BIM EXECUTION PLAN TEMPLATE
Notes
The applicants must establish, implement and document the processes and procedures required to achieve BIM objectives in the BIM Execution Plan (BEP), including the following:
1. BIM workflows and delivery methodologies
2. Individual discipline modelling2.1 Revision management2.2 Model orientation and site configuration2.3 Model division and structure2.4 Modelling guidelines
3. Inter-discipline collaboration3.1 Data sharing process, framework and protocol, including the
data information and models to be shared, file formats and frequency of data sharing
3.2 Coordination review process and plan, including use of BIM in coordination meetings
3.3 Clash detection procedure, methodology and plan
Besides Items 1 – 3 above, BIM Fund applicants must fill up Items 4 – 9 below, which will be reviewed for BIM Fund assessment purposes. Applicants may use other templates, as long as the equivalent content of all Items 1 – 9 are included and any other relevant information.
4. Project Information Page 2
5. Project Members Page 2
6. Key Performance Indicators Page 3
7. Model Checklist for BIM Collaboration Page 4
8. BIM Objective and Responsibility Matrix Page 6
9. Model Elements for each Deliverable Page 6
1
4. PROJECT INFORMATION
Project Owner
Project Reference Number
Project Title
Project Description
Contract Type
Estimated Project Size (GFA)
Estimated Project Value
5. PROJECT MEMBERS
Title Name Company Discipline Remarks
2
6. KEY PERFORMANCE INDICATORS
Key Performance Indicators are used to quantify the productive performance of the BIM project delivery.
Leading Indicators (see example below)
• Time taken to resolve RFIs (latency)
• No of RFIs trending over time
3
7. MODEL CHECKLIST FOR BIM COLLABORATION
NotesApplicants must fulfil at minimum the list below, in at least one of the following stages: - Design stage before tender - Before substructure construction- Before superstructure construction.
7.1 All Control Elements7.2 Any 3 clash-free pair of elements in each of the Architectural-Structural, Structural-MEP and Architectural-MEP matrix
(Applicant to submit a total of 9 pairs) 7.3 Any 3 elements in each of the 3 disciplines to meet intra-discipline quality standards 1 – 4
(Applicant to submit a total of 9 elements) 7.4 Sample images
7.1 CONTROL ELEMENTS
LOCATION AND ORIENTATION Link models by "Origin to origin". All models must align.
GRIDS Check in any floor plan if grids align in all models
LEVELSCheck if levels align in all models. (Note: it is acceptable for SFL to be different from FFL provided the difference in drops between both is logical and consistent, and there is a corresponding SFL for every FFL.)
4
7.2 INTER-DISCIPLINE 7.3 INTRA-DISCIPLINE
5
COORDINATION CLASHES: Perform interference checks for all coloured boxes below
- The GREEN boxes are compulsory to be checked, if applicable. There must be zero interferences
1. OVERLAPS AND DUPLICATES: Perform automated interference checks for the same element. There must be zero interferences2. USE OF CORRECT OBJECTS: Turn off visibility of all categories except for category to check. There must be no instance of any model element not belonging to this category. 3. INFORMATION Open prepared schedule There must be no instance of any model type using "Generic", “Typical”,
"Default", or any ambiguous type4. NAMING CONSISTENCY In same schedule, all model types must be named consistently
ARCHITECTURAL STRUCTURAL
1 2 3 4 NAMING CONVENTION REMARKS
Floo
r
Wal
l
Cei
ling
Doo
r
Win
dow
(oth
ers)
Stru
ctur
al
Col
umn
Stru
ctur
al
Foun
datio
n
Stru
ctur
al
Fram
ing
Stru
ctur
al
Wal
l
Sla
b
(oth
ers)
ARCH
ITECTU
RAL Floor 00
WallCeilingDoorWindowGeneric Models
STRU
CTURA
L
Structural ColumnStructural FoundationStructural FramingStructural WallSlabGeneric Models
MEP
Mechanical EquipmentDuctsAir TerminalsPipePlumbing FixturesCable TrayGeneric Models
6
7.4 SAMPLE IMAGESControl Elements Intra-Discipline Inter-Discipline
Correct Incorrect Correct Incorrect Correct IncorrectModels located in the same coordinates
Models not located in the same coordinates
2 floor elements do not overlap
2
floor elements overlap
Slab openings for ducts
No slab opening, thus ducts penetrate slabs
Grids are aligned Grids are not aligned Single plumbing fixture Duplicate plumbing fixture No clashes for pile cap Pipe clashing with pile cap
Levels are alignedLevels are not aligned
Floor category consists of floors only
Louvers modelled as floors Beam and ceiling free of clashes
Beam clashing with ceiling
8. BIM Objective and Responsibility Matrix (Refer to Singapore BIM Guide Appendix B)
9. Model elements within each deliverable (Refer to Singapore BIM Guide Appendix A)