Site Layout, Deployment Planning and Site Coordination

Yeong Sok MingProductivity Development (Industry) Department

[email protected]

Copyright © March 2013 Building and Construction Authority

Disclaimer

Important note: Information presented during this sharing session and all

materials in these slides are for the purpose of the sharing only and NOT

meant for any other purposes. If you wish to use the materials for any

purpose, please seek the consent of the Building and Construction Authority

(BCA).

Copyright © March 2013 Building and Construction Authority

Outline of Presentation:Productivity through Good Management Practice• Pre-construction Stage• Construction Stage• Post Construction Stage

Copyright © March 2013 Building and Construction Authority

Pre-construction Stage

Copyright © March 2013 Building and Construction Authority

Pre-Construction Planning• Site Management

– Early Consideration of Constructability– Conduct Pre-construction Survey of Adjacent Building– Risk Assessment (RA) on Adjacent Building Properties– Planning of space usage to cater for the needs

Copyright © March 2013 Building and Construction Authority

Pre-Construction Planning• Construction Management

– Project Quality Plan (PQP)– Identify key process / critical items– Produce Shop Drawings for Ease of Construction– Planning of Authority Inspections

Copyright © March 2013 Building and Construction Authority

Pre-Construction Planning• Manpower Management

– Briefing to Site Supervisor– Briefing to Builder / Subcontractors / Sub-subcontractors– Additional Site Staff for Night-shift Works

Copyright © March 2013 Building and Construction Authority

Resource Planning• Use of project planning tools to allocate resources, manage

manpower eg: Primavera• Balance resource capacity • Plan, schedule, and control complex projects • Allocate best resources and track progress • Monitor and visualize project performance versus. plan

Copyright © March 2013 Building and Construction Authority

Resource Planning:Before After

Copyright © March 2013 Building and Construction Authority

Buildablity & Constructability• Design integration of Architectural, Structural and

M&E Design / Details• More buildablity & constructible elements for better

productivity• M&E, Architectural and Structural elements• Construction methods planning

Copyright © March 2013 Building and Construction Authority

Constructible Structural Elements:

Structural

• System Formwork

• Self Compacting Concrete

• Precast toilet

Copyright © March 2013 Building and Construction Authority

Constructible Architectural Elements:

Architectural

• Screedless Tiles

• Drywalls

Copyright © March 2013 Building and Construction Authority

Constructible MEP Elements

M&E

• Flexible Pipes

Copyright © March 2013 Building and Construction Authority

Authorities Inspections• Inspections should be pre-planned. • To avoid time wasted on last minute scheduling of

inspections with clients, QP, authorities. • Study on the preparation for authorities inspections:

eg: BCA, URA, LTA, NEA, PUB

Copyright © March 2013 Building and Construction Authority

Resource Planning• Use of software eg Primavera / MS Project to identify

key process and critical elements• Effective site management especially storage problem• Manpower planning and labour efficiency• Identify process that can be improved and tap on to

CPCF grant eg: MechC Scheme, PIP Scheme

Copyright © March 2013 Building and Construction Authority

Resource Management• Maximise site space usage

Located at MSCP Part 2

Approximate Area = 985 m² including temporary storage area and cube room

with courtesy from Kimly Construction

Copyright © March 2013 Building and Construction Authority

Resource Management• Just-in-time / minimum storage

with courtesy from Kimly Construction

Copyright © March 2013 Building and Construction Authority

Construction Stage

Copyright © March 2013 Building and Construction Authority

Site Management• Quality Manual in-place• Safety , Health and Environmental Guidelines• Resource tracking includes manpower• Adhere authorities regulatories

Copyright © March 2013 Building and Construction Authority

Construction Management• Compliance with Approved Structural Plans• Compliance with Workmanship Standard• Prepare Monthly Site Inspection Schedule• Detection of Construction Irregularities• Minimise Abortive Construction Works

Copyright © March 2013 Building and Construction Authority

Manpower Management• On-the-job training to enhance skill of workers• Good communications among subcontractors• Rewards and fines for workers• Proper accommodations• Physical health and mental health of workers

Copyright © March 2013 Building and Construction Authority

Site Management• Good Safety, Health and Environment Planning

Safety Management

• Restricted site access• Storage area is well

compacted & leveled• Proper planning• Regular tool box meeting

Accident Prevention

• Safety Provision• Safety Inspection• Safety Training• Safety Innovation• Defects Rectification

Copyright © March 2013 Building and Construction Authority

Site Management• Resource management especially manpower• Efficient way to monitor manpower• Use of IT system to replace manual monitoring

Copyright © March 2013 Building and Construction Authority

Before

After

Site Management• Use of Biometric system or RFID at site entrance for

manpower management

with courtesy from Straits Construction with courtesy from Straits Construction

Copyright © March 2013 Building and Construction Authority

Manpower Management• Importance of Manpower Management: because

workforce is the main asset to project succeed• Need to take care of them in order to gain their

respect and raise their pride and confidence in you

Copyright © March 2013 Building and Construction Authority

Courtesy of Dragages

Manpower Management• Examples of better working conditions

– To provide a safe , clean and well organized working environment

• Examples of better housing conditions – To provide proper workers quarters with, showers,

recreational facilities, canteens.

Copyright © March 2013 Building and Construction Authority

Courtesy of Dragages

Manpower Management• Examples of better living conditions

– Recreational facilities and events

• Examples of better health care – Workers yearly free health check– Corporate follow-up on ill health of workers– Safety and Health Campaign

with courtesy from Dragages Singapore

Copyright © March 2013 Building and Construction Authority

Examples of Good Housing Condition

with courtesy from Dragages Singapore

Copyright © March 2013 Building and Construction Authority

Examples of Good Housing Condition

with courtesy from Dragages Singapore

with courtesy from Dragages Singapore

Copyright © March 2013 Building and Construction Authority

Examples of Good Housing Condition

with courtesy from Dragages Singaporewith courtesy from Dragages Singapore

Copyright © March 2013 Building and Construction Authority

Examples of Good Housing Condition

with courtesy from Dragages Singaporewith courtesy from Dragages Singapore

Copyright © March 2013 Building and Construction Authority

Examples of Good Recreation Facilities

Gym

Mini Mart

with courtesy from Dragages Singapore with courtesy from Dragages Singapore

with courtesy from Dragages Singapore

Copyright © March 2013 Building and Construction Authority

Examples of Good Recreation Facilities

Soccer

Marathon

with courtesy from Dragages Singapore

with courtesy from Dragages Singapore

with courtesy from Dragages Singapore

Copyright © March 2013 Building and Construction Authority

Post Construction Stage

Copyright © March 2013 Building and Construction Authority

Post Construction Stage Planning• Submission of Certification of Completion of Building• Check the Completed Building Works• Collaborate with Architect For TOP/CSC Application

Copyright © March 2013 Building and Construction Authority

Post Construction Stage Management:• Manpower & equipment relocation• Authority inspections for completion and hand-over• Admin matters / documents archiving / closing of

accounts• Productivity data submission to authority