Booster Short Kicker Testing Update • Testing short & Long Kicker modules using noker CX1168 Thyratron system • Two short modules look similar in characteristic but not as expected. • Short Kicker rebuild in progress to make to get third module

description

Testing short & Long Kicker modules using noker CX1168 Thyratron system Two short modules look similar in characteristic but not as expected. Short Kicker rebuild in progress to make to get third module with modifications. Booster Short Kicker Testing Update. - PowerPoint PPT Presentation

Transcript of Booster Short Kicker Testing Update

Page 1: Booster Short Kicker Testing Update

Booster Short Kicker TestingUpdate

• Testing short & Long Kicker modules using noker CX1168 Thyratron system• Two short modules look similar

in characteristic but not as expected.• Short Kicker rebuild in progress

to make to get third module with modifications.

Page 2: Booster Short Kicker Testing Update
Page 3: Booster Short Kicker Testing Update
Page 4: Booster Short Kicker Testing Update
Page 5: Booster Short Kicker Testing Update
Page 6: Booster Short Kicker Testing Update
Page 7: Booster Short Kicker Testing Update

Preliminary Finding is a 8-15 ns difference between ANU pulser and Operational Booster pulser(Slower)

Page 8: Booster Short Kicker Testing Update

Long BKED012 Magnet

Page 9: Booster Short Kicker Testing Update

Short BKEE002 Magnet