15
Björn Zapfel UNFCCC Secretariat JI Sub-Programme http://ji.unfccc.int [email protected] Joint Implementation Track 2 UNFCCC Technical Workshop on Joint Implementation Bonn, Germany – 16 October 2007

Transcript of Björn Zapfel UNFCCC Secretariat JI Sub-Programme [email protected] Joint Implementation Track 2...

Page 1: Björn Zapfel UNFCCC Secretariat JI Sub-Programme  bzapfel@unfccc.int Joint Implementation Track 2 UNFCCC Technical Workshop on Joint.

Björn ZapfelUNFCCC Secretariat

JI Sub-Programme

http://[email protected]

Joint ImplementationTrack 2

UNFCCC Technical Workshop onJoint Implementation

Bonn, Germany – 16 October 2007

Page 2: Björn Zapfel UNFCCC Secretariat JI Sub-Programme  bzapfel@unfccc.int Joint Implementation Track 2 UNFCCC Technical Workshop on Joint.

Joint Implementation Track 2 JI Track 1/Track 2

JI Track 1/Track 2

Elig

ibili

ty r

equ

irem

en

ts(E

RU

iss

uan

ce,

tran

sfer

an

d

acq

uis

itio

n)

• Party to the Kyoto Protocol

• Assigned amount calculated

• National registry in place for tracking assigned amount • National system in place for estimating emissions/removals

• Submission of most recent required emissions inventory

• Accurate accounting of assigned amount and submission of information

Participation requirements (e.g.):Designated focal point

National guidelines and procedures

Track 2 procedure

Verification procedure under JISC

Track 1 procedure

Verification procedure according to host Party rules

Page 3: Björn Zapfel UNFCCC Secretariat JI Sub-Programme  bzapfel@unfccc.int Joint Implementation Track 2 UNFCCC Technical Workshop on Joint.

Joint Implementation Track 2 JI Supervisory Committee

Joint Implementation Supervisory Committee

Establishment of JISC: CMP 1

Basic role: Operationalization and supervision of JI Track 2 procedure

* Resignation as JISC member as of 2 May 2007 ** Resignation as JISC alternate member as of 15 August 2007

Members Alternate members Annex I (EIT)

Mr. Oleg Pluzhnikov Mr. Evgeny SokolovMs. Daniela Stoycheva Ms. Astrida CelminaMr. Vlad Trusca Mr. Matej Gasperic

Annex I (Non-EIT) Mr. Olle Björk Mr. Franzjosef SchafhausenMr. Maurits Blanson Henkemans Mr. Hiroki KudoMr. Georg Børsting (Vice-Chair) (Mr. Darren Goetze)**

Non-Annex I Mr. Jaime Bravo Mr. Marcos Castro RodriguezMs. Fatou Gaye (Chair) Mr. Vincent Kasulu Seya Makonga(Mr. Shailendra Kumar Joshi)* Mr. Maosheng Duan

Non-Annex I (AOSIS)Mr. Derrick Oderson Ms. Yumiko Crisostomo

Page 4: Björn Zapfel UNFCCC Secretariat JI Sub-Programme  bzapfel@unfccc.int Joint Implementation Track 2 UNFCCC Technical Workshop on Joint.

Joint Implementation Track 2 Mandates of the JISC

CDM experienceSimilarities Differences

• No approval of methodologies

• No project registration

• No ERU issuance by the JISC

• No limitation of LULUCF projects to afforestation and reforestation

Mandates of the JISC

Legal basis: “Marrakesh Accords” (Decision 9/CMP.1 ) “Montreal decision” (Decision 10/CMP.1 ) “Nairobi decisions” (Decisions 2/CMP.2 & 3/CMP.2 )

Mandates:

• Rules of procedure

• Accreditation of independent entities

• Criteria for baseline setting and monitoring

• Provisions for small-scale projects

• JI project design document (PDD) form(s)

• Reviews

• Provisions for fees

• Management plan

• Reporting to the CMP

Page 5: Björn Zapfel UNFCCC Secretariat JI Sub-Programme  bzapfel@unfccc.int Joint Implementation Track 2 UNFCCC Technical Workshop on Joint.

Joint Implementation Track 2 Status of work of the JISC

2006: operationalization of JI Track 2 procedure

Mandates Adoption/ agreement (revision) by J I SC

Adoption by CMP

Administrative issues • Rules of procedure • Management plan 2006-2007

J I SC 01

J I SC 04 (05)

CMP 2

- PDD forms • PDD form • Guidelines for users (PDD form) • LULUCF PDD form • Guidelines for users (LULUCF PDD form)

J I SC 03

J I SC 03 (06) J I SC 04

J I SC 04 (06)

CMP 2

- CMP 2

- Verification procedure • Procedures on public availability of documents • Procedures for appraisals of determinations • Procedures for reviews

J I SC 04 J I SC 04 J I SC 03

- - -

Accreditation • Standards/ procedures • Panel

J I SC 04 (06)

J I SC 03

- -

Baseline setting and monitoring • Guidance on criteria

J I SC 04

-

Small-scale projects • Provisions for SSC projects • SSC PDD form • Guidelines for users (SSC PDD form)

J I SC 04 (06) J I SC 04 (05) J I SC 05 (06)

-

CMP 2 -

Fees • Provisions

J I SC 04

CMP 2 (endorsement)

J I SC report to CMP 2 • Main report • Addendum

prior to J I SC 04

after J I SC 05

- -

Launch ofJI Track 2 procedure

on26 October 2006

2007: operation/supervision of JI Track 2 procedure

Page 6: Björn Zapfel UNFCCC Secretariat JI Sub-Programme  bzapfel@unfccc.int Joint Implementation Track 2 UNFCCC Technical Workshop on Joint.

Joint Implementation Track 2 JI Track 2 project cycle

Project development

Preparation and publication ofPDD by

project participants/AIE

Page 7: Björn Zapfel UNFCCC Secretariat JI Sub-Programme  bzapfel@unfccc.int Joint Implementation Track 2 UNFCCC Technical Workshop on Joint.

Joint Implementation Track 2 Baseline setting / monitoring

Baseline setting and monitoring

• Basis: Criteria for baseline setting and monitoring in appendix B of JI guidelines

• Guidance agreed on by JISC:

Baseline: on project-specific basis and/or using multi-project emission factor

Project participants allowed, but not obliged, to use approvedCDM baseline and monitoring methodologies

Additionality: various approaches possible

• Provisions for small-scale projects agreed on by JISC:

JI SSC definitions: like for CDM SSC project activities (non-A/R) –revised by CMP 2

Main difference to CDM approach: No limits on bundling

Page 8: Björn Zapfel UNFCCC Secretariat JI Sub-Programme  bzapfel@unfccc.int Joint Implementation Track 2 UNFCCC Technical Workshop on Joint.

Joint Implementation Track 2 JI Track 2 project cycle (cont.)

Project development

Preparation and publication ofPDD by

project participants/AIE

30 days:stakeholders’ comments

Page 9: Björn Zapfel UNFCCC Secretariat JI Sub-Programme  bzapfel@unfccc.int Joint Implementation Track 2 UNFCCC Technical Workshop on Joint.

Joint Implementation Track 2 Stakeholders’ comments (status)

84 PDDs published for stakeholders’ comments(8 open for comments)

Host Parties:• Bulgaria (7 PDDs)• Estonia (4)• Germany (1)• Hungary (1)• Latvia (1) • Lithuania (6)• Poland (4)• Romania (2)• Russian Federation (41)• Slovakia (1)• Ukraine (16)

Technologies:• Renewable energy (biomass, wind, hydro)• Methane avoidance (gas distribution, landfills, coal mine)• Destruction of nitrous oxide from chemical processes (nitric acid production)• Energy efficiency (manufacturing industries, district heating)• Fuel switch (manufacturing industries, transportation, power generation)

Emission reductions 2008-2012: ~ 145,000,000 t CO2equ

Page 10: Björn Zapfel UNFCCC Secretariat JI Sub-Programme  bzapfel@unfccc.int Joint Implementation Track 2 UNFCCC Technical Workshop on Joint.

Joint Implementation Track 2 JI Track 2 project cycle (cont.)

Project development

Preparation and publication ofPDD by

project participants/AIE

30 days:stakeholders’ comments

Participation requirementsProject approval by host Party

Fees (advance payment)

Page 11: Björn Zapfel UNFCCC Secretariat JI Sub-Programme  bzapfel@unfccc.int Joint Implementation Track 2 UNFCCC Technical Workshop on Joint.

Joint Implementation Track 2 Participation requirements (status)

Designated Focal Point

National guidelines

and procedures

Austria

Belarus*

Belgium

Bulgaria

Canada

Czech Republic

Denmark

European Community

Finland

France

Germany

Hungary

Ireland

Italy

Japan

Liechtenstein

Designated Focal Point

National guidelines

and procedures

Lithuania

Luxembourg

Netherlands

New Zealand

Poland

Portugal

Romania

Russian Federation

Slovenia

Spain

Sweden

Switzerland

Ukraine

United Kingdom of Great Britain and Northern Ireland

* The CMP, by its decision 10/CMP.2, adopted an amendment to Annex B to the Kyoto Protocol, adding Belarus to it.

Page 12: Björn Zapfel UNFCCC Secretariat JI Sub-Programme  bzapfel@unfccc.int Joint Implementation Track 2 UNFCCC Technical Workshop on Joint.

Joint Implementation Track 2 JI Track 2 project cycle (cont.)

Preparation and publication ofDetermination by

AIE

Possiblereview by

JISC

45 days:decision on review request by

Parties involved/individual JISC members,

supp. by 2 JISC members’/alternates’ appraisal (incl. expert inputs)

Project development

Preparation and publication ofPDD by

project participants/AIE

30 days:stakeholders’ comments

Participation requirementsProject approval by host Party

Fees (advance payment)

Page 13: Björn Zapfel UNFCCC Secretariat JI Sub-Programme  bzapfel@unfccc.int Joint Implementation Track 2 UNFCCC Technical Workshop on Joint.

Joint Implementation Track 2 Determinations (status)

Determinations regarding PDDs

First determination deemed final on 26 March 2007(“Switch from wet-to-dry process at Podilsky Cement”):

Host Party: Ukraine

Emission reductions 2008-2012: ~ 3,000,000 t CO2equ

Second determination publishedon 11 September 2007(“Rehabilitation of Dolna ArdaHydropower Cascade”):

Host Party: Bulgaria

Emission reductions 2008-2012: ~ 270,000 t CO2equ

Page 14: Björn Zapfel UNFCCC Secretariat JI Sub-Programme  bzapfel@unfccc.int Joint Implementation Track 2 UNFCCC Technical Workshop on Joint.

Joint Implementation Track 2 JI Track 2 project cycle (cont.)

Preparation and publication ofDetermination by

AIE

Possiblereview by

JISC

Preparation and publication ofmonitoring report byproject participants/AIE

Preparation and publication ofDetermination by

AIE

Possiblereview by

JISC

45 days:decision on review request by

Parties involved/individual JISC members,

supp. by 2 JISC members’/alternates’ appraisal (incl. expert inputs)

15 days:decision on review request by

Parties involved/individual JISC members,

supp. by 2 JISC members’/alternates’ appraisal

Project development Project implementation

Issuance of ERUs

by host Party (conversion of AAUs/RMUs)

Transfer of ERUs by host Party and

acquisition of ERUs

Carbon Market

Preparation and publication ofPDD by

project participants/AIE

30 days:stakeholders’ comments

Participation requirementsProject approval by host Party

Fees (advance payment)

Fees Project approval by non-host Party

(at the latest)

Eligibility requirements

Page 15: Björn Zapfel UNFCCC Secretariat JI Sub-Programme  bzapfel@unfccc.int Joint Implementation Track 2 UNFCCC Technical Workshop on Joint.

Joint Implementation Track 2 Further information

http://ji.unfccc.int/