National Aeronautics and Space Administration
Bob Cabana, Director
Kennedy Space Center
![Page 2: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/2.jpg)
![Page 3: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/3.jpg)
Premier Multi-User Spaceport
![Page 4: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/4.jpg)
KSC Programs and Projects
Commercial Crew Program Launch Services Program
Exploration Research & Technology
Programs
Exploration Ground Systems
Gateway — A spaceport for human and
robotic exploration to the Moon and beyond
![Page 5: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/5.jpg)
2019 KSC Key Milestones
o March 2 SpaceX Demo-1 LC 39A
o June 27 Mobile Launcher rolls testing to SLC 39B
o July 2 Orion Launch Abort System Test SLC-46
o October 10 ICON Mission CCAFS
o November 4 Boeing Pad Abort Test White Sands
Remaining Milestones Planned in 2019
Boeing Orbital Flight Test – Target date mid December
SpaceX In-Flight Abort Test – Target date early December
Gateway Logistics Contract Award
![Page 6: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/6.jpg)
2020 KSC Key Milestones
Orion Mass Simulator on dock KSC - 1/24/20
SpaceX Demo-2
Boeing Crewed Flight Test
Solar Orbiter – 2/5/20
SLS Boosters arrive and processing begins - 3/18/20
Orion turnover to EGS - 5/16/20
MARS 2020 -7/17/20
Sentinel 6A - 11/15/20
Landsat-9 – 12/15/20
![Page 7: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/7.jpg)
National Aeronautics and Space Administration7
![Page 8: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/8.jpg)
![Page 9: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/9.jpg)
![Page 10: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/10.jpg)
SpaceX Demo-1March 2, 2019
![Page 11: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/11.jpg)
Boeing Hotfire & Parachute TestsMay 22, 2019
![Page 12: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/12.jpg)
![Page 13: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/13.jpg)
![Page 14: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/14.jpg)
![Page 15: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/15.jpg)
![Page 16: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/16.jpg)
![Page 17: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/17.jpg)
National Aeronautics and Space AdministrationNational Aeronautics and Space Administration
![Page 18: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/18.jpg)
![Page 19: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/19.jpg)
NASA Internal Use Only Do Not Distribute
Space Technology for
2024 and Beyond
18
Cryofluid
Management
High
Performance
Spaceflight
Computing Solar
Electric
Propulsion
Precision
Landing
Surface
Excavation/Construction
Extreme Access
Lunar Dust
Mitigation
Extreme Environments
In Situ
Resource
Utilization
Lunar Surface
Power
Lunar Surface Innovation Initiative
![Page 20: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/20.jpg)
EGS Striving Toward Launch of Artemis I
![Page 21: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/21.jpg)
NASA Internal Use Only Do Not Distribute
National Aeronautics and Space Administration
NASA Internal Use Only Do Not Distribute32
2 fe
et
Roc
ket B
oost
er
Eng
ine
SLS Block 1
Orio
n
Core Stage
Intertank
Liquid oxygen
130
feet
Crew Access Arm
274 feet
Mobile Launcher
380 feet
Artemis I
![Page 22: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/22.jpg)
Vehicle AssemblyBuilding
![Page 23: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/23.jpg)
MobileLauncher
380 feet
• 10.5 million lbs.
• Tower about 355 ft. tall
![Page 24: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/24.jpg)
![Page 25: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/25.jpg)
Launch Pad39B
![Page 26: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/26.jpg)
Landing and Recovery
Orion Test Article
U.S. Navy
![Page 27: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/27.jpg)
Orion Ascent Abort-2 Flight TestJuly 2, 2019
![Page 28: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/28.jpg)
Firing Rooms and Launch Control
![Page 29: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/29.jpg)
SLS Core Stage Pathfinder
October 15-16, 2019
![Page 30: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/30.jpg)
2019 2020
Gateway LogisticsCommercial Crew
Program
Commercial
Resupply Services
Providing Advisory Services
Venture Class
Launch Services
ICON
Ionospheric Connection Explorer Mars 2020
Sentinel 6A(Jason-CS) Landsat-9Solar Orbiter
Launch Services Program Manifest
![Page 31: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/31.jpg)
Ionospheric Connection Explorer (ICON) October 10, 2019
![Page 32: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/32.jpg)
Exploration Research and Technology Programs
![Page 33: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/33.jpg)
Exploration Research and Technology - 2019 Awards
NASA’s Technology Transfer Licensing Award
• KSC won with 18 patent licenses in FY18
• Patent licensing is one of the ways we transfer NASA technologies
to industry
FLC Interagency Partnership Award for Technology Transfer
• KSC is the only NASA center to win award in 2019
• The Autonomous Flight Termination System (AFTS) augments or
replaces the functions of the traditional human-in-the-loop system
• Allows multiple vehicles to be launched and tracked at the same
time
• AFTS transferred to 30+ commercial space companies and other
government organizations
![Page 34: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/34.jpg)
National Aeronautics and Space Administration
2019 2020 2021 2022 2023 2024
Exploration
Research &
Technology
International
Space Station
Commercial Crew
Launch Services
Lunar Gateway
Construction of
Facilities
KSC Roadmap – September 2019
CCHQ
Phase 1CCHQ
Phase 2 (2026)
CCF, LC-39B
LH2 UpgradesLC-39B
LN2 System
KSC Shoreline
Restoration
VAB Utility
Annex Upgrades
CCHQ
Solar PlantPHSF
Upgrades
Robotic Mining
Competition
Launch
Complex 48
DM-1 DM-2
OFT CFT
CM-1
PCM-1
SpaceX
Boeing
In-Flight
Abort Test
Pad Abort
Test
SpX-22
SpX-23
SpX-24NG-11 NG-12 NG-13 NG-14
SpX-17
SpX-18
SpX-19 SpX-21 NG-15HTV8
HTV9 HTV-X1 HTV-X2
CRS 2-14SpX-20
ML-2
DCRDesign/Build Contract Award
Roll to
LC-39BML-1
DCR
MPPF
DCR
SLS Artemis I
Block 1
Uncrewed
SLS Artemis II
Block 1
Crewed
SLS SM-1
Block 1
Cargo(Europa)
SLS Artemis III
Block 1B
Crewed
ML-1, VAB Modifications
Emergency Egress System
AA-2
CT-2
SAR
VAB, LC-39B
SAR
ML-1
Facilities
OPI
ML-2
MiniHab
Logistics-1
Human Lander System
Crewed Lunar Surface
Logistics Contract Award
Commercial Lunar
Payload Services
ICON
Solar Orbiter
IXPE
DART
SWOT
Lucy
GOES-T SPHEREx
Mars 2020
Sentinel 6A
Landsat 9 GOES-U
IMAP
JPSS-2
Psyche
PACE
Restore-L
Restore-L
Robotic spacecraft servicing
Mass Spectrometer
Observing Lunar OperationsOrbital Syngas/ Commodity
Augmentation Reactor
CM-4
PCM-4
CM-5
PCM-5
CM-2
PCM-2
CM-6
PCM-6
CM-3
PCM-3
SpX-25
SpX-26
CRS 2-12
CRS 2-13
VCLS-E
VCLS-L
Power/Propulsion Element
103 CoF Projects at >$1B value
~ 4 EGS launches
~ 5 Gateway launches
~ 17 LSP launches
~ 14 crewed launches
~ 22 ISS launches
~ 65 NASA launches, 10+ NASA launches/year
~ 7
+ la
un
ch v
ehic
le f
leet
s
~ 16 CCP launches
![Page 35: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/35.jpg)
KSC’s Economic
Impact
![Page 36: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/36.jpg)
![Page 37: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/37.jpg)
![Page 38: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/38.jpg)
ELaNa 25ADate: November 2, 2019
Mission: NG-12 – Antares II, Wallops Flight Facility, VA
7 CubeSat Missions scheduled to be deployed
SOCRATES – University of Minnesota, Minneapolis, Minnesota
SOCRATES will advance a Gamma Ray Incidence Detector (GRID) sensor from TRL 5 to 7. The sensor is being developed to make accurate positioning,
navigation and timing measurements for CubeSats.
![Page 39: Bob Cabana, Director Kennedy Space Center · Technology International Space Station Commercial Crew Launch Services Lunar Gateway Construction of Facilities KSC Roadmap –September](https://reader036.fdocuments.us/reader036/viewer/2022081409/6075eceb6dc2c631e60e7285/html5/thumbnails/39.jpg)
National Aeronautics and Space Administration39