BMC Control-M 9: Powering Innovation · PDF fileControl-M 9 Unmatched application workflow...
Transcript of BMC Control-M 9: Powering Innovation · PDF fileControl-M 9 Unmatched application workflow...
—
BMC Control-M 9: Powering Innovation
What’s New in Control-M 9
BMC Software Marcelo Ruiz
Control-M 9
Unmatched application workflow automation
Lowering TCO
Increasing application deployment speed
Gartner Magic Quadrant for Workload Automation
Control-M 9 Benefits
• Reduced TCO • Automated client and agent deployment
reduces update and maintenance times from up to a month down to a couple days or less
• Global calendar capability that reduces admin time by 50% or more
• More Business Value • Reducing the risk and costs of business
interruption with 24X7 high availability capability
Control-M 9 Benefits
• Improved AppDev support • Accelerating application change and
deployment cycle times from automated promotion across environments (test to production) in Workload Change Manager improves time-to-value up to 80% by eliminating human errors and manual work
• Improved Analytics • A single enterprise view, predictive run
time performance estimation capability at-a-glance for all jobs
—
For Administrator
Control-M 9
Automatic Agents Deployment • Simplify Control-M
Agent upgrades • Manage
upgrades from CCM
• Available for: • GA, Fix Packs
and Patches • v6.4 and above
to v9
• Rollback
Automatic Agents Deployment
Automatic Agents Deployment
Automatic Client Deployment
• Simplify EM Client updates
• Distribute GA, Fix Pack and Patch installations
• Centrally Manage:
• SSL configuration
• Deadline
• Replaces Web Launch
High Availability
• Business continuity • Automatic or Manual failover
• Unified Control-M solution
• Simplicity • Installation wizard
• Actions and monitoring via CCM
• Cost savings on 3rd party solutions
High Availability
High Availability
Manual Failover
PostgreSQL Replication
Control-M Server
Control-M Server
Database
Control-M Server
Control-M Server
Database
High Availability
Customer provided solution for database layer high availability
Automatic or Manual Failover
Control-M Server
Control-M Server
Database
Enterprise Manager Database
Enterprise Manager
Control-M Server
Control-M Server
Database
Enterprise Manager Database
Enterprise Manager
Automatic or Manual Failover
High Availability
Control-M Server and PostgreSQL database replicated to a secondary host
Pause Control-M (quiesce) • Set pause mode from
CCM or via CLI
• Bypass specific jobs using “Run Now”
Usage Alerts
• Gain visibility to workload capacity
• Email notifications for different thresholds
• Mainframe & Distributed
• Aggregation from different Enterprise Manager environments
Additional Enhancements • Support for IPv6 • Support for NFS • New check_req
• Verify individual packages • Detailed & user-friendly report
• SSL Management • Support for external
Certificate Authority (CA)
• Operations on multiple Agents • Support for additional industry
encryption standards: • AES suite ciphers
(128 bit & 256 bit) • SHA-2 set functions hashing
(EM Client-Server) • RSA keys with length
2048, 3072 and 4096
—
For Schedulers
Control-M 9
Global Calendars
• Save time and reduce the efforts invested in calendar management
• Single calendar distributed to all Control-M Servers
Share Data Between Jobs
• Capture data from job output
• Share values between jobs • Within the same folder
• Using named pools
Remote Order Job
• Triggers job ordering on remote Control-M servers
• Supports any combination of platforms
• Distributed and z/OS
• Passes variables
Multi-days job flows monitoring
• Manages the smart folder and its jobs as a single entity
• In case of a failure, keeps the folder and all jobs in the active environment
Clear designation in the application titles to which environment users are connected to
Load Folders and Jobs: Enhanced Filtering
Additional Enhancements
• Bookmarks
• Export to Visio (EMF)
• Control-M Event Management Rules in WLA client
• CLI for EMAPI (emapi_cli)
—
For Business Users
Control-M 9
Promotion Between Environments
• Fast and error-free deployment
• Eliminate manual work
• Control over the process
Runtime Estimations
• Instant visibility to job runtimes
• Including jobs that are not part of batch business services
Gantt View (V9 Fix Pack 1)
• View job flows on a timeline • From all domains
• Easy monitoring and troubleshooting
• See what Jobs run in parallel
• See gaps between Jobs
• View timeline through the end of the day
• Estimated runtime visualization on the Gantt with Batch Impact Manager
“What-If” Host Simulation
• Proactively handles maintenance windows
• Reduces impact of urgent downtimes
Customers Testimonials
Agents Deployment High Availability
Batch Impact Manager Runtime Estimations
Leading Workload Automation Solution in the market
• History of innovation and investment
• On-going customers engagement
• Record breaking CXI
Why Control-M 9?
• Unmatched application workflow automation
• Lowering TCO
• Increasing application deployment speed
Key Elements
• Automated agent and client deployment
• Runtime analytics
• High Availability
• Automated application workflow
promotion between environments
Release Highlights
Control-M 9
Executive Summary
—
Bring IT to Life.™
Thank You
BMC Control-M 9: Powering Innovation