New challenges demanding new solutions Åsa Groth, Director Product Management

description

Ventyx SCADA

Transcript of BCN Tran D2 02 NewChallengesDemandingNewSolutions

  • New challenges demanding new solutions

    sa Groth, Director Product Management

  • Life threatening emergencies & fire alarm/emergency evacuation

  • 2014 Ventyx, an ABB company | Confidential & Proprietary | 3

    Dial 700 from any meeting room or house for life

    threatening emergencies

  • 2014 Ventyx, an ABB company | Confidential & Proprietary | 4

    Upon activation of a fire alarm, all attendees should:

    Find the nearest exit and evacuate the building

    Follow instructions of the Security Services department and the public address system

    Calmly proceed to the nearest assembly point. Resort employees will be on hand to direct and assist

    Do not reenter the hotel/building unless instructed to do so by an employee

  • 2014 Ventyx, an ABB company | Confidential & Proprietary | 5

    The information contained herein:

    is for informational purposes only and may not be incorporated into any contract

    is intended to outline our general product direction and should not be relied on in making a purchasing decision

    is not a commitment, promise, or legal obligation to deliver any material, code or functionality

    The development, release, and timing of any features or functionality described for our products remains at our sole discretion.

  • Market Drivers

  • Market Drivers

    The electric market is growing and changing in nature

    Power generation is forecast to grow by 49% between 2011 and 2030 (Source: BP Statistical Review)

    Aging infrastructure focuses attention on reliability and increasing efficiency increased reliance on interconnectivity

    Increasing impact of renewable and demand-side participation in the electric supply chain (of the $9.7 trillion of global investment in power generation 71% will be in renewables or clean generation Citi Research)

    Regional differences leads to different timing on needs

    2014 Ventyx, an ABB company | Confidential & Proprietary | 7

  • Smart Grid Drivers by Region

    2014 Ventyx, an ABB company | Confidential & Proprietary | 8

  • ENTSO-E integration the European harmonized market Increased emphasis on advanced applications to ensure

    reliable and efficient operation of the distribution and the sub-transmission network as we see significant penetration of intermittent resources in the lower voltage networks

    Other, 25

    Oil, 4

    Nuclear, 12

    Gas, 23

    Wind, 31

    Solar, 35

    Coal, 45

    German generation capacity mix (GW), July 2013

    2014 Ventyx, an ABB company | Confidential & Proprietary | 9

    Market drivers - Europe

  • The new reality

    2014 Ventyx, an ABB company | Confidential & Proprietary | 10

    An increasingly uncertain world Historically predicting the generation requirement was fairly certain -

    embedded generation, EV and demand side participation changes all of that

    Wind and solar power generation can change rapidly the system needs to be able to accommodate these rapid changes

    New tools are needed Operational planning tools close to real-time to ensure the reliability

    of the system

    New ways of operating are needed We will have to get more out of a network designed in a different era, having

    insight into the real-time operating constraints will be essential

  • The European Electric Market

  • European Interconnected Network Lower the cost of power to

    the end customer

    Pool reserves for greater efficiency

    Facilitate the wider participation of renewable energy sources

    2014 Ventyx, an ABB company | Confidential & Proprietary | 12

  • ENTSO-E Network Codes http://networkcodes.entsoe.eu/operational-codes/

    2014 Ventyx, an ABB company | Confidential & Proprietary | 13

  • TSC - TSO Security Cooperation and Coreso

    Operational planning (DACF)

    Receive TSO model data

    Build common data model

    N-1 security analysis

    Distribute results

    Real-Time Awareness & Alarm System

    TSOs provide every 15 min real time snapshots incl topology, power flows, voltage, generation, load and technical characteristics of the network

    Wind data exchange

    Umbrella wind power R&D project (www.e-umbrella.eu)

    http://www.coreso.eu http://www.tso-security-cooperation.net/en/index.htm

    2014 Ventyx, an ABB company | Confidential & Proprietary | 14

    http://www.e-umbrella.eu/http://www.e-umbrella.eu/http://www.e-umbrella.eu/

  • Increased needs for near real-time operations support

    Short circuit current supervision more advanced fault analysis

    Dynamic temperature limit calculation

    Congestion forecasting - Planning

    Voltage collapse evaluation

    Frequency stability tracking

    Operational reserves tracking

    Decision support for when to ramp up/down units

    On-line dynamic stability evaluation

    Continuous forecast of renewable production

    2014 Ventyx, an ABB company | Confidential & Proprietary | 15

  • Operation and operational planning systems

    2013 Ventyx, an ABB company | Confidential & Proprietary | 16

    Operational planning functions in operational system, CF1 Intra Day Congestion Forecast (IDCF)

    D-1, Day Ahead Congestion Forecast (DACF)

    D-2, Day 2 Ahead Congestion Forecast (D2CF) for ATC determination

    Security coordinator planning functions, CF2 Same as for CF1 above but for larger region

    TSO

    SCADA/EMS

    Energy Market

    Schedules

    Security Coordinator

    OP CF 2

    Network Model With Power Flow Solutions

    CF 1

  • NM Congestion Forecast Overview

    2014 Ventyx, an ABB company | Confidential & Proprietary | 17

    Transmission Level TSO Network Models

    Distribution Level DSO Network Models

    Transmission Level Security Coordinator Network Model

    Model Merge

  • NM SCADA/ EMS - IDCF - DACF - D2CF

    NM Congestion Forecast (CF) Solution

    2014 Ventyx, an ABB company | Confidential & Proprietary | 18

    Market Management

    Outage Scheduling

    Load Forecasting

    UDW

    CF Module

    DE 400

    DCI File exchange

    Security Coordinator - Coreso - TSC -

    CGMES, CIMXML/EQ

    Options; 1 CGMES, CIMXML/SSH 2 - UCTE/DEF

    CGMES Common Grid Model Exchange Specification - Version 2.4.13 based on CIM16 CIMXML/EQ equipment profile CIMXML/SSH steady state hypothesis initial power flow conditions UCTE/DEF bus-branch format from UCTE to be replaced by CGMES during 2015-2016

  • Network Manager near real-time operational support

  • Renewable production a challenge for dispatchers

    Customers own words: focus on planning, forecasting, estimation, risk analysis, control of operations (voltage, power production etc.). This with the purpose to ensure security, stability and system availability with all relevant energy system actors

    Forecast and predict the impact of renewable energy in the transmission network

    Prevent instability issues

    Minimize transmission losses

    Reduce operator stress

    Operational constraints

    Available transmission

    capacity

    Weather forecast

    SCADA

    Weather

    EMS

    Forecast

    (Demand response)

    Visualization

    2014 Ventyx, an ABB company | Confidential & Proprietary | 20

  • A day at the Smart Grid Control Center

    1 SGCC User

    comes to

    work

    2 Checks Real-Time

    Events

    3 User looks at

    forecasted future

    events and trends

    Supervise

    and React Plan on

    forecasted

    events

    4 Proacts

    Informed Supervision

    2014 Ventyx, an ABB company | Confidential & Proprietary | 21

  • Expected benefits

    Minimized grid losses Optimization of voltage profile and reactive power

    Proactive network operation More accurate monitoring and control of power flows

    Predictive monitoring of grid operation

    Optimization of active power flow

    Reduced operator stress and attract new operators Better grid visualization and situational awareness

    Congestion and dynamic line rating

    Dynamic temperature limit calculation

    2014 Ventyx, an ABB company | Confidential & Proprietary | 22

  • Overview Visualization

    2014 Ventyx, an ABB company | Confidential & Proprietary | 23

  • Transformer mode switching

  • Overview Transformer Mode Switching Optimization

    Generator Plans (1h) (e.g. Generators and HVDC links modelled as generators) ENTSO-E/ESS format

    Scada / Avanti

    Weather

    EMS (VVC)

    Nostradamus

    FocalPoint

    Transformer info UDW

    Scheduled: - Load % of system load - Tap positions - Voltages ... ...

    Measurements Indications Limits

    Planned outages

    System Load Generation Plans

    For each time step: - P, Q, U, I, S

    DCI

    Direct access

    UDW (repl)

    ETL

    Forecast Data (1h): - System Load - Wind generation

    Weather Forecast (1h) - Temp - Wind - Humidity ...

    SPL calculation (Power Losses)

    File Import

    2014 Ventyx, an ABB company | Confidential & Proprietary | 25

  • Dashboard Transformer Mode Switching Optimization

    2014 Ventyx, an ABB company | Confidential & Proprietary | 26

  • Transformer Mode Switching Optimization

    2014 Ventyx, an ABB company | Confidential & Proprietary | 27

  • Transformer Mode Switching Optimization

    2014 Ventyx, an ABB company | Confidential & Proprietary | 28

  • Voltage and Reactive power

  • Overview Voltage and Reactive Power Optimization

    Scada / Avanti

    Weather

    EMS (VVC)

    Nostradamus

    FocalPoint

    Voltage profile UDW

    Scheduled: - Load % of system load - Tap positions - Voltages ... ...

    Measurements Indications Limits

    Planned outages

    System Load Generation Plans

    For each time step: - P, Q, U, I, S

    DCI

    Direct access

    UDW (repl)

    ETL

    Forecast Data (1h): - System Load - Wind generation

    Weather Forecast (1h) - Temp - Wind - Humidity ...

    Generator Plans (1h) (e.g. Generators and HVDC links modelled as generators) ENTSO-E/ESS format

    File Import

    2014 Ventyx, an ABB company | Confidential & Proprietary | 30

  • Dashboard Voltage and Reactive Power Optimization

    2014 Ventyx, an ABB company | Confidential & Proprietary | 31

  • Details Voltage and Reactive Power Optimization

    2014 Ventyx, an ABB company | Confidential & Proprietary | 32

  • Subscription Optimization

  • Overview Subscription Optimization

    Scada / Avanti

    Weather

    EMS (VVC/NS)

    Nostradamus

    DRMS (Hour 0-6)

    FocalPoint

    Predicted violations UDW Scheduled: - Load % of system load - Tap positions - Voltages ... ...

    Measurements Indications Limits

    Planned outages

    System Load Generation Plans

    For each time step: - P, Q, U, I, S - Violations - Load Sensitivity

    DCI Direct access

    UDW (repl)

    ETL

    Load Reduction Schedules (1 h) Load Sensitivity Factors (1 h)

    Forecast Data (1h): - System Load - Wind generation - Area Load (hour 7-36)

    Weather Forecast (1h) - Temp - Wind - Humidity ...

    Avaliabilty Profiles from Industrial Customers (1 h)

    Reduction Suggestions - Schedules

    Generator Plans (1h) (e.g. Generators and HVDC links modelled as generators) ENTSO-E/ESS format

    SPL calculation (Hour 7-36)

    File Import

    Subscriptions (1h) Entered in UDW using SxReport.

    2014 Ventyx, an ABB company | Confidential & Proprietary | 34

  • Dashboard Subscription Optimization

    2014 Ventyx, an ABB company | Confidential & Proprietary | 35

  • Details Subscription Optimization

    2014 Ventyx, an ABB company | Confidential & Proprietary | 36

  • Congestions and Dynamic Line Rating

  • Overview Congestions and Dynamic Line Rating

    Scada / Avanti

    Weather

    EMS (VVC)

    Nostradamus

    FocalPoint

    Line ratings Weather data UDW

    Generator Plans (1h) (e.g. Generators and HVDC links modelled as generators) ENTSO-E/ESS format

    Scheduled: - Load % of system load - Tap positions - Voltages ... ...

    Measurements Indications Limits

    Planned outages

    System Load Generation Plans Line limits for specified lines

    For each time step: - P, Q, U, I, S - Violations

    DCI

    Direct access

    UDW (repl)

    ETL

    Forecast Data (1h): - System Load - Wind generation

    Weather Forecast (1h) - Temp - Wind - Humidity ...

    DLR calculation

    File Import

    2014 Ventyx, an ABB company | Confidential & Proprietary | 38

  • Dashboard Congestions and Dynamic Line Rating

    2014 Ventyx, an ABB company | Confidential & Proprietary | 39

  • Line information Congestions and Dynamic Line Rating