BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

19
BEAM SPIGOTS connected to one DeltaBeam

Transcript of BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

Page 1: BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

BEAM SPIGOTS connected to one DeltaBeam

Page 2: BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

DOUBLE GUARDRAIL connected to the DeltaBeam

Page 3: BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

DOUBLE GUARDRAIL FOR RIDGE BEAM installed

Page 4: BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

…guide the Tube through the End-pocket of the Sheet to the opposite side…

Page 5: BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

…… or only one. It depends of the length of the sheet.

Page 6: BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

Lead the Sheet-bolt into the CORNER BEAM FOR SHEET and….

Page 7: BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

….pull the Sheet trough the CORNER BEAM FOR SHEET

Page 8: BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

Secure the CORNER BEAM FOR SHEET with the Lock Bolts for BEAM SPIGOTS

Page 9: BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

Install the ADJUSTABLE PIPE WITH COUPLERS to the CORNER BEAM FOR SHEET and…

Page 10: BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

Install a standard Steel- or Alupipe through the couplers and ….

Page 11: BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

….all the way through the next ADJUSTABLE PIPE WITH COUPLERS

Page 12: BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

THE COVERED ROOF IS FINISHED

Page 13: BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

The temporary calculations shows that we can build a roof with free span-width of 23.5 m. (Third parts verification of the calculations remain)

The snow load is 0.75 kN/m2 and the wind load is 0.64 kN/m2 (32 m/s).

Page 14: BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

Both end (gable) bays full of GUARDRAILS and DIAGONALS while the rest is as shown below. Four bays without DIAGONALS then one with, and so on.

Page 15: BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

To increase the span width we can use a TIE BEAM…

Page 16: BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

…or build it up like this.

Page 17: BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

Another way to build a Roof.

Page 18: BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

Use the DB750 Covering System to build a HALLSection View

Page 19: BEAM SPIGOTS connected to one DeltaBeam. DOUBLE GUARDRAIL connected to the DeltaBeam.

Use the DB750 Covering System to build a HALLIsometric View