BOC Strategic Meeting Presentation 2010

39
Managing Complexity of Managing Complexity of Process Process Changes Changes By Christine Schmetz By Christine Schmetz Quality System Services Manager Quality System Services Manager

Transcript of BOC Strategic Meeting Presentation 2010

Page 1: BOC Strategic Meeting Presentation 2010

Managing Complexity of Managing Complexity of Process Process ChangesChangesBy Christine SchmetzBy Christine Schmetz

Quality System Services ManagerQuality System Services Manager

Page 2: BOC Strategic Meeting Presentation 2010

1- Introduction

1.1 Emerson – Emerson Climate Technologies

1.2 Products & Manufacturing Processes

1.3 Mapping Manufacturing Processes

Table of ContentsTable of ContentsTable of ContentsTable of Contents

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 2

2- Complexity of Process Changes

2.1 Short Term Changes – Versions / Status

2.2 Long Term Changes – Variants / Target State

3- Outlook: Issues to be solved…

Page 3: BOC Strategic Meeting Presentation 2010

11--1 About Emerson 1 About Emerson

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 3

A diversified technology company with

US$ 20.9B of sales worldwide in FY 09.

Page 4: BOC Strategic Meeting Presentation 2010

11--1 About Emerson 1 About Emerson

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 4

129,000 employees 250 manufacturing locations worldwide –

165 located outside the United States.

Page 5: BOC Strategic Meeting Presentation 2010

1-1 About Emerson Structure

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 5

55

Europe USA Asia

Process Management

Appliances & Tools

IndustrialAutomation

NetworkPower

5 Financial Segments

of Emerson

Page 6: BOC Strategic Meeting Presentation 2010

• Supermarkets

• Restaurants• Pharmaceutical industry• Air driers• Milk cooling• Industrial process cooling

• Chillers • Rooftop systems• Commercial and Light Commercial Heat Pumps

• Self-contained systems• Water coolers

11--1 Emerson Climate Technologies 1 Emerson Climate Technologies -- Products Products & Markets& Markets11--1 Emerson Climate Technologies 1 Emerson Climate Technologies -- Products Products & Markets& Markets

REFRIGERATIONREFRIGERATIONCOMMERCIAL COMFORTCOMMERCIAL COMFORT

• Chillers • Rooftop systems• Commercial and Light Commercial Heat Pumps

• Self-contained systems• Water coolers

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 6

Air Conditioning and Heat

Pumps for residential

applications

• Trailers and commercial distribution trucks• Trains and busses• Sea containers

RESIDENTIAL COMFORTRESIDENTIAL COMFORT

TRANSPORTATIONTRANSPORTATION

Heating, Ventilation, Air Conditioning and Refrigeration solutions for residential, industrial and commercial applications.

•Air Conditioning and

Heat Pumps for

residential applications

• Trailers and commercial distribution trucks• Trains and busses• Sea containers

Page 7: BOC Strategic Meeting Presentation 2010

11--1 Emerson 1 Emerson Climate Technologies Products ManufacturingClimate Technologies Products Manufacturing11--1 Emerson 1 Emerson Climate Technologies Products ManufacturingClimate Technologies Products Manufacturing

Welkenraedt, Belgium

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 7

NORTH AMERICA:

� Brantford, Ontario (Canada)

� Sidney, Ohio (4)

� Hartselle, Alabama

� Natchitoches, Louisiana

� Ava, Missouri

� Lebanon, Missouri

� Rushville, Indiana

� Reynosa, Mexico

� Guadalajara, Mexico

EUROPE:

� Cookstown, Northern Ireland

� Welkenraedt, Belgium

� Mikulov, Czech Republic

� Kolín, Czech Republic (Alco)

� Pieve d´Alpago, Italy (Dixell)

ASIA:

� Suzhou, China

� Shenyang, China

� Karad, India

� Atit, India

� Rayong, Thailand

� Dubai, UAE

Page 8: BOC Strategic Meeting Presentation 2010

11--1 About our1 About our Manufacturing Manufacturing Location Location in Belgium.in Belgium.11--1 About our1 About our Manufacturing Manufacturing Location Location in Belgium.in Belgium.

� Biggest Manufacturinglocation in Europe

� +/- 500 Employees

� Max. capacity :250.000 compressors

� Machining and Assembly

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 8

� Machining and AssemblyProcesses.

Page 9: BOC Strategic Meeting Presentation 2010

1- Introduction

1.1 Emerson – Emerson Climate Technologies

1.2 Products & Manufacturing Processes

1.3 Mapping Manufacturing Processes

Table of ContentsTable of ContentsTable of ContentsTable of Contents

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 9

2- Complexity of Process Changes

2.1 Short Term Changes – Versions / Status

2.2 Long Term Changes – Variants / Target State

3- Outlook: Issues to be solved…

Page 10: BOC Strategic Meeting Presentation 2010

11--2 About 2 About our Productsour Products11--2 About 2 About our Productsour Products

3 Product Families

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 10

SUMMIT 7.5-15Hp

SPECTER7.5-15Hp

LCS 20-40Hp

Page 11: BOC Strategic Meeting Presentation 2010

11--2 About 2 About our our Machining & Assembly ProcessesMachining & Assembly Processes11--2 About 2 About our our Machining & Assembly ProcessesMachining & Assembly Processes

1 Machining area – 2 Zones (Turning & Milling)

Turning

Milling

2 Main Assembly Lines - 3 Product Families–

Merging into 1 for the Final Process

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 11

LCS / SPECT

ER

LSH

DS

Summit Ass.

Specter /LCS Ass. Final Test

Pack.

Painting

Page 12: BOC Strategic Meeting Presentation 2010

1- Introduction

1.1 Emerson – Emerson Climate Technologies

1.2 Products & Manufacturing Processes

1.3 Mapping Manufacturing Processes

Table of ContentsTable of ContentsTable of ContentsTable of Contents

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 12

2- Complexity of Process Changes

2.1 Short Term Changes – Versions / Status

2.2 Long Term Changes – Variants / Target State

3- Outlook: Issues to be solved…

Page 13: BOC Strategic Meeting Presentation 2010

11--3 Adonis 3 Adonis as as ourour central central ProcessProcess ModellingModelling PlatformPlatform

40 Main Processes65 Sub Processes

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 13

PRODUCTION PROCESS FLOWADMINISTRATIVE PROCESSES

3 Assembly LinesMachining Area

Page 14: BOC Strategic Meeting Presentation 2010

11--3 Mapping Manufacturing Processes 3 Mapping Manufacturing Processes –– Why ?Why ?11--3 Mapping Manufacturing Processes 3 Mapping Manufacturing Processes –– Why ?Why ?

Innovation :

Quick Respond to Market Needs and Trends

=> Introduction of new Products on existing lines

Customer Orientation :

Professional way to communicate with customers / auditors about

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 14

Professional way to communicate with customers / auditors about control plan, process flow, changes made on process….

Productivity :

Continuous Rebalancing of the line to increase Productivity(automation of operation, new equipment, move operation…).

Page 15: BOC Strategic Meeting Presentation 2010

11--3 Mapping Manufacturing Processes 3 Mapping Manufacturing Processes –– Why ?Why ?11--3 Mapping Manufacturing Processes 3 Mapping Manufacturing Processes –– Why ?Why ?

Quality :

Ensure Flexibility and Continuous Improvement of the Control Plan :

1- Increase / Decrease control frequency :

- Justified by problems encountered,

- By equipment capability,

- FMEA risk analysis

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 15

- FMEA risk analysis

2- Add / Suppress Control

3- Change Ownership of Controls

Demand Driven :

Ensure efficient training of new operators (peak season)

Ensure flexibility of operators on the line (ability to work on variousworkstations)

Page 16: BOC Strategic Meeting Presentation 2010

11--3 3 ManufacturingManufacturing ProcessesProcesses -- SpecificitiesSpecificities

- Many Product variations on same Assembly Line.

-1 Model per Manufacturing Process (including various products)

LCS

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 16

Page 17: BOC Strategic Meeting Presentation 2010

11--3 3 ManufacturingManufacturing ProcessesProcesses -- SpecificitiesSpecificities

Work-, Control-, Checking-, Mastering Operations

Work Op.

Control Op.

Unique ID N°

Color Codes

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 17

Control Op.

Checking Op.

Mastering Op.

Page 18: BOC Strategic Meeting Presentation 2010

11--3 Link 3 Link between Operation and Controlsbetween Operation and Controls11--3 Link 3 Link between Operation and Controlsbetween Operation and Controls

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 18

Automatic Link to the related Control Operations

Page 19: BOC Strategic Meeting Presentation 2010

11--3 Key Figures3 Key Figures

3 Assembly Lines Machining Area

84 Workstations 23 Workstations

230 Work Operations 78 Work Operations - 232 Sub Op.

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 19

230 Work Operations 78 Work Operations - 232 Sub Op.

214 Control Operations 587 Control Operations

65 Checking Operations 52 Checking Operations

125 Equipements 60 Equipements

600 Documents 350 Documents

Page 20: BOC Strategic Meeting Presentation 2010

11--3 Elements linked to an Operation3 Elements linked to an Operation11--3 Elements linked to an Operation3 Elements linked to an Operation

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 20

Page 21: BOC Strategic Meeting Presentation 2010

1- Introduction

1.1 Emerson – Emerson Climate Technologies

1.2 Products & Manufacturing Processes

1.3 Mapping Manufacturing Processes

Table of ContentsTable of ContentsTable of ContentsTable of Contents

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 21

2- Complexity of Process Changes

2.1 Short Term Changes – Versions / Status

2.2 Long Term Changes – Variants / Target State

3- Outlook: Issues to be solved…

Page 22: BOC Strategic Meeting Presentation 2010

2. Different Types of Changes2. Different Types of Changes2. Different Types of Changes2. Different Types of Changes

Keep processes up too date

« Daily changes » - Short Term – Versions / Status

Current model is being updated to reflect short-term changes

Versus

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 22

Integrate new product, new cell…

« Major change » - Long Term - Variants

Daily Changes must be integrated on a regular basis on the model +

the model serves as basis for the implementation of major mid- or long termchanges.

Page 23: BOC Strategic Meeting Presentation 2010

22--1 „Daily Changes“ 1 „Daily Changes“ –– Key FiguresKey Figures22--1 „Daily Changes“ 1 „Daily Changes“ –– Key FiguresKey Figures

Ca. 400 Changes / year

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 23

Ca. 250 Changes / year

Page 24: BOC Strategic Meeting Presentation 2010

22--1 „Daily Changes“ 1 „Daily Changes“ –– Key DriversKey Drivers22--1 „Daily Changes“ 1 „Daily Changes“ –– Key DriversKey Drivers

Control plan (control frequency, add/suppress….)

Operations (line rebalancing => reallocate operations & operationcontent)

Suppress / Add machining sub operations

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 24

Introduction of new tooling, equipement,…

=> Communication, Reactivity, Integration and Traceability

Page 25: BOC Strategic Meeting Presentation 2010

22--1 „Daily Changes“ 1 „Daily Changes“ -- Get InformationGet Information22--1 „Daily Changes“ 1 „Daily Changes“ -- Get InformationGet Information

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 25

Page 26: BOC Strategic Meeting Presentation 2010

22--1 „Daily Changes“ 1 „Daily Changes“ -- Prepare Change ImplementationPrepare Change Implementation22--1 „Daily Changes“ 1 „Daily Changes“ -- Prepare Change ImplementationPrepare Change Implementation

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 26

-Increment Version of current model - « Save as » in the DRAFT Folder (move ref.)-

-Change Status in « DRAFT »

Page 27: BOC Strategic Meeting Presentation 2010

22--1 „Daily Changes“ 1 „Daily Changes“ -- Implement ChangesImplement Changes22--1 „Daily Changes“ 1 „Daily Changes“ -- Implement ChangesImplement Changes

-Identify Impact of Changes

-Search

-Object references

-Related Controls

-….

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 27

-….

Page 28: BOC Strategic Meeting Presentation 2010

22--1 „Daily Changes“ 1 „Daily Changes“ -- Implement ChangesImplement Changes22--1 „Daily Changes“ 1 „Daily Changes“ -- Implement ChangesImplement Changes

- Implement Changes on process flow and related elements :

-Documentation

-SOEs

-Equipment => EQM software

-Control Plan

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 28

Page 29: BOC Strategic Meeting Presentation 2010

22--1 „Daily Changes“ 1 „Daily Changes“ -- Implement ChangesImplement Changes22--1 „Daily Changes“ 1 „Daily Changes“ -- Implement ChangesImplement Changes

- Track changes in History

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 29

Page 30: BOC Strategic Meeting Presentation 2010

22--1 „Daily Changes“ 1 „Daily Changes“ -- ApproveApprove22--1 „Daily Changes“ 1 „Daily Changes“ -- ApproveApprove

- Publish DRAFT Model in HTML

-- Send approval mail (votting buttons) and get « Approve » or « Comments »

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 30

Page 31: BOC Strategic Meeting Presentation 2010

22--1 „Daily Changes“ 1 „Daily Changes“ -- PublishPublish22--1 „Daily Changes“ 1 „Daily Changes“ -- PublishPublish

- Change status of current model in « Archived »

- Drag current model in folder ARCHIVED – ADL export on server

- Change status of draft model in « Released »

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 31

- Change status of draft model in « Released »

- Drag in folder RELEASED

- Inform users per e-mail of new version (+ change history)

Page 32: BOC Strategic Meeting Presentation 2010

22--2 Major Changes2 Major Changes22--2 Major Changes2 Major Changes

Introduction of a new product on existing Assembly Line (ex. REF Summit)

⇒Existing process as a basis :

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 32

⇒ to assess required investments and changes

⇒ to develop control plan

⇒ to establish or review documentation…

Page 33: BOC Strategic Meeting Presentation 2010

22--2 Major Changes 2 Major Changes –– Current situationCurrent situation22--2 Major Changes 2 Major Changes –– Current situationCurrent situation

Changes related to the new « product » are :

- Integrated in the current model – Red Agregation.

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 33

Page 34: BOC Strategic Meeting Presentation 2010

22--2 Major Changes 2 Major Changes –– Current situationCurrent situation22--2 Major Changes 2 Major Changes –– Current situationCurrent situation

New product is added in the product model.

-New product is added in the new / existing operations.

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 34

Page 35: BOC Strategic Meeting Presentation 2010

22--2 Major Changes 2 Major Changes –– Current situationCurrent situation22--2 Major Changes 2 Major Changes –– Current situationCurrent situation

By clicking on the new

Product in the product model,

Point at operations referring

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 35

Point at operations referring

To this new product.

Page 36: BOC Strategic Meeting Presentation 2010

22--2 Major Changes 2 Major Changes –– Current situationCurrent situation22--2 Major Changes 2 Major Changes –– Current situationCurrent situation

- Red Agregations will dissapear when new product is released.

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 36

Page 37: BOC Strategic Meeting Presentation 2010

1- Introduction

1.1 Emerson – Emerson Climate Technologies

1.2 Products & Manufacturing Processes

1.3 Mapping Manufacturing Processes

Table of ContentsTable of ContentsTable of ContentsTable of Contents

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 37

2- Complexity of Process Changes

2.1 Short Term Changes – Versions / Status

2.2 Long Term Changes – Variants / Target State

3- Challenge: Issues to be solved…

Page 38: BOC Strategic Meeting Presentation 2010

3. Challenges3. Challenges3. Challenges3. Challenges

2 (or more) models being updated in parallel :

-To reflect short term changes.

-To assess / prepare new product implementation.

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 38

-SYNCHRONIZATION….

Page 39: BOC Strategic Meeting Presentation 2010

Thank You For Your Attention ! Thank You For Your Attention !

[email protected]

BOC Strategic Meeting Sept 10 – Managing Complexity of Process Changes Page 39