Bond Construction Update Facilities Advisory Committee
description
Transcript of Bond Construction Update Facilities Advisory Committee
Bond Construction Bond Construction UpdateUpdate
Facilities Advisory Facilities Advisory CommitteeCommittee
Bond Construction Bond Construction UpdateUpdate
Facilities Advisory Facilities Advisory CommitteeCommittee
Long Beach Community College District April 6, 2011
EDUCATE ENGAGE EMPOWER 1
Agenda
Completed Construction Projects LAC Parking Structure LAC Building O Complex PCC Walnut Ave. Arrival Court
Current Construction Projects LAC Building A – Student Services Retrofit LAC Infrastructure Improvements Project and District Wide –
Energy Efficiency Project LAC Building I (Bookstore) LAC South Walkway Extension LAC W Trailers Demo PCC MDAB (Multi-Disciplinary Academic Building) District Wide – Monument Signs
Upcoming Construction Projects PCC Building CC Retrofit
Q & A
2
Completed Construction ProjectsLAC Parking Structure – Measure E 2008LAC Parking Structure – Measure E 2008
3
Spaces for 893 Vehicles Solar generation system is commissioned and
operational Project is complete and being used for student parking
Completed Construction ProjectsLAC Building O Complex – Measure E 2008LAC Building O Complex – Measure E 2008
4
Two structures totaling 87,000 square feet Occupants for Building O2 are Foundation, ERD, LBNP and
ALCI IITS and BMT are moved in, Warehouse Facility moving Project is complete with some punch walk items left
Completed Construction Projects
5
UU/VV demo completed. Site converted to a parking lot April 4th, 2011.
PCC Walnut Ave. Arrival Court - Measure E 2008PCC Walnut Ave. Arrival Court - Measure E 2008
Current Construction ProjectsLAC Building A – Student Services RetrofitLAC Building A – Student Services Retrofit
Measure E 2008Measure E 2008
6
New home for A&R, Counseling, Health Services, Cashier, Transfer Center
Project currently in demolition and structure upgrade
Construction fence and temporary walkways complete
End of construction anticipated Summer 2012.
7
LAC Infrastructure Improvement Project and District LAC Infrastructure Improvement Project and District Wide Energy Efficiency Project Measure E Wide Energy Efficiency Project Measure E
20082008
Current Construction Projects
Total annual estimated savings of 1.5 mil. Kwh Project started Fall 2009; currently hydro seeding all
affected areas(All phases) Majority of existing building HVAC systems to be
upgraded and connected to the Central Plant Buildings C,D, G,H, & J are connected Buildings B and E will be scheduled by end of April
Exterior lighting and controls upgrades All parking lots north of Lew Davis are on new system
New Reclaimed Water tie-ins to irrigation connected New gas lines installed for Buildings B, C, D, E, G, H, J, M,
N, and P New domestic lines installed for Buildings B, C, D, E, F, G,
H, I Trailers, J, K,L, M, N, P Anticipated end of construction Winter 2011
Current Construction Projects
8
Adds additional 4,000 square feet to existing building Architecture to match LAC Mediterranean Theme G2K Construction working on demolition and utlitites End of Construction anticipated Fall 2011
LAC Building I - Measure E 2008LAC Building I - Measure E 2008
Current Construction ProjectsLAC South Walkway ExtensionLAC South Walkway Extension
Measure E 2008Measure E 2008
9
99% complete Palm trees to be replaced May 2011 Continues Master Plan pedestrian corridor
Current Construction Projects
10
Green Giant Construction has remove old W trailers Grading of lot to commence in this month Project will address storm run off issues with bio swales Site to be converted to a parking lot Estimated project completion Summer 2011.
LAC W Trailers Demo - Measure E 2008LAC W Trailers Demo - Measure E 2008
Current Construction ProjectsPCC MDAB PCC MDAB
(Multi-Disciplinary Academic Building)(Multi-Disciplinary Academic Building)Measure E 2002 and 2008Measure E 2002 and 2008
11
MDAB building remodel project Phase 1 of 2 currently under construction Project currently in demolition and structural reinforcement Phase 1 Project to be completed Summer 2012
Current Construction ProjectsDistrict Wide – Monument SignsDistrict Wide – Monument Signs
Measure E 2008Measure E 2008
12
District Wide Monument Signs. Locations:
LAC-Clark/Conant – completed January 8, 2011 PCC-20th/Walnut Ave. – Completed March 30, 2011
Installation of building designators for LAC Bldg. O1 and O2 completed
Estimated construction completion Spring 2011.
LAC Bldg. Designator LAC Monument SignPCC Monument Sign
Upcoming Construction ProjectsPCC Building CC Retrofit - Measure E 2008PCC Building CC Retrofit - Measure E 2008
13
Houses the Fitness Center, Gymnasium, Weight Room, and Faculty and Staff Offices
Swing space located on PCC Campus (Bldg. GG) Approved by DSA on 1/27/11. Currently in bid process To be completed concurrently with MDAB project phase 1 Anticipated end of construction 2012
l i b
e r
a l
a r
t s
Liberal Arts CampusSite Plan
p a
c i f
i c
c
o a
s t
Pacific Coast CampusSite Plan
QUESTIONS&
ANSWERS