Bond Construction Update
Citizens Oversight Committee
Long Beach Community College District August 8, 2011
EDUCATE ENGAGE EMPOWER 1
Agenda Completed Construction Projects
LAC South Walkway Extension LAC Infrastructure Improvements Project and District Wide –
Energy Efficiency Project
Current Construction Projects LAC Building A – Student Services Retrofit LAC Building I (Bookstore) LAC W Trailers Demo LAC Master Landscape PCC MDAB (Multi-Disciplinary Academic Building) PCC Tech 1 (Sheet Metal)
Upcoming Construction Projects LAC Stadium Parking Lot Lights and Stadium Lights PCC Building CC Retrofit LAC Math Technology Building PCC Building GG LAC Building C Retrofit
Q & A
2
Completed Construction ProjectsLAC South Walkway Extension
Measure E 2008
3
Project complete Palm trees to be replaced August 2011 Continues Master Plan pedestrian corridor
4
LAC Infrastructure Improvement Project and District Wide Energy Efficiency Project Measure E 2008
Completed Construction Projects
Total annual estimated savings of 1.5 mil. Kwh Project started Fall 2009; currently hydro seeding all
affected areas(All phases) Majority of existing building HVAC systems to be
upgraded and connected to the Central Plant Buildings B,C,D,E,G, & H are connected
Exterior lighting and controls upgrades All parking lots north of Lew Davis are on new system
New Reclaimed Water tie-ins to irrigation connected New gas lines installed for Buildings B, C, D, E, G, H,
J, M, N, and P New domestic lines installed for Buildings B, C, D, E,
F, G, H, I Trailers, J, K,L, M, N, P Construction completed Summer 2011
Current Construction ProjectsLAC Building A – Student Services Retrofit
Measure E 2008
5
New home for A&R, Counseling, Health Services, Cashier, Transfer Center
Project currently in structural upgrade End of construction anticipated Summer 2012
Current Construction Projects
6
Adds additional 4,000 square feet to existing building Architecture to match LAC Mediterranean Theme Work on framing and utilities underway End of Construction anticipated Fall 2011
LAC Building I - Measure E 2008
Current Construction Projects
7
Grading of lot and paving to be completed this month
Project will address storm run off issues with bio swales
Site to be converted to a parking lot Estimated project completion Summer 2011
LAC W Trailers Demo - Measure E 2008
Current Construction Projects
8
Currently in Design Phase(Finalizing design) Plans to be submitted to DSA in August Quad areas North and South of Bldg. A will bid Fall 2011 Remaining areas designed at 25% Scope includes new hardscape/landscape and pedestrian
pathways
LAC Master Landscape - Measure E 2008
Current Construction ProjectsPCC MDAB
(Multi-Disciplinary Academic Building)Measure E 2008
9
MDAB building remodel project Phase 1 of 2 currently under construction Project currently in demolition and structural reinforcement Phase 1 Project to be completed Summer 2012
Current Construction Projects
10
Construction started Summer 2011 Equipment and utilities currently being installed Projected to be completed before start of Fall semester 2011
PCC Tech 1 (Sheet Metal) - Measure E 2008
11
Stadium Parking Lot Lights and Stadium Lighting Measure E 2008
Upcoming Construction Projects
Stadium parking lot lights and Stadium lighting retrofit Awaiting final DSA approval
Estimated start of construction Fall 2011
Upcoming Construction ProjectsPCC Building CC Retrofit - Measure E 2008
12
Houses the Fitness Center, Gymnasium, Weight Room, and Faculty and Staff Offices
Swing space located on PCC Campus (Bldg. GG) Approved by DSA on 1/27/11. Currently in bid process To be completed concurrently with MDAB project phase 1 Anticipated end of construction Fall 2012
Upcoming Construction Projects
Will house Math and Culinary Arts instructional program as well as Reprographics
Design Build delivery method Currently Requesting Qualifications (RFQ)
Due 8/3 Shortlist and interview 5 respondents (TBD)
Select 3 and request for proposals Anticipated start of construction 2013
LAC Math Technology Building – Measure E 2008
13
Upcoming Construction ProjectsPCC Building GG - Measure E 2008
14
Design Build delivery method Request for Qualifications (RFQ)
Start in September and due late October Building to house Health Services, EOPS, DSPS, Financial Aid, Cashier, A&R, and
Counseling Estimated start of construction December 2013
Upcoming Construction ProjectsLAC Building C Retrofit - Measure E 2008
15
Hired Architect to do design work Currently in schematic phase Work includes modernization of structure, classrooms spaces, and
office areas
l i b
e r
a l
a r t
s
Liberal Arts CampusSite Plan
p a
c i f
i c
c o
a s
t
Pacific Coast CampusSite Plan
QUESTIONS&
ANSWERS