17
Power trading strategy for Mongolia (Asian Super Grid & Gobitec) JAMBAA Lkhagva, Engineer, Ministerial Task Team on Asian Super Grid, Ministry of Energy [email protected] www.facebook.com/MongoliaAsianSuperGrid

Transcript of BCM's Environmental Working Group Meeting

Power trading strategy for Mongolia

(Asian Super Grid & Gobitec)

JAMBAA Lkhagva,

Engineer, Ministerial Task Team on Asian Super Grid, Ministry of Energy

[email protected] www.facebook.com/MongoliaAsianSuperGrid

2

OUTLINE

Solar and wind energy resource potential in Mongolia

What are Gobitech and Asian Super Grid ?

What are benefits for the participating countries ?

The way forward & activities

Links for more information

Power sector and its exporting strategy

3

Solar and wind energy resource potential in Mongolia

Comparing total annual energy consumption of Mongolia to its energy resources shows huge potential to supply electricity to the country and the countries in Northeast Asia.

Source: National Renewable Energy Laboratory (NREL), US

Gobi  Wind  resource    946  TWh    

Gobi  Solar  Energy  Resource    4777  TWh  

China electricity production in 2011 5000TWh

World electricity production in 2011 22126 TWh

18%   95%  

4%   21%  

4

Power sector and its exporting strategy

Power  Plant   Capacity   Share  

CHPs   877.3  MW   87  %  

Renewable  power   81.7  MW   8  %  

Diesel  sta;ons   46  MW   5  %  

Total   955  MW   100  %  

907 1002 1143 1284

1915

2321

2747 3080

70 107 222 305

784 1006 1022 1041

0

500

1000

1500

2000

2500

3000

3500

2011 2012 2013 2014 2015 2020 2025 2030

Total Demand Mining Sector

Source: Ministry of Energy 2013

CHP,#877.3MW,#87%#

Diesel,#46MW,##5%#

HPP,#28MW,##3%#

Solar6Wind,#

53.7MW,#5%#

Total installed capacity by energy resources

5

Power sector and its exporting strategy

Source: Ministry of Energy 2013

Proposed power plant projects for electricity export

Oyu tolgoi TPP 450 MW Tavan tolgoi TPP 300 MW

Buuruljuut TPP 600 MW

Choir Wind Farm 50 MW

Sainshand Wind Farm 52 MW

Khanbogd Wind Farm 250 MW

Shivee Ovoo TPP 4800 MW

6

Power sector and its exporting strategy

China’s installed electricity capacity by fuel, end 2012 (Installed capacity:1,145GW)

China’s installed electricity capacity by fuel, 2040 (Installed capacity:2,265GW)

Source: EIA, International Energy Outlook 2013

China was the world's largest power generator as of 2011. Fossil fuels, particularly coal, continue to be the leading sources of the country's electricity generation and installed capacity. China has a goal to produce at least 15% of overall energy output by 2020 from renewable energy sources as the government aims to address environmental issues. Chinese companies invested $65 billion in renewable energy projects in 2012, 20% higher than investments in 2011, and they plan to spend $473 billion on clean energy investments between 2011 and 2015, according to the country's Five-Year Plan

7

Power sector and its exporting strategy

•  A solution to Chinese the imbalanced distribution of resource and energy

Source: State Grid report, China 2012

China has begun construction on a large-scale ultra-high voltage (UHV) power project, which will help alleviate air pollution problems. The project, estimated to cost 68.3 billion yuan ($11.2 billion), will involve 4,740 km of new power lines as well as several new transformer substations, and will stretch from Inner Mongolia in the northwest to the capital Beijing and down the coast to Shanghai.

8

What are Gobitech and Asian Super Grid?

The Gobitec concept represents the idea of producing clean energy from renewable energy sources in the Gobi Desert and to deliver the produced energy to regions with a high demand of electric energy.

Gobitech project:

9

Power generation level of the participating countries in 2030

based on BAU forecast Generation mix of the countries in Northeast Asia is based on 2030 Business As Usual (BAU) forecast.

Source:“Gobitec and ASG for Renewable energies in Northeast Asia” report, 2014.

What are Gobitech and Asian Super Grid?

Gobitech project:

10

It is aimed to interconnect strategic countries in Northeast Asia (NEA) with electricity generation areas in the Gobi Desert.

What are Gobitech and Asian Super Grid?

Asian Super Grid project:

Because of differences in time zone and peak load of the countries, demand and supply can be balanced more easily

ASG will connect 5 capital cities and 9 regional cities with 7735 km of transmission line and submarine HVDC cable

11

What are benefits for the participating countries?

Gobitech+ASG project can deliver economic, social and environmental benefits to the participating countries such as job creation, poverty

alleviation and a reduction of CO2 emission

12

What are benefits for the participating countries?

Mongolia will profit benefits in many ways from the Asian Super Grid & Gobitec economically, socially and environmentally.

13

The way forward and activities

Information on the geographic starting point for possible power generation projects/transmission line in the context of the power trading with the greatest opportunities / identification of the cost effective technology mix. Study on opportunities and risks for a project in the power trading in terms of investment, technical aspects, legal agreements, regulation, tariffs and business climate in the two countries. Provide institutional capacity building through effective training and workshop that targeting institutions, investors in development of the electricity export oriented business in Mongolia for the power trading with China. Developing of policy recommendations based on best practice examples for decision making for the power trading.

ü

ü

ü

ü

2013.03.  

MOU signed among representatives from the Mongolia, Korea, Russia,

Japan and Energy Charter for Joint Study

“Gobitec and ASG for Renewable energies in Northeast Asia” report

published  

2014.01.24  2013.12.17  

Request for ADB Technical Assistance (TA) for next

research project submitted to ADB

2012.06.20    

The president emphasized ASG/

Gobitech project on his speech at RIO+20 UN

conference

2012.11.12  

“The Renewable Energy Cooperation and Grid

Integration in Northeast Asia” International Conference in

Mongolia

Regional Workshop on the joint study 'Gobitech& Asian Supergrid' for Renewables in Northeast Asia

2013.09.26  

The way forward and activities

2014.03.20  

Ministerial Task Team on Asian Super Grid was

established under Ministry of Energy of Mongolia

2014.01.28  

“International Symposium on Roadmap to Asia Super

Grid” was held in Tokyo,Japan

The way forward and activities

2014.05.19  

1/5 of total electricity to export is supposed to be

produced from Renewable energy.

2014.05.29  

Reached the understanding in re-starting cooperation

on Shivee Ovoo powe plant project.

2014.06.26  

“Developing Renewable Energy across Gobitec &

Asian Super Grid in NEA” forum.

Xi Jinping reiterated his support to electricity export to China from

Mongolia

2014.08.27  

16

Links for more information  

ü “Gobitec and ASG for Renewable energies in Northeast Asia” report  hCp://www.encharter.org/index.php?id=643&L=0    

ü “Developing Renewable Energy across Gobitec &Asian Super Grid in NEA” Forum in Ulaanbaatar, June 26, 2014

hCp://www.encharter.org/index.php?id=661&L=0    

ü “Energy Mongolia 2014” International Conference and Expo in Ulaanbaatar, May 22-24, 2014

hCp://energy-­‐mongolia.mn/index.php/en/    

ü Ministerial Task Team on Asian Super Grid, Ministry of Energy, Mongolia

hCps://www.facebook.com/MongoliaAsianSuperGrid    

Thank you for your attention

17