Board of managers meeting packet february 22, 2014

23
Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District Regular Meeting of the Capitol Region Watershed District (CRWD) Board Of Managers, for Wednesday, February 19, 2014 6:00 p.m. at the office of the CRWD, 1410 Energy Park Drive, Suite 4, St. Paul, Minnesota. REGULAR MEETING AGENDA I. Call to Order of Regular Meeting (President Joe Collins) A) Attendance B) Review, Amendments and Approval of the Agenda II. Public Comment For Items not on the Agenda (Please observe a limit of three minutes per person.) III. Permit Applications and Program Updates (Permit Process: 1) Staff Review/Recommendation, 2) Applicant Response, 3) Public Comment, and 4) Board Discussion and Action.) A) Permit # 14-004 Hampden Park Stormwater Bank (Kelley) B) Permit Program/Rules Update (Kelley) IV. Special Reports A) Urban Roots Program Update, Tamara Downs Schwei B) Trout Brook Nature Sanctuary Update, Kathleen Anglo, St Paul Parks and Recreation V. Action Items A) AR: Approve Minutes of the February 5, 2014 Regular Meeting (Sylvander) B) AR: Approve Accounts Payable & Budget Update (Sylvander) VI. Unfinished Business A. FI: Highland Ravine (Eleria) VII. General Information A) Administrator’s Report B) Closed Session for Administrator Performance Evaluation VIII. Next Meetings A) Wednesday, February 26, 2014 Special Meeting Agenda Review B) Wednesday, March 5, 2014 CAC Meeting Review IX. Adjournment W:\04 Board of Managers\Agendas\2014\February 19, 2014 Agenda Regular Mtg.docx Materials Enclosed

description

 

Transcript of Board of managers meeting packet february 22, 2014

Page 1: Board of managers meeting packet february 22, 2014

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District

Regular Meeting of the Capitol Region Watershed District (CRWD) Board Of Managers, for Wednesday,

February 19, 2014 6:00 p.m. at the office of the CRWD, 1410 Energy Park Drive, Suite 4, St. Paul, Minnesota.

REGULAR MEETING AGENDA

I. Call to Order of Regular Meeting (President Joe Collins)

A) Attendance

B) Review, Amendments and Approval of the Agenda

II. Public Comment – For Items not on the Agenda (Please observe a limit of three minutes per person.)

III. Permit Applications and Program Updates (Permit Process: 1) Staff Review/Recommendation, 2) Applicant Response, 3) Public Comment, and 4)

Board Discussion and Action.)

A) Permit # 14-004 Hampden Park Stormwater Bank (Kelley)

B) Permit Program/Rules Update (Kelley)

IV. Special Reports – A) Urban Roots Program Update, Tamara Downs Schwei

B) Trout Brook Nature Sanctuary Update, Kathleen Anglo, St Paul Parks and

Recreation

V. Action Items

A) AR: Approve Minutes of the February 5, 2014 Regular Meeting (Sylvander)

B) AR: Approve Accounts Payable & Budget Update (Sylvander)

VI. Unfinished Business

A. FI: Highland Ravine (Eleria)

VII. General Information

A) Administrator’s Report

B) Closed Session for Administrator Performance Evaluation

VIII. Next Meetings

A) Wednesday, February 26, 2014 Special Meeting Agenda Review

B) Wednesday, March 5, 2014 CAC Meeting Review

IX. Adjournment

W:\04 Board of Managers\Agendas\2014\February 19, 2014 Agenda Regular Mtg.docx

Materials Enclosed

Page 2: Board of managers meeting packet february 22, 2014

Capitol Region Watershed District Permit Application 14-004 Hampden Park Volume Bank

Permit Report 14-004 February 19, 2014 Board Meeting

Applicant: Aaron Hass, PE Consultant: N/A Saint Paul Public Works 25 West Fourth Street (CHA 700) Saint Paul, MN 55102 Description: Construction of an Underground Stormwater Infiltration System in Hampden Park Stormwater Management: Volume Bank Project District Rule: C Disturbed Area: 0.44 Acres

PERMIT RECOMMENDATION: Approve with 4 Conditions 1. Provide plans signed by a professional engineer per the Minnesota Board of AELSLAGID. 2. Specify on construction plan that 60” HDPE shall be perforated. 3. Provide a note on the plan sheets indicating that construction equipment shall not be driven on the bottom of the system below the fine filter aggregate 4. Provide pretreatment of runoff coming from the 15” pipe into the infiltration system VOLUME BANK RECOMMENDATION: Approve 31,808 cubic feet of Volume Reduction Credits to the City of St. Paul. Final Credit Split between Parks and Publix Work to be Determined at a Later Date

Aerial Photo

Bayless

Raym

ond Ave

Permit Location

Page 3: Board of managers meeting packet february 22, 2014

W:\07 Programs\Permitting\2014\14-004 Hampden Park Underground\14-004 Permit_Report1.doc Page 1 of 4

Capitol Region Watershed District Permit Report

CRWD Permit #: 14-006 Review date: February 10, 2014 Project Name: Hampden Park Water Quality Improvements Applicant: City of St. Paul Purpose: Installation of underground infiltration system Location: Hampden Park, west of intersection of Raymond and Hampden

Avenues Applicable Rules: C, D, and F Recommendation: Approve with 4 Conditions EXHIBITS:

1. Construction Plan (6 sheets), by City of St. Paul, dated 1/15/14, recd. 1/30/14. 2. Letter to CRWD, by City of St. Paul, dated 1/30/14, recd. 1/30/14. 3. Drainage Area Map, by City of St. Paul, not dated, recd. 1/30/14. 4. HydroCAD report, by City of St. Paul, dated 1/28/14, recd. 1/30/14.

HISTORY & CONSIDERATIONS: None. RULE C: STORMWATER MANAGEMENT

Standards Proposed discharge rates for the 2-, 10-, and 100-year events shall not exceed

existing rates. Developments and redevelopments must reduce runoff volumes in the amount

equivalent to an inch of runoff from the impervious areas of the site. Stormwater must be pretreated before discharging to infiltration areas to

maintain the long-term viability of the infiltration area. Developments and redevelopments must incorporate effective non-point

source pollution reduction BMPs to achieve 90% total suspended solid removal.

Findings

Page 4: Board of managers meeting packet february 22, 2014

W:\07 Programs\Permitting\2014\14-004 Hampden Park Underground\14-004 Permit_Report1.doc Page 2 of 4

1. A hydrograph method based on sound hydrologic theory is used to analyze runoff for the design or analysis of flows and water levels.

2. Runoff rates for the proposed activity do not exceed existing runoff rates for the 2-, 10-, and 100-year critical storm events. Stormwater leaving the project area is discharged into a well-defined receiving channel or pipe and routed to a public drainage system.

3. Stormwater runoff volume retention is achieved onsite in the amount equivalent to the runoff generated from one inch of rainfall over the watershed impervious surfaces.

a. There is no impervious surface proposed by the project. b. Volume retention: Volume Retention Required (cu. ft.) Volume Retention Provided (cu. ft.)

0 31,808 (based on 2.0” rainfall over

impervious surface)

c. Banking of excess volume retention of 31,089 cubic feet is proposed. d. Infiltration volume and facility size has been calculated using the

appropriate hydrological soil group classification and design infiltration rate.

e. The infiltration area is capable of infiltrating the required volume within 48 hours.

f. Stormwater runoff is not pretreated to remove solids before discharging to infiltration areas.

4. Alternative compliance sequencing has not been requested. 5. Best management practices achieve 90% total suspended solids removal from

the runoff generated on an annual basis. 6. A memorandum of agreement for maintenance of stormwater facilities exists

between the City and the CRWD.

RULE D: FLOOD CONTROL Standards Compensatory storage shall be provided for fill placed within the 100-year

floodplain. All habitable buildings, roads, and parking structures on or adjacent to a

project site shall comply with District freeboard requirements. Findings 1. There is no floodplain on the property according to FEMA. 2. It is not known if all habitable buildings, roads, and parking structures on or

adjacent to the project site comply with CRWD freeboard requirements. However, sufficient conveyances have been provided to allow the storm sewer system to function as or better than it did prior to the project.

Page 5: Board of managers meeting packet february 22, 2014

W:\07 Programs\Permitting\2014\14-004 Hampden Park Underground\14-004 Permit_Report1.doc Page 3 of 4

RULE E: WETLAND MANAGEMENT Standard

Wetlands shall not be drained, filled (wholly or in part), excavated, or have sustaining hydrology impacted such that there will be a decrease in the inherent (existing) functions and values of the wetland.

A minimum buffer of 25 feet of permanent nonimpacted vegetative ground cover abutting and surrounding a wetland is required.

Findings 1. There are no known wetlands located on the property.

RULE F: EROSION AND SEDIMENT CONTROL

Standards A plan shall demonstrate that appropriate erosion and sediment control

measures protect downstream water bodies from the effects of a land-disturbing activity.

Erosion Control Plans must adhere to the MPCA Protecting Water Quality in Urban Areas Manual.

Findings 1. Erosion and sediment control measures are consistent with best management

practices, as demonstrated in the MPCA manual Protecting Water Quality in Urban Areas.

2. Adjacent properties are protected from sediment transport/deposition. 3. Wetlands, waterbodies and water conveyance systems are protected from

erosion/sediment transport/deposition. 4. Project site is not greater than 1 acre; an NPDES permit is not required.

RULE G: ILLICIT DISCHARGE AND CONNECTION

Standard Stormwater management and utility plans shall indicate all existing and

proposed connections from developed and undeveloped lands for all water that drains to the District MS4.

Findings 1. New direct connections or replacement of existing connections are not

proposed. 2. Prohibited discharges are not proposed.

RECOMMENDATION: Approve with 4 Conditions Conditions:

Page 6: Board of managers meeting packet february 22, 2014

W:\07 Programs\Permitting\2014\14-004 Hampden Park Underground\14-004 Permit_Report1.doc Page 4 of 4

1. Provide plans signed by a professional engineer per the Minnesota Board of AELSLAGID.

2. Specify on construction plan that 60” HDPE shall be perforated. 3. Provide a note on the plan sheets indicating that construction equipment shall not

be driven on the bottom of the system prior to placement of the fine filter aggregate.

4. Provide pretreatment of runoff coming from the 15” pipe into the infiltration system.

Page 7: Board of managers meeting packet february 22, 2014
Page 8: Board of managers meeting packet february 22, 2014

2/14/2014 Volume Banking CreditsAccount: Saint Paul Public Works

Transaction Requested Approved Permit Project Deposit Withdrawal Balance (cf)Deposit 4/4/2007 NA Chatsworth-Goodrich 10,532 10,532Withdrawal 4/4/2007 07-009 Davern 0 5,717 4,815Withdrawal 1/22/2008 08-001 Selby Avenue 0 3,790 1,025Deposit Pending 07-008 Hubbard-Griggs 9,386 10,411Withdrawal 8/20/2008 08-003 Seventh-Bay 0 8,278 2,133Withdrawal 8/20/2008 08-004 Ashland-Pascal 0 20,069 -17,936Deposit Pending 08-016 Payne Avenue 2,576 -15,360Withdrawal 3/18/2009 09-004 East Sixth Street 0 6,044 -21,404Deposit Pending 09-009 Victoria Street 1,991 -19,413Withdrawal 6/3/2009 09-011 Magnolia-Earl 0 18,356 -37,769Deposit Pending 09-017 Knapp-Ramond 2,338 -35,431Withdrawal 3/16/2010 5/5/2010 10-005 Seventh-Douglas 0 17,462 -52,893Withdrawal 4/14/2010 5/19/2010 10-011 Davern-Jefferson 0 39,308 -92,201Deposit 5/26/2010 Pending 10-014 Front-Victoria 14,791 -77,410Withdrawal 2/2/2011 2/2/2011 11-002 Fairview 18,034 -95,444Deposit 2/25/2011 Pending 11-004 Blair-Griggs 5,935 -89,509Withdrawal 2/25/2011 4/20/2011 11-005 Howell-Goodrich (revised 15,238 to Zero) 0 -89,509Withdrawal 2/25/2011 4/20/2011 11-006 Davern-Jefferson II 25,611 -115,120Deposit 9/7/2011 Pending 11-021 College Park 99,457 -15,663Transfer 10/14/2011 11/16/2011 09-031 Wells and Russell 116,436 100,773Deposit 11/16/2011 Pending 11-027 Hewitt-Tatum 4,067 104,840Deposit 1/4/2012 1/4/2012 NA St. Albans-Arundel Trenches 35,710 140,550Withdrawal 1/4/2012 Pending 11-030 Prior-Goodrich TBD 140,550Deposit 5/2/2012 Pending 12-004 Wheelock Parkway Bridge 391 140,941Deposit 9/19/2012 Pending 12-018 Hamline Library Pervious Alley 7,100 148,041Withdrawal 12/19/2012 12/19/2012 12-029 Arlington-Rice 28,035 120,006Withdrawal 2/6/2013 2/6/2013 13-001 Hatch-Agate 22,216 97,790Withdrawal 2/6/2013 2/6/2013 13-002 Hamline Avenue Bridge 6,697 91,093Deposit 5/15/2013 Pending 13-014 Trout Brook Nature Sanctuary 103,455 194,548Withdrawal 7/10/2013 7/10/2013 13-021 Jefferson-Griggs Bike Routes 5,881 188,667Withdrawal 9/18/2013 9/18/2013 13-018C Prince Street 7,303 187,245Deposit 2/19/2014 Pending 14-004 Hampden Park** 23,856 7,303 181,364** Estimated volume based on assumed 75/25 split with Parks 438,021 240,104 197,917

Page 9: Board of managers meeting packet february 22, 2014

2/14/2014 Volume Banking CreditsAccount: Saint Paul Parks Department

Transaction Requested Approved Permit Project Deposit Withdrawal Balance (cf)Deposit 8/8/2012 Pending 07-020 Polar Bear Exhibit 463 463Deposit 8/8/2012 Pending 08-023 Phalen-Arcade Trailhead 489 951Deposit 8/8/2012 Pending 10-020 Como Pool 6,643 7,594Deposit 8/2/2011 Pending 11-018 Gorilla Forest 2,846 10,440Excess Filtration 8/8/2012 Pending 11-023 Victoria Park 5,450* 10,440Deposit 8/8/2012 Pending 12-015 Crosby Park Parking Lot 3,505 13,945Deposit 5/15/2013 Pending 13-014 Trout Brook Nature Sanctuary 5,445 19,390Deposit 2/19/2014 Pending 14-004 Hampden Park** 7,952

27,342 0 27,342*Excess filtration capacity available for future direct drainage impervious** Estimated volume based on assumed 75/25 split with Public Works

Page 10: Board of managers meeting packet february 22, 2014

W:\07 Programs\Edu-Outreach\Board\2014 BMs\BM Urban Roots special report.docx

DATE: February 12, 2014

TO: CRWD Board of Managers

FROM: Elizabeth Beckman

RE: Special Report: Urban Roots program update

Background

Since 2008, CRWD has supported Community Design Center of Minnesota through a Partner

Grant for stipends for youth serving in the conservation corps program. Student participants

spend the summer installing and maintaining rain gardens and other environmental restoration

work.

Issues

Last year, Community Design Center of Minnesota changed its name to Urban Roots

(http://www.urbanrootsmn.org), and Executive Director Tamara Downs-Schwei will give a

2014 program update at the February 19 board meeting.

CRWD Board approved a 2014 Partner Grant of $12,000 to fund conservation corps youth

stipends. Corps members will spend time on several projects that have been supported by

CRWD in the past including the Gateway Rain Garden managed by Saint Paul Parks and

Recreation, the Maria-Bates rain garden adjacent to Swede Hollow Café and CRWD

Stewardship Grant projects on Saint Paul’s East Side.

Request Action

None requested.

February 19, 2014 Board

Meeting

Special Report: Urban Roots

program update

Page 11: Board of managers meeting packet february 22, 2014

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District

Regular Meeting of the Capitol Region Watershed District (CRWD) Board of Managers, for Wednesday,

February 5, 2014 6:05 p.m. at the office of the CRWD, 1410 Energy Park Drive, Suite 4, St. Paul, Minnesota.

REGULAR MEETING

I. Call to Order of Regular Meeting (President Joe Collins)

A) Attendance

Joe Collins

Shirley Reider

Seitu Jones

Mary Texer

Mike Thienes, absent

w/notice

Others Present

Mark Doneux, CRWD

Michelle Sylvander, CRWD

Forrest Kelley, CRWD

Nate Zwonitzer, CRWD

Bob Fossum, CRWD

Gustavo Castro, CRWD

Jim Mogen, Ramsey County

Attorney’s Office

Public Attendees Charlene Harper, Geosyntec

Consultants

Rich Hackamen, Dellwood

Gardens

Sia Lo, Dellwood Gardens

Joe Hughes, CB Richard Ellis

B) Review, Amendments and Approval of the Agenda

President Collins asked for additions or changes to the agenda. No changes were requested.

Motion 14-017: Approve the February 5, 2014 Agenda.

Texer/Jones

Unanimously approved

II. Public Comments – For Items not on the Agenda

There were no public comments.

III. Permit Applications and Program Updates

A) Board discussion – Delegation of Erosion Control Permits (Kelley)

Mr. Kelley reviewed that currently all permits are approved by the Board of Managers prior to being issued for

work to commence. Erosion control permits generally require less review time, and in most cases consist of

straightforward Stormwater Pollution Prevention Plans identifying locations of silt fence, and inlet protection

devices. Occasionally, contractors or land owners are not aware of the requirement to obtain CRWD Erosion

Control permits for demolition projects, or grading work must occur before stormwater management solutions

are determined. The ability for staff to review and approve Erosion Control Permits would reduce the time

between plan submittal and the permit being issued. This would also reduce staff time preparing Board Packet

materials. Staff suggests that complex or politically controversial projects that require a higher level of review

February 19, 2014 Board Meeting

V. Action Item A) Approve Minutes

of February 5, 2014

DRAFT Regular Board Meeting

(Sylvander)

Page 12: Board of managers meeting packet february 22, 2014

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District

still be brought to the Board of Managers for approval, and permits issued during the period between Meetings

would be presented as regular updates.

Motion 14-018: Delegate the Authority to Approve and Issue Erosion and Sediment Control Permits

Determined to be in Compliance with CRWD Rule F to Staff.

Texer/Reider

Unanimously approved

B) Permit Program/Rules Update (Kelley)

Mr. Kelley gave an update on the permit program. Mr. Kelley will be organizing the next TAC meeting in late

February.

IV. Special Reports.

A) High Performance Green Infrastructure: Distributed Real-time Monitoring and Control, Charlene

Harper, Geosyntec Consultants

Ms. Charlene Harper, Sr. Engineer with Geosyntec was in attendance to share information about a high

performance green infrastructure with real-time monitoring and control. The system that Ms. Harper reviewed is

designed to empty storage tanks when an expected rainfall is at 70%. This system uses NOAA weather

predictions to determine timing and how much water should be discharged to maximize rainwater capture

during a storm (flood protection). The storage tanks will empty prior to a rainfall and prevent erosion and

flooding. The storage tanks refill again from the rainfall. The system is run on solar power with a battery

backup. The Board thanked Ms. Harper for her presentation.

B) Dellwood Gardens Rainwater Reuse Feasibility Study, Nate Zwonitzer, Charlene Harper and

Rich Pakonen

Mr. Zwonitzer introduced Mr. Pakonen and Mr. Sia Lo from Dellwood Gardens. Mr. Pakonen, the owner of the

building was in the process of renovating to create an assisted living facility that serves minority populations.

Mr. Pakonen has options to reduce building overhead costs and maximize services provided to residents. Mr.

Pakonen was curious about rainwater harvesting and reuse options. To learn more about rainwater harvesting

opportunities, CRWD contracted with Geosyntec Consultants to complete a feasibility study for the property.

Ms. Charlene Harper reviewed a feasibility study identifing several options for harvesting rainwater from the

roof of Dellwood Gardens and using it for irrigation or a combination of irrigation and toilet flushing. It also

discusses challenges to the project including building infrastructure requirements and plumbing code. The

report describes the benefits provided by two reuse system types. First is a passive system with a valve that can

be opened or closed seasonally to slowly draw down the tank and provide storage space for the next rain event.

Cost is a major factor in reuse systems. Potable water is very inexpensive in Minnesota, and potable water

savings alone do not provide enough return on investment to justify reuse systems. CRWD will continue

working with Dellwood Gardens to explore funding options, and the project may be submitted for a future

round of Special Grants.

V. Action Items

A) AR: Approve Minutes of the January 22nd, 2013 Regular Meeting (Sylvander)

Page 13: Board of managers meeting packet february 22, 2014

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District

Motion 14-019: Approve Minutes of the January 22nd, 2013 Regular Meeting.

Jones/Texer

Unanimously approved

B) AR: Approve Request for Qualifications for Information Technology Services (Sylvander)

Ms. Sylvander reviewed that in 2013 CRWD entered into an agreement with All Covered, Inc. for Professional

IT Support. As part of the IT Support, All Covered was hired to assess and advise on equipment, provide

desktop support, maintain and manage computer systems. Staff have formed a Technology Committee to

review the needs of CRWD. Staff are requesting authorization to solicit qualifications from professional

vendors for Information Technology support services. The qualified vendor will enable CRWD to improve

information technology (IT) effectiveness, enhance its quality of services, stabilize its support cost, and improve

staff and organizational efficiency and ensure safe and reliable access to District electronic records and data.

Motion 14-020: Authorize staff to distribute Request for Qualifications for Information Technology Support

Services.

Texer/Reider

Unanimously approved

C) AR: Approve Request for Qualifications for Title Services (Eleria)

Ms. Eleria reviewed the Ownership and responsibility for the six-mile Trout Brook Storm Sewer Interceptor

(TBI) was transferred from Metropolitan Council to CRWD in 2006. Prior to completing transfer of ownership,

CRWD hired Sunde Surveying to conduct an assessment of TBI easements in 2004. Sunde mapped the existing

TBI easements and collected available easement documentation. During the easement assessment, several issues

were identified but these issues did not affect CRWD’s acquisition of TBI. The issues include TBI sections

without an easement, only 20-foot easements for sections of TBI when a 40-foot easement is desirable,

easement boundaries not matching the actual location of TBI, no recorded deed or other recorded

documentation of the easements, and all TBI easements in the name of previous owner, City of Saint Paul or

Metropolitan Council.

CRWD staff seeks to hire a title company or other qualified professional to conduct a comprehensive

identification and assessment of the issues and resolve them accordingly. Enclosed is a draft request for

qualifications (RFQ). CRWD staff anticipates distributing the RFQ to at least three title companies and has

received title company recommendations from Sunde Surveying and Barr Engineering. Because the scope of

the issues (number of parcels involved, issue type(s), etc.) is not fully understood at this time, it is difficult to

estimate a budget for this work. Interested firms will be evaluated on their proposed approach, tasks,

deliverables and staff hourly rates. Funding for this work would come from Project #320-14552.

Motion 14-021: Approve request for qualifications for TBI Easement Title Services Project and authorize

Administrator to distribute to title companies or other qualified professional.

Reider/Texer

Unanimously approved

D) AR: Approve Letter of Understanding with the Office of the State Auditor (Sylvander)

Page 14: Board of managers meeting packet february 22, 2014

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District

Ms. Sylvander reviewed that each year the District contracts the State of Minnesota – Office of the State

Auditor to conduct our annual audit. The District annually executes a Letter of Understanding with the Office

of the State Auditor. The audit will begin around March 1st and is expected to be completed in mid-April. The

results of the audit and copies of the financial statements are included in our annual report. Staff will request the

letter of understanding be reissued with President Joe Collins name.

Motion 14-022: Authorize Board President and Administrator to execute the Letter of Understanding for 2013

Audit Services with the Office of the State Auditor.

Texer/Reider

Unanimously approved

E) AR: Authorize Letter of Interest for Future Office Space (Doneux)

Administrator Doneux reviewed that at the January 8th

Board meeting, CRWD’s real estate consultants Michelle

McGuire and Joe Hughes from CB Richard Ellis presented the Districts the preliminary Needs Assessment as

well as a review of existing facilities. Michelle McGuire presented the findings of preliminary Market Analysis

including a financial analysis of three office facility options. Those options include build, buy and lease.

Michelle McGuire conducted a Board Workshop to further refine and clarify the Districts needs and priorities

for a future office space.

At the conclusion of the workshop it was agreed to conduct an office tour with the Board of Managers. The

tour was conducted on January 29th

and the Board viewed four potential office locations. As a result of that

tour, the Board may consider sending a non-binding letter of intent to agent for the 327 York Avenue property.

Joe Hughes of CB Richard Ellis drafted an example agreement to discuss and review. Administrator Doneux

requested a delay for action. The first action would be to have Attorney Mogan review the letter of intent. The

letter also includes an amount that the Board of Managers needs to review and discuss. Administrator Doneux

would like additional time to summarize comments from the staff tour.

Motion 14-023: To schedule a closed meeting on February 26th

for further consideration of the letter of

interest for 327 York Avenue.

Texer/Jones

Unanimously approved

VI. Unfinished Business

A. FI: Highland Ravine (Eleria)

Ms. Eleria provided an update on the Highland Ravine. A homeowners was held on February 3rd

. The meeting

included a review of the timeline with a final completion date. Ms. Eleria said the meeting went very well. The

neighbors who were in attendance had some very good questions. The Deer Park Association is currently

reviewing the access agreement.

B. FI: Curtiss Pond (Fossum).

Mr. Fossum reviewed changes to the final design plans from Houston Engineering. Mr. Fossum reviewed

changes that would increase the storage area. The design change will also reduce addition work required by the

City of Falcon Heights maintaining the holding tanks. Mr. Fossum will be meeting with the City of Falcon

Heights City Engineer to review these changes.

Page 15: Board of managers meeting packet february 22, 2014

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District

VII. General Information

A) Administrator’s Report

Administrator Approved or Executed Agreements

Amendment No. 1 to Consultant Services Agreement with Houston Engineering Inc. for the BMP database. To

extend deadline to March 31, 2014.

Stewardship Grant Agreement for 2 rain gardens at 1375 Juliet Avenue, Saint Paul - $1,000.00

Board Approved or Executed Agreements

Consultant Services Agreement with the U of MN for Analysis of CRWD water quality data (2005 – 2012) and

development of two reports – $24,683.

Partner Grant Agreement with Public Art Saint Paul for the involvement of an artist in the planning of the

Western Avenue street reconstruction - $3,000.

Partner Grant Agreement with Great River Greening for youth involvement during planting at Trout Brook

Nature Sanctuary and staffing for the Science Area Teen Network Program - $5,000.

Partner Grant Agreement with Lower Phalen Creek Project for cooperative maintenance planning of Gateway

and Maria Bates rain gardens and installation of an interpretive sign at Maria Bates - $5,500.

Partner Grant Agreement with MN Health Advocates (Frogtown Green) for focused outreach, cooperative

maintenance planning and installation of an interpretive sign at the Minnehaha Mall Rain Gardens. - $12,000.

Consultant Services Agreement with Century College for Confined Space and First Aid training - $6,265.

General updates including recent and upcoming meetings and events

Anna Eleria presented the Green Line Green Infrastructure Project at the MPCA Collection Systems Conference

on January 29, 2014.

Forrest Kelley presented the use of underground stormwater systems at the Stearns County Contractor

Workshop on January 30, 2014.

1.) Upcoming events and meetings

a) Next Board Meeting is Wednesday February 19, 2014 from 6:00 – 8:00 pm

b) Next CAC Meeting is Wednesday February 12, 2014 from 7:00-9:00 pm.

President Collins will be attending the February 12th

CAC meeting.

2.) Project Updates - there are no updates at this time.

VIII. Next Meeting

A) Wednesday, February 19, 2014 Meeting Agenda Review

B) Wednesday, February 12, 2014 CAC Meeting Review

IX. Adjournment

Page 16: Board of managers meeting packet february 22, 2014

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District

Motion 14-024: Adjournment of the February 5, 2014 Regular Board Meeting at 7:50 p.m.

Texer/Jones

Unanimously Approved

Respectfully submitted,

Michelle Sylvander

Page 17: Board of managers meeting packet february 22, 2014

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District.

DATE: February 13, 2014

TO: CRWD Board of Managers

FROM: Michelle Sylvander, Office Manager

RE: January 2014 Accounts Payable/Receivable and Administrative/Program Budget

Report

_________________________________________________________________________________

Background

Enclosed are the Accounts Payable/Receivable and the Administrative/Program Budget Reports for the

Month of January 2014.

Issues

Summary of Accounts Payable/Receivable Report: Accounts Payable $ 440,204.40

Accounts Receivable $ 480,489.70

Summary of Preliminary Budget Report:

Administrative Budget $ 54,377.21

Program Budget $ 60,505.74

Project Budget $ 8,476.72

Capital Improvement Budget $ 161,326.90

TOTAL $ 284,686.57

January 2014 Expenses $ 135,956.99

January 2014 Expenses paid on January 22, 2014with Dec. 2013 A/P $ 148,729.58

2014 Expenditures $ 284,686.57 *

Less 2014 Expenses pd with 2013 $- 148,729.58

2013 Expenditures $ 304,247.41

TOTAL $ 440,204.40

*This total includes the $148,729.58 2014 expenses paid in January with 2013 expenses.

Request Action

Approve January 2014 Accounts Payable/Receivable and December Budget Report and direct Treasurer

and Board President to endorse and disperse checks for these payments.

enc: January 2014 Accounts Payable/Receivable

January 2014 Preliminary Budget Report W:\02 Budget and Finance\Board Memos\Board Memos 2014\BD Memo AP Budget Report 2.13.2014.docx

February 19, 2014

Board Meeting

V. Action Items – B) Accounts

Payable & Budget Update

(Sylvander)

Page 18: Board of managers meeting packet february 22, 2014

CAPITOL REGION WATERSHED DISTRICT 2013 BUDGET REPORT REPORT DATE: 2/14/2014

OPERATIONS

Project/Program: 2014 Budget

2014 Budget

Transfers/

Amendments

2014 Amended

BudgetCurrent Month Expenditures YTD Expenditures

Balance of Budget

Remaining% of Budget Expended

ADMINISTRATION Administrative Budget 419,800.00 419,800.00 54,377.21 54,377.21 365,422.79 12.95%

200-Administration 80,081.00 80,081.00 - - 80,081.00 0.00%

201-Groundwater 7,950.00 7,950.00 0.00 0.00 7,950.00 0.00%

207-Rulemaking/Rule Revisions 28,650.00 28,650.00 27.62 27.62 28,622.38 0.10%

208-Permitting 177,482.00 177,482.00 9,862.22 9,862.22 167,619.78 5.56%

210-Stewardship Grants 210,152.00 210,152.00 17,347.41 17,347.41 192,804.59 8.25%

211-Monitoring and Data Collection 489,802.00 489,802.00 19,983.74 19,983.74 469,818.26 4.08%

220-Education/Outreach 224,530.00 224,530.00 8,284.21 8,284.21 216,245.79 3.69%

225-Technical Resources & Information Sharing 48,080.00 48,080.00 - 0.00 48,080.00 0.00%

228-Future Trends: Research & Positioning 98,000.00 98,000.00 - 0.00 98,000.00 0.00%

230-Geogrpahic Information Systems (GIS) 71,490.00 71,490.00 3,974.47 3,974.47 67,515.53 5.56%

240-Safety Program 28,140.00 28,140.00 1,026.07 1,026.07 27,113.93 3.65%

PROGRAM TOTAL 1,464,357.00 0.00 1,464,357.00 60,505.74 60,505.74 1,403,851.26 4.13%

300-Administration 39,169.00 39,169.00 0.00 0.00 39,169.00 0.00%

301-Shoreline & Streambank Maintenance 20,920.00 20,920.00 0.00 0.00 20,920.00 0.00%

305-Como Lake Subwatershed 185,594.00 185,594.00 17.27 17.27 185,576.73 0.01%

310-Lake McCarron's Subwatershed 30,000.00 30,000.00 - 0.00 30,000.00 0.00%

313-Loeb Lake Subwatershed 11,920.00 11,920.00 - 0.00 11,920.00 0.00%

315-Trout Brook Subwatershed 219,230.00 219,230.00 6,319.17 6,319.17 212,910.83 2.88%

317-Crosby Lake Subwatershed 11,920.00 11,920.00 0.00 0.00 11,920.00 0.00%

325-Wetland, Stream and Ecosystem Restoration-Planning 76,320.00 76,320.00 533.41 533.41 75,786.59 0.00%

330-Mississippi River Subwatershed 107,398.00 107,398.00 1,606.87 1,606.87 105,791.13 1.50%

PROJECTS TOTAL 702,471.00 0.00 702,471.00 8,476.72 8,476.72 693,994.28 1.21%

TOTAL OPERATIONS BUDGET $2,586,628.00 $0.00 $2,586,628.00 $123,359.67 $123,359.67 $2,463,268.33 4.77%

Capital Improvement Project 2014 Budget

2014 Budget

Transfers/

Amendments

2014 Amended

BudgetCurrent Month Expenditures YTD Expenditures

Balance of Budget

Remaining% of Budget Expended

401-Shoreline Restoration Fund 48,380.00 48,380.00 0.00 0.00 48,380.00 0.00%

405-Como BMP Fund 599,620.00 599,620.00 2,119.45 2,119.45 597,500.55 0.35%

410- Lake McCarron's BMP Fund 67,700.00 67,700.00 3,908.86 3,908.86 63,791.14 5.77%

415-Trout Brook BMP's 35,400.00 35,400.00 373.36 373.36 35,026.64 1.05%

417-Crosby Lake BMP 45,600.00 45,600.00 2,104.01 2,104.01 43,495.99 0.00%

425-Wetland, Stream and Ecosystem Restoration - Implementation 151,920.00 151,920.00 - 0.00 151,920.00 0.00%

430-Mississippi River Subwatersheds BMP's 76,520.00 76,520.00 12,026.74 12,026.74 64,493.26 0.00%

440-Special Projects and Grants 539,510.00 539,510.00 1,263.57 1,263.57 538,246.43 0.23%

490-Debt Services 372,000.00 372,000.00 139,530.91 139,530.91 232,469.09 37.51%

TOTAL CAPITAL IMPROVEMENT PROGRAM $1,936,650.00 $0.00 $1,936,650.00 $161,326.90 $161,326.90 $1,775,323.10 8.33%

Fund Balances Unaudited Fund

Balance @ 12/31/13

2014 Fund Balance

Transfers

Unaudited Fund

Balance @ 12/31/142014 YTD Revenue

Current Month

ExpendituresYTD Expenditures

Unaudited Fund Balance

@ 01/31/14

Operations 1,848,107.92 - 1,848,107.92 2,035.48 123,359.67 123,359.67 1,726,783.73

Capital Improvement 2,500,635.85 - 2,500,635.85 430,050.87 161,326.90 161,326.90 2,769,359.82

TOTAL FUND BALANCE: $4,348,743.77 $0.00 $4,348,743.77 $432,086.35 $284,686.57 $284,686.57 $4,496,143.55

PR

OG

RA

MS

PR

OJ

EC

TS

CA

PIT

AL

IM

PR

OV

EM

EN

TF

UN

D B

AL

AN

CE

S

Page 19: Board of managers meeting packet february 22, 2014

Report Date 2/19/14

Date Vendor Name Vendor Address Invoice # Description Amount Total Check # G/L Code G/L Description

01/28/14 Al's Coffee820 Decatur Ave. North

Golden Valley, MN 55427125646 Coffee $197.50 --- --- 101-14970-4210 Office Supplies

02/01/14 Al's Coffee820 Decatur Ave. North

Golden Valley, MN 5542732425 Oasis Filter Cooler $10.76 $208.26 15742 101-14970-4210 Office Supplies

01/02/14 All Covered

Dept. 33163

P.O. Box 33163

San Francisco, CA 94139-3163

591586 Monthly Service Fee $1,555.38 --- --- 101-14970-4610 Equipment Purchase/Rental/Lease

02/03/14 All Covered

Dept. 33163

P.O. Box 33163

San Francisco, CA 94139-3163

596112 Monthly Service Fee $1,557.38 $3,112.76 15743 101-14970-4610 Equipment Purchase/Rental/Lease

01/24/14 Barr Engineering4700 West 77th Street

Minneapolis MN 55435-480323621112.00-8 CCLRT Engineering Services $1,326.60 --- --- 330-14624-4470 Engineering Expense

01/24/14 Barr Engineering4700 West 77th Street

Minneapolis MN 55435-480323620944.05-36 TBI Engineering Services $1,792.00 --- --- 315-14550-4470 Engineering Expense

01/24/14 Barr Engineering4700 West 77th Street

Minneapolis MN 55435-480323620944.11-4 Farrington Drainage $4,457.00 --- --- 415-13818-4470 Engineering Expense

01/24/14 Barr Engineering4700 West 77th Street

Minneapolis MN 55435-480323620944.09-25 Trout Brook Realignment from I-35E to Cayuga $9,180.62 $16,756.22 15744 415-12815-4470 Engineering Expense

01/24/14 Ben MeadowsP.O. Box 5275

Janesville, WI 53547-52751019957199 Two way radio $157.59 --- --- 211-14200-4210 Office Supplies

01/10/14 Ben MeadowsP.O. Box 5275

Janesville, WI 53547-52751019937715 Saftey equipment $331.20 $488.79 15745 240-14396-4210 Office Supplies

01/13/14 Benefit Extras, Inc.P.O. Box 1815

Burnsville, MN 5533754117 Monthly Flex and Renewal Processing Fee $351.75 $351.75 15746 101-14970-4040 Employee Benefits

02/20/14 Bille Bus12215 3rd Street NE

Blaine, MN 55434CPE006 Educational Field trips $175.00 $175.00 15747 220-14275-4280 Training & Education

01/08/14 City of White Bear Lake4701 Highway 61

White Bear Lake, MN 551109164 Ramsey County 2014 GIS Fees $1,705.97 $1,705.97 15748 230-14370-4270 Miscellaneous Expense

02/01/14 c/o Cassidy Turley Midwest Inc

1400-1410 Energy Pk Dr Holdings LLC

4678 World Parkway Circle

St. Louis MO 63134

March Rent Office Rent - March $5,722.45 $5,722.45 15749 101-14970-4220 Office/District Facility Lease/Rent

01/24/14 Joe Collins1410 Energy Park Dr.

St. Paul, MN 551084th Quarter Expense Report 4th qtr. 2013 $1,472.36 $1,472.36 15750

101-13970-4000 $1050.00

101-13970-4010 $422.36Manager Per Diem/Expense

12/31/13 Mark Doneux1410 Energy Park Dr.

St. Paul, MN 55108Expense Report Expense Report 4th qtr. 2013 $91.61 --- --- 101-13970-4330 $91.61 Staff Expense

01/31/14 Mark Doneux1410 Energy Park Dr.

St. Paul, MN 55108Expense Report Expense Report Jan. 2014 $30.06 $121.67 15751 101-14970-4330 $30.06 Staff Expense

01/12/14 Dynamex2100 Old Highway 8 NW

New Brighton, MN 5511204/07/49 Delivery Service $50.66 $50.66 15752 101-14970-4300 Postage

12/11/13 EOR651 Hale Avenue North

Oakdale, MN 5512844-0054-13 Burns Avenue Raingarden $3,786.50 $3,786.50 15753 210-12142-4490 Scientific Analysis/Research

01/21/14 Ford Motor Credit Company, LLC

Municipal Finance

1 American Road, MD 7500

Dearborn, MI 48126

1145R01 2013 Ford Edge Lease $535.81 $535.81 15754

208-14000-4635 - 160.74 210-

14141-4635 - 160.74 220-

14275-4635 - 107.16 315-

14550-4635 - 107.15

Equipment Lease/Purchase

01/17/14 Freshwater Society2500 Shadywood Road

Excelsior, MN 55331Membership Steward Membership $250.00 $250.00 15755 220-14250-4280 Training & Education

01/24/14 Geosyntec900 Broken Sound Pkwy, Suite 200

Boca Raton, FL 33487-27751714018 Dellwood Gardens $7,717.00 $7,717.00 15756 210-13142-4430 Consultants

01/14/14 Great River Greening35 West Water Street, Suite 201

St. Paul, MN 55107Stewardship Grant Internship Grant Reimbursement $348.00 $348.00 15757 210-13143-4710 Grants/Costshare/Partner Funding

01/11/14 HDR Engineering, Inc.701 Xenia Avenue Sourth

Minneapolis, MN 55416405469-H Villa Park Wetland Restoration $275.23 $275.23 15758 410-12750-4470 Engineering Expense

01/08/14 Health Partners

NW 3600

PO Box 1450

Minneapolis, MN 55485-3600

45561934 Feb. Health & Dental Benefits $9,826.48 --- --- Various 2014 Employee Benefits

02/10/14 Health Partners

NW 3600

PO Box 1450

Minneapolis, MN 55485-3600

March March Health & Dental Benefits $11,954.77 $21,781.25 15759 Various 2014 Employee Benefits

01/31/14 HLB Tautges Redpath, LTD.4810 White Bear Parkway

White Bear Lake, MN 55110150412707 Monthly Accounting January 2014 $4,242.80 $4,242.80 15760 101-14970-4440 Accounting Expense

01/10/14 Houston Engineering Inc.1401 21st Ave. N.

Fargo, ND 5810218474 Curtiss Pond Design & Construction Project $299.25 $299.25 15761 405-13700-4430 Consultants

ACCOUNTS PAYABLE/RECEIVABLE

Page 20: Board of managers meeting packet february 22, 2014

Report Date 2/19/14

Date Vendor Name Vendor Address Invoice # Description Amount Total Check # G/L Code G/L Description

ACCOUNTS PAYABLE/RECEIVABLE

01/23/14 Integra TelecomP.O. Box 2966

Milwaukee, WI 53201-2966120349335 Add X124 for Sarah Wein $498.85 --- --- 101-14970-4610 Equipment Purchase/Rental/Lease

01/23/14 Integra TelecomP.O. Box 2966

Milwaukee, WI 53201-2966120349337 Set time out on main message $121.07 --- --- 101-14970-4610 Equipment Purchase/Rental/Lease

02/03/14 Integra TelecomP.O. Box 2966

Milwaukee, WI 53201-296611651764 Monthly Phone service $554.50 $1,174.42 15762 101-14970-4610 Equipment Purchase/Rental/Lease

01/31/14 C Lanphear Design3715 45th Avenue South

Minnapolis, MN 554060114-01 RSVP & Road Maintenacne postcards $175.00 $175.00 15763 220-14250-4210 Office Supplies

02/21/14 League of Minnesota Cities Ins. Trust145 University Avenue W.

St. Paul, MN 55103-2044200107511 Workers Compensation Deposit Premium $4,183.00 --- --- 101-14970-4290 Insurance & Bonds

02/21/14 League of Minnesota Cities Ins. Trust145 University Avenue W.

St. Paul, MN 55103-2044107511 Volunteers Renewal $123.00 $4,306.00 15764 101-14970-4290 Insurance & Bonds

01/17/14 MarcoP.O. Box 790448

St. Louise, MO 63179-0448245315536 Konica Minolta Copier $1,389.33 $1,389.33 15765 101-14970-4610 Equipment Purchase/Rental/Lease

01/13/14 MarcoNW 7128, P.O. Box 1450

Minneapolis, MN 55485-71281782609 HP contract 11/18-12/1702013 $21.04 --- --- 101-13970-4610 Equipment Purchase/Rental/Lease

01/14/14 MarcoNW 7128, P.O. Box 1450

Minneapolis, MN 55485-71281771501 HP contract 12/18/2013-1/17/2014 $21.04 --- --- 101-13970-4610 Equipment Purchase/Rental/Lease

01/21/14 MarcoNW 7128, P.O. Box 1450

Minneapolis, MN 55485-71281782609 HP contract 1/18/2014-2/17/2014 $21.04 $63.12 15766 101-14970-4610 Equipment Purchase/Rental/Lease

01/24/14 Menards

Capitol One Commercial

P.O. Box 5219

Carol Stream, IL 60197-5219

3.18136E+14 Monitoring Supplies $35.48 $35.48 15767 211-13200-4210 Office Supplies

02/01/14 Metro Children's Waterfest

Carver Co. Water Management

600 E. 4th Street

Chaska, MN 55318

Contribution Membership Contribution 2014 $1,000.00 $1,000.00 15768 220-14265-4710 Grants/Costshare/Partner Funding

01/23/14 Metropolitan Transit

Accounts Receivable

560-6th Avenue North

Minneapolis, MN 55411-4398

NCV-24555 Cooperative Construction Agreement - Sydicate Rain Garden $10,738.50 $10,738.50 15769 430-13880-4510 Construction Expense

01/21/14 Metlife

Group Benefits

4150 N. Mulberry Drive, Suite 300

Kansas City, MO 64116

Jan. 2014 Employee Benefits - Jan. $257.04 --- --- Various Employee Benefits

02/01/14 Metlife

Group Benefits

4150 N. Mulberry Drive, Suite 300

Kansas City, MO 64116

Feb. 2014 Employee Benefits - Feb. $724.08 $981.12 15770 Various Employee Benefits

12/04/13 Noah & Associates8117 Telegraph Road

Bloomington, MN 554381467 Consulting Services for Oct. & Nov. 2013 $1,531.25 $1,531.25 15771 101-13970-4430 Consultants

12/31/13 Pioneer Press345 Cedar Street

St Paul, MN 551011213424071 Legal Notice for Annual Meeting $88.40 $88.40 15772 101-13970-4310 Legal Notices

01/27/14 Pitney BowesP.O. Box 371896

Pittsburgh, PA 15250-789643896887 Ink for postage meter $86.29 $86.29 15773 101-14970-4210 Office Supplies

02/09/14 Pitney BowesP.O. Box 223648

Pittsburgh, PA 15250-264838926275 Postage Meter refill $300.00 $300.00 15774 101-14970-4300 Postage

02/06/14 Corey Poland1410 Energy Park Dr.

St. Paul, MN 55108Expense Report Jan. Expense Report $27.40 $27.40 15775 211-14200-4330 Staff Expense

12/31/13 Ramsey County - Attorney

90 Plato Blvd. W

P.O. Box 64097

St. Paul, MN 55164-0097

Atty - 4564 Attorney Services - Decebmer 2013 $918.00 $918.00 15776 101-13970-4420 Legal Services

12/30/13 Ramsey Conservation District1425 Paul Kirkwold Drive

Arden Hills, MN 55112123013CRWD Services for Stewardship Grant Program 10/1/2013-12/31/2013 $7,630.00 $7,630.00 15777 211-13142-4490 Scientific Analysis/Research

02/01/14 Rice Creek Watershed District4325 Pheasant Ridge Dr. #611

Blaine, MN 55449RCWD 2014 Blue Thumb membership $1,200.00 $1,200.00 15778 220-14265-4710 Grants/Costshare/Partner Funding

01/09/14 Royal Textile ManufacturingP.O. Box 44154

Eden Prairie, MN 5534404/12/30 CRWD logo patches $119.31 $119.31 15779

101-14970-4210 $59.65

220-14275-4210 $59.66Office Supplies

01/04/14 Staples

Dept. DET

P.O. Box 83689

Chicago, IL 60696-3689

8028244135 Office Supplies $10.75 --- --- 101-13970-4210 Office Supplies

02/01/14 Staples

Dept. DET

P.O. Box 83689

Chicago, IL 60696-3689

8028597034 Office Supplies $62.18 $72.93 15780 101-14970-4210 Office Supplies

Page 21: Board of managers meeting packet february 22, 2014

Report Date 2/19/14

Date Vendor Name Vendor Address Invoice # Description Amount Total Check # G/L Code G/L Description

ACCOUNTS PAYABLE/RECEIVABLE

02/12/14 St. Paul Riverfront Corporation214 Fourth Street E.

St. Paul, MN 55101Exhibit Exhibitor for Great River Gathering 5/8/2014 $175.00 $175.00 15781 220-14250-4280 Training & Education

01/31/14 Sunde9001 East Bloomington Freeway, Suite 118

Bloomington, MN 55420-343545771 Surveying at Highland Ravine - Easement sketch $423.00 $423.00 15782 417-12801-4460 Surveying, Mapping, GIS

02/04/14 Michelle Sylvander6593 Albert Ct.

Lino Lakes, MN 55038Expense Report Jan. Expense Report $207.86 $207.86 15783

101-14970-4330 $22.60

101-14970-4210 $185.26Staff Expense/Office Supplies

01/09/14 University of Minnesota

Regents of the University of Minnesota

NW 5960

P.O. Box 1450

230010738 Wetland Assessment $11,500.00 $11,500.00 15784 211-13215-4490 Scientific Analysis/Research

01/11/14 UPSLockbox 577

Carol Stream, IL 60132-0577Y348W8024 Delivery Service $6.05 --- --- 101-14970-4300 Postage

01/22/14 UPSLockbox 577

Carol Stream, IL 60132-0577Y348W8034 Delivery Service $26.25 $32.30 15785 101-14970-4300 Postage

01/15/14 Urban Roots731 East 7th Street, Suite 100

St. Paul, MN 55106Project Project Closeout - Burns Ave. Rain Garden $4,847.29 $4,847.29 15786 210-12142-4710 Grants/Costshare/Partner Funding

01/29/14 US BankP.O. Box 790408

St. Louis, MO 63179-0408Jan. 9994

Fredpryor Careertrack $199.00 - workshop Michelle, St. Paul

Bagelry $24.56 Mtg refreshments, Weathertech Macneil

$197.90 floor mats for truck

$421.46 --- ---

101-14970-4210 $24.56

101-14970-4280 $199.00

101-14970-4635 $197.90

Various/Monthly Credit Card

01/29/14 US BankP.O. Box 790408

St. Louis, MO 63179-0408Jan. 1811 Intermedia.net $360.74, Lynda.com $25.00, Carbonite Backup

$1275.93

$1,661.67 $2,083.13 15787 101-14970-4210 Office Supplies

01/21/14 Veit & Company, Inc.14000 Viet Place

Rogers, MN 55374Application #4 Trout Brook Storm Sewer Interceptor Realignment - final pymt $250,438.67 $250,438.67 15788 415-12815-4530 Construction/Maintenance Expense

01/10/14 WaltersP.O. Box 67

Circle Pines, MN 55014630511 Trash/Recycling - January $52.16 $52.16 15789 101-14970-4320 Utilities

01/21/14 Wenck

1800 Pioneer Creek Center

P.O. Box 249

Maple Plain, MN 55359-0249

1400016 Highland Ravine $2,975.60 --- --- 417-12801-4470 Engineering Expense

01/21/14 Wenck

1800 Pioneer Creek Center

P.O. Box 249

Maple Plain, MN 55359-0249

1400018 Lake Statistical Analysis $599.32 --- --- 211-13205-4470 Engineering Expense

01/21/14 Wenck

1800 Pioneer Creek Center

P.O. Box 249

Maple Plain, MN 55359-0249

1400019 Permit Engineering $1,454.40 --- ---

208-14000-4470 $136.80

208-14001-4470 $603.20

208-14002-4470 $714.40

Engineering Expense

01/21/14 Wenck

1800 Pioneer Creek Center

P.O. Box 249

Maple Plain, MN 55359-0249

1400017 Permit Program $3,297.00 $8,326.32 15790

208-13004-4470 $1970.00

208-13003-4470 $817.00

208-13036-4470 $510.00

Engineering Expense

02/05/14 Women's Environmental NetworkP.O. Box 14555

Minneapolis, MN 554144/2/2014

Center for Global Environmental Education -

informational/networking event$115.00 $115.00 15791 220-14250-4280 Training & Education

01/31/14 Xcel EnergyP.O. Box 9477

Minneapolis, MN 55484-9477399914362 Jan. 2014 Electrial Service $318.00 $318.00 15792 101-14970-4320 Utilities

02/10/14 Nate Zwonitzer Expense Report Jan. 2014 Expense Report $8.00 $8.00 15793 440-14910-4330 Staff Expense

Approved for Payment:__________________________02/19/14

$440,204.40

$440,204.40

Michael Thienes, Treasurer Date

RECEIPTS

Date Vendor Name Vendor Address Description Check Amount Check # G/L Code G/L Description

01/08/14Ryan Companies

50 S. 10th Street, Suite 300

Minneapolis, MN 55403-2012Associated Bank Surety $4,650.00 662712 208-13026

01/10/14State of Minnesota

658 Cedar Street, Suite 400

St. Paul, MN 55155-1616Pollution Control $430,000.00 53297377 410-12750

Page 22: Board of managers meeting packet february 22, 2014

Report Date 2/19/14

Date Vendor Name Vendor Address Invoice # Description Amount Total Check # G/L Code G/L Description

ACCOUNTS PAYABLE/RECEIVABLE

01/24/14Ramsey County

15 Kellogg Blvd. W #270

St. Paul, MN 55102USD $43,753.35 wired 101 various

01/31/14LHB Inc.

21 West Superior Street, Suite 500

Duluth, MN 55802Hazalden Redevelopment $2,000.00 98644 208-14005

01/31/14

PMA FINANCIAL - 4M Fund

7th Floor

2135 City Gate Lane

Naperville, IL 60563

Interest Income $86.35 N/A 101-3700

TOTAL $480,489.70

OUTSTANDING

INVOICES/CREDITS

08/31/13 Northern Battery 1326007 Credit RM363478 & RM377567 -credit for core charge ($80.00) ($80.00)

12/26/2013 All Covered

Dept. 33163

P.O. Box 39000

San Francisco, CA 94139-3163 590836 Livecycle Software - not installed yet 2/10 - still not installed $643.60 $643.60

Page 23: Board of managers meeting packet february 22, 2014

DATE: February 14, 2014

TO: CRWD Board of Managers and Staff

FROM: Mark Doneux, Administrator

RE: February 19, 2014 Administrator’s Report

Administrator Approved or Executed Agreements

Board Approved or Executed Agreements

Partner Grant Agreement with Asian Outdoor Heritage for a half-day workshop on water quality issues, exhibits

at the Hmong New Years Celebration and Fourth of July, youth education and broadcasting on Hmong media

outlets - $8,000.

Partner Grant Agreement with CGEE for the development of the ‘Adopt a storm drain’ phone app - $8,000.

Partner Grant Agreement with Springboard for the Arts for education and involvement of water themed dance

performance as part of Open Streets 2014. - $10,000.

Partner Grant Agreement with Citizens League and Como Lake Neighbor Network for the pilot of the Como

Civic Governance Pilot Project - $10,000.

General updates including recent and upcoming meetings and events

Staff participated and Managers Jones and Texer attended the 2013 Blooming St Paul Award Ceremony and

recognized the Clean Water Award Category winners.

1.) Upcoming events and meetings

a) CAC Charter Committee, Monday, February 24th

, 5:00 PM (Managers Texer and Reider)

b) Board Workshop-Closed Session, Wednesday, February 26th

, 5:00PM.

c) Next Board Meeting is Wednesday March 5, 2014 from 6:00 – 8:00 pm

d) Next CAC Meeting is Wednesday March 12, 2014 from 7:00-9:00 pm.

2.) Project Updates - there are no updates at this time.

W:\04 Board of Managers\Correspondence\Administrator's Report 2014\Administrator's Report 2-19-14.docx

Our Mission is to protect, manage and improve the water resources of Capitol Region Watershed District.