngalzing 6.00 6.00 6.00 6.00 Completed 11 Constn. of S/Bridges over Tengkhol stream between Tongjang and Lungjang SGT Tongjang & Lungzing 6.00 6.00 6.00 6.00 Completed c) Community Building BORDER AREA DEVELOPMENT PROGRAMME(BADP) (Rs. in lakhs) Name of the District:CHURCHANDPUR Sl.No. Name of the schemes/projects Location COMPLETED SCHEMES/PROJECTS TAKEN UP UNDER BADP (YEAR-WISE/DISTRICT-WISE/BLOCK-WISE/DEPTT-WISE/SECTOR-WISE) Amount released by MHA Amount utilised Remarks Project Cost Amount Sanctioned

Transcript of BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river...

Page 1: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

YEAR:2008-09

Block Village Approved Revised(if available)

1 2 3 4 5 6 7 8 9 10A SINGHAT BLOCKi) Generala) Communication (IVR)1 Constn. Of IVR from Lanchah to Mongjang SGT Lanchah 4.00 4.00 4.00 4.00 Completed

2 Constn. Of IVR from Theigotang to Hiangtam (V)

do Theogotang 3.00 3.00 3.00 3.00 Completed

3 Constn. Of IVR from Hengjang to Hiangtam (K)

do Hengjang 4.00 4.00 4.00 4.00 Completed

4 Constn. Of IVR from Suangdai to Ngaljang do Suangdai 4.00 4.00 4.00 4.00 Completed

5 Impvt. Of Link Road between L. Kanan & Behiang

do L. Kanan 3.00 3.00 3.00 3.00 Completed

6 Constn. Of IVR from Hengjang to Songjang do Hengjang 4.00 4.00 4.00 4.00 Completed

7 Cosntn. Of IVR from Suangdoh to Sialbu via Chingai

Suangdoh 10.00 10.00 10.00 10.00 Completed

b) BRIDGES

8 Constn. of S/Bridge over Tuilak river between Lungthul(L)& Sialbu

SGT Lungthul (L) 7.32 7.32 7.32 7.32 Completed

9 Constn. of S/Bridge over Tuivel river between Pakmual and Behiang (V)

SGT Pakmual & Behiang

6.00 6.00 6.00 6.00 Completed

10 Constn. of S/Bridges over Kangkap river between Kangkap and Ngaljang

SGT Kangkap & Ngalzing

6.00 6.00 6.00 6.00 Completed

11 Constn. of S/Bridges over Tengkhol stream between Tongjang and Lungjang

SGT Tongjang & Lungzing

6.00 6.00 6.00 6.00 Completed

c) Community Building

BORDER AREA DEVELOPMENT PROGRAMME(BADP)

(Rs. in lakhs)Name of the District:CHURCHANDPURSl.No. Name of the schemes/projects Location

COMPLETED SCHEMES/PROJECTS TAKEN UP UNDER BADP (YEAR-WISE/DISTRICT-WISE/BLOCK-WISE/DEPTT-WISE/SECTOR-WISE)

Amount released by MHA

Amount utilised

RemarksProject Cost Amount Sanctioned

Page 2: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

Block Village Approved Revised(if available)

1 2 3 4 5 6 7 8 9 10

Sl.No. Name of the schemes/projects Location Amount released by MHA

Amount utilised

RemarksProject Cost Amount Sanctioned

12 Constn. Of Community Hall at Tuima (Kangkap) SGT Tuima (Kangkap)

5.00 5.00 5.00 5.00 Completed

13 Constn. Of Community Hall at Tuikuimuallum do Tuikuimuallum 5.00 5.00 5.00 5.00 Completed

14 Constn. Of Community Hall at Sialbu do Sialbu 5.00 5.00 5.00 5.00 Completed

15 Constn. Of VA house at Hiangtam (V) do Hiangtam (V) 3.00 3.00 3.00 3.00 Completed

d) Education/ Playground

16 Constn. Of Tribal Girl Hostel at Singngat HQ do Singngat HQ 20.00 20.00 20.00 20.00 Completed

17 Constn. Of Playground at Suangphu do Suangphu 3.00 3.00 3.00 3.00 Completed

18 Constn. Of Playground at Theigotang do Theigotang 3.00 3.00 3.00 3.00 Completede) Agriculture & Allied

19 Community Fishery farm at Hengjang do Hengjang 2.00 2.00 2.00 2.00 Completed

20 Banana Plantation at Tonjang do Tonjang 3.50 3.50 3.50 3.50 Completed

f) MI DAMS

21 Constn. Of B/S Dam at Tengkol stream at Jangnuam for Nengkhanmang Lourup

do Jangnuam 3.00 3.00 3.00 3.00 Completed

22 improvement of M.I. Dam at Ngasuan river near Tonjang

Tonjang 5.00 5.00 5.00 5.00 Completed

g) Health & sanitation

23 Provision for treatment & purchase medicine etc in medical emergencies in remote border areas.

do 5.00 5.00 5.00 5.00 Completed

h) WATER SUPPLY

24 Constn. Of RWS at L.Kanan do L.Kanan 3.00 3.00 3.00 3.00 Completed

25 Constn. Of RWS at Mongjang do Mongjang 3.00 3.00 3.00 3.00 Completed

i) BEHIANG CLUSTER

COMMUNICATION :

26 Construction of IVR from Songjang to Aishi do Songjang 5.00 5.00 5.00 5.00 Completed

27 Constn. Of IVR from L. Kanan to Behiang(V) do L.Kanan 5.00 5.00 5.00 5.00 Completed

AGRICULTURE & ALLIED

Page 3: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

Block Village Approved Revised(if available)

1 2 3 4 5 6 7 8 9 10

Sl.No. Name of the schemes/projects Location Amount released by MHA

Amount utilised

RemarksProject Cost Amount Sanctioned

28 Plantation of Lemon at Pakmual do Pakmual 3.00 3.00 3.00 3.00 Completed

29 Plantation of Ginger at Suangdoh do Suangdoh 2.00 2.00 2.00 2.00 Completed

SUANGDOH CLUSTER

j) COMMUNICATION :

30 Constn. Of IVR from Sialbu to Lungthul (L) with 4m.span slab culvert over Sialbu stream

do Sialbu & Lungthul

6.00 6.00 6.00 6.00 Completed

Total (Singhat): 146.82 0.00 146.82 146.82 146.82 0.00

B THANLON BORDER BLOCK

a) Infrastructure

COMMUNCIATION

31 Constn. Of IVR from Thuangtam to Umtal Thanlon Thuangtam & Umtal

6.00 6.00 6.00 6.00 Completed

32 Constn. Of IVR from Umtal to Mualkui do Umtal & Mualkui

5.00 5.00 5.00 5.00 Completed

33 Construction of road from Mong-on to Vaipheimual

do Mong-on & Vaipheimual

6.00 6.00 6.00 6.00 Completed

b) BRIDGES/SLAB CULVERT

34 Constn. Of S/Bridge over Tuikui river between Pangmual and Khuanggin

do Pangmual & Khuanggin

7.00 7.00 7.00 7.00 Completed

c) Social sectorCOMMUNITY DEVELOPMENT

35 Constn. Of VA House at Songtal do Songtal 6.00 6.00 6.00 6.00 Completed

36 Constn. Of VA House at Thuangtam do Thuangtam 6.00 6.00 6.00 6.00 Completed

37 Constn. Of VA House at Tongkham do Tongkham 5.00 5.00 5.00 5.00 Completed

38 Constn. Of Community Hall at Sumtuh do Sumtuh 8.00 8.00 8.00 8.00 Completed

39 Constn. Of VA House at Phailenbung do Phailenbung 4.00 4.00 4.00 4.00 Completed

40 Cosntn. Of VA House at Phaitong do Phaitong 5.00 5.00 5.00 5.00 Completed

41 Cosntn. Of Community Hall at Thuangtam do Thuangtam 4.50 4.50 4.50 4.50 Completed

42 Construction of V.A. House at Pamjal do Pamjal 5.00 5.00 5.00 5.00 Completed

Page 4: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

Block Village Approved Revised(if available)

1 2 3 4 5 6 7 8 9 10

Sl.No. Name of the schemes/projects Location Amount released by MHA

Amount utilised

RemarksProject Cost Amount Sanctioned

43 Construction of V.A. House at Mong-on do Mong-on 5.00 5.00 5.00 5.00 Completed

44 Construction of Community Hall at Mualkui do Mualkui 5.00 5.00 5.00 5.00 Completed

45 Construction of Community Hall at Kaihlam do Kaihlam 4.50 4.50 4.50 4.50 Completed

46 Construction of Villaga Authority House at Phaipheng

do Phaipheng 4.50 4.50 4.50 4.50 Completed

MARKET SHED

47 Cosntn. Of Market shed at Songtal do Songtal 8.00 8.00 8.00 8.00 Completed

b) Education Sector

48 Constn. Of Tribal Girl Hostel Building at Thanlon HQ

do Thanlon 20.00 20.00 20.00 20.00 Completed

c) Agriculture & Allied Sector

MI DAM

49 Cosntn. Of MI Dam at Sumtuh do Sumtuh 6.00 6.00 6.00 6.00 Completed

50 Constn. of Community Fishery pond at Sumtuh

do Sumtuh 6.00 6.00 6.00 6.00 Completed

51 Constn. of Community Fishery pond at Khajang

do Khajang 6.00 6.00 6.00 6.00 Completed

d) Health & sanitation Sector

52 Provision for treatment & purchase medicine etcin medical emergencies in remote border areas.

do Whole Bolck 5.28 5.28 5.28 5.28 Completed

Water Supply

53 RWS at Umtal do Umtal 3.00 3.00 3.00 3.00 Completed

54 RWS at Khajang do Khajang 3.00 3.00 3.00 3.00 Completed

Total (Thanlon): 143.78 143.78 143.78 143.78

Total (Churachandpur District): 290.60 290.60 290.60 290.60

Page 5: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

YEAR:2008-09

Block Village Approved Revised(if available)

1 2 3 4 5 6 7 8 9 10

I:TENGNOUPAL BLOCK :A. Education Sectors

Constn of Hostel Building1 Constn. Of Girls Dormitory for

Moreh Govt. High SchoolTPL Moreh 6.00 6.00 6.00 6.00 Completed

Constn. Of Library Building:1 Constn. Of Library cum Recreation

Centre at Moreh Ward No. 3TPL Moreh 8.00 8.00 8.00 8.00 Completed

Constn. Of Playground2 Constn. of Play ground at Angbrasu

VillageTPL Angbrasu 5.00 5.00 5.00 5.00 Completed

3 Constn. of Play ground at Sairel Shaisim

TPL Sairel Shaisim

5.00 5.00 5.00 5.00 Completed

4 ,-do- at New Mongjang/ Khomunnom

TPL New Mongjang

5.00 5.00 5.00 5.00 Completed

5 ,-do- at Khudengthabi TPL Khudengthabi

4.00 4.00 4.00 4.00 Completed

B. Agricultural & Allied Sectors6 Construction of MI Dam across

Phaisan stream for Phisan LoubukTPL Lamlong

Khunou5.00 5.00 5.00 5.00 Completed

7 Constrn. Of MI Dam 7 canal across Kangoitong stream for kangoitong Loubuk

TPL Lamlong Khunou

5.00 5.00 5.00 5.00 Completed

Amount utilised

Remarks

BORDER AREA DEVELOPMENT PROGRAMME(BADP)COMPLETED SCHEMES/PROJECTS TAKEN UP UNDER BADP (YEAR-WISE/DISTRICT-WISE/BLOCK-WISE/DEPTT-WISE/SECTOR-WISE)

Name of the District:CHANDEL (Rs. in lakhs)Sl.No. Name of the schemes/projects Location Project Cost Amount

SanctionedAmount released by MHA

Page 6: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

8 MI Dam across Anchapso river for M Piba Loubuk

TPL Saibol 2.00 2.00 2.00 2.00 Completed

9 -do- Mangkarok Lok for AS Piba Loubuk

TPL Saibol 4.00 4.00 4.00 4.00 Completed

10 -do- Ngachan Lok to Mayonmi Loubuk

TPL Yangkhul 4.00 4.00 4.00 4.00 Completed

11 -do- Tuiphei Lok for Kochai and Angkham Loukon

TPL Kharou Khunou

5.00 5.00 5.00 5.00 Completed

Plantation12 Banana Plantation at Rilram Centre TPL Rilram

Centre3.00 3.00 3.00 3.00 Completed

C. Health & SanitationConstruction of Water Reservoir at:

13 Chellep TPL Chellep 3.00 3.00 3.00 3.00 Completed

14 N. Gamnom TPL N. Gamnom 3.00 3.00 3.00 3.00 Completed

15 Near Good Shepherd English School, Moreh.

TPL Moreh. 3.00 3.00 3.00 3.00 Completed

D InfrastructureSectorRoad & Culvert

16 Levelling of IVR at Kambang Khullen

TPL Kambang Khullen

2.00 2.00 2.00 2.00 Completed

17 Levelling of IVR at Leibi TPL Leibi 2.00 2.00 2.00 2.00 Completed

18 Contn. of IVR from Yongkhul to Ngachan

TPL Yongkhul & Ngachan

4.00 4.00 4.00 4.00 Completed

19 Constn. of Slab culvert with Singling at Moreh Heinou Makhong, Meitei Leikai

TPL Moreh Heinou

Makhong

4.00 4.00 4.00 4.00 Completed

20 Construction of road from Lamlong Khunou to Tatyang

TPL Lamlong Khunou

5.00 5.00 5.00 5.00 Completed

Page 7: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

21 IVR from Rilram Center to Kharou Khullel

TPL Kharou Khullel

3.00 3.00 3.00 3.00 Completed

22 IVR from B. Bongjang to L. Molphei

TPL B. Bongjang 3.00 3.00 3.00 3.00 Completed

23 Constn. of IVR from T. Yangnom Village to Maojang

TPL T. Yangnom 5.00 5.00 5.00 5.00 Completed

24 Constn. of IVR from Chongjang to Ch. Tengnoupal

TPL Chongjang 3.00 3.00 3.00 3.00 Completed

25 Constn of IVR from T. Khonomjang to T. Jangnom/ Khokahjang

TPL T. Khonomjang 5.00 5.00 5.00 5.00 Completed

26 Construction of IVR from S.M. Lhangjol to Maipi Mangsom

TPL Lhangjol 3.00 3.00 3.00 3.00 Completed

27 Construction of IVR from D. Mounaphai to border of New leikot

TPL D. Mounaphai

6.00 6.00 6.00 6.00 Completed

28 Construction of IVR from Govajang to Gamgilok stream

TPL Govajang 5.00 5.00 5.00 5.00 Completed

29 Constn. of IVR from Kwatha to kwatha khunou

TPL Kwatha 5.00 5.00 5.00 5.00 Completed

30 Construction of drain at Moreh Ward No.6

TPL Moreh Ward No.6

4.00 4.00 4.00 4.00 Completed

31 Construction of IVR from Saibol to Yangoupokpi through Tuisomjang Anchapao River 15 km.

TPL Saibol, Yangoupokpi

8.00 8.00 8.00 8.00 Completed

32 Construction of IVR from Choktong to Waksu

TPL Choktong 3.00 3.00 3.00 3.00 Completed

33 Construction of IVR from Chellep to Leitan

TPL Chellep 3.00 3.00 3.00 3.00 Completed

Page 8: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

34 -do- Lokchao (New Champhai) Maipi Mongsom

TPL Maipi Mongsom

3.00 3.00 3.00 3.00 Completed

35 Construction of IVR from Kambang Khunou to Leibi

TPL Kambang Khunou

5.00 5.00 5.00 5.00 Completed

36 Construction of IVR from Kharaou Khunou to Durringphai

TPL Kharaou Khunou

6.98 6.98 6.98 6.98 Completed

37 Construction of IVR from Langkhongching to Lungwarkhong

TPL Langkhongching

3.00 3.00 3.00 3.00 Completed

38 Construction of IVR from Moirangthel to Khoirangalthel

TPL Moirangthel 6.00 6.00 6.00 6.00 Completed

Ring Wells39 Construction of Ring Wells at

Moreh Ward o 4 & 5TPL Moreh Ward

No. 4 & 54.00 4.00 4.00 4.00 Completed

40 Construction of ring well at Moreh Ward No. 1

TPL Moreh Ward No. 1

2.00 2.00 2.00 2.00 Completed

41 Construction of Bridge/Suspension Bridg over Tuikhulok stream at K. Moulshang village.

TPL K. Moulshang

5.00 5.00 5.00 5.00 Completed

Social SectorConstruction of Community Hall at:

42 Maipi Mangsong TPL Maipi Mangsong

5.00 5.00 5.00 5.00 Completed

43 L. Phunchong TPL L. Phunchong 5.00 5.00 5.00 5.00 Completed

44 ,-do- New Laikot TPL New Laikot 5.00 5.00 5.00 5.00 Completed

45 ,-do- Jangoupokpi TPL Jangoupokpi 5.00 5.00 5.00 5.00 Completed

46 ,-do- Muslim Basti Moreh TPL Muslim Basti Moreh

5.00 5.00 5.00 5.00 Completed

Market Shed

Page 9: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

47 Constn. of Market Shed for Ima Keithel (Variety Vegetable Market side)

TPL Moreh 7.00 7.00 7.00 7.00 Completed

Rest House48 Construction of Public Rest House

at Kambang Khullen TPL Kambang

Khullen 6.00 6.00 6.00 6.00 Completed

49 Construction of Waiting Shed at Kambang Khullen

TPL Kambang Khullen

2.00 2.00 2.00 2.00 Completed

Construction of Workshed at:50 1. Leibi TPL Leibi 5.00 5.00 5.00 5.00 Completed

51 2. H. Mongjang TPL H. Mongjang 5.00 5.00 5.00 5.00 Completed

52 3. Yangoutubi TPL Yangoutubi 4.00 4.00 4.00 4.00 Completed

Total (Tengnoupal): 231.98 231.98 231.98 231.98II:CHAKPIKARONG BLOCK:A. Education Sector:Constrn./Extension of Classroom at:

53 a) K. Savumpa village CKG K. Savumpa 4.00 4.00 4.00 4.00 Completed

54 b) Songjang CKG Songjang 4.00 4.00 4.00 4.00 Completed

55 c) Sehlon CKG Sehlon 4.00 4.00 4.00 4.00 Completed

56 d) Khengjoy CKG Khengjoy 4.00 4.00 4.00 4.00 Completed

Construction of Playground at:57 a) Tuitung CKG Tuitung 2.00 2.00 2.00 2.00 Completed

58 b) P. Chehjang CKG P. Chehjang

2.00 2.00 2.00 2.00 Completed

59 c) Moltuk CKG Moltuk 3.00 3.00 3.00 3.00 Completed

60 d) S. Sijang CKG S.Sijang 3.00 3.00 3.00 3.00 Completed

B. Health Sector:

Page 10: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

C. Agri. & Allied Sectors:1 Horticulture:

61 a) Estt. of Lemon and Orange Farm at Gelmol.

CKG Gelmol 3.00 3.00 3.00 3.00 Completed

62 b) Estt. of Orange and banana farm at Khengjoy.

CKG Khengjoy 3.00 3.00 3.00 3.00 Completed

63 c) Cultivation of Banana and lemon at Leisan

CKG Leisan 3.00 3.00 3.00 3.00 Completed

2 Construction of MI Dam/BS Dam and canal:

64 a) across Thelna Lok for K. Bethel Loukol.

CKG K. Bethel 5.00 5.00 5.00 5.00 Completed

65 b) across Twidel stream Joldam village.

CKG Joldam 5.00 5.00 5.00 5.00 Completed

66 c) across Shilok stream at Thingphai village

CKG Thingphai 5.00 5.00 5.00 5.00 Completed

67 d) across Gova lok stream at K, Selhei village.

CKG K. Selhei 5.00 5.00 5.00 5.00 Completed

68 e) across Khangtung lok stream at Pannajang village.

CKG Pannajang 4.00 4.00 4.00 4.00 Completed

69 f) across Kana River at the confluence of Thelna at Aigejang.

CKG Aigejang 5.00 5.00 5.00 5.00 Completed

70 g) across Sonbuk stream at Khunmunom village.

CKG Khunmunom

5.00 5.00 5.00 5.00 Completed

D.INFRASTRUCTURE:Construction of IVR from:

71 a) Chaljang to Chacham Lok. CKG Chaljang 5.00 5.00 5.00 5.00 Completed

72 b) T.S. Lajang to K. Savumpa village

CKG TS. Lajang & K, Savumpa

5.00 5.00 5.00 5.00 Completed

Page 11: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

73 c) T.L. Maojang to Hollenjang. CKG TL. Maojang

3.00 3.00 3.00 3.00 Completed

74 d) Aibol Jankhomang to Twisa. CKG Aibol Jamkhomang

3.00 3.00 3.00 3.00 Completed

75 e) T. Monglen to Tuidam. CKG T.Monglen 8.00 8.00 8.00 8.00 Completed

76 f) SL. Changpol to Old Changpol CKG SL Changpol 6.00 6.00 6.00 6.00 Completed

77 g) Aisi to Gunjil CKG Aisi 5.00 5.00 5.00 5.00 Completed

78 h) T. Nampao to Beleijang CKG T Nampao 6.00 6.00 6.00 6.00 Completed

79 i) Heiphai to Jangnom CKG Heiphai 5.00 5.00 5.00 5.00 Completed

80 j) S. Bongjoy to Sejang Theose CKG S. Bongjoy 5.00 5.00 5.00 5.00 Completed

81 k) LH Jhangnomphai to Lajang village

CKG LH Jangnomphai

5.00 5.00 5.00 5.00 Completed

82 l) Khengjang to BRTF road towards Old Somtal.

CKG Khengjang 4.00 4.00 4.00 4.00 Completed

83 m) T. Tuivang to Namku stream towards Khumkot.

CKG T.Tuivang 4.00 4.00 4.00 4.00 Completed

84 n) Moldenom to Wailou CKG Moldenom 3.51 3.51 3.51 3.51 Completed

Construction of Bridge/Suspension bridge:

85 a) Repairing of Tuivang bridge at yangoulen.

CKG Yangoulen 3.00 3.00 3.00 3.00 Completed

86 b) Repairing of Govadung bridge at Molcham

CKG Molcham 2.00 2.00 2.00 2.00 Completed

87 c) Suspension bridge over Langkep river in between Gamphazol & Thingphai village.

CKG Gamphazol, Thingphai

8.00 8.00 8.00 8.00 Completed

88 d) Suspension bridge over Khoidung river in between S Lamphei and Tuidim village.

CKG S Lamphei, Tuidam

4.00 4.00 4.00 4.00 Completed

Page 12: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

89 e) Repairing of of wooden bridge over Twito river at Molcham

CKG Molcham 2.00 2.00 2.00 2.00 Completed

a) Wailou CKG Wailou 4.00 4.00 4.00 4.00 Completed

90 b) Sailam CKG Sailam 4.00 4.00 4.00 4.00 Completed

91 c) LV Champhai CKG LV Champhai 4.00 4.00 4.00 4.00 Completed

92 d) T. Yangnom CKG T. Yangnom 4.00 4.00 4.00 4.00 Completed

Completed

a) Jangmol CKG Jangmol 4.00 4.00 4.00 4.00 Completed

E.SOCIAL SECTOR:194 a) Hengshi CKG Hengshi 5.00 5.00 5.00 5.00 Completed

95 b) PS Konjang CKG PS Konjang 5.00 5.00 5.00 5.00 Completed

96 c) Bolchang CKG Bolchang 5.00 5.00 5.00 5.00 Completed

97 d) Tuidam CKG Tuidam 5.00 5.00 5.00 5.00 Completed

98 e) T. Leiyang Khopi CKG T Leiyang Khopi

5.00 5.00 5.00 5.00 Completed

99 Construction of Community Hall at Nabil

CKG Nabil 5.00 5.00 5.00 5.00 Completed

100 Estt. of Rice Mill at the focal village of Changpol for the Cluster.

CKG Changpol 10.00 10.00 10.00 10.00 Completed

101 Construction of Playground at TS Lajang.

CKG TS Lajang 3.00 3.00 3.00 3.00 Completed

102 Construction of Market Shed at Changpol.

CKG Changpol 5.00 5.00 5.00 5.00 Completed

Total (Chakpikarong Block) 223.51 223.51 223.51 223.51Total:Chandel District 455.49 455.49 455.49 455.49

A Security related works

Construction of Community Hall at :

CLUSTER PROGRAMME

Construction of Workshed at:

93 Construction of Market shed at

Page 13: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

i) Manipur PoliceI Ukhrul District

IA Chingai Block1 Construction of compund wall fencing

with one steel gate for Chingai Police , P.S.

Chingai Chingai 25.00 25.00 25.00 25.00 Completed

2 Construction of 20 SM barracks, Chingai, P.S.

Chingai Chingai 19.23 19.23 19.23 19.23 Completed

3 Construction of type three quarters, Chingai, P.S.

Chingai Chingai 13.34 13.34 13.34 13.34 Completed

IB Kasom Khullen Block

4 Construction of Kitchen-cum-Dining Hall and Toilet blocks at Kasom Khulen P.S.

Kasom Kl. Kasom Khulen

12.43 12.43 12.43 12.43 Completed

Total Police 70.00 70.00 70.00 70.00ii) Assam Rifles

Ukhrul DistrictKasom Khullen Block

5 Construction of 350 mtr retaining wall on landslide prone road strech near Khonglo Bridge on road Sorde to Kasong

Kasom Kl. Kasong 20.50 20.50 20.50 20.50 Completed

6 Construction of 400 mtr PCC rd on landslide prone stretch near Khonglo Brdige on rd Sorde-Kasong.

Kasom Kl. Kasong 5.00 5.00 5.00 5.00 Completed

Chandel District

Tengnoupal Block

7 Widening of road from Rilram centre to Saibol

TPL Rilram Centre and Saibol

34.50 34.50 34.50 34.50 Completed

Total (Assam Rifles) 60.00 60.00 60.00 60.00B. Training/ Monitoring, etc 5.70 5.70 5.70 5.70

Total:Ccpur,UKL&CDL, 1357.00 1357.00 1357.00 1357.00C. Addl for New Somtal Rehab(2nd Instal) 176.37 176.37 176.37 176.37

Grand Total:2008-09. 1533.37 1533.37 1533.37 1533.37

Page 14: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

YEAR:2008-09

Block Village Approved Revised(if available)

1 2 3 4 5 6 7 8 9 10I : Ukhrul Blocka) Education

1 Constn. of kitchen and toilet for Govt. Hostel at Wino tang. (Hostel already constructed under BADP, 2007-08)

Ukhrul Ukhrul 3.00 3.00 3.00 3.00 Completed

2 Dev. Of playground at Nungshong Khullen.

Ukhrul Nungshong Kl. 2.00 2.00 2.00 2.00 Completed

3 Dev. Of playground at Somdal. Ukhrul Somdal 3.00 3.00 3.00 3.00 Completed

b) Health & sanitation4 Constn. of water tank at Chingsou. Ukhrul Chingshou 3.00 3.00 3.00 3.00 Completed

5 Constn. of water tank at Mapum. Ukhrul Mapum 3.00 3.00 3.00 3.00 Completed

6 Constn. of Public Convenience at Somdal

Ukhrul Somdal 4.44 4.44 4.44 4.44 Completed

7 Constn. of Dam and M.I. at Arthei Lok, Ukhrul.

Ukhrul Ukhrul 2.00 2.00 2.00 2.00 Completed

8 Land reclamation at Khangai Kulon Ngalu, Lunghar village.

Ukhrul Lunghar 4.00 4.00 4.00 4.00 Completed

9 Constn. of dam over Shongsho stream and canal of 2.5 Kms atLunghar.

Ukhrul Lunghar 4.00 4.00 4.00 4.00 Completed

10 Constn. of dam at Masoyam paddy field, Sihai Khullen..

Ukhrul Sihai Kl. 2.00 2.00 2.00 2.00 Completed

11 Constn. of cultivation tank cum fishery tank at Losunanangkho at K. Phungtha.

Ukhrul K. Phungthar 2.00 2.00 2.00 2.00 Completed

Amount utilised

Remarks

c) Agri & alleid sector including M.I.

BORDER AREA DEVELOPMENT PROGRAMME(BADP)COMPLETED SCHEMES/PROJECTS TAKEN UP UNDER BADP (YEAR-WISE/DISTRICT-WISE/BLOCK-WISE/DEPTT-WISE/SECTOR-WISE)

Name of the District:UKHRUL (Rs. in lakhs)Sl.No. Name of the schemes/projects Location Project Cost Amount

SanctionedAmount

released by MHA

Page 15: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

12 Constn. of water harvesting pond at K. Wallely Atorakhong.

Ukhrul K. Wallely 4.00 4.00 4.00 4.00 Completed

13 Constn. of rain water harvest pond at Khongreira at Halang.

Ukhrul Halang 6.00 6.00 6.00 6.00 Completed

14 Tree plantation at community land, Khamasom.

Ukhrul Khamasom 4.00 4.00 4.00 4.00 Completed

15 Embankment of irrigation channel at Khawor paddy field at Kasomkong, Halang.

Ukhrul Halang 3.00 3.00 3.00 3.00 Completed

16 Constn. of river embankment at Tallui, Changkong.

Ukhrul Talloi 3.00 3.00 3.00 3.00 Completed

17 Constn. of RCC weir dam and MI channel over Mazik Lui at Shirui.

Ukhrul Shirui 3.00 3.00 3.00 3.00 Completed

18 Constn. of Check Dam at Shakan Sawa at Sihai Khullen

Ukhrul Shihai Kl 3.00 3.00 3.00 3.00 Completed

19 Constn. of Check Dam at Marangra Khannai Kong west at Langdang Khullen.

Ukhrul Langdang Kl 3.00 3.00 3.00 3.00 Completed

d) Infrastructure

20 Constn. of IVR from Zingsui to Roni. Ukhrul Zingsui, Roni 2.00 2.00 2.00 2.00 Completed

21 Constn. of Jeepable road from Shirui junction to Shirui Jr. H/S.

Ukhrul Shirui 2.00 2.00 2.00 2.00 Completed

22 Constn. of IVR from Lunghar to Shongcha.

Ukhrul Lunghar 4.00 4.00 4.00 4.00 Completed

23 Constn. of suspension bridge over Rantha river in between Sihai Khunou and Sihai Khulle.

Ukhrul Sihai Kn & Kl. 7.00 7.00 7.00 7.00 Completed

24 Shingling and drainage from Sashim to BRTF Camp with culverts.

Ukhrul Ukhrul 5.00 5.00 5.00 5.00 Completed

25 Constn. of IVR from Alungtang to Kashalazeng, Ukhrul.

Ukhrul Ukhrul 4.00 4.00 4.00 4.00 Completed

26 Impvt. of link road at Wino Tang, Ukhrul near TNL ground.

Ukhrul Ukhrul 3.00 3.00 3.00 3.00 Completed

Page 16: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

27 Constn. of IVR Nungshong Khunou to Kamjong road junction.

Ukhrul Nungshong Kn.

3.00 3.00 3.00 3.00 Completed

28 Constn. of wooden bridge (Jeepable) over Chihui river at Choithar.

Ukhrul Choithar 3.00 3.00 3.00 3.00 Completed

29 Constn. of IVR from Nungshong Khullen to Luinaothuk Aze.

Ukhrul Nungshong Kl. 4.00 4.00 4.00 4.00 Completed

e) Social sector.

30 Constn. of community hall ar Rusheah (Ronshak) village

Ukhrul Ronshak 3.00 3.00 3.00 3.00 Completed

31 Constn. of Common shelter for Old age people at Tallui (Tolloi).

Ukhrul Tolloi 4.00 4.00 4.00 4.00 Completed

32 Constn. of Primary School Mid Day Meal store house at Phungreitang.

Ukhrul Ukhrul 6.00 6.00 6.00 6.00 Completed

33 Constn. of Public Guest House at Halang.

Ukhrul Halang 6.00 6.00 6.00 6.00 Completed

34 Constn. of Vocational Training Centre of TSL at Ukhrul.

Ukhrul Ukhrul 6.00 6.00 6.00 6.00 Completed

Total (Ukhrul Block) 123.44 123.44 123.44 123.44II : Chingai Block

a) Education35 Dev. Of playground at New

Kharasom.Chingai Kharasom 3.00 3.00 3.00 3.00 Completed

36 Dev. Of playground at Jessami Chingai Jessami 3.00 3.00 3.00 3.00 Completed37 Constn. of playground at Challou Chingai Challou 3.00 3.00 3.00 3.00 Completed38 Constn. of Public Convenience at

NungbiChingai Nungbi 3.00 3.00 3.00 3.00 Completed

39 Dev. Of playground at Kuirei village. Chingai Kuirei 2.00 2.00 2.00 2.00 Completed

b) Health & Sanitation

40 Constn. of water tank at Tusom Khullen.

Chingai Tusom Kl 3.00 3.00 3.00 3.00 Completed

41 Constn. of public toilet at Awang Kasom.

Chingai Awang Kasom 5.00 5.00 5.00 5.00 Completed

Page 17: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

c) Agri & allied sector

42 Constn. of public irrigation (pick up weir) at Rachai Khullen.

Chingai Razai Kl 4.00 4.00 4.00 4.00 Completed

43 Constn. of public irrigation (pick up weir) at Zarui, New Tusom..

Chingai New Tusom 3.00 3.00 3.00 3.00 Completed

44 Constn. of river embankment at New Tusom.

Chingai New Tusom 3.00 3.00 3.00 3.00 Completed

45 Constn. of river embankment atTina river, Kharasom.

Chingai Kharasom 3.00 3.00 3.00 3.00 Completed

46 Constn. of irrigation canal at Atchazeda over Challou river.

Chingai Challou 3.00 3.00 3.00 3.00 Completed

47 Constn. of minor irrigation work (pucca canal) at Marem.

Chingai Marem 3.00 3.00 3.00 3.00 Completed

48 Constn. of fishery pond at Ngahui village

Chingai Ngahui 2.00 2.00 2.00 2.00 Completed

49 Constn. of river embenkment at Kuirei Ngahor Vaira river.

Chingai Kuirei 2.00 2.00 2.00 2.00 Completed

50 Constn. of CC Weir dam and M.I. canal at Lemor Lok, Kuirei.

Chingai Kuirei 2.00 2.00 2.00 2.00 Completed

51 Constn. of MI at NIRA river, Phungcham village.

Chingai Phungcham 2.00 2.00 2.00 2.00 Completed

52 Constn. of Minor Irrigation and Weir Dam at Kashim Ron, Ngahui village.

Chingai Ngahui 2.00 2.00 2.00 2.00 Completed

53 Constn. of CC Weir dam over Alozala river and M.I. channel.

Chingai Chingjaroi Kl 2.00 2.00 2.00 2.00 Completed

54 Embankment of irrigation channel at Chaoye Luisa Rangazak Kong, Lori Kajui.

Chingai Lori Kajui 3.00 3.00 3.00 3.00 Completed

55 Constn. of RCC weir dam over Aching Khaluirui Kong, Razai Khunou.

Chingai Razai Kn. 3.00 3.00 3.00 3.00 Completed

56 Constn. of RCC weir dam over Likhao river ti irrigate paddy field (for 70 families) at Challou village.

Chingai Challou 3.00 3.00 3.00 3.00 Completed

Page 18: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

57 Constn. of dam and M.I. channel at Paoyilui, Chingjaroi C.V.

Chingai Chingjaroi CV. 3.00 3.00 3.00 3.00 Completed

58 Community Fishery farm at Davidla Nevia, Kuingai village.

Chingai Kuingai 3.00 3.00 3.00 3.00 Completed

59 Community Fishery farm at Areo Marakvan, Chingai village.

Chingai Chingai 3.00 3.00 3.00 3.00 Completed

d) Infrastructure

60 Constn. of IVR from Luireishimphung to BRTF road.

Chingai Luireishimphung

4.00 4.00 4.00 4.00 Completed

61 Constn. of IVR (road) from Nungbi Khullen to Wanja paddy field.

Chingai Nungbi Kl. 3.00 3.00 3.00 3.00 Completed

62 Impvt. of road from Namrei BRTF road to RKL complex.

Chingai Namrei 4.00 4.00 4.00 4.00 Completed

63 Constn. of wooden bridge over Yaorei river towards Salt well at Wahong.

Chingai Wahong 5.00 5.00 5.00 5.00 Completed

64 Constn. of circular road at Kuirei from Pukhri to Manarenra.

Chingai Kuirei 4.00 4.00 4.00 4.00 Completed

65 Constn. of IVR from Ngahui to Kamsamron river.

Chingai Ngahui 4.00 4.00 4.00 4.00 Completed

66 Constn. of suspension bridge over Challou river at Huishu.

Chingai Huishu 13.00 13.00 13.00 13.00 Completed

67 Constn. of IVR from Awang Kasom to Poi.

Chingai Awang Kasom 4.00 4.00 4.00 4.00 Completed

e) Social sector.

68 Constn. of community hall at Razai Khunou.

Chingai Razai Kn. 4.00 4.00 4.00 4.00 Completed

69 Constn. of Public Toilet of 4 units with water tank (Two Nos.) one at Headman;s Compound and one at Panraphei Market site.

Chingai Chingai 5.00 5.00 5.00 5.00 Completed

70 Constn. of community hall at Poi village.

Chingai Poi 4.97 4.97 4.97 4.97 Completed

71 Constn. of Public Guest House cum V.A. Court with Toilet facility at Marem Khullen.

Chingai Marem Kl. 5.00 5.00 5.00 5.00 Completed

Page 19: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

72 Constn. of Guest House cum V.A. Court at Kuingai village.

Chingai Kuingai 4.00 4.00 4.00 4.00 Completed

Total (Chingai Block) 134.97 134.97 134.97 134.97

III : Kamjong Block

a) Education73 Constn. of Library Hall at Kamjong. Kamjong Kamjong 5.00 5.00 5.00 5.00 Completed

74 Constn. of primary school building (3 rooms) at Phange.

Kamjong Phange 6.00 6.00 6.00 6.00 Completed

75 Constn. of RCC school building (4 rooms) at Grihang.

Kamjong Grihang 8.00 8.00 8.00 8.00 Completed

76 Constn. of primary school building (4 rooms) at Kangpat Khunou

Kamjong Kangpat Kn. 8.00 8.00 8.00 8.00 Completed

77 Constn. of addl. Classrooms of Maokot Jr. H/S

Maokot 5.00 5.00 5.00 5.00 Completed

78 Dev. Of play field at Kachouphung (K) Kamjong Kachouphung K.

3.00 3.00 3.00 3.00 Completed

79 Dev. Of playground at Khoikai. Kamjong Khoikai 3.87 3.87 3.87 3.87 Completed

b) Health & sanitation

80 Constn. of watewr tank at Grihang. Kamjong Grihang 3.00 3.00 3.00 3.00 Completed

81 Constn. of watewr tank at Phange. Kamjong Phange 3.00 3.00 3.00 3.00 Completed

82 Constn. of water tank / reservoir with distribution system at Kholuishiya Kong, Khayang.

Kamjong Khayang 5.00 5.00 5.00 5.00 Completed

c) Agri & allied sector

83 Land reclamation and MI at Mapi wet land at Chatric Khullen.

Kamjong Chatric Kl 4.00 4.00 4.00 4.00 Completed

d) Infrastructure

84 Constn. of IVR from Kongkan to Namya river, Baily bridge and 5 slab culverts.

Kamjong Konhkan 10.00 10.00 10.00 10.00 Completed

85 Constn. of IVR from Kangpat to Zingshophai (Charo).

Kamjong Kangpat 4.00 4.00 4.00 4.00 Completed

Page 20: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

86 Constn. of IVR from Grihang to Neinem Shimphung at Grihang.

Kamjong Grihang 10.00 10.00 10.00 10.00 Completed

87 Constn. of IVR from Pihang to Khoikai with one wooden bridge.

Kamjong Pihang, Khoikai

5.00 5.00 5.00 5.00 Completed

88 Constn. of wooden bridge (Jeepable) over Lusha Kong at Khayang.

Kamjong Khayang 3.00 3.00 3.00 3.00 Completed

89 Constn. of suspension bridge at kachouphung (K).

Kamjong Kachouphung K.

4.00 4.00 4.00 4.00 Completed

90 Constn. of IVR from Kachouphung (K) to Gampal.

Kamjong Kachouphung K.

4.00 4.00 4.00 4.00 Completed

91 Constn. of IVR from Chamu towards Kachouphung (T)

Kamjong Chamu 7.00 7.00 7.00 7.00 Completed

92 Constn. of IVR from Kachouphung (T) towards Khayang village.

Kamjong Kachouphung (T)

7.00 7.00 7.00 7.00 Completed

(e) Social Sector

93 Constn. of community hall at Chahong Phalung

Kamjong Chahong Phalung

5.00 5.00 5.00 5.00 Completed

94 Constn. of Guest House at Phungtha. Kamjong Phungtha 5.00 5.00 5.00 5.00 Completed

95 Constn. of community hall / Village Court at Roni village.

Kamjong Roni 5.00 5.00 5.00 5.00 Completed

96 Constn. of community hall at Chahong Khunou.

Kamjong Chahong Kn. 5.00 5.00 5.00 5.00 Completed

97 Constn. of Community Hall at Phaimol Kamjong Phaimol 5.00 5.00 5.00 5.00 Completed

Total (Kamjong Block) 132.87 132.87 132.87 132.87IV : Kasom Khullen Block

a) Education98 Constn. of Jr. H/S Hostel (7 rooms) at

Mawai.Kasom Kl. Mawai 10.00 10.00 10.00 10.00 Completed

99 Constn. of Hostel building at Nambashi Kl.

Kasom Kl. Nambashi Kl 10.00 10.00 10.00 10.00 Completed

b) Health/ Sanitation Completed

Page 21: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

100 Constn. of one main water reservoir / tank at K. Ashang Khullen Aze.

Kasom Kl. K. Ashang Kl. Aze

4.00 4.00 4.00 4.00 Completed

c) Agri & allied sector

101 Medicinal & Herbal plantation Farm at Shimui Chihang, Mawai.

Kasom Kl. Mawai 3.00 3.00 3.00 3.00 Completed

d) Infrastructure

102 Constn. /Impvt. of IVR with shingling and drainage from Kasom Khunou to Khunthak village.

Kasom Kl. Kasom Kn. 5.00 5.00 5.00 5.00 Completed

103 Constn. of IVR from Mawai towards Tuyungbi.

Kasom Kl. Mawai 4.00 4.00 4.00 4.00 Completed

104 Constn. of IVR from K. Ashang Khullen to PWD junction.

Kasom Kl. K. Ashang Kl 4.00 4.00 4.00 4.00 Completed

105 Constn. of IVR from K. Ashang Khullen Aze to Tuidap B.P. No.8.PWD junction.

Kasom Kl. K. Ashang Kl Aze

10.00 10.00 10.00 10.00 Completed

106 Constn. of IVR from Lairam Khullen to Taret Lok.

Kasom Kl. Lairam Kl. 10.00 10.00 10.00 10.00 Completed

e) Social sector.

107 Constn. of community hall at Nambashi.

Kasom Kl. Nambashi 3.93 3.93 3.93 3.93 Completed

108 Constn. of community hall at K. Ashang Khullen Aze.

Kasom Kl. K. Ashang Kl Aze

4.00 4.00 4.00 4.00 Completed

109 Constn. of community hall at Nambashi Horton.

Kasom Kl. Nambashi Horton

4.00 4.00 4.00 4.00 Completed

110 Constn. of community Centre at Nambashi Khunou..

Kasom Kl. Nambashi Kn. 4.00 4.00 4.00 4.00 Completed

111 Constn. of community hall at Nambashi Valley.

Kasom Kl. Nambashi V.. 4.00 4.00 4.00 4.00 Completed

112 Constn. of Cultural hall at K. Ashang Khullen.

Kasom Kl. K. Ashang Kl. 4.00 4.00 4.00 4.00 Completed

Total (Kasom Kl. Block) 83.93 83.93 83.93 83.93

TOTAL:UKHRUL DISTRICT 475.21 475.21 475.21 475.21

Page 22: BORDER AREA DEVELOPMENT PROGRAMME(BADP ... 2008-09.pdf22 improvement of M.I. Dam at Ngasuan river near Tonjang Tonjang 5.00 5.00 5.00 5.00 Completed g) Health & sanitation 23 Provision

YEAR:2008-09

Block Village Approved Revised(if available)

1 2 3 4 5 6 7 8 9 10

A Security related worksi) Manipur Police

I Ukhrul DistrictIA Chingai Block

1 Construction of compund wall fencing with one steel gate for Chingai Police , P.S.

Chingai Chingai 25.00 25.00 25.00 25.00 Completed

2 Construction of 20 SM barracks, Chingai, P.S. Chingai Chingai 19.23 19.23 19.23 19.23 Completed

3 Construction of type three quarters, Chingai, P.S. Chingai Chingai 13.34 13.34 13.34 13.34 Completed

IB Kasom Khullen Block

4 Construction of Kitchen-cum-Dining Hall and Toilet blocks at Kasom Khulen P.S.

Kasom Kl. Kasom Khulen 12.43 12.43 12.43 12.43 Completed

Total Police 70.00 70.00 70.00 70.00ii) Assam Rifles

Ukhrul DistrictKasom Khullen Block

5 Construction of 350 mtr retaining wall on landslide prone road strech near Khonglo Bridge on road Sorde to Kasong

Kasom Kl. Kasong 20.50 20.50 20.50 20.50 Completed

6 Construction of 400 mtr PCC rd on landslide prone stretch near Khonglo Brdige on rd Sorde-Kasong.

Kasom Kl. Kasong 5.00 5.00 5.00 5.00 Completed

Chandel District

Tengnoupal Block

7 Widening of road from Rilram centre to Saibol TPL Rilram Centre and Saibol

34.50 34.50 34.50 34.50 Completed

Total (Assam Rifles) 60.00 60.00 60.00 60.00

Location Project Cost Amount Sanctioned

Amount released by MHA

Amount utilised

Remarks

BORDER AREA DEVELOPMENT PROGRAMME(BADP)COMPLETED SCHEMES/PROJECTS TAKEN UP UNDER BADP (YEAR-WISE/DISTRICT-WISE/BLOCK-WISE/DEPTT-WISE/SECTOR-WISE)

SECURITY RELATED WORK (Rs. in lakhs)Sl.No. Name of the schemes/projects