Blood Alley Square/Trounce Alley Redesign · 2020. 8. 27. · Make sure to provide your feedback by...

16
1 vancouver.ca/blood-alley-square Blood Alley Square/Trounce Alley Redesign Why are we here today? What are we doing today? In June 2016, we held series of kick-off events to introduce the Blood Alley Square/Trounce Alley Redesign Project. Over the past 10 weeks, the consultant team has been working with various departments from the City incorporating feedback from questionnaires, open houses and consultation with stakeholders. We now have two site design concepts and two case studies for solid waste management for you to review. Summarizing feedback to date Illustrating technical, engineering and design challenges Identifying goals and objectives that inform the design Introducing case studies to inform potential solid waste management strategies. Make sure to provide your feedback by filling out a questionnaire either here or online at vancouver.ca/blood-alley-square. What’s next after today? Input on the design concepts and case studies will help inform the detailed design and the solid waste management strategy. We will be hosting another open house in the new year to: Illustrate a refined design concept; Recommend strategies for improved solid waste management; Explore opportunities for stewardship and local economic development. Contact the Project Manager and Neighbourhood Planner about the Redesign Tom Warren, Project Manager, Streets and Electrical Design Branch 604.873.7757 | [email protected] Helen Ma, Planner, Downtown Eastside Planning Group 604.873.7919 | [email protected] For more information: Phone 3-1-1 [email protected] Fill out the questionnaire online: vancouver.ca/blood-alley-square

Transcript of Blood Alley Square/Trounce Alley Redesign · 2020. 8. 27. · Make sure to provide your feedback by...

Page 1: Blood Alley Square/Trounce Alley Redesign · 2020. 8. 27. · Make sure to provide your feedback by filling out a questionnaire ... studies will help inform the detailed design and

1

vancouver.ca/blood-alley-square

Blood Alley Square/Trounce Alley Redesign

Why are we here today?

What are we doing today?

In June 2016, we held series of kick-off events to introduce the Blood Alley Square/Trounce Alley Redesign Project.

Over the past 10 weeks, the consultant team has been working with various departments from the City incorporating feedback from questionnaires, open houses and consultation with stakeholders.

We now have two site design concepts and two case studies for solid waste management for you to review.

• Summarizing feedback to date• Illustrating technical, engineering and design challenges• Identifying goals and objectives that inform the design• Introducing case studies to inform potential solid waste

management strategies.

Make sure to provide your feedback by filling out a questionnaire either here or online at vancouver.ca/blood-alley-square.

What’s next after today? Input on the design concepts and case studies will help inform the detailed design and the solid waste management strategy. We will be hosting another open house in the new year to:

• Illustrate a refined design concept;• Recommend strategies for improved solid waste management;• Explore opportunities for stewardship and local economic development.

Contact the Project Manager and Neighbourhood Planner about the RedesignTom Warren, Project Manager, Streets and Electrical Design Branch

604.873.7757 | [email protected] Helen Ma, Planner, Downtown Eastside Planning Group

604.873.7919 | [email protected]

For more information: Phone 3-1-1

[email protected]

Fill out the questionnaire online: vancouver.ca/blood-alley-square

Page 2: Blood Alley Square/Trounce Alley Redesign · 2020. 8. 27. · Make sure to provide your feedback by filling out a questionnaire ... studies will help inform the detailed design and

2

vancouver.ca/blood-alley-square

Blood Alley Square/Trounce Alley Redesign

Retail and commercial shops and restaurants on Carrall Street support street and alleyway vitality in Gastown. Trounce Alley (looking west) with Blood Alley Square to the left.

Wide sidewalks with mature street trees and lighting, and separate bike lane on the Carrall Street Greenway create a comfortable environment that encourages walking and cycling.

East Van Roasters, a social enterprise on Carrall Street, provides training and employment to women, while creating ‘bean-to-bar’ chocolate and coffee roasted and prepared locally.

Applicable Plan Policies:

6.2.2 Retain the predominant retail and commercial character with tourist-oriented goods and services, destination shops, boutiques, restaurants, and offices, and support a vibrant street life by retaining the character of the existing public realm.

• Rehabilitate Blood Alley Square/Trounce Alley, to improve the public realm, increase safety and introduce programming, with support for community stewardship as a shared space, including opportunities for the low-income community.

• Support the community in stewardship and programming of the Carrall Street Greenway and Blood Alley Square.

• Seek to improve walking and cycling connections to commercial areas and to other neighbourhood areas.

7.2 Ensure that all are welcomed in the programming of urban spaces—Identify important places and spaces and involve the local community in programming towards supporting the DTES identity.

• Reinforce and enhance the historic public realm—Recognizing the prevailing, and historically distinctive, public realm asset and strengthen through thoughtful improvements, programming and celebration.

The Downtown Eastside Plan (2014) provides a clear but flexible framework to guide positive change, development and public benefits in the Downtown Eastside over the next 30 years. The over-arching goal is to make the Downtown Eastside a more livable, safe and supportive place for all of its diverse residents.

Background Information

12.2.2 Reinforce and recognize the distinct identity of historic areas through streetscape treatments, design elements, and street furniture.

12.3.2 Improve signage and enhance the distinct identity of the historic area’s laneways as inviting pedestrian spaces.

12.3.3 Improve existing and explore new opportunities for community access and programming in plazas, squares, and gathering spaces.

12.3.4 Encourage community stewardship and programming of plazas and green spaces.

12.3.5 Ensure plazas and gathering spaces have infrastructure, (e.g. water, power, lighting, grey water disposal, and storage) to support community programming, and stewardship for all types of community events.

13.1.1 Identify, preserve and improve places with social and cultural meaning to the community.

15.4.1 Encourage stewardship of trees, green spaces and green storm water infrastructure, e.g. rain gardens, and bioswales. Plant shade trees where appropriate and species that are hardy to changing climate conditions.

16.1.1 Pursue opportunities for additional drinking fountains or bottle filling stations when opportunities arise.

Page 3: Blood Alley Square/Trounce Alley Redesign · 2020. 8. 27. · Make sure to provide your feedback by filling out a questionnaire ... studies will help inform the detailed design and

3

Blood Alley Square/Trounce Alley Statement of Significance (October 2010, commissioned by City of Vancouver)

• A Statement of Significance (SOS) explains the historic importance of Blood Alley Square and Trounce Alley, and identifies the critical elements that define the area

• This report includes recommendations for conservation work needed to maintain the character of Blood Alley

Square / Trounce Alley

(February 2015, commissioned by the Gastown BIA)

(October 2005, commissioned by the Gastown BIA)

(Development Application DE419722)

• The proposed redevelopment could present new opportunities to make the square even more vibrant and

welcoming. For example, it could add new businesses fronting Blood Alley Square to further activate the space.

• To better manage the use of the square, any activities held by the businesses on City-owned property require permits, e.g. special events permits, patio permits, etc.

Public Realm Vision Summary

33 W Cordova Redevelopment (Stanley New Fountain Site)

Business Plan for the Dumpster-Free Alley Pilot Project

• The report envisions Blood Alley to be “a model project for creating a more sustainable, pedestrian-friendly public realm. This model could also incorporate innovative approaches to

dealing with garbage / recycling.”

• Businesses and residents have long advocated for alternative ways to manage commercial waste and recycling in Gastown to activate alleyways as pedestrian spaces.

• This report proposed a plan to eliminate commercial waste containers (dumpsters) from the alley.

vancouver.ca/blood-alley-square

Blood Alley Square/Trounce Alley Redesign

An open-air performance of Handel’s Messiah by the Vancouver’s Bach Choir attracted 400 people from a diverse background to Blood Alley Square, November 2001

Studies and Projects Informing the Redesign

Social Impact ObjectivesThe Social Impact Objectives guide and manage change and development in the neighbourhood. These objectives seek to:

• Ensure developments and businesses fit the DTES neighbourhood context, offer needed, locally-serving uses, and do not significantly exclude or negatively impact the low-income community.

• Encourage a wide range of housing options in the neighbourhood, with particular focus on new social and affordable housing for the homeless and other low- and moderate-income singles and families.

• Ensure diverse development that is respectful of heritage assets, surrounding scale, urban pattern, and social and community context.

• Improve the overall quality, accessibility and inclusiveness of the public realm in the DTES, recognizing the uniqueness of each sub-area.

• Retain, preserve and celebrate local heritage, arts and culture for all.

• Maintain the diversity of existing businesses and commercial uses and support affordable commercial spaces for social enterprises, micro enterprises and small businesses providing low-cost goods and services for residents.

• Encourage the use of local goods and services in the construction, operation and maintenance of the proposed development or business.

• Encourage local and inclusive hiring in the construction, operation and maintenance phases of the improvement and the strengthening of social and micro economies.

• Maintain adequate health and social services within the community, as well as community amenity and gathering spaces to serve the needs of the diverse local population.

Page 4: Blood Alley Square/Trounce Alley Redesign · 2020. 8. 27. · Make sure to provide your feedback by filling out a questionnaire ... studies will help inform the detailed design and

4

vancouver.ca/blood-alley-square

Blood Alley Square/Trounce Alley Redesign

Blood Alley Square/Trounce Alley construction, Aug/Sep 1973 (T. Sebastian)

Granite herringbone paving, bollards and permanent tree planters after completion, 1975. Porte cochère (covered connection) and storefronts facing Blood Alley Square, 1975.

Trounce Alley (looking west) before Blood Alley Square was created

History of Blood Alley Square and Trounce AlleyAs Vancouver’s first neighbourhood, Gastown is a National Historic Site and has long been recognized for its historic value and rich architectural character. Blood Alley Square and Trounce Alley are an important part of Gastown. Trounce Alley was established in 1870 when the Old Granville Townsite was surveyed and is one of the oldest original roadways in Vancouver. As the Townsite grew, Trounce Alley became an important access route to the buildings fronting Water and Cordova Streets in the 1920s and 1930s.

Blood Alley Square is a significant open space abutting Trounce Alley, and the Stanley/New Fountain Hotels. In 1971, in an effort to create pedestrian spaces in the centre of Gastown, the City of Vancouver purchased the rear 40-foot portion of the Stanley/New Fountain Hotels lot. The existing garages were demolished and construction of the Square began in 1972. It was named Blood Alley Square that same year.

A heritage consultant has been engaged to confirm the historically significant elements and materials that should be retained or re-purposed such as the red brick and granite cobblestones, the iconic dragon head light standards, and the now mature trees. 

Page 5: Blood Alley Square/Trounce Alley Redesign · 2020. 8. 27. · Make sure to provide your feedback by filling out a questionnaire ... studies will help inform the detailed design and

5

vancouver.ca/blood-alley-square

Blood Alley Square/Trounce Alley Redesign

E WATERFRONT R

WATER ST

WATERFRONT ROAD

CAMBIE

ST

T

ON ST

ORDOVA ST

R ST

E CORDOVA ST

MA

IN S

T

GO

RE

AV

E

CO

LU

MB

IA

ST

POWELL ST

ALEXANDER

ST

form

erCPR

RIGHT-O

F-WAY

SH

AN

GH

AI

AL

LE

Y

TA

YL

OR

ST

E PENDER ST

E HASTINGS ST

WATER ST

CA

RR

AL

L S

T

W

CORDOVA

ST

W PENDER ST

W HASTINGS ST

AB

BO

TT

ST

W PENDER ST

CA

MB

IE S

T

W HASTINGS ST

BLOODALLEY

TROUNCELOB

ODALLEYR

SQUA ESQUARE

TROUNCE ALLEY

TROUNCE

Project Overview

Where are we now?

Background Blood Alley Square is a public space in the heart of Gastown, adjacent to Trounce Alley. The cobblestones, narrow lane, streetlights and brick buildings bring a sense of character unlike anywhere else in the city. The Square is cherished by residents, businesses and community groups alike.

Project Design Goals and Objectives:

The redesign will be guided by the nine social impact objectives in the Downtown Eastside Plan to ensure it is inclusive and welcoming to all community members. With these objectives in mind, the consultant team has developed the following design goals:

Project Area

• Conservation and / or reinterpretation of important heritage characteristics• Retention of mature existing trees where possible• Creation of a stewardship plan that brings residents, businesses and community together

to create economic opportunities for all• Accommodation of shared loading for residents and businesses• Opportunities for diverse activities and events within the Square• Improved function of solid waste management for all residents and businesses• Stronger connection between the Square and adjacent developments, including 33 W

Cordova• Creation of an urban space that is diverse, dynamic and welcoming

*Updated to take into account the feedback from Kick-off events in June.

Page 6: Blood Alley Square/Trounce Alley Redesign · 2020. 8. 27. · Make sure to provide your feedback by filling out a questionnaire ... studies will help inform the detailed design and

6

vancouver.ca/blood-alley-square

Blood Alley Square/Trounce Alley Redesign

Your feedbackA total of 175 people attended the two kick-off events and 253 questionnaires were completed.

June 1, 2016- Kick off Event

What we heard in June...

92% thought the conservation of trees and planters on the site was important, though many respondents commented the planters are not important or should be updated.

Seating opportunities were the top amenity desired for the Square.

Pedestrian

activities:Place to sit, socialize, and shop were identified as priorities for the site.

68% support ensuring the redesign offered community amenity and gathering spaces for the diverse local population.

64% of respondents were dissatisfied with waste management in the Square and Alley.

“Clean up and security are most needed. Space can look great but if people do not feel comfortable in it, they will continue to

stay away.”

“As long as it is tasteful and of relevance to the neighbourhood - weaving historical and contemporary culture

together.”

“Blood Alley is a very important space to Vancouver. It has the potential to be a human-scale laneway. Cities all over the world have used alleys as spaces for people to live and

interact”

“Make the space friendly, make it clear to all that they don’t need to purchase anything to enjoy space. Make it family friendly to animate space and make it safer

for everyone”

84% of respondants support a stronger connection between the square and the 33 W Cordova redevelopment.

Page 7: Blood Alley Square/Trounce Alley Redesign · 2020. 8. 27. · Make sure to provide your feedback by filling out a questionnaire ... studies will help inform the detailed design and

7

vancouver.ca/blood-alley-square

Blood Alley Square/Trounce Alley Redesign

Concept 1 Concept 2

Site AnalysisThe design process begins with a careful site analysis to understand the important elements - the “design drivers” which govern the process. The “design drivers” do not change; they are the elements that transcend the design .

HeritageHeritage elements have been identified and will be restored, or re-purposed to provide a new use or arrangement.

Tree retentionTrees are a vital component of the form and character of the square and will be retained where possible. Those that are affected by construction will be replaced with large specimen trees.

CirculationSite circulation and connectivity has been carefully studied. The design will create safe connections between Blood Alley Square and adjacent developments.

33 West CordovaIt will be important to resolve the differences in heights between the Cordova site and the Square that makes the space more comfortable, safe and inviting.

Project Site

Prominent Building

Translink Bus Stop

Loading Class 1

Accessibility Stop

Loading Stop

Loading and Accessibility Stop

Bike Path

Pedestrian Path

Loading Class 2

Translink Bus Path

Cyclist Path

Accessibility Path

L0.5Site Analysis - Circulation

ABBOTT STREET

CARRALL STREET

WATE

R ST

REET

WES

T CO

RDO

VA S

TREE

T

The Garage

Alhambra

Lore Krill Housing Co-operative

33 Cordova (New Development)

Blood Alley Square

Trounce Alley

Blood AlleyBlood Alley Square16061Client Review

Vancouver

August, 2016202—175 East Broadway, Vancouver, British Columbia, V5T 1W2, www.ennsgauthier.com

N

Project Site

Prominent Building

Building Footprint

Gear

Lights

Cobblestone

Stair Rail

Stair

Brick

L0.7Site Analysis - Heritage Elements

WATE

R ST

REET

WES

T CO

RDO

VA S

TREE

T

The Garage

Trounce Alley

Alhambra

Lore Krill Housing Co-operative

Blood Alley Square

WES

T CO

RDO

VA S

TREE

T

WATE

R ST

REET

33 Cordova (New Development)

Blood AlleyBlood Alley Square16061Client Review

Vancouver

August, 2016202—175 East Broadway, Vancouver, British Columbia, V5T 1W2, www.ennsgauthier.com

N

Healthy Tree

Unhealthy Tree

Loading, Commercial(Class B)

Loading, Passenger(Class A)

Project Site

Prominent Building

Translink Bus Stop

Loading Class 1

Accessibility Stop

Loading Stop

Loading and Accessibility Stop

Bike Path

Pedestrian Path

Loading Class 2

Translink Bus Path

Cyclist Path

Accessibility Path

L0.5Site Analysis - Circulation

ABBOTT STREET

CARRALL STREET

WATE

R ST

REET

WES

T CO

RDO

VA S

TREE

T

The Garage

Alhambra

Lore Krill Housing Co-operative

33 Cordova (New Development)

Blood Alley Square

Trounce Alley

Blood AlleyBlood Alley Square16061Client Review

Vancouver

August, 2016202—175 East Broadway, Vancouver, British Columbia, V5T 1W2, www.ennsgauthier.com

N

+5.10m

+6.05m

+5.50m

+5.10m

+5.10m+6.05m

Page 8: Blood Alley Square/Trounce Alley Redesign · 2020. 8. 27. · Make sure to provide your feedback by filling out a questionnaire ... studies will help inform the detailed design and

8

vancouver.ca/blood-alley-square

Blood Alley Square/Trounce Alley Redesign

Concept Design - #1 - Open Square

Concrete bench and seating area

Start of elevated Alley “plaza”

New large tree

Timber deck for restaurant patio

Accessible ramp up to 33 W Cordova(re-use of heritage red brick pavers) Shared commercial loading

space

Re-use of red brick pavers in original layout

Start of elevated Alley “plaza”

Utility service area for neighbourhood

Re-use of heritage cobblestones in square

Crosswalk connection to Gaoler’s Mews

Eight steps to connect to 33 W Cordova

Expanded planter area to maintain health of trees

Iron drain for tree health

Globe lights

Re-use of cobblestones throughout the Square

Porte cochère (covered connection) to Cordova Street

Re-use of heritage cobblestones along extent of Trounce Alley to Alhambra building

Access for 57 W Cordova

Two shared passenger loading stallsBollards

Timber deck for seating or performance

Concrete benches double as traffic calming

This concept emphasizes the heritage qualities of the space. The redesign of the square retains much of its original spatial arrangement. The original red brick paving has been maintained, most of the trees have been retained and the cobble has been re-set in a linear fashion.

A

A

BB

Blood Alley Square

Trounce A

lley

33 W C

ord

ova

PR

OP

ER

TY L

INE

4.31

5.93

4.64

4.68

4.52

4.44

4.59

4.694.59

4.394.21

4.27 4.09

5.46CN

*

5.595.90

7.55

5.91

CN

*

5.486.03

6.41

5.63CN

*

5.70

6.00

5.23

5.07

25.5125.29

5.07

5.93

CN

*

25.46

4.44

5.24

5.02

4.88

4.17

MO

N

4.79

5.99

6.21

6.31

6.47

5.93

6.01

6.00

4.96

4.98

4.73

4.79

4.83

6.26

6.08

5.96

5.98

6.42

6.08

5.95

4.79

4.8

2

4.85

4.8

34.8

34.7

6

4.79

4.7

94.7

84.7

7

5.12

6.0

56.0

96.1

36.1

76.2

06.2

66.3

16.3

26.3

46.4

06.3

7

800

801

802

803

804

805

806

807

808

809

810

811

812

813

814

815

816

817

818

819

820

821

822

823

824

826

827 828

829

830

831

832

833

834

835

836

837

838

839

843

844

845

846

847

848

849

850

852

853

854

855

856

857

858

859

860

861

862

863

866

867

12.5

8

11.7

6(O

HW

)

11.7

8(O

HW

)

12.3

5

12.4

211.4

5(O

HW

)

11.4

6(O

HW

)

12.14(OHW)

11.5

1(O

HW

)

11.5

3(O

HW

)

12.19(OHW)

6.08

6.04

5.99

5.95

5.89

5.87

5.82

5.79

6.20

6.21

6.24

6.27

6.32

6.37

6.42

6.44

6.22

6.22

6.08

6.04

5.98

5.93

5.85

6.03

6.02

6.1

46.2

16.3

06.3

46.3

86.4

3

6.52

6.39

6.36

6.31

6.20

6.14

6.13

6.06

5.99

5.98

5.99

5.92

PM

5.92

5.93

LS

5.92

5.96

PM

6.00

LS

6.02

6.02

PM

6.05

6.14

LS

6.09

PM

6.17

6.14

6.15

6.15

6.41

6.43

6.17

6.40

6.33

6.29

PM

6.26

EB

6.29

WM

6.26

6.22

FH

6.22

LS

6.02

6.00

6.22

6.27

6.13

WV

6.02

LS

6.41

6.28

6.27

WV

6.20

WV

6.15

WV

6.11

WV

5.74

WV

5.92

LS

5.93

PM

5.93

6.00 WM

5.93LS

5.96PM

6.02

6.05

LS

6.05

PM

6.10

6.12

PM

6.18

LS

6.21

PM

6.31

WM

6.26

6.25LS

6.28

PM

6.32

6.39

WM

6.37

LS

6.38PM

6.42

6.23

MH

6.46

5.70

CB

5.73

6.08

6.11

5.97

1016

1017

1018

1019

4.81

4.86

5.05

5.03

4.66

4.674.67

4.644.66

4.64

4.86MH

4.99

MH

5.04LS

4.63

CB

4.80MH

4.80MH

5.0

4M

H

4.90

CB

1039

1040

1041

1042

1043

1044

1045

1046

1047

1048

1049

1050

1051

1052

1053

1054

1055

1056

1057

1058

1059

1060

1061

1062

1063

1064

1065

1066

1067

1068

1069

1070

1071

10721

073

1074

1075

1076

1077

1078

1079

1080

1081

1082

1083

1084

1085

1087

1088

1089

1090

1091

1092

1093

1094

1095

1096

1097

1098

1099

1100

1101

1102

1103

1104

1105

1106

1107

1108

1109

1110

1111

1112

1113

1114

1116

1117

1118

1119

1120

1121

1122

1123

1124

4.87

4.99

4.85

4.95

4.75

4.73

4.82

4.87

4.83

4.82

4.95

MH

4.86MH

4.96

MH

4.96

MH

4.78

4.99

4.87

4.86

4.85

4.85

4.96

LS

4.90

LS

4.88LS

4.93

4.98

4.97

4.74

4.84

4.81

4.82

4.78

4.88

4.93

4.97

5.01

4.87

4.86

4.89

4.94

4.94

4.96

4.98

5.04

5.07

4.64

4.60

4.66

4.64

4.82

4.88

4.95

4.99

4.64

4.62

4.65

4.66

5.09

5.09

5.08

5.1

0

5.09(W)

5.12

5.07

5.11

5.10

5.07

5.09

5.09 5.16

5.14

5.18

5.16

4.84

6.93

6.93

6.94

6.94

7.66

7.655.13

5.09

4.87

4.87

5.0

0(W

)

5.03

4.90

4.63

4.63

4.55

4.59

4.67

4.71

4.69

4.69

4.57

4.56

CB

4.72MH

5.04

4.91

5.07

4.64

4.6

2

4.71

4.70

4.98

4.97

4.66

4.68

5.05

4.94

4.96

4.96

5.03

MH

5.01

MH

5.33

5.34

5.30

5.32

5.26(W

)

5.13

5.11

5.13(W) 5.16

5.43

5.01

5.08

4.5

9

4.62

5.69

5.70

5.71

5.72

7.68

7.68

5.70

5.27(W)

5.05(W)

5.00(W)

5.0

5(W

)

4.63

4.64

4.70

4.76

5.10

5.14

5.07

GV

5.21

MH

5.02

GV

5.10

MH

5.04

MH

5.01

5.15

5.05

4.96

5.00

5.04

4.99

5.03

5.03

5.10

5.07

5.06 5.03

5.06

5.08

5.29(W)

5.32(W)

5.38

5.36

5.38

5.35

5.3

9(W

)

5.73(W)

5.72(W)

5.7

5(W

)

5.77(W)

5.4

1

5.07

4.63

4.76

4.87

4.84

4.93

5.14

5.15

5.14

4.90

4.8

2

5.17

5.18

5.19

5.14

4.84

6.42

4.8

45.5

6

5.5

5

5.7

27.49

7.495.7

2

5.7

3

5.7

3

4.8

4

4.8

2

4.93

4.74

4.65

4.68

4.76

4.76

4.71

5.12

5.10

GU

TT

ER

CU

RB

GU

TT

ER

CU

RB

Re

m 1

4

Re

m 1

3

Re

m 1

2R

em

11

0.9

22

9.7

60.0

6

24.47

9.5

49.9

51

1.2

3

24.44

8.9

62

0.5

5

24.41

3.8

5

0.11

2.1

5

0.11

0.6

5

2.1

36.0

3

0.20

0.6

4

12.4

6

0.10

3.0

4

0.6

3

0.20

0.110.5

1

0.2

1

0.10

3.63

3.66

3.43

0.0

1C

LE

AR

0.0

0

0.06OVER

0.10CLEAR

0.05OVER

0.06OVER

3.68

3.64

2.7

6

0.0

0

0.0

1C

LE

AR

EX

TE

NT

OF

AT

TA

CH

ED

CA

NO

PY

0.54OVER

3.34

3.34

3.44

BLO

OD

ALLE

Y S

QU

AR

E

TR

OU

NC

E A

LLE

Y

10.6

45 P

L2

0.1

05 P

L2

0.1

05 P

L1

2.1

80 P

L

28.146 PL

12.1

71 P

L2

0.0

96 P

L2

0.0

96 P

L1

0.6

45 P

L

28.085 PL

28.096 PL

28.115 PL

28.134 PL

FU

RT

HE

ST

AP

PA

RE

NT

EX

TE

NT

OF

TY

PIC

AL C

OR

NIC

E

FURTHEST

APP

ARENT

EXTENTS

OFTYPI

CAL

PARAPET

WE

ST

CO

RD

OV

A S

TR

EE

T

2 S

T O

R E

Y B

U I L

D I N

G

3 S

T O

R E

Y B

U I L

D I N

G

P L

A N

1 6

8

0.00

0.00

0.04CLEAR

LIN

E O

F B

RIC

K C

OLU

MN

S

CR

OW

N O

F R

OA

D

:0.4

3

:0.4

3

:0.5

2

:0.6

4

:0.4

3

:0.2

1

RO

CK

WA

LL

BRICKRAM

P

BRIC

KRA

MP

BRICK

RAM

PD

Ø:0

.43

:0.4

3

LA

ND

ING

BA

LC

ON

YB

ALC

ON

Y

RO

CK

WA

LL

BR

ICK S

TE

PS

BR

ICK S

TE

PS

EDG

E OF BRIC

K

ED

GE

OF B

RIC

K

PLA

NT

ER

PLAN

TER

PLAN

TER

CON

CRETESTEPS

CONCRETE

STEPS

ST

ON

E W

ALL

"G

AR

AG

E" B

UIL

DIN

G"

ALH

AM

BR

A"

BU

ILD

ING

BU

ILD

ING

OU

TLIN

E

BU

ILD

ING

OU

TLIN

E

"T

ER

MIN

US

" B

UIL

DIN

G

LANDING

STON

E WALL

:0.4

6

CO

NC

RE

TE

ST

EP

S

BU

ILD

ING

OU

TLIN

E

ED

GE

OF B

RIC

K

ED

GE

OF B

RIC

K

CR

OW

N O

F A

SP

HA

LT

RO

AD

:0.1

5D

Ø:0

.05

:0.3

3D

Ø:0

.16

:0.2

2

6.32

PP

AB

AN

DO

NE

D

:0.2

2D

Ø:0

.22

:0.2

7

6.15

:0.1

1D

Ø:0

.27

:0.0

5

:0.2

5

6.31

MH

HY

DR

O

HY

DR

O

MAIN FLOOR

ELEVATION

4.54

CB

WO

OD

HO

AR

DIN

G

WOOD HOARDING

:0.1

3

HY

DR

O

VA

ULT

HY

DR

O

VA

ULT

HY

DR

OH

YD

RO

TE

L

HY

DR

O

HY

DR

OH

YD

RO

OV

ER

HE

AD

WIR

E

OV

ER

HE

AD

WIR

E

OV

ER

HE

AD

WIR

E

OV

ER

HE

AD

WIR

E

OVERHEAD WIRE

OVERHEAD WIRE

OVERHEAD WIRE

LE

TD

OW

NLE

TD

OW

N

GU

TT

ER

CU

RB

(OH

W)

(OH

W)

(OH

W)

5.60

0.03OVER

ST

EP

S

CO

NC

RE

TE

4.60

LS

TE

L

PLA

NT

ER

(W)

(W)

(W)

(W)

(W)

(W)

(W)

(W)

(W)

(W)

PLAN

TER(W)

(W)

(W)

PLAN

TER(W)

(W)

(W)

4.96B

(W)

PLAN

TER

(W)

(W)

(W)

4.85

BCON

CRETESTEPS

ROCK WALL

(W)

G

PLA

N

EAST 26' OF 14PLA

N 1

68

5.79

6.38

B

PLA

N 1

07

53

ST

RA

TA

PLA

NLM

S738

ST

RA

TA

PLA

N

BC

S3

22

9

ST

RA

TA

PLA

N

BC

S3

64

7

Z

PLA

N B

CP

29042

A

RE

F P

LA

N 1

45

7

EAST PART OF 1

RE

F P

LA

N 1

32

Rem 13

E 1/24W 1/24

5REM E 1/36

SEWER BOX

PLA

N 1

68

10

5°3

8'3

7"

LIN

E O

F B

RIC

K C

OLU

MN

S

FURTHEST

APP

ARENT

EXTENTS

OFTYPI

CAL

PARAPET

15° 44' 41"

15° 47' 51"

10

5° 4

1' 5

6"

10

5° 3

8' 3

7"

6.24

GC

CARRALL STREET

B

PLA

N B

CP

27174

BU

ILD

ING

OU

TLIN

E

BU

ILD

ING

OU

TLIN

E

LM

P4

72

32

STRATA PLAN BCS4367

5.73

LO

T A

RE

A:

29

9.0

m2

LO

T A

RE

A:

56

4.9

m2

LO

T A

RE

A:

56

5.3

m2

LO

T A

RE

A:

34

2.6

m2

5.12

4.92

6.41

EL. B

OT

TO

M

OF K

IOS

K:5.2

4

EL. T

OP O

F

KIO

SK

:6.14

GRO

UN

D

GRO

UND

DOOR

OPENING

DOOR

OPENING

ELE

VA

TIO

N D

OO

R S

ILL:6

.45

ELE

VA

TIO

N T

OP O

F D

OO

R O

PE

NIN

G:8

.50

KIOSK

4.31

5.93

4.64

4.68

4.52

4.44

4.59

4.694.59

4.394.21

4.27 4.09

5.46

CN

*

5.595.90

7.55

5.91

CN

*

5.486.03

6.41

5.63

CN

*

5.70

6.00

5.23

5.07

25.5125.29

5.07

5.93

CN

*

25.46

4.44

5.24

5.02

4.88

4.17

MO

N

4.79

5.99

6.21

6.31

6.47

5.93

6.01

6.00

4.96

4.98

4.73

4.79

4.83

6.26

6.08

5.96

5.98

6.42

6.08

5.95

4.79

4.8

2

4.85

4.8

34.8

34.7

6

4.79

4.7

94.7

84.7

7

5.12

6.0

56.0

96.1

36.1

76.2

06.2

66.3

16.3

26.3

46.4

06.3

7

800

801

802

803

804

805

806

807

808

809

810

811

812

813

814

815

816

817

818

819

820

821

822

823

824

826

827 828

829

830

831

832

833

834

835

836

837

838

839

843

844

845

846

847

848

849

850

852

853

854

855

856

857

858

859

860

861

862

863

866867

12.5

8

11.7

6(O

HW

)

11.7

8(O

HW

)

12.3

5

12.4

211.4

5(O

HW

)

11.4

6(O

HW

)

12.14(OHW)

11.5

1(O

HW

)

11.5

3(O

HW

)

12.19(OHW)

6.08

6.04

5.99

5.95

5.89

5.87

5.82

5.79

6.20

6.21

6.24

6.27

6.32

6.37

6.42

6.44

6.22

6.22

6.08

6.04

5.98

5.93

5.85

6.03

6.02

6.1

46.2

16.3

06.3

46.3

86.4

3

6.52

6.39

6.36

6.31

6.20

6.14

6.13

6.06

5.99

5.98

5.99

5.92

PM

5.92

5.93

LS

5.92

5.96

PM

6.00

LS

6.02

6.02

PM

6.05

6.14

LS

6.09

PM

6.17

6.14

6.15

6.15

6.41

6.43

6.17

6.40

6.33

6.29

PM

6.26

EB

6.29

WM

6.26

6.22

FH

6.22

LS

6.02

6.00

6.22

6.27

6.13

WV

6.02

LS

6.41

6.28

6.27WV

6.20WV

6.15

WV

6.11

WV

5.74WV

5.92

LS

5.93

PM

5.93

6.00 WM

5.93LS

5.96

PM

6.02

6.05

LS

6.05

PM

6.10

6.12

PM

6.18

LS

6.21

PM

6.31

WM

6.26

6.25

LS

6.28

PM

6.32

6.39

WM

6.37

LS

6.38

PM

6.42

6.23

MH

6.46

5.70

CB

5.73

6.08

6.11

5.97

1016

1017

1018

1019

4.81

4.86

5.05

5.03

4.66

4.674.67

4.644.66

4.64

4.86MH

4.99MH

5.04LS

4.63

CB

4.80

MH

4.80MH

5.0

4M

H

4.90

CB

1039

1040

1041

1042

1043

1044

1045

1046

1047

1048

1049

1050

1051

1052

1053

1054

1055

1056

1057

1058

1059

1060

1061

1062

1063

1064

1065

1066

1067

1068

1069

1070

1071

10721

073

1074

1075

1076

1077

1078

1079

1080

1081

1082

1083

1084 1

085

1087

1088

1089

1090

1091

1092

1093

1094

1095

1096

1097

1098

1099

1100

1101

1102

1103

1104

1105

1106

1107

1108

1109

1110

1111

1112

1113

1114

1116

1117

1118

1119

1120

1121

1122

1123

1124

4.87

4.99

4.85

4.95

4.75

4.73

4.82

4.87

4.83

4.82

4.95

MH

4.86MH

4.96

MH

4.96

MH

4.78

4.99

4.87

4.86

4.85

4.85

4.96

LS

4.90

LS

4.88LS

4.93

4.98

4.97

4.74

4.84

4.81

4.82

4.78

4.88

4.93

4.97

5.01

4.87

4.86

4.89

4.94

4.94

4.96

4.98

5.04

5.07

4.64

4.60

4.66

4.64

4.82

4.88

4.95

4.99

4.64

4.62

4.65

4.66

5.09

5.09

5.08

5.1

0

5.09(W)

5.12

5.07

5.11

5.10

5.07

5.09

5.09 5.16

5.14

5.18

5.16

4.84

6.93

6.93

6.94

6.94

7.66

7.655.13

5.09

4.87

4.875.0

0(W

)

5.03

4.90

4.63

4.63

4.55

4.59

4.67

4.71

4.69

4.69

4.57

4.56

CB

4.72MH

5.04

4.91

5.07

4.64

4.6

2

4.71

4.70

4.98

4.97

4.66

4.68

5.05

4.94

4.96

4.96

5.03

MH

5.01

MH

5.33

5.34

5.30

5.32

5.26(W

)

5.13

5.11

5.13(W) 5.16

5.43

5.01

5.08

4.5

9

4.62

5.69

5.70

5.71

5.72

7.68

7.68

5.70

5.27(W)

5.05(W)

5.00(W)

5.0

5(W

)

4.63

4.64

4.70

4.76

5.10

5.14

5.07

GV

5.21

MH

5.02

GV

5.10

MH

5.04

MH

5.01

5.15

5.05

4.96

5.00

5.04

4.99

5.03

5.03

5.10

5.07

5.06 5.03

5.06

5.08

5.29(W)

5.32(W)

5.38

5.36

5.38

5.35

5.3

9(W

)

5.73(W)

5.72(W)

5.7

5(W

)

5.77(W)

5.4

1

5.07

4.63

4.76

4.87

4.84

4.93

5.14

5.15

5.14

4.90

4.8

2

5.17

5.18

5.19

5.14

4.84

6.42

4.8

45.5

6

5.5

5

5.7

27.49

7.495.7

2

5.7

3

5.7

3

4.8

4

4.8

2

4.93

4.74

4.65

4.68

4.76

4.76

4.71

5.12

5.10

GU

TT

ER

CU

RB

GU

TT

ER

CU

RB

Re

m 1

4

Re

m 1

3

Re

m 1

2R

em

11

0.9

22

9.7

60.0

6

24.47

9.5

49.9

51

1.2

3

24.44

8.9

62

0.5

5

24.41

3.8

5

0.11

2.1

5

0.11

0.6

5

2.1

36.0

3

0.20

0.6

4

12.4

6

0.10

3.0

4

0.6

3

0.20

0.110.5

1

0.2

1

0.10

3.63

3.66

3.43

0.0

1C

LE

AR

0.0

0

0.06OVER

0.10CLEAR

0.05OVER

0.06OVER

3.68

3.64

2.7

6

0.0

0

0.0

1C

LE

AR

EX

TE

NT

OF

AT

TA

CH

ED

CA

NO

PY

0.54OVER

3.34

3.34

3.44

BLO

OD

ALLE

Y S

QU

AR

E

TR

OU

NC

E A

LLE

Y

10.6

45 P

L2

0.1

05 P

L2

0.1

05 P

L1

2.1

80 P

L

28.146 PL

12.1

71 P

L2

0.0

96 P

L2

0.0

96 P

L1

0.6

45 P

L

28.085 PL

28.096 PL

28.115 PL

28.134 PL

FU

RT

HE

ST

AP

PA

RE

NT

EX

TE

NT

OF

TY

PIC

AL C

OR

NIC

E

FURTHEST

APP

ARENT

EXTENTS

OFTYPI

CAL

PARAPET

WE

ST

CO

RD

OV

A S

TR

EE

T

2 S

T O

R E

Y B

U I L

D I N

G

3 S

T O

R E

Y B

U I L

D I N

G

P L

A N

1 6

8

0.00

0.00

0.04CLEAR

LIN

E O

F B

RIC

K C

OLU

MN

S

CR

OW

N O

F R

OA

D

:0.4

3

:0.4

3

:0.5

2

:0.6

4

:0.4

3

:0.2

1

RO

CK

WA

LL

BRICKRAM

P

BRIC

KRA

MP

BRICK

RAM

PD

Ø:0

.43

:0.4

3

LA

ND

ING

BA

LC

ON

YB

ALC

ON

Y

RO

CK

WA

LL

BR

ICK S

TE

PS

BR

ICK S

TE

PS

EDG

E OF BRIC

K

ED

GE

OF B

RIC

K

PLA

NT

ER

PLAN

TER

PLAN

TER

CON

CRETESTEPS

CONCRETE

STEPS

ST

ON

E W

ALL

"G

AR

AG

E" B

UIL

DIN

G"

ALH

AM

BR

A"

BU

ILD

ING

BU

ILD

ING

OU

TLIN

E

BU

ILD

ING

OU

TLIN

E

"T

ER

MIN

US

" B

UIL

DIN

G

LANDING

STON

E WALL

:0.4

6

CO

NC

RE

TE

ST

EP

S

BU

ILD

ING

OU

TLIN

E

ED

GE

OF B

RIC

K

ED

GE

OF B

RIC

K

CR

OW

N O

F A

SP

HA

LT

RO

AD

:0.1

5D

Ø:0

.05

:0.3

3D

Ø:0

.16

:0.2

2

6.32

PP

AB

AN

DO

NE

D

:0.2

2D

Ø:0

.22

:0.2

7

6.15

:0.1

1D

Ø:0

.27

:0.0

5

:0.2

5

6.31MH

HY

DR

O

HY

DR

O

MAIN FLOOR

ELEVATION

4.54

CB

WO

OD

HO

AR

DIN

G

WOOD HOARDING

:0.1

3

HY

DR

O

VA

ULT

HY

DR

O

VA

ULT

HY

DR

OH

YD

RO

TE

L

HY

DR

O

HY

DR

OH

YD

RO

OV

ER

HE

AD

WIR

E

OV

ER

HE

AD

WIR

E

OV

ER

HE

AD

WIR

E

OV

ER

HE

AD

WIR

E

OVERHEAD WIRE

OVERHEAD WIRE

OVERHEAD WIRE

LE

TD

OW

NLE

TD

OW

N

GU

TT

ER

CU

RB

(OH

W)

(OH

W)

(OH

W)

5.60

0.03OVER

ST

EP

S

CO

NC

RE

TE

4.60

LS

TE

L

PLA

NT

ER (W

)

(W)

(W)

(W)

(W)

(W)

(W)

(W)

(W)

(W)

PLAN

TER(W)

(W)

(W)

PLAN

TER(W)

(W)

(W)

4.96B

(W)

PLAN

TER

(W)

(W)

(W)

4.85

BCON

CRETESTEPS

ROCK WALL

(W)

G

PLA

N

EAST 26' OF 14PLA

N 1

68

5.79

6.38

PLA

N 1

07

53

ST

RA

TA

PLA

NLM

S738

ST

RA

TA

PLA

N

BC

S3

22

9

ST

RA

TA

PLA

N

BC

S3

64

7

Z

PLA

N B

CP

29042

A

RE

F P

LA

N 1

45

7

EAST PART OF 1

RE

F P

LA

N 1

32

Rem 12

E 1/24W 1/24

5REM E 1/36

SEWER BOX

PLA

N 1

68

10

5°3

8'3

7"

LIN

E O

F B

RIC

K C

OLU

MN

S

FURTHEST

APP

ARENT

EXTENTS

OFTYPI

CAL

PARAPET

15° 44' 41"

15° 47' 51"

10

5° 4

1' 5

6"

10

5° 3

8' 3

7"

6.24

GC

CARRALL STREET

B

PLA

N B

CP

27174

A

BU

ILD

ING

OU

TLIN

E

BU

ILD

ING

OU

TLIN

E

LM

P4

72

32

STRATA PLAN BCS4367

5.73

LO

T A

RE

A:

299.0

m2

LO

T A

RE

A:

56

4.9

m2

LO

T A

RE

A:

56

5.3

m2

LO

T A

RE

A:

34

2.6

m2

5.12

4.92

6.41

EL. B

OT

TO

M

OF K

IOS

K:5.2

4

EL. T

OP O

F

KIO

SK

:6.14

GRO

UN

D

GRO

UND

DOOR

OPENING

DOOR

OPENING

ELE

VA

TIO

N D

OO

R S

ILL:6

.45

ELE

VA

TIO

N T

OP O

F D

OO

R O

PE

NIN

G:8

.50

KIOSK

Sta

ff R

oo

m

EN

TR

YB

AT

H

UP

DN

UP

DN

PE

- 0

4

Elevator Lobby

Co

rrid

or

SO

CIA

L H

OU

SIN

G

PL

AN

- B

1S

UIT

E 2

02

42

8 s

f -

ST 1

BA

PL

AN

- C

1'S

UIT

E 2

03

37

5 s

f -

ST 1

BA

PL

AN

- C

1'S

UIT

E 2

05

42

2 s

f -

ST 1

BA

PL

AN

- C

1'S

UIT

E 2

06

42

2 s

f -

ST 1

BA

PL

AN

- D

1S

UIT

E 2

07

62

8 s

f -

1 B

D 1

BA

PL

AN

- H

1S

UIT

E 2

18

41

0 s

f -

1 B

D 1

BA

PL

AN

- B

1S

UIT

E 2

21

42

5 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 2

20

42

2 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 2

19

42

2 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 2

18

42

2 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 2

17

42

2 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 2

16

42

3 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 2

11

42

2 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 2

10

42

2 s

f -

ST 1

BA

PL

AN

- F

1S

UIT

E 2

09

38

0 s

f -

ST 1

BA

PL

AN

- E

1S

UIT

E 2

08

38

5 s

f -

ST 1

BA

PL

AN

- G

1S

UIT

E 2

12

41

0 s

f -

ST 1

BA

Kit

chen

En

try

UPDN

UP DN

ELEC

MECH

PE

- 0

1F

IRE

PE

- 0

2

ELEC

ME

CH

Co

rrid

or

PE

- 0

3

EL

EC

RO

OF D

EC

KR

OO

F D

EC

KR

OO

F D

EC

KR

OO

F D

EC

K

EX

IST

ING

WA

LL

RO

OF

DE

CK

RO

OF

DE

CK

RO

OF

DE

CK

RO

OF

DE

CK

RO

OF

DE

CK

RO

OF

DE

CK

RO

OF

DE

CK

ADJACENT BUILDING(4 STOREYS)

LIN

E O

F B

UIL

DIN

G A

BO

VE

RO

OF

RO

OF

DE

CK

RO

OF

DE

CK

RO

OF

DE

CK

T.O.W

.+12.50mT.

O.W

.

+12.

50m

PL

AN

- G

1S

UIT

E 2

13

37

3 s

f -

ST 1

BA

PL

AN

- G

1S

UIT

E 2

14

38

0 s

f -

ST 1

BA

PL

AN

- G

1S

UIT

E 2

15

41

0 s

f -

ST 1

BA

Am

enit

y S

pac

e1

23

0sf BC

Ho

usi

ng

Am

enit

y R

oo

f D

eck

W

Lau

nd

ry

PL

AN

- C

1'S

UIT

E 2

04

37

5 s

f -

ST 1

BA

PL

AN

- A

1S

UIT

E 2

01

49

8 s

f -

1 B

D 1

BA

W

FD

Off

ice

FD

Sto

rag

e

Nu

rse

Sta

tio

n

M.

T.O

.W.

+12.

50m

TO

BE

UP

DA

TE

D

UP

DN

UP

DN

PE

- 0

4

Ele

vato

r L

ob

by

EX

IST

ING

WA

LL

OP

EN

TO

BE

LO

W OP

EN

TO

BE

LO

W

OPEN TO BELOW

PL

AN

- A

1S

UIT

E 3

01

56

5 s

f -

1 B

D 1

BA

PL

AN

- B

1S

UIT

E 3

02

44

0 s

f -

ST 1

BA

P

LA

N -

C1'

SU

ITE

30

3

39

0 s

f -

ST 1

BA

PL

AN

- C

1'S

UIT

E 3

04

39

0 s

f -

ST 1

BA

P

LA

N -

C1'

SU

ITE

30

5

37

5 s

f -

ST 1

BA

PL

AN

- C

1'S

UIT

E 3

06

42

2 s

f -

ST 1

BA

PL

AN

- C

1'S

UIT

E 3

07

42

2 s

f -

ST 1

BA

PL

AN

- C

1'S

UIT

E 3

12

42

2 s

f -

ST 1

BA

PL

AN

- C

1'S

UIT

E 3

13

42

2 s

f -

ST 1

BA

PL

AN

- D

1S

UIT

E 3

14

62

8 s

f -

1 B

D 1

BA

PL

AN

- H

1S

UIT

E 3

29

41

0sf -

1 B

D 1

BA

PL

AN

- B

1'S

UIT

E 3

28

42

5 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 3

27

42

2 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 3

26

42

2 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 3

25

42

2 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 3

24

42

2 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 3

23

42

3 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 3

18

42

2 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 3

17

42

2 s

f -

ST 1

BA

PL

AN

- F

1S

UIT

E 3

16

38

0 s

f -

ST 1

BA

PL

AN

- E

1S

UIT

E 3

15

38

5 s

f -

ST 1

BA

PL

AN

- J

1S

UIT

E 3

19

41

0 s

f -

ST 1

BA

PL

AN

-J1

'S

UIT

E 3

08

38

7 s

f -

ST 1

BA

P

LA

N -

K1'

SU

ITE

30

9

38

0 s

f -

ST 1

BA

PL

AN

- K

1'S

UIT

E 3

10

38

0 s

f -

ST 1

BA

P

LA

N -

J1'

SU

ITE

31

1

38

7 s

f -

ST 1

BA

PL

AN

- K

1S

UIT

E 3

20

37

3 s

f -

ST 1

BA

PL

AN

- K

1S

UIT

E 3

21

38

0 s

f -

ST 1

BA

PL

AN

- J

1S

UIT

E 3

22

41

0 s

f -

ST 1

BA

PE

- 0

3

EL

EC

ADJACENT BUILDING(4 STOREYS)

T.O.W

.+15.73m

T.O.W

.+15.73m

FD

Co

rrid

or

M.

N

62

m

11m7m8m2m3m

31m

28m

11m7m8m2m3m

31m

28m

5m

5m

5m

5m

1m

6m

6m

6m

6m

1m

5m

5m

6m

62

m

5m

5m

5m

5m

1m

6m

6m

6m

6m

1m

5m

5m

6m

Salt Tasting Room

Gringo

Parking

MeeT in Gastown

Tacofino

L'abbattoir Resraurant

To inner courtyard

To Gaoler's Mews

BIKE LANE

BIKE LANE

4.31

5.93

4.64

4.68

4.52

4.44

4.59

4.694.59

4.394.21

4.27 4.09

5.46CN

*

5.595.90

7.55

5.91

CN

*

5.486.03

6.41

5.63CN

*

5.70

6.00

5.23

5.07

25.5125.29

5.07

5.93

CN

*

25.46

4.44

5.24

5.02

4.88

4.17

MO

N

4.79

5.99

6.21

6.31

6.47

5.93

6.01

6.00

4.96

4.98

4.73

4.79

4.83

6.26

6.08

5.96

5.98

6.42

6.08

5.95

4.79

4.8

2

4.85

4.8

34.8

34.7

6

4.79

4.7

94.7

84.7

7

5.12

6.0

56.0

96.1

36.1

76.2

06.2

66.3

16.3

26.3

46.4

06.3

7

800

801

802

803

804

805

806

807

808

809

810

811

812

813

814

815

816

817

818

819

820

821

822

823

824

826

827 828

829

830

831

832

833

834

835

836

837

838

839

843

844

845

846

847

848

849

850

852

853

854

855

856

857

858

859

860

861

862

863

866

867

12.5

8

11.7

6(O

HW

)

11.7

8(O

HW

)

12.3

5

12.4

211.4

5(O

HW

)

11.4

6(O

HW

)

12.14(OHW)

11.5

1(O

HW

)

11.5

3(O

HW

)

12.19(OHW)

6.08

6.04

5.99

5.95

5.89

5.87

5.82

5.79

6.20

6.21

6.24

6.27

6.32

6.37

6.42

6.44

6.22

6.22

6.08

6.04

5.98

5.93

5.85

6.03

6.02

6.1

46.2

16.3

06.3

46.3

86.4

3

6.52

6.39

6.36

6.31

6.20

6.14

6.13

6.06

5.99

5.98

5.99

5.92

PM

5.92

5.93

LS

5.92

5.96

PM

6.00

LS

6.02

6.02

PM

6.05

6.14

LS

6.09

PM

6.17

6.14

6.15

6.15

6.41

6.43

6.17

6.40

6.33

6.29

PM

6.26

EB

6.29

WM

6.26

6.22

FH

6.22

LS

6.02

6.00

6.22

6.27

6.13

WV

6.02

LS

6.41

6.28

6.27

WV

6.20

WV

6.15

WV

6.11

WV

5.74

WV

5.92

LS

5.93

PM

5.93

6.00 WM

5.93LS

5.96PM

6.02

6.05

LS

6.05

PM

6.10

6.12

PM

6.18

LS

6.21

PM

6.31

WM

6.26

6.25LS

6.28

PM

6.32

6.39

WM

6.37

LS

6.38PM

6.42

6.23

MH

6.46

5.70

CB

5.73

6.08

6.11

5.97

1016

1017

1018

1019

4.81

4.86

5.05

5.03

4.66

4.674.67

4.644.66

4.64

4.86MH

4.99

MH

5.04LS

4.63

CB

4.80MH

4.80MH

5.0

4M

H

4.90

CB

1039

1040

1041

1042

1043

1044

1045

1046

1047

1048

1049

1050

1051

1052

1053

1054

1055

1056

1057

1058

1059

1060

1061

1062

1063

1064

1065

1066

1067

1068

1069

1070

1071

10721

073

1074

1075

1076

1077

1078

1079

1080

1081

1082

1083

1084

1085

1087

1088

1089

1090

1091

1092

1093

1094

1095

1096

1097

1098

1099

1100

1101

1102

1103

1104

1105

1106

1107

1108

1109

1110

1111

1112

1113

1114

1116

1117

1118

1119

1120

1121

1122

1123

1124

4.87

4.99

4.85

4.95

4.75

4.73

4.82

4.87

4.83

4.82

4.95

MH

4.86MH

4.96

MH

4.96

MH

4.78

4.99

4.87

4.86

4.85

4.85

4.96

LS

4.90

LS

4.88LS

4.93

4.98

4.97

4.74

4.84

4.81

4.82

4.78

4.88

4.93

4.97

5.01

4.87

4.86

4.89

4.94

4.94

4.96

4.98

5.04

5.07

4.64

4.60

4.66

4.64

4.82

4.88

4.95

4.99

4.64

4.62

4.65

4.66

5.09

5.09

5.08

5.1

0

5.09(W)

5.12

5.07

5.11

5.10

5.07

5.09

5.09 5.16

5.14

5.18

5.16

4.84

6.93

6.93

6.94

6.94

7.66

7.655.13

5.09

4.87

4.87

5.0

0(W

)

5.03

4.90

4.63

4.63

4.55

4.59

4.67

4.71

4.69

4.69

4.57

4.56

CB

4.72MH

5.04

4.91

5.07

4.64

4.6

2

4.71

4.70

4.98

4.97

4.66

4.68

5.05

4.94

4.96

4.96

5.03

MH

5.01

MH

5.33

5.34

5.30

5.32

5.26(W

)

5.13

5.11

5.13(W) 5.16

5.43

5.01

5.08

4.5

9

4.62

5.69

5.70

5.71

5.72

7.68

7.68

5.70

5.27(W)

5.05(W)

5.00(W)

5.0

5(W

)

4.63

4.64

4.70

4.76

5.10

5.14

5.07

GV

5.21

MH

5.02

GV

5.10

MH

5.04

MH

5.01

5.15

5.05

4.96

5.00

5.04

4.99

5.03

5.03

5.10

5.07

5.06 5.03

5.06

5.08

5.29(W)

5.32(W)

5.38

5.36

5.38

5.35

5.3

9(W

)

5.73(W)

5.72(W)

5.7

5(W

)

5.77(W)

5.4

1

5.07

4.63

4.76

4.87

4.84

4.93

5.14

5.15

5.14

4.90

4.8

2

5.17

5.18

5.19

5.14

4.84

6.42

4.8

45.5

6

5.5

5

5.7

27.49

7.495.7

2

5.7

3

5.7

3

4.8

4

4.8

2

4.93

4.74

4.65

4.68

4.76

4.76

4.71

5.12

5.10

GU

TT

ER

CU

RB

GU

TT

ER

CU

RB

Re

m 1

4

Re

m 1

3

Re

m 1

2R

em

11

0.9

22

9.7

60.0

6

24.47

9.5

49.9

51

1.2

3

24.44

8.9

62

0.5

5

24.41

3.8

5

0.11

2.1

5

0.11

0.6

5

2.1

36.0

3

0.20

0.6

4

12.4

6

0.10

3.0

4

0.6

3

0.20

0.110.5

1

0.2

1

0.10

3.63

3.66

3.43

0.0

1C

LE

AR

0.0

0

0.06OVER

0.10CLEAR

0.05OVER

0.06OVER

3.68

3.64

2.7

6

0.0

0

0.0

1C

LE

AR

EX

TE

NT

OF

AT

TA

CH

ED

CA

NO

PY

0.54OVER

3.34

3.34

3.44

BLO

OD

ALLE

Y S

QU

AR

E

TR

OU

NC

E A

LLE

Y

10.6

45 P

L2

0.1

05 P

L2

0.1

05 P

L1

2.1

80 P

L

28.146 PL

12.1

71 P

L2

0.0

96 P

L2

0.0

96 P

L1

0.6

45 P

L

28.085 PL

28.096 PL

28.115 PL

28.134 PL

FU

RT

HE

ST

AP

PA

RE

NT

EX

TE

NT

OF

TY

PIC

AL C

OR

NIC

E

FURTHEST

APP

ARENT

EXTENTS

OFTYPI

CAL

PARAPET

WE

ST

CO

RD

OV

A S

TR

EE

T

2 S

T O

R E

Y B

U I L

D I N

G

3 S

T O

R E

Y B

U I L

D I N

G

P L

A N

1 6

8

0.00

0.00

0.04CLEAR

LIN

E O

F B

RIC

K C

OLU

MN

S

CR

OW

N O

F R

OA

D

:0.4

3

:0.4

3

:0.5

2

:0.6

4

:0.4

3

:0.2

1

RO

CK

WA

LL

BRICKRAM

P

BRIC

KRA

MP

BRICK

RAM

PD

Ø:0

.43

:0.4

3

LA

ND

ING

BA

LC

ON

YB

ALC

ON

Y

RO

CK

WA

LL

BR

ICK S

TE

PS

BR

ICK S

TE

PS

EDG

E OF BRIC

K

ED

GE

OF B

RIC

K

PLA

NT

ER

PLAN

TER

PLAN

TER

CON

CRETESTEPS

CONCRETE

STEPS

ST

ON

E W

ALL

"G

AR

AG

E" B

UIL

DIN

G"

ALH

AM

BR

A"

BU

ILD

ING

BU

ILD

ING

OU

TLIN

E

BU

ILD

ING

OU

TLIN

E

"T

ER

MIN

US

" B

UIL

DIN

G

LANDING

STON

E WALL

:0.4

6

CO

NC

RE

TE

ST

EP

S

BU

ILD

ING

OU

TLIN

E

ED

GE

OF B

RIC

K

ED

GE

OF B

RIC

K

CR

OW

N O

F A

SP

HA

LT

RO

AD

:0.1

5D

Ø:0

.05

:0.3

3D

Ø:0

.16

:0.2

2

6.32

PP

AB

AN

DO

NE

D

:0.2

2D

Ø:0

.22

:0.2

7

6.15

:0.1

1D

Ø:0

.27

:0.0

5

:0.2

5

6.31

MH

HY

DR

O

HY

DR

O

MAIN FLOOR

ELEVATION

4.54

CB

WO

OD

HO

AR

DIN

G

WOOD HOARDING

:0.1

3

HY

DR

O

VA

ULT

HY

DR

O

VA

ULT

HY

DR

OH

YD

RO

TE

L

HY

DR

O

HY

DR

OH

YD

RO

OV

ER

HE

AD

WIR

E

OV

ER

HE

AD

WIR

E

OV

ER

HE

AD

WIR

E

OV

ER

HE

AD

WIR

E

OVERHEAD WIRE

OVERHEAD WIRE

OVERHEAD WIRE

LE

TD

OW

NLE

TD

OW

N

GU

TT

ER

CU

RB

(OH

W)

(OH

W)

(OH

W)

5.60

0.03OVER

ST

EP

S

CO

NC

RE

TE

4.60

LS

TE

L

PLA

NT

ER

(W)

(W)

(W)

(W)

(W)

(W)

(W)

(W)

(W)

(W)

PLAN

TER(W)

(W)

(W)

PLAN

TER(W)

(W)

(W)

4.96B

(W)

PLAN

TER

(W)

(W)

(W)

4.85

BCON

CRETESTEPS

ROCK WALL

(W)

G

PLA

N

EAST 26' OF 14PLA

N 1

68

5.79

6.38

B

PLA

N 1

07

53

ST

RA

TA

PLA

NLM

S738

ST

RA

TA

PLA

N

BC

S3

22

9

ST

RA

TA

PLA

N

BC

S3

64

7

Z

PLA

N B

CP

29042

A

RE

F P

LA

N 1

45

7

EAST PART OF 1

RE

F P

LA

N 1

32

Rem 13

E 1/24W 1/24

5REM E 1/36

SEWER BOX

PLA

N 1

68

10

5°3

8'3

7"

LIN

E O

F B

RIC

K C

OLU

MN

S

FURTHEST

APP

ARENT

EXTENTS

OFTYPI

CAL

PARAPET

15° 44' 41"

15° 47' 51"

10

5° 4

1' 5

6"

10

5° 3

8' 3

7"

6.24

GC

CARRALL STREET

B

PLA

N B

CP

27174

BU

ILD

ING

OU

TLIN

E

BU

ILD

ING

OU

TLIN

E

LM

P4

72

32

STRATA PLAN BCS4367

5.73

LO

T A

RE

A:

29

9.0

m2

LO

T A

RE

A:

56

4.9

m2

LO

T A

RE

A:

56

5.3

m2

LO

T A

RE

A:

34

2.6

m2

5.12

4.92

6.41

EL. B

OT

TO

M

OF K

IOS

K:5.2

4

EL. T

OP O

F

KIO

SK

:6.14

GRO

UN

D

GRO

UND

DOOR

OPENING

DOOR

OPENING

ELE

VA

TIO

N D

OO

R S

ILL:6

.45

ELE

VA

TIO

N T

OP O

F D

OO

R O

PE

NIN

G:8

.50

KIOSK

+ El 5.05m

+ El 5.10m

+ El 6.00m

+ El 6.05m

+ El 5.60m

+ El 6.05m

+ El 6.05m

+ El 5.60m

+ El 5.50m

+ El 5.05m

+ El 6.05m

+ El 6.05m

+ El 5.30m

+ El 5.50m

+ El 4.95m

+ El 6.05m + El 5.00m

+ El 4.90m

+ El 4.80m

+ El 6.05m

+ El 5.60m + El 5.15m

0 3 7 11 15 m

Page 9: Blood Alley Square/Trounce Alley Redesign · 2020. 8. 27. · Make sure to provide your feedback by filling out a questionnaire ... studies will help inform the detailed design and

9

vancouver.ca/blood-alley-square

Blood Alley Square/Trounce Alley Redesign

Precedents Cross Section BB

Perspective of Square looking West Perspective of Square looking East

Elevation of Blood Alley Square Looking South (Section AA)

33 W Cordova

6.05m+ 5.05m

+

Blood Alley Square Trounce Alley

1. Accessible ramp2. Porte cochère (covered

connection) to Cordova St.3. Timber deck / patio4. Eight steps to connect to

33 W Cordova 5. Concrete seat walls6. Refurbished heritage globe

lights7. Guardrail and handrail for

fall protection8. Concrete benches for traffic

calming9. Commercial Class B loading

(1)10. Passenger Class A loading

(2)11. New large tree12. Existing tulip trees, to

remain

41

5

5

7

12

12

11

11

12

10

92

3

3 8

6

Page 10: Blood Alley Square/Trounce Alley Redesign · 2020. 8. 27. · Make sure to provide your feedback by filling out a questionnaire ... studies will help inform the detailed design and

10

vancouver.ca/blood-alley-square

Blood Alley Square/Trounce Alley Redesign

PR

OP

ER

TY L

INE

4.31

5.93

4.64

4.68

4.52

4.44

4.59

4.694.59

4.394.21

4.27 4.09

5.46CN

*

5.595.90

7.55

5.91

CN

*

5.486.03

6.41

5.63CN

*

5.70

6.00

5.23

5.07

25.5125.29

5.07

5.93

CN

*

25.46

4.44

5.24

5.02

4.88

4.17

MO

N

4.79

5.99

6.21

6.31

6.47

5.93

6.01

6.00

4.96

4.98

4.73

4.79

4.83

6.26

6.08

5.96

5.98

6.42

6.08

5.95

4.79

4.8

2

4.85

4.8

34.8

34.7

6

4.79

4.7

94.7

84.7

7

5.12

6.0

56.0

96.1

36.1

76.2

06.2

66.3

16.3

26.3

46.4

06.3

7

800

801

802

803

804

805

806

807

808

809

810

811

812

813

814

815

816

817

818

819

820

821

822

823

824

826

827 828

829

830

831

832

833

834

835

836

837

838

839

843

844

845

846

847

848

849

850

852

853

854

855

856

857

858

859

860

861

862

863

866

867

12.5

8

11.7

6(O

HW

)

11.7

8(O

HW

)

12.3

5

12.4

211.4

5(O

HW

)

11.4

6(O

HW

)

12.14(OHW)

11.5

1(O

HW

)

11.5

3(O

HW

)

12.19(OHW)

6.08

6.04

5.99

5.95

5.89

5.87

5.82

5.79

6.20

6.21

6.24

6.27

6.32

6.37

6.42

6.44

6.22

6.22

6.08

6.04

5.98

5.93

5.85

6.03

6.02

6.1

46.2

16.3

06.3

46.3

86.4

3

6.52

6.39

6.36

6.31

6.20

6.14

6.13

6.06

5.99

5.98

5.99

5.92

PM

5.92

5.93

LS

5.92

5.96

PM

6.00

LS

6.02

6.02

PM

6.05

6.14

LS

6.09

PM

6.17

6.14

6.15

6.15

6.41

6.43

6.17

6.40

6.33

6.29

PM

6.26

EB

6.29

WM

6.26

6.22

FH

6.22

LS

6.02

6.00

6.22

6.27

6.13

WV

6.02

LS

6.41

6.28

6.27

WV

6.20

WV

6.15

WV

6.11

WV

5.74

WV

5.92

LS

5.93

PM

5.93

6.00 WM

5.93LS

5.96PM

6.02

6.05

LS

6.05

PM

6.10

6.12

PM

6.18

LS

6.21

PM

6.31

WM

6.26

6.25LS

6.28

PM

6.32

6.39

WM

6.37

LS

6.38PM

6.42

6.23

MH

6.46

5.70

CB

5.73

6.08

6.11

5.97

1016

1017

1018

1019

4.81

4.86

5.05

5.03

4.66

4.674.67

4.644.66

4.64

4.86MH

4.99

MH

5.04LS

4.63

CB

4.80MH

4.80MH

5.0

4M

H

4.90

CB

1039

1040

1041

1042

1043

1044

1045

1046

1047

1048

1049

1050

1051

1052

1053

1054

1055

1056

1057

1058

1059

1060

1061

1062

1063

1064

1065

1066

1067

1068

1069

1070

1071

10721

073

1074

1075

1076

1077

1078

1079

1080

1081

1082

1083

1084

1085

1087

1088

1089

1090

1091

1092

1093

1094

1095

1096

1097

1098

1099

1100

1101

1102

1103

1104

1105

1106

1107

1108

1109

1110

1111

1112

1113

1114

1116

1117

1118

1119

1120

1121

1122

1123

1124

4.87

4.99

4.85

4.95

4.75

4.73

4.82

4.87

4.83

4.82

4.95

MH

4.86MH

4.96

MH

4.96

MH

4.78

4.99

4.87

4.86

4.85

4.85

4.96

LS

4.90

LS

4.88LS

4.93

4.98

4.97

4.74

4.84

4.81

4.82

4.78

4.88

4.93

4.97

5.01

4.87

4.86

4.89

4.94

4.94

4.96

4.98

5.04

5.07

4.64

4.60

4.66

4.64

4.82

4.88

4.95

4.99

4.64

4.62

4.65

4.66

5.09

5.09

5.08

5.1

0

5.09(W)

5.12

5.07

5.11

5.10

5.07

5.09

5.09 5.16

5.14

5.18

5.16

4.84

6.93

6.93

6.94

6.94

7.66

7.655.13

5.09

4.87

4.87

5.0

0(W

)

5.03

4.90

4.63

4.63

4.55

4.59

4.67

4.71

4.69

4.69

4.57

4.56

CB

4.72MH

5.04

4.91

5.07

4.64

4.6

2

4.71

4.70

4.98

4.97

4.66

4.68

5.05

4.94

4.96

4.96

5.03

MH

5.01

MH

5.33

5.34

5.30

5.32

5.26(W

)

5.13

5.11

5.13(W) 5.16

5.43

5.01

5.08

4.5

9

4.62

5.69

5.70

5.71

5.72

7.68

7.68

5.70

5.27(W)

5.05(W)

5.00(W)

5.0

5(W

)

4.63

4.64

4.70

4.76

5.10

5.14

5.07

GV

5.21

MH

5.02

GV

5.10

MH

5.04

MH

5.01

5.15

5.05

4.96

5.00

5.04

4.99

5.03

5.03

5.10

5.07

5.06 5.03

5.06

5.08

5.29(W)

5.32(W)

5.38

5.36

5.38

5.35

5.3

9(W

)

5.73(W)

5.72(W)

5.7

5(W

)

5.77(W)

5.4

1

5.07

4.63

4.76

4.87

4.84

4.93

5.14

5.15

5.14

4.90

4.8

2

5.17

5.18

5.19

5.14

4.84

6.42

4.8

45.5

6

5.5

5

5.7

27.49

7.495.7

2

5.7

3

5.7

3

4.8

4

4.8

2

4.93

4.74

4.65

4.68

4.76

4.76

4.71

5.12

5.10

GU

TT

ER

CU

RB

GU

TT

ER

CU

RB

Re

m 1

4

Re

m 1

3

Re

m 1

2R

em

11

0.9

22

9.7

60.0

6

24.47

9.5

49.9

51

1.2

3

24.44

8.9

62

0.5

5

24.41

3.8

5

0.11

2.1

5

0.11

0.6

5

2.1

36.0

3

0.20

0.6

4

12.4

6

0.10

3.0

4

0.6

3

0.20

0.110.5

1

0.2

1

0.10

3.63

3.66

3.43

0.0

1C

LE

AR

0.0

0

0.06OVER

0.10CLEAR

0.05OVER

0.06OVER

3.68

3.64

2.7

6

0.0

0

0.0

1C

LE

AR

EX

TE

NT

OF

AT

TA

CH

ED

CA

NO

PY

0.54OVER

3.34

3.34

3.44

BLO

OD

ALLE

Y S

QU

AR

E

TR

OU

NC

E A

LLE

Y

10.6

45 P

L2

0.1

05 P

L2

0.1

05 P

L1

2.1

80 P

L

28.146 PL

12.1

71 P

L2

0.0

96 P

L2

0.0

96 P

L1

0.6

45 P

L

28.085 PL

28.096 PL

28.115 PL

28.134 PL

FU

RT

HE

ST

AP

PA

RE

NT

EX

TE

NT

OF

TY

PIC

AL C

OR

NIC

E

FURTHEST

APP

ARENT

EXTENTS

OFTYPI

CAL

PARAPET

WE

ST

CO

RD

OV

A S

TR

EE

T

2 S

T O

R E

Y B

U I L

D I N

G

3 S

T O

R E

Y B

U I L

D I N

G

P L

A N

1 6

8

0.00

0.00

0.04CLEAR

LIN

E O

F B

RIC

K C

OLU

MN

S

CR

OW

N O

F R

OA

D

:0.4

3

:0.4

3

:0.5

2

:0.6

4

:0.4

3

:0.2

1

RO

CK

WA

LL

BRICKRAM

P

BRIC

KRA

MP

BRICK

RAM

PD

Ø:0

.43

:0.4

3

LA

ND

ING

BA

LC

ON

YB

ALC

ON

Y

RO

CK

WA

LL

BR

ICK S

TE

PS

BR

ICK S

TE

PS

EDG

E OF BRIC

K

ED

GE

OF B

RIC

K

PLA

NT

ER

PLAN

TER

PLAN

TER

CON

CRETESTEPS

CONCRETE

STEPS

ST

ON

E W

ALL

"G

AR

AG

E" B

UIL

DIN

G"

ALH

AM

BR

A"

BU

ILD

ING

BU

ILD

ING

OU

TLIN

E

BU

ILD

ING

OU

TLIN

E

"T

ER

MIN

US

" B

UIL

DIN

G

LANDING

STON

E WALL

:0.4

6

CO

NC

RE

TE

ST

EP

S

BU

ILD

ING

OU

TLIN

E

ED

GE

OF B

RIC

K

ED

GE

OF B

RIC

K

CR

OW

N O

F A

SP

HA

LT

RO

AD

:0.1

5D

Ø:0

.05

:0.3

3D

Ø:0

.16

:0.2

2

6.32

PP

AB

AN

DO

NE

D

:0.2

2D

Ø:0

.22

:0.2

7

6.15

:0.1

1D

Ø:0

.27

:0.0

5

:0.2

5

6.31

MH

HY

DR

O

HY

DR

O

MAIN FLOOR

ELEVATION

4.54

CB

WO

OD

HO

AR

DIN

G

WOOD HOARDING

:0.1

3

HY

DR

O

VA

ULT

HY

DR

O

VA

ULT

HY

DR

OH

YD

RO

TE

L

HY

DR

O

HY

DR

OH

YD

RO

OV

ER

HE

AD

WIR

E

OV

ER

HE

AD

WIR

E

OV

ER

HE

AD

WIR

E

OV

ER

HE

AD

WIR

E

OVERHEAD WIRE

OVERHEAD WIRE

OVERHEAD WIRE

LE

TD

OW

NLE

TD

OW

N

GU

TT

ER

CU

RB

(OH

W)

(OH

W)

(OH

W)

5.60

0.03OVER

ST

EP

S

CO

NC

RE

TE

4.60

LS

TE

L

PLA

NT

ER

(W)

(W)

(W)

(W)

(W)

(W)

(W)

(W)

(W)

(W)

PLAN

TER(W)

(W)

(W)

PLAN

TER(W)

(W)

(W)

4.96B

(W)

PLAN

TER

(W)

(W)

(W)

4.85

BCON

CRETESTEPS

ROCK WALL

(W)

G

PLA

N

EAST 26' OF 14PLA

N 1

68

5.79

6.38

B

PLA

N 1

07

53

ST

RA

TA

PLA

NLM

S738

ST

RA

TA

PLA

N

BC

S3

22

9

ST

RA

TA

PLA

N

BC

S3

64

7

Z

PLA

N B

CP

29042

A

RE

F P

LA

N 1

45

7

EAST PART OF 1

RE

F P

LA

N 1

32

Rem 13

E 1/24W 1/24

5REM E 1/36

SEWER BOX

PLA

N 1

68

10

5°3

8'3

7"

LIN

E O

F B

RIC

K C

OLU

MN

S

FURTHEST

APP

ARENT

EXTENTS

OFTYPI

CAL

PARAPET

15° 44' 41"

15° 47' 51"

10

5° 4

1' 5

6"

10

5° 3

8' 3

7"

6.24

GC

CARRALL STREET

B

PLA

N B

CP

27174

BU

ILD

ING

OU

TLIN

E

BU

ILD

ING

OU

TLIN

E

LM

P4

72

32

STRATA PLAN BCS4367

5.73

LO

T A

RE

A:

29

9.0

m2

LO

T A

RE

A:

56

4.9

m2

LO

T A

RE

A:

56

5.3

m2

LO

T A

RE

A:

34

2.6

m2

5.12

4.92

6.41

EL. B

OT

TO

M

OF K

IOS

K:5.2

4

EL. T

OP O

F

KIO

SK

:6.14

GRO

UN

D

GRO

UND

DOOR

OPENING

DOOR

OPENING

ELE

VA

TIO

N D

OO

R S

ILL:6

.45

ELE

VA

TIO

N T

OP O

F D

OO

R O

PE

NIN

G:8

.50

KIOSK

4.31

5.93

4.64

4.68

4.52

4.44

4.59

4.694.59

4.394.21

4.27 4.09

5.46

CN

*

5.595.90

7.55

5.91

CN

*

5.486.03

6.41

5.63

CN

*

5.70

6.00

5.23

5.07

25.5125.29

5.07

5.93

CN

*

25.46

4.44

5.24

5.02

4.88

4.17

MO

N

4.79

5.99

6.21

6.31

6.47

5.93

6.01

6.00

4.96

4.98

4.73

4.79

4.83

6.26

6.08

5.96

5.98

6.42

6.08

5.95

4.79

4.8

2

4.85

4.8

34.8

34.7

6

4.79

4.7

94.7

84.7

7

5.12

6.0

56.0

96.1

36.1

76.2

06.2

66.3

16.3

26.3

46.4

06.3

7

800

801

802

803

804

805

806

807

808

809

810

811

812

813

814

815

816

817

818

819

820

821

822

823

824

826

827 828

829

830

831

832

833

834

835

836

837

838

839

843

844

845

846

847

848

849

850

852

853

854

855

856

857

858

859

860

861

862

863

866867

12.5

8

11.7

6(O

HW

)

11.7

8(O

HW

)

12.3

5

12.4

211.4

5(O

HW

)

11.4

6(O

HW

)

12.14(OHW)

11.5

1(O

HW

)

11.5

3(O

HW

)

12.19(OHW)

6.08

6.04

5.99

5.95

5.89

5.87

5.82

5.79

6.20

6.21

6.24

6.27

6.32

6.37

6.42

6.44

6.22

6.22

6.08

6.04

5.98

5.93

5.85

6.03

6.02

6.1

46.2

16.3

06.3

46.3

86.4

3

6.52

6.39

6.36

6.31

6.20

6.14

6.13

6.06

5.99

5.98

5.99

5.92

PM

5.92

5.93

LS

5.92

5.96

PM

6.00

LS

6.02

6.02

PM

6.05

6.14

LS

6.09

PM

6.17

6.14

6.15

6.15

6.41

6.43

6.17

6.40

6.33

6.29

PM

6.26

EB

6.29

WM

6.26

6.22

FH

6.22

LS

6.02

6.00

6.22

6.27

6.13

WV

6.02

LS

6.41

6.28

6.27WV

6.20WV

6.15

WV

6.11

WV

5.74WV

5.92

LS

5.93

PM

5.93

6.00 WM

5.93LS

5.96

PM

6.02

6.05

LS

6.05

PM

6.10

6.12

PM

6.18

LS

6.21

PM

6.31

WM

6.26

6.25

LS

6.28

PM

6.32

6.39

WM

6.37

LS

6.38

PM

6.42

6.23

MH

6.46

5.70

CB

5.73

6.08

6.11

5.97

1016

1017

1018

1019

4.81

4.86

5.05

5.03

4.66

4.674.67

4.644.66

4.64

4.86MH

4.99MH

5.04LS

4.63

CB

4.80

MH

4.80MH

5.0

4M

H

4.90

CB

1039

1040

1041

1042

1043

1044

1045

1046

1047

1048

1049

1050

1051

1052

1053

1054

1055

1056

1057

1058

1059

1060

1061

1062

1063

1064

1065

1066

1067

1068

1069

1070

1071

10721

073

1074

1075

1076

1077

1078

1079

1080

1081

1082

1083

1084 1

085

1087

1088

1089

1090

1091

1092

1093

1094

1095

1096

1097

1098

1099

1100

1101

1102

1103

1104

1105

1106

1107

1108

1109

1110

1111

1112

1113

1114

1116

1117

1118

1119

1120

1121

1122

1123

1124

4.87

4.99

4.85

4.95

4.75

4.73

4.82

4.87

4.83

4.82

4.95

MH

4.86MH

4.96

MH

4.96

MH

4.78

4.99

4.87

4.86

4.85

4.85

4.96

LS

4.90

LS

4.88LS

4.93

4.98

4.97

4.74

4.84

4.81

4.82

4.78

4.88

4.93

4.97

5.01

4.87

4.86

4.89

4.94

4.94

4.96

4.98

5.04

5.07

4.64

4.60

4.66

4.64

4.82

4.88

4.95

4.99

4.64

4.62

4.65

4.66

5.09

5.09

5.08

5.1

0

5.09(W)

5.12

5.07

5.11

5.10

5.07

5.09

5.09 5.16

5.14

5.18

5.16

4.84

6.93

6.93

6.94

6.94

7.66

7.655.13

5.09

4.87

4.875.0

0(W

)

5.03

4.90

4.63

4.63

4.55

4.59

4.67

4.71

4.69

4.69

4.57

4.56

CB

4.72MH

5.04

4.91

5.07

4.64

4.6

2

4.71

4.70

4.98

4.97

4.66

4.68

5.05

4.94

4.96

4.96

5.03

MH

5.01

MH

5.33

5.34

5.30

5.32

5.26(W

)

5.13

5.11

5.13(W) 5.16

5.43

5.01

5.08

4.5

9

4.62

5.69

5.70

5.71

5.72

7.68

7.68

5.70

5.27(W)

5.05(W)

5.00(W)

5.0

5(W

)

4.63

4.64

4.70

4.76

5.10

5.14

5.07

GV

5.21

MH

5.02

GV

5.10

MH

5.04

MH

5.01

5.15

5.05

4.96

5.00

5.04

4.99

5.03

5.03

5.10

5.07

5.06 5.03

5.06

5.08

5.29(W)

5.32(W)

5.38

5.36

5.38

5.35

5.3

9(W

)

5.73(W)

5.72(W)

5.7

5(W

)

5.77(W)

5.4

1

5.07

4.63

4.76

4.87

4.84

4.93

5.14

5.15

5.14

4.90

4.8

2

5.17

5.18

5.19

5.14

4.84

6.42

4.8

45.5

6

5.5

5

5.7

27.49

7.495.7

2

5.7

3

5.7

3

4.8

4

4.8

2

4.93

4.74

4.65

4.68

4.76

4.76

4.71

5.12

5.10

GU

TT

ER

CU

RB

GU

TT

ER

CU

RB

Re

m 1

4

Re

m 1

3

Re

m 1

2R

em

11

0.9

22

9.7

60.0

6

24.47

9.5

49.9

51

1.2

3

24.44

8.9

62

0.5

5

24.41

3.8

5

0.11

2.1

5

0.11

0.6

5

2.1

36.0

3

0.20

0.6

4

12.4

6

0.10

3.0

4

0.6

3

0.20

0.110.5

1

0.2

1

0.10

3.63

3.66

3.43

0.0

1C

LE

AR

0.0

0

0.06OVER

0.10CLEAR

0.05OVER

0.06OVER

3.68

3.64

2.7

6

0.0

0

0.0

1C

LE

AR

EX

TE

NT

OF

AT

TA

CH

ED

CA

NO

PY

0.54OVER

3.34

3.34

3.44

BLO

OD

ALLE

Y S

QU

AR

E

TR

OU

NC

E A

LLE

Y

10.6

45 P

L2

0.1

05 P

L2

0.1

05 P

L1

2.1

80 P

L

28.146 PL

12.1

71 P

L2

0.0

96 P

L2

0.0

96 P

L1

0.6

45 P

L

28.085 PL

28.096 PL

28.115 PL

28.134 PL

FU

RT

HE

ST

AP

PA

RE

NT

EX

TE

NT

OF

TY

PIC

AL C

OR

NIC

E

FURTHEST

APP

ARENT

EXTENTS

OFTYPI

CAL

PARAPET

WE

ST

CO

RD

OV

A S

TR

EE

T

2 S

T O

R E

Y B

U I L

D I N

G

3 S

T O

R E

Y B

U I L

D I N

G

P L

A N

1 6

8

0.00

0.00

0.04CLEAR

LIN

E O

F B

RIC

K C

OLU

MN

S

CR

OW

N O

F R

OA

D

:0.4

3

:0.4

3

:0.5

2

:0.6

4

:0.4

3

:0.2

1

RO

CK

WA

LL

BRICKRAM

P

BRIC

KRA

MP

BRICK

RAM

PD

Ø:0

.43

:0.4

3

LA

ND

ING

BA

LC

ON

YB

ALC

ON

Y

RO

CK

WA

LL

BR

ICK S

TE

PS

BR

ICK S

TE

PS

EDG

E OF BRIC

K

ED

GE

OF B

RIC

K

PLA

NT

ER

PLAN

TER

PLAN

TER

CON

CRETESTEPS

CONCRETE

STEPS

ST

ON

E W

ALL

"G

AR

AG

E" B

UIL

DIN

G"

ALH

AM

BR

A"

BU

ILD

ING

BU

ILD

ING

OU

TLIN

E

BU

ILD

ING

OU

TLIN

E

"T

ER

MIN

US

" B

UIL

DIN

G

LANDING

STON

E WALL

:0.4

6

CO

NC

RE

TE

ST

EP

S

BU

ILD

ING

OU

TLIN

E

ED

GE

OF B

RIC

K

ED

GE

OF B

RIC

K

CR

OW

N O

F A

SP

HA

LT

RO

AD

:0.1

5D

Ø:0

.05

:0.3

3D

Ø:0

.16

:0.2

2

6.32

PP

AB

AN

DO

NE

D

:0.2

2D

Ø:0

.22

:0.2

7

6.15

:0.1

1D

Ø:0

.27

:0.0

5

:0.2

5

6.31MH

HY

DR

O

HY

DR

O

MAIN FLOOR

ELEVATION

4.54

CB

WO

OD

HO

AR

DIN

G

WOOD HOARDING

:0.1

3

HY

DR

O

VA

ULT

HY

DR

O

VA

ULT

HY

DR

OH

YD

RO

TE

L

HY

DR

O

HY

DR

OH

YD

RO

OV

ER

HE

AD

WIR

E

OV

ER

HE

AD

WIR

E

OV

ER

HE

AD

WIR

E

OV

ER

HE

AD

WIR

E

OVERHEAD WIRE

OVERHEAD WIRE

OVERHEAD WIRE

LE

TD

OW

NLE

TD

OW

N

GU

TT

ER

CU

RB

(OH

W)

(OH

W)

(OH

W)

5.60

0.03OVER

ST

EP

S

CO

NC

RE

TE

4.60

LS

TE

L

PLA

NT

ER (W

)

(W)

(W)

(W)

(W)

(W)

(W)

(W)

(W)

(W)

PLAN

TER(W)

(W)

(W)

PLAN

TER(W)

(W)

(W)

4.96B

(W)

PLAN

TER

(W)

(W)

(W)

4.85

BCON

CRETESTEPS

ROCK WALL

(W)

G

PLA

N

EAST 26' OF 14PLA

N 1

68

5.79

6.38

PLA

N 1

07

53

ST

RA

TA

PLA

NLM

S738

ST

RA

TA

PLA

N

BC

S3

22

9

ST

RA

TA

PLA

N

BC

S3

64

7

Z

PLA

N B

CP

29042

A

RE

F P

LA

N 1

45

7

EAST PART OF 1

RE

F P

LA

N 1

32

Rem 12

E 1/24W 1/24

5REM E 1/36

SEWER BOX

PLA

N 1

68

10

5°3

8'3

7"

LIN

E O

F B

RIC

K C

OLU

MN

S

FURTHEST

APP

ARENT

EXTENTS

OFTYPI

CAL

PARAPET

15° 44' 41"

15° 47' 51"

10

5° 4

1' 5

6"

10

5° 3

8' 3

7"

6.24

GC

CARRALL STREET

B

PLA

N B

CP

27174

A

BU

ILD

ING

OU

TLIN

E

BU

ILD

ING

OU

TLIN

E

LM

P4

72

32

STRATA PLAN BCS4367

5.73

LO

T A

RE

A:

299.0

m2

LO

T A

RE

A:

56

4.9

m2

LO

T A

RE

A:

56

5.3

m2

LO

T A

RE

A:

34

2.6

m2

5.12

4.92

6.41

EL. B

OT

TO

M

OF K

IOS

K:5.2

4

EL. T

OP O

F

KIO

SK

:6.14

GRO

UN

D

GRO

UND

DOOR

OPENING

DOOR

OPENING

ELE

VA

TIO

N D

OO

R S

ILL:6

.45

ELE

VA

TIO

N T

OP O

F D

OO

R O

PE

NIN

G:8

.50

KIOSK

Sta

ff R

oo

m

EN

TR

YB

AT

H

UP

DN

UP

DN

PE

- 0

4

Elevator Lobby

Co

rrid

or

SO

CIA

L H

OU

SIN

G

PL

AN

- B

1S

UIT

E 2

02

42

8 s

f -

ST 1

BA

PL

AN

- C

1'S

UIT

E 2

03

37

5 s

f -

ST 1

BA

PL

AN

- C

1'S

UIT

E 2

05

42

2 s

f -

ST 1

BA

PL

AN

- C

1'S

UIT

E 2

06

42

2 s

f -

ST 1

BA

PL

AN

- D

1S

UIT

E 2

07

62

8 s

f -

1 B

D 1

BA

PL

AN

- H

1S

UIT

E 2

18

41

0 s

f -

1 B

D 1

BA

PL

AN

- B

1S

UIT

E 2

21

42

5 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 2

20

42

2 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 2

19

42

2 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 2

18

42

2 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 2

17

42

2 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 2

16

42

3 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 2

11

42

2 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 2

10

42

2 s

f -

ST 1

BA

PL

AN

- F

1S

UIT

E 2

09

38

0 s

f -

ST 1

BA

PL

AN

- E

1S

UIT

E 2

08

38

5 s

f -

ST 1

BA

PL

AN

- G

1S

UIT

E 2

12

41

0 s

f -

ST 1

BA

Kit

chen

En

try

UPDN

UP DN

ELEC

MECH

PE

- 0

1F

IRE

PE

- 0

2

ELEC

ME

CH

Co

rrid

or

PE

- 0

3

EL

EC

RO

OF D

EC

KR

OO

F D

EC

KR

OO

F D

EC

KR

OO

F D

EC

K

EX

IST

ING

WA

LL

RO

OF

DE

CK

RO

OF

DE

CK

RO

OF

DE

CK

RO

OF

DE

CK

RO

OF

DE

CK

RO

OF

DE

CK

RO

OF

DE

CK

ADJACENT BUILDING(4 STOREYS)

LIN

E O

F B

UIL

DIN

G A

BO

VE

RO

OF

RO

OF

DE

CK

RO

OF

DE

CK

RO

OF

DE

CK

T.O.W

.+12.50mT.

O.W

.

+12.

50m

PL

AN

- G

1S

UIT

E 2

13

37

3 s

f -

ST 1

BA

PL

AN

- G

1S

UIT

E 2

14

38

0 s

f -

ST 1

BA

PL

AN

- G

1S

UIT

E 2

15

41

0 s

f -

ST 1

BA

Am

enit

y S

pac

e1

23

0sf BC

Ho

usi

ng

Am

enit

y R

oo

f D

eck

W

Lau

nd

ry

PL

AN

- C

1'S

UIT

E 2

04

37

5 s

f -

ST 1

BA

PL

AN

- A

1S

UIT

E 2

01

49

8 s

f -

1 B

D 1

BA

W

FD

Off

ice

FD

Sto

rag

e

Nu

rse

Sta

tio

n

M.

T.O

.W.

+12.

50m

TO

BE

UP

DA

TE

D

UP

DN

UP

DN

PE

- 0

4

Ele

vato

r L

ob

by

EX

IST

ING

WA

LL

OP

EN

TO

BE

LO

W OP

EN

TO

BE

LO

W

OPEN TO BELOW

PL

AN

- A

1S

UIT

E 3

01

56

5 s

f -

1 B

D 1

BA

PL

AN

- B

1S

UIT

E 3

02

44

0 s

f -

ST 1

BA

P

LA

N -

C1'

SU

ITE

30

3

39

0 s

f -

ST 1

BA

PL

AN

- C

1'S

UIT

E 3

04

39

0 s

f -

ST 1

BA

P

LA

N -

C1'

SU

ITE

30

5

37

5 s

f -

ST 1

BA

PL

AN

- C

1'S

UIT

E 3

06

42

2 s

f -

ST 1

BA

PL

AN

- C

1'S

UIT

E 3

07

42

2 s

f -

ST 1

BA

PL

AN

- C

1'S

UIT

E 3

12

42

2 s

f -

ST 1

BA

PL

AN

- C

1'S

UIT

E 3

13

42

2 s

f -

ST 1

BA

PL

AN

- D

1S

UIT

E 3

14

62

8 s

f -

1 B

D 1

BA

PL

AN

- H

1S

UIT

E 3

29

41

0sf -

1 B

D 1

BA

PL

AN

- B

1'S

UIT

E 3

28

42

5 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 3

27

42

2 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 3

26

42

2 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 3

25

42

2 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 3

24

42

2 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 3

23

42

3 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 3

18

42

2 s

f -

ST 1

BA

PL

AN

- C

1S

UIT

E 3

17

42

2 s

f -

ST 1

BA

PL

AN

- F

1S

UIT

E 3

16

38

0 s

f -

ST 1

BA

PL

AN

- E

1S

UIT

E 3

15

38

5 s

f -

ST 1

BA

PL

AN

- J

1S

UIT

E 3

19

41

0 s

f -

ST 1

BA

PL

AN

-J1

'S

UIT

E 3

08

38

7 s

f -

ST 1

BA

P

LA

N -

K1'

SU

ITE

30

9

38

0 s

f -

ST 1

BA

PL

AN

- K

1'S

UIT

E 3

10

38

0 s

f -

ST 1

BA

P

LA

N -

J1'

SU

ITE

31

1

38

7 s

f -

ST 1

BA

PL

AN

- K

1S

UIT

E 3

20

37

3 s

f -

ST 1

BA

PL

AN

- K

1S

UIT

E 3

21

38

0 s

f -

ST 1

BA

PL

AN

- J

1S

UIT

E 3

22

41

0 s

f -

ST 1

BA

PE

- 0

3

EL

EC

ADJACENT BUILDING(4 STOREYS)

T.O.W

.+15.73m

T.O.W

.+15.73m

FD

Co

rrid

or

M.

N

62

m

11m7m8m2m3m

31m

28m

11m7m8m2m3m

31m

28m

5m

5m

5m

5m

1m

6m

6m

6m

6m

1m

5m

5m

6m

62

m

5m

5m

5m

5m

1m

6m

6m

6m

6m

1m

5m

5m

6m

Salt Tasting Room

Gringo

Parking

MeeT in Gastown

Tacofino

L'abbattoir Resraurant

To inner courtyard

To Gaoler's Mews

BIKE LANE

BIKE LANE

4.31

5.93

4.64

4.68

4.52

4.44

4.59

4.694.59

4.394.21

4.27 4.09

5.46CN

*

5.595.90

7.55

5.91

CN

*

5.486.03

6.41

5.63CN

*

5.70

6.00

5.23

5.07

25.5125.29

5.07

5.93

CN

*

25.46

4.44

5.24

5.02

4.88

4.17

MO

N

4.79

5.99

6.21

6.31

6.47

5.93

6.01

6.00

4.96

4.98

4.73

4.79

4.83

6.26

6.08

5.96

5.98

6.42

6.08

5.95

4.79

4.8

2

4.85

4.8

34.8

34.7

6

4.79

4.7

94.7

84.7

7

5.12

6.0

56.0

96.1

36.1

76.2

06.2

66.3

16.3

26.3

46.4

06.3

7

800

801

802

803

804

805

806

807

808

809

810

811

812

813

814

815

816

817

818

819

820

821

822

823

824

826

827 828

829

830

831

832

833

834

835

836

837

838

839

843

844

845

846

847

848

849

850

852

853

854

855

856

857

858

859

860

861

862

863

866

867

12.5

8

11.7

6(O

HW

)

11.7

8(O

HW

)

12.3

5

12.4

211.4

5(O

HW

)

11.4

6(O

HW

)

12.14(OHW)

11.5

1(O

HW

)

11.5

3(O

HW

)

12.19(OHW)

6.08

6.04

5.99

5.95

5.89

5.87

5.82

5.79

6.20

6.21

6.24

6.27

6.32

6.37

6.42

6.44

6.22

6.22

6.08

6.04

5.98

5.93

5.85

6.03

6.02

6.1

46.2

16.3

06.3

46.3

86.4

3

6.52

6.39

6.36

6.31

6.20

6.14

6.13

6.06

5.99

5.98

5.99

5.92

PM

5.92

5.93

LS

5.92

5.96

PM

6.00

LS

6.02

6.02

PM

6.05

6.14

LS

6.09

PM

6.17

6.14

6.15

6.15

6.41

6.43

6.17

6.40

6.33

6.29

PM

6.26

EB

6.29

WM

6.26

6.22

FH

6.22

LS

6.02

6.00

6.22

6.27

6.13

WV

6.02

LS

6.41

6.28

6.27

WV

6.20

WV

6.15

WV

6.11

WV

5.74

WV

5.92

LS

5.93

PM

5.93

6.00 WM

5.93LS

5.96PM

6.02

6.05

LS

6.05

PM

6.10

6.12

PM

6.18

LS

6.21

PM

6.31

WM

6.26

6.25LS

6.28

PM

6.32

6.39

WM

6.37

LS

6.38PM

6.42

6.23

MH

6.46

5.70

CB

5.73

6.08

6.11

5.97

1016

1017

1018

1019

4.81

4.86

5.05

5.03

4.66

4.674.67

4.644.66

4.64

4.86MH

4.99

MH

5.04LS

4.63

CB

4.80MH

4.80MH

5.0

4M

H

4.90

CB

1039

1040

1041

1042

1043

1044

1045

1046

1047

1048

1049

1050

1051

1052

1053

1054

1055

1056

1057

1058

1059

1060

1061

1062

1063

1064

1065

1066

1067

1068

1069

1070

1071

10721

073

1074

1075

1076

1077

1078

1079

1080

1081

1082

1083

1084

1085

1087

1088

1089

1090

1091

1092

1093

1094

1095

1096

1097

1098

1099

1100

1101

1102

1103

1104

1105

1106

1107

1108

1109

1110

1111

1112

1113

1114

1116

1117

1118

1119

1120

1121

1122

1123

1124

4.87

4.99

4.85

4.95

4.75

4.73

4.82

4.87

4.83

4.82

4.95

MH

4.86MH

4.96

MH

4.96

MH

4.78

4.99

4.87

4.86

4.85

4.85

4.96

LS

4.90

LS

4.88LS

4.93

4.98

4.97

4.74

4.84

4.81

4.82

4.78

4.88

4.93

4.97

5.01

4.87

4.86

4.89

4.94

4.94

4.96

4.98

5.04

5.07

4.64

4.60

4.66

4.64

4.82

4.88

4.95

4.99

4.64

4.62

4.65

4.66

5.09

5.09

5.08

5.1

0

5.09(W)

5.12

5.07

5.11

5.10

5.07

5.09

5.09 5.16

5.14

5.18

5.16

4.84

6.93

6.93

6.94

6.94

7.66

7.655.13

5.09

4.87

4.87

5.0

0(W

)

5.03

4.90

4.63

4.63

4.55

4.59

4.67

4.71

4.69

4.69

4.57

4.56

CB

4.72MH

5.04

4.91

5.07

4.64

4.6

2

4.71

4.70

4.98

4.97

4.66

4.68

5.05

4.94

4.96

4.96

5.03

MH

5.01

MH

5.33

5.34

5.30

5.32

5.26(W

)

5.13

5.11

5.13(W) 5.16

5.43

5.01

5.08

4.5

9

4.62

5.69

5.70

5.71

5.72

7.68

7.68

5.70

5.27(W)

5.05(W)

5.00(W)

5.0

5(W

)

4.63

4.64

4.70

4.76

5.10

5.14

5.07

GV

5.21

MH

5.02

GV

5.10

MH

5.04

MH

5.01

5.15

5.05

4.96

5.00

5.04

4.99

5.03

5.03

5.10

5.07

5.06 5.03

5.06

5.08

5.29(W)

5.32(W)

5.38

5.36

5.38

5.35

5.3

9(W

)

5.73(W)

5.72(W)

5.7

5(W

)

5.77(W)

5.4

1

5.07

4.63

4.76

4.87

4.84

4.93

5.14

5.15

5.14

4.90

4.8

2

5.17

5.18

5.19

5.14

4.84

6.42

4.8

45.5

6

5.5

5

5.7

27.49

7.495.7

2

5.7

3

5.7

3

4.8

4

4.8

2

4.93

4.74

4.65

4.68

4.76

4.76

4.71

5.12

5.10

GU

TT

ER

CU

RB

GU

TT

ER

CU

RB

Re

m 1

4

Re

m 1

3

Re

m 1

2R

em

11

0.9

22

9.7

60.0

6

24.47

9.5

49.9

51

1.2

3

24.44

8.9

62

0.5

5

24.41

3.8

5

0.11

2.1

5

0.11

0.6

5

2.1

36.0

3

0.20

0.6

4

12.4

6

0.10

3.0

4

0.6

3

0.20

0.110.5

1

0.2

1

0.10

3.63

3.66

3.43

0.0

1C

LE

AR

0.0

0

0.06OVER

0.10CLEAR

0.05OVER

0.06OVER

3.68

3.64

2.7

6

0.0

0

0.0

1C

LE

AR

EX

TE

NT

OF

AT

TA

CH

ED

CA

NO

PY

0.54OVER

3.34

3.34

3.44

BLO

OD

ALLE

Y S

QU

AR

E

TR

OU

NC

E A

LLE

Y

10.6

45 P

L2

0.1

05 P

L2

0.1

05 P

L1

2.1

80 P

L

28.146 PL

12.1

71 P

L2

0.0

96 P

L2

0.0

96 P

L1

0.6

45 P

L

28.085 PL

28.096 PL

28.115 PL

28.134 PL

FU

RT

HE

ST

AP

PA

RE

NT

EX

TE

NT

OF

TY

PIC

AL C

OR

NIC

E

FURTHEST

APP

ARENT

EXTENTS

OFTYPI

CAL

PARAPET

WE

ST

CO

RD

OV

A S

TR

EE

T

2 S

T O

R E

Y B

U I L

D I N

G

3 S

T O

R E

Y B

U I L

D I N

G

P L

A N

1 6

8

0.00

0.00

0.04CLEAR

LIN

E O

F B

RIC

K C

OLU

MN

S

CR

OW

N O

F R

OA

D

:0.4

3

:0.4

3

:0.5

2

:0.6

4

:0.4

3

:0.2

1

RO

CK

WA

LL

BRICKRAM

P

BRIC

KRA

MP

BRICK

RAM

PD

Ø:0

.43

:0.4

3

LA

ND

ING

BA

LC

ON

YB

ALC

ON

Y

RO

CK

WA

LL

BR

ICK S

TE

PS

BR

ICK S

TE

PS

EDG

E OF BRIC

K

ED

GE

OF B

RIC

K

PLA

NT

ER

PLAN

TER

PLAN

TER

CON

CRETESTEPS

CONCRETE

STEPS

ST

ON

E W

ALL

"G

AR

AG

E" B

UIL

DIN

G"

ALH

AM

BR

A"

BU

ILD

ING

BU

ILD

ING

OU

TLIN

E

BU

ILD

ING

OU

TLIN

E

"T

ER

MIN

US

" B

UIL

DIN

G

LANDING

STON

E WALL

:0.4

6

CO

NC

RE

TE

ST

EP

S

BU

ILD

ING

OU

TLIN

E

ED

GE

OF B

RIC

K

ED

GE

OF B

RIC

K

CR

OW

N O

F A

SP

HA

LT

RO

AD

:0.1

5D

Ø:0

.05

:0.3

3D

Ø:0

.16

:0.2

2

6.32

PP

AB

AN

DO

NE

D

:0.2

2D

Ø:0

.22

:0.2

7

6.15

:0.1

1D

Ø:0

.27

:0.0

5

:0.2

5

6.31

MH

HY

DR

O

HY

DR

O

MAIN FLOOR

ELEVATION

4.54

CB

WO

OD

HO

AR

DIN

G

WOOD HOARDING

:0.1

3

HY

DR

O

VA

ULT

HY

DR

O

VA

ULT

HY

DR

OH

YD

RO

TE

L

HY

DR

O

HY

DR

OH

YD

RO

OV

ER

HE

AD

WIR

E

OV

ER

HE

AD

WIR

E

OV

ER

HE

AD

WIR

E

OV

ER

HE

AD

WIR

E

OVERHEAD WIRE

OVERHEAD WIRE

OVERHEAD WIRE

LE

TD

OW

NLE

TD

OW

N

GU

TT

ER

CU

RB

(OH

W)

(OH

W)

(OH

W)

5.60

0.03OVER

ST

EP

S

CO

NC

RE

TE

4.60

LS

TE

L

PLA

NT

ER

(W)

(W)

(W)

(W)

(W)

(W)

(W)

(W)

(W)

(W)

PLAN

TER(W)

(W)

(W)

PLAN

TER(W)

(W)

(W)

4.96B

(W)

PLAN

TER

(W)

(W)

(W)

4.85

BCON

CRETESTEPS

ROCK WALL

(W)

G

PLA

N

EAST 26' OF 14PLA

N 1

68

5.79

6.38

B

PLA

N 1

07

53

ST

RA

TA

PLA

NLM

S738

ST

RA

TA

PLA

N

BC

S3

22

9

ST

RA

TA

PLA

N

BC

S3

64

7

Z

PLA

N B

CP

29042

A

RE

F P

LA

N 1

45

7

EAST PART OF 1

RE

F P

LA

N 1

32

Rem 13

E 1/24W 1/24

5REM E 1/36

SEWER BOX

PLA

N 1

68

10

5°3

8'3

7"

LIN

E O

F B

RIC

K C

OLU

MN

S

FURTHEST

APP

ARENT

EXTENTS

OFTYPI

CAL

PARAPET

15° 44' 41"

15° 47' 51"

10

5° 4

1' 5

6"

10

5° 3

8' 3

7"

6.24

GC

CARRALL STREET

B

PLA

N B

CP

27174

BU

ILD

ING

OU

TLIN

E

BU

ILD

ING

OU

TLIN

E

LM

P4

72

32

STRATA PLAN BCS4367

5.73

LO

T A

RE

A:

29

9.0

m2

LO

T A

RE

A:

56

4.9

m2

LO

T A

RE

A:

56

5.3

m2

LO

T A

RE

A:

34

2.6

m2

5.12

4.92

6.41

EL. B

OT

TO

M

OF K

IOS

K:5.2

4

EL. T

OP O

F

KIO

SK

:6.14

GRO

UN

D

GRO

UND

DOOR

OPENING

DOOR

OPENING

ELE

VA

TIO

N D

OO

R S

ILL:6

.45

ELE

VA

TIO

N T

OP O

F D

OO

R O

PE

NIN

G:8

.50

KIOSK

+ El 5.05m

+ El 5.10m

+ El 6.00m

+ El 6.05m

+ El 5.60m

+ El 6.05m

+ El 6.05m

+ El 5.60m

+ El 5.50m

+ El 5.05m

+ El 6.05m

+ El 6.05m

+ El 5.30m

+ El 5.50m

+ El 4.95m

+ El 6.05m + El 5.00m

+ El 4.90m

+ El 4.80m

+ El 6.05m

+ El 5.60m + El 5.15m

0 3 7 11 15 m

Concept Design - #2 - Multi-level Square

Concrete bench and seating area

Start of elevated Alley “plaza”

New large tree

Two steps up to Blood Alley Square

Timber deck for patio seating and/or event space

Accessible ramp up to 33W Cordova(re-use of heritage red brick pavers)

Shared commercial loading space

Large planter to maintain health of existing tree

Re-use of heritage red brick pavers

Start of elevated Alley “plaza”

Utility service area for neighbourhood

Re-use of heritage cobblestones in Square

Crosswalk connection to Gaoler’s Mews

Three wide steps connect to the 33W Cordova development

Expanded planter area to maintain health of trees. Possible space for public artRefurbished globe light

Seating area, stage and public connection to Cordova Street

Re-use of heritage cobblestones in Alley

Two shared passenger loading stalls

BB

A

A

This concept emphasizes the long-term health of the existing trees by ensuring that the planters are expanded to provide adequate moisture and nutrients. These planters lead to a multi-level design for the space. The Square is divided into two zones: a smaller passive space for sitting and a larger space for events, performances, and patio seating.

Access for 57 W Cordova

Blood Alley Square

Trounce A

lley

33 W C

ord

ova

Page 11: Blood Alley Square/Trounce Alley Redesign · 2020. 8. 27. · Make sure to provide your feedback by filling out a questionnaire ... studies will help inform the detailed design and

11

vancouver.ca/blood-alley-square

Blood Alley Square/Trounce Alley Redesign

Perspective of Square looking West Perspective of Square looking East

1. Accessible ramp2. Porte cochère (covered

connection) to Cordova St.

3. Timber deck / patio4. 3 Steps to 33 W Cordova5. Concrete seat walls6. Refurbished heritage

globe lights7. Passenger Class A

loading (1)8. Commercial Class B

loading (2)9. New large tree10. Existing tulip trees, to

remain

33 W Cordova Blood Alley Square Trounce Alley

1

5

6

10

9

9

10

8 24

3

7

5 3

Precedents Cross Section BB

Elevation of Blood Alley Square Looking South (Section AA)

6.05m

+ 5.05m+

5.55m

+

10

Page 12: Blood Alley Square/Trounce Alley Redesign · 2020. 8. 27. · Make sure to provide your feedback by filling out a questionnaire ... studies will help inform the detailed design and

12

vancouver.ca/blood-alley-square

Blood Alley Square/Trounce Alley Redesign

Tree No. Botanical Name Height(m)Minimum Tree

Protection Zone (m)

Action/Comment

1 Pine(Pinus Nigra) 11 2.0 Poor Health

2Tulip

(Liriodendron Tulipifera)

19 2.5Limited crown growth due to staircase construction

3Tulip

(Liriodendron Tulipifera)

19 3.2Limited foliage growth due to disturbance of root zone

4Tulip

(Liriodendron Tulipifera)

20 3.0 Relative good growth

5Locust

(Robinia Pseudoacacia)

18 2.5Number of dead lower branches, suffered from drought

6Locust

(Robinia Pseudoacacia)

17 2.5Leans to the south, needs to be pruned for new building which would limit its future.

7Locust

(Robinia Pseudoacacia) 18 2.5

Lower limb dieback, relative good growth otherwise

8Tulip

(Liriodendron Tulipifera) 21 3.0 Healthy looking, with slight kink midstem

9Tulip

(Liriodendron Tulipifera) 19 3.0 Good growth with limited light

S01Blood Alley

16061

202—175 East Broadway, Vancouver, British Columbia, V5T 1W2, www.ennsgauthier.com

Schematic Design

Vancouver, BC

TR

OU

NC

E A

LLE

Y

33 W CORDOVA ST

TR

OU

NC

E A

LLE

Y

BLOOD ALLEY SQUARE

0 3 7 11 15 m

The trees are an iconic and treasured feature of Blood Alley Square and Trounce Alley.

Canopy foliage has suffered due to limited to access to light and soil volumes.How could development impact tree health?

There are a number of factors, such as soil contamination, future utilities construction and future upgrades to Trounce Alley, which could impact the feasibility of retaining some trees.

The design options boards illustrate steps being taken to ensure the trees remain healthy and continue to provide the Square with its unique character. Examples of this include steel drainage troughs to provide nutrients and water to the roots (Concept Design 1) and expanded planters to preserve tree and root health (Concept Design 2).

Trees Management StrategyThe existing trees contribute to the character, beauty and enjoyment of Blood Alley Square. A careful assessment of the trees has been undertaken by a certified arborist with the goal to retain as many trees as possible. The table below illustrates the location and current condition of the trees.

Tree Inventory, Diamond Head Consulting Ltd.

Table 1: Tree Inventory and Recommendations, Diamond Head Consulting Ltd.

• Locust (Robinia) and Pine (Pinus) trees are unlikely to survive re-development and are proposed to be removed;

• Tulip (Liriodendron) trees are the largest trees and are in the best condition. Every effort will be made to protect and keep them.

92% thought the conservation of trees in the Square

was important

Why are some trees struggling?

Trees in constrained urban environments typically have shorter life spans because paving prevents water and nutrients from reaching the roots, and surrounding buildings limit access to light.

Existing UnhealthyTree

Existing Tree to Remain

1

6

7

8

2

3

4

5

9

Page 13: Blood Alley Square/Trounce Alley Redesign · 2020. 8. 27. · Make sure to provide your feedback by filling out a questionnaire ... studies will help inform the detailed design and

13

vancouver.ca/blood-alley-square

Blood Alley Square/Trounce Alley Redesign

Waste Management With the input from residents, businesses and organizations and other levels of government, the city is working towards a comprehensive Zero Waste strategy.

Achieving Zero Waste in Blood Alley Square and Trounce Alley would create a cleaner environment; reduce and ultimately eliminate dumpsters; and increase the amount of materials that can be diverted from landfills or incinerators. This would attract more users to the square and set a precedent for innovative waste management that can be replicated in other parts of the City.

An effective waste management strategy must meet the following City policies: • The 2020 Greenest City goal of reducing the amount of solid waste from landfills and incinerators

by 50% (from 2008 levels).• The Zero Waste Strategy by 2040 Goals.

Different Roles in Waste ManagementCity of Vancouver• Provide collection to single-family and multi-family residential properties;• Increase awareness and education of new policies and regulations;• Enforce by-law infractions;• Set policies and regulations that foster innovative waste management solutions;• Connect businesses to vendors with innovative solutions;• Review and provide comments to procurement documents related to new waste management

system, if requested;

Businesses and stratas/property management companies• Hire waste haulers to ensure proper disposal of all solid waste generated on-site; • Provide the appropriate type and number of storage containers, preferably within each building’s

property line;• Educate residents, workers and customers on how to properly dispose of solid waste.

Waste haulers• Encourage and educate owners and tenants on how to properly dispose of solid waste;• Act as liaison between the City and owners and tenants when new policies come into effect;• Foster changes to the waste management system that align with new policies and regulations.

Gastown Business Improvement Association• Educate members on how to properly dispose of solid waste;• Act as liaison between the City and members when new policies come into effect;• Update waste management practices within the BIA to align with new policies and regulations.

Internal storage of waste into their various streams.

Page 14: Blood Alley Square/Trounce Alley Redesign · 2020. 8. 27. · Make sure to provide your feedback by filling out a questionnaire ... studies will help inform the detailed design and

14

vancouver.ca/blood-alley-square

Blood Alley Square/Trounce Alley Redesign

Waste Management ConsultationThe Gastown BIA, businesses and residents in the area would like to improve waste management in the area and ultimately see the removal of dumpsters from Blood Alley Square and Trounce Alley. The City has hired a solid waste consultant to look at options.

Businesses and residents were surveyed on how waste is collected, the structure of service contracts and their opinions on the feasibility of different options. A total of 61 groups were contacted and 14 responses were recevied.

Key findings include:

• Public recycling and garbage bins would be beneficial;• Illegal dumping is a challenge;• More frequent pick-up of restaurant waste is necessary; • Any new strategy must be convenient and user-friendly;• Safety and sanitation (drug use, biohazard materials, rodents) must

be addressed;• Damage and misuse of bins is an issue.

Solid Waste Management (SWM) Principles

A successful strategy is dependent on buy-in from businesses and residents.

Principles guiding this process are listed below:

• Eliminate waste containers;• Reduce collection truck traffic to prioritize

pedestrians;• Create a cleaner and safer waste disposal system;• Provide shared spaces for loading; • Apply a phased approach to convert from current to new system;• Find a cost-effective and financially sustainable system for all users and providers; `• Align with DTES Plan for local employment opportunities.

64% of respondents were dissatisfied with waste management in

the Square and Alley.

Dumpsters in the alley along building wall and inside enclosed storage.

The majority of respondents would prefer to see the dumpster bins removed from

the Alley.

Page 15: Blood Alley Square/Trounce Alley Redesign · 2020. 8. 27. · Make sure to provide your feedback by filling out a questionnaire ... studies will help inform the detailed design and

15

vancouver.ca/blood-alley-square

Blood Alley Square/Trounce Alley Redesign

Waste ManagementCurrent Waste Management ConditionThe current waste management system is managed by a number of competing companies all with their own large dumpsters scattered throughout Trounce Alley and Blood Alley Square. Waste removal is a concern for businesses, property owners, and residents. There are now 16 commercial dumpsters in the alley collected by eight different waste haulers.

Total waste volumes for the area immediately adjacent to Trounce Alley and Blood Alley Square are estimated at between 194,600 - 222,238 litres per week. The percentage of this waste can be broken down by the following streams:

• Garbage: 51%• Glass: 1%• Organics: 15%• Mixed Paper 30%• Mixed Containers 5%

A variety of factors must be considered when developing an effective waste management strategy. The consultant team has identified two possible case studies that address the issue in different ways. Public feedback will help develop strategies tailored for Trounce Alley and Blood Alley Square .

Interior Waste Storage

Cart

Glass

Mixed Containers

Mixed Paper

Organics

Garbage

Project Site

Prominent Building

Building Footprint

L0.4Site Analysis - Waste Management

ABBOTT STREET

CARRALL STREET

WATE

R ST

REET

WES

T CO

RDO

VA S

TREE

T

The Garage

Alhambra

Stanley Hotel

Lore Krill Housing Co-operative

Trounce Alley

Blood Alley Square

Blood AlleyBlood Alley Square16061Client Review

Vancouver

August, 2016202—175 East Broadway, Vancouver, British Columbia, V5T 1W2, www.ennsgauthier.com

N

Page 16: Blood Alley Square/Trounce Alley Redesign · 2020. 8. 27. · Make sure to provide your feedback by filling out a questionnaire ... studies will help inform the detailed design and

16

vancouver.ca/blood-alley-square

Blood Alley Square/Trounce Alley Redesign

Cutaway showing underground storage.

Case Study 2: On-site FacilityUsers place sortedwaste into large storage containers at a centralized location in Blood Alley Square where it is removed by specialized garbage trucks.

Placement: Sorted waste is deposited directly in a centralized on-site composters and storage that handle large volumes of waste.

Pick-up: Collection by a specialized truck that removes the waste from the storage.

Underground storage of bin.

Spatial Impact On Alley and Square: Significant. Underground storage require dedicated space and loading area in Blood Alley Square, reducing space available for other uses.

Cost to Users: High. Capital costs required to install the infrastructure resulting in higher hauling costs.

Local Employment Opportunities: Low. Waste is held in storage bins with limited access.

4. Cost

5. Stewardship

CASE STUDY 3

1. User Disposal

2. Collection

3. Facility

S SM T W T F

4. Cost

5. Stewardship

CASE STUDY 3

1. User Disposal

2. Collection

3. Facility

S SM T W T F

Case Study 1: Flexible Just In Time

Office organic collection by bicycle, University of Vermont.

Users sort waste and place them into pre-purchased coloured bags, which are then stored in carts. A small vehicle or bike picks up the totes on a regular basis, several times per day.

Placement: Bags or carts wheeled out to lane at a scheduled pick-up time to local transfer station.

Pick-up: Daily. Bags or carts put out in the lane before scheduled pick up time to local transfer station by either small truck or bike.

Spatial Impact On Alley and Square: Minimal. Flexible approaches take up little physical space.

Cost to Users: Low. Users purchase bags to cover cost of collection.

Local Employment Opportunities: High. Opportunities for partnership with social enterprises that waste could provide collection, oversight and maintenance.

CASE STUDY 2

1. User Disposal

2. Collection

3. Facility

4. Cost

5. Stewardship

CASE STUDY 1

1. User Disposal

2. Collection

3. Facility

4. Cost

5. Stewardship

CASE STUDY 1

1. User Disposal

2. Collection

3. Facility

4. Cost

5. Stewardship

CASE STUDY 1

1. User Disposal

2. Collection

3. Facility

4. Cost

5. Stewardship

CASE STUDY 1

1. User Disposal

2. Collection

3. Facility

4. Cost

5. Stewardship

CASE STUDY 1

1. User Disposal

2. Collection

3. Facility

4. Cost

5. Stewardship

CASE STUDY 2

1. User Disposal

2. Collection

3. Facility

4. Cost

5. Stewardship

4. Cost

5. Stewardship

CASE STUDY 3

1. User Disposal

2. Collection

3. Facility

S SM T W T F

CASE STUDY 1

1. User Disposal

2. Collection

3. Facility

4. Cost

5. Stewardship

Sorting Method: Users sort waste, organics, and recycling.

Sorting Method: User sort waste into various streams (organic, plastic, paper, glass, garbage) and puts it into pre-purchased coloured bags which can be stored in carts inside building or in the alley.

CASE STUDY 2

1. User Disposal

2. Collection

3. Facility

4. Cost

5. Stewardship

4. Cost

5. Stewardship

CASE STUDY 3

1. User Disposal

2. Collection

3. Facility

S SM T W T F

4. Cost

5. Stewardship

CASE STUDY 3

1. User Disposal

2. Collection

3. Facility

S SM T W T F

4. Cost

5. Stewardship

CASE STUDY 3

1. User Disposal

2. Collection

3. Facility

S SM T W T F

4. Cost

5. Stewardship

CASE STUDY 3

1. User Disposal

2. Collection

3. Facility

S SM T W T F