INTRODUCING BINH HUNG - WATER TREATMENT PLANT HCMC, October 4, 2011 Advisor: Prof. Marion Martienssen Speaker: Vo My Y Nguyen Dinh Khoa

Transcript of Binh Hung Waste water treatment (Ho Chi Minh City)

Page 1: Binh Hung Waste water treatment (Ho Chi Minh City)

INTRODUCING

BINH HUNG - WATER TREATMENT PLANT

HCMC, October 4, 2011

Advisor: Prof. Marion MartienssenSpeaker: Vo My Y

Nguyen Dinh Khoa

Page 2: Binh Hung Waste water treatment (Ho Chi Minh City)

OUTLINE

• WASTE WATER IN HOCHIMINH CITY

• DONG DIEU PUMPING

• BÌNH HƯNG TREATMENT PLANT

Page 3: Binh Hung Waste water treatment (Ho Chi Minh City)

OVERVIEWS OF WASTE WATER IN HOCHIMINH CITY

• Water consumption per capita: 150 l/day (source: JICA project for sewage planning in Hanoi)

• Total discharge in Ho Chi Minh city: 876,170 m3/day• 83 hospitals, 26 medical centres - Discharge: 17,000 – 20,000 m3/day• Total discharge from industrial zones/parks: 400,000 – 500,000 m3/day• From Domestic: 300,000 m3/day.

(source: 2009, PCD project for building the wastewater pollution control action plan in Ho Chi Minh city)

• Wide range of wastewater . (Industry, domestic, hospital)• Seprate and combine waste water system.

Page 4: Binh Hung Waste water treatment (Ho Chi Minh City)

OVERVIEWS OF WASTE WATER IN HOCHIMINH CITY

• Domestic wastewater treated: less than 10%• Only 30% of the industrial zones/parks have centralized wastewater

treatment systems.• Can only treat certain pollutants at certain concentration limits. Eg: pH,

BOD, COD, SS, colority, nutrients. (satisfy column A and B of TCVN 5945:2005)

• Planning a system of 9 wastewater treatment plants (one has already been in operation, 3 are being prepared for construction).

• Building wastewater treatment systems in large hospitals• Improving centralized wastewater treatment systems of industrial parks

(equipping automatic monitoring system)

Page 5: Binh Hung Waste water treatment (Ho Chi Minh City)

Tôn Đức Thắng St.

D300mm

Dis.5

Tàu Hủ Channel

Đôi Channel

D2200mm

Dis.10Trần Hưng Đạo St.

D1500mm

Đồng Diều\ Pumping Station

Dis.1Dis.3

Main sewage 6.5km

H=-15m Dis.8

Nguyễn Văn Linh St.

Loading sewage 3km

H=-15mTreatment Plant 141.000m3/day

MAP OF COLLECTING SEWAGE ROUTE

Page 6: Binh Hung Waste water treatment (Ho Chi Minh City)

OVERVIEWS OF WASTE WATER IN HOCHIMINH CITY

Page 7: Binh Hung Waste water treatment (Ho Chi Minh City)

ĐỒNG DIỀU PUMPING STATION

• Pumping waste water from main sewage at Tàu Hủ - Bến Nghé - Đôi - Tẻ Channel to Bình Hưng Waste Water Treatment Plant

• Capacity: - Phase 1: 133.3 m3/minute (192,000 m3/day) by three

underground pumps- Phase 2: 400 m3/minute (576,000 m3/day) (will be

installed three more underground pumps)

Page 8: Binh Hung Waste water treatment (Ho Chi Minh City)

BÌNH HƯNG TREATMENT PLANT OVERVIEW

Phase 1- Capacity: 141,000 m3/day- Technology: Activated Sludge- Location: Bình Hưng Ward, Bình Chánh District, Hồ Chí

Minh City- Square: 14 ha- ODA funding from Japan: 100 millions USD- Started at 11/2004- Finished at 12/2008

Page 9: Binh Hung Waste water treatment (Ho Chi Minh City)

DESIGN PARAMETERS

Year Square Area (ha)

Population Capacity (m3/day)

Effluent Quality

Phase 1 2008 824.8 425,830 141,000 BOD ≤ 50mg/LSS ≤ 100mg/L

Phase 2 2015 2,791.6 1,421,778 469,000 BOD ≤ 50mg/LSS ≤ 100mg/L

Phase 3 2020 2,791.6 1,390,282 512,000 BOD ≤ 20mg/LSS ≤ 50mg/L

Discharge standardPhase 1 & 2: TCVN 5945:2005, level B (BOD ≤ 50mg/L; SS ≤ 100mg/L)Phase 3: TCVN 5945:2005, level A (BOD ≤ 20mg/L; SS ≤ 50mg/L)

Page 10: Binh Hung Waste water treatment (Ho Chi Minh City)

PERSPECTIVE OF BINH HUNG TREATMENT PLANT

Composting

Storage

Booster pump

Effluent

Aerobic tank

Influent

Sludge treatment

Sedimentation

Disinfection

Compress air

Office

Page 11: Binh Hung Waste water treatment (Ho Chi Minh City)

Screening

Effluent

Disinfection

Secondary ClarifierPrimary Sedimentation

Recycled sludge 25%

Aerated tank

Centrifugal Thickening

Gravity Thickening

Dewatering

Sludge tankComposting

Exceeding sludge

Mixed Sludge Sludge blocks

Influent

TECHNOLOGY PROCESS

Page 12: Binh Hung Waste water treatment (Ho Chi Minh City)

Booster Pump stationPrimary sedimentation Aerated tank Secondary SedimentationDisinfection tank

Gravity Thinkenning Sludge pump Compress air pipes Water filtering system for reuse

Polime Supplier Centrifugal dewatering

EQUIPMENTS AND DEVICES

Page 13: Binh Hung Waste water treatment (Ho Chi Minh City)

140,000

128,936

120,000

100,000

80,000

60,000

40,000

20,000

-

48,3754,169

31,643

13,387

91,688

83,408

56,821

108,242

88,89084,526

77,034

110,457

99,937

89,727 90,068

79,064

72,185 69,740

5 6 7 8 9 10 11 12 1/10 2 3 4 5 6 7 8 9 10 11

MonthWaste Water (m3)

Parameter Unit Influent Effluent

Date: 23/06/2010

1 SS Mg/L 200 81

2 BOD Mg/L 53 41

3 Total N Mg/L 12.9 6.7

4 Total P Mg/L 1.6 1.4

Date: 25/08/2010

1 SS Mg/L 472 85

2 BOD Mg/L 46 43

3 Total N Mg/L 22.4 6.2

4 Total P Mg/L 4.9 1.5

WATER ANALYSIS RESULTWASTE WATER FLOW

Page 14: Binh Hung Waste water treatment (Ho Chi Minh City)

MAIN RESULTS

• 100 personnel: 50% of bachelor, 30% of engineers, 3 foreign experts.

• Quality of effluent meets design standard (TCVN, level B)• In good condition: remove 23.265 kg BOD/day

Page 15: Binh Hung Waste water treatment (Ho Chi Minh City)

Operating and monitoring

Take sample and analysing Maintaining

OPERATING AND MAINTAIN

Page 16: Binh Hung Waste water treatment (Ho Chi Minh City)

OVERVIEW OF TREATMENT SYSTEM

Page 17: Binh Hung Waste water treatment (Ho Chi Minh City)

PRIMARY SEDIMENTATION

Page 18: Binh Hung Waste water treatment (Ho Chi Minh City)

AEROBIC TANK (ACTIVATED SLUDGE)

Page 19: Binh Hung Waste water treatment (Ho Chi Minh City)

SECONDARY CLARIFIER

Page 20: Binh Hung Waste water treatment (Ho Chi Minh City)

DISINFECTION TANK

DISINFECTION TANK

Page 21: Binh Hung Waste water treatment (Ho Chi Minh City)

COMPOSTING, THICKENING SLUDGE

Page 22: Binh Hung Waste water treatment (Ho Chi Minh City)

WE HAD A NICE TRIPTHANK YOU