• Benin City CNG Project

• On 7th March’ 2007 NIPCO plc made its presentation to the Inter-ministerial

Team of FGN at Abuja on the CNG Program and on 21st March’2007 FGN

accorded its approval for the proposed project at Benin City.

• NIPCO introduced CNG in the Benin City, Edo State, on a pilot scale, to

demonstrate to the Public, the Government & other stakeholders, the

followings:

• Its seriousness towards the CNG business in Nigeria.

• Its Project implementation capabilities.

• The benefits of CNG over conventional fuels.

• Popularize CNG as a new vehicular fuel in Nigeria.

Page 3: Benin City CNG Project On 7th March 2007 NIPCO plc made its presentation to the Inter-ministerial Team of FGN at Abuja on the CNG Program and on 21st.

• Benin City CNG Project

• NIPCO formed a Joint Venture Company, GREEN GAS LIMITED, with the

Nigerian Gas Company Limited (NGC) to implement the CNG project.

• Important targeted parameters of the Benin City CNG project are:

• Target for CNG Vehicle Conversion :

50,000 CNG Vehicles in 3 to 4 yrs

• CNG Stations:

8 to 10 Nos. in first 2 yrs

• Steel Pipelines to be laid:

Around 50kms in first 2 yrs

• CNG Conversion workshops:

2 Nos. in first 2 yrs

Page 4: Benin City CNG Project On 7th March 2007 NIPCO plc made its presentation to the Inter-ministerial Team of FGN at Abuja on the CNG Program and on 21st.

CNG Station

Laid Steel Pipeline Route

CNG STATION LOCATIONS IN BENIN CITY

UNIVERSITY OF BENIN

Auchi Road

Agbor Road

New Lagos Road

MM Way Road

Siliku Road

Textile Mill Road

Sapele Road

Ring Road

Ramat Park

7 Up Plant

Coca Cola Plant

NIPCO’s City Gate Station

CNG Workshop

Guinness Plant

Benin Airport

CNG Stations Commissioned:

•Eiyaen, Near Coca Cola Plant, Auchi Road

•Agbor Road, Near Guinness Plant

•2nd East Circular Road, Off. Akpakpava Road

•Sapele Road, Opp. Exclusive Stores

CNG Stations Under Construction :

•Benin-Lagos Road, Near 7-Up Plant

•Textile Mill Road

•5 Junction

•MM Way Road

CNG Kit Fitment Workshop:

•Aduwawa, Auchi Road

5 Junction

2nd E

ast C

ircul

ar

Page 5: Benin City CNG Project On 7th March 2007 NIPCO plc made its presentation to the Inter-ministerial Team of FGN at Abuja on the CNG Program and on 21st.
Page 6: Benin City CNG Project On 7th March 2007 NIPCO plc made its presentation to the Inter-ministerial Team of FGN at Abuja on the CNG Program and on 21st.
Page 7: Benin City CNG Project On 7th March 2007 NIPCO plc made its presentation to the Inter-ministerial Team of FGN at Abuja on the CNG Program and on 21st.
Page 8: Benin City CNG Project On 7th March 2007 NIPCO plc made its presentation to the Inter-ministerial Team of FGN at Abuja on the CNG Program and on 21st.
Page 9: Benin City CNG Project On 7th March 2007 NIPCO plc made its presentation to the Inter-ministerial Team of FGN at Abuja on the CNG Program and on 21st.