    Fill in your own data and see what Ellipse Planni

    Follow the indications for each step and see for yourself the savings

    Note: Only yellow cells can be edited

    Part I - Lower your engineering costs (Spend less in surv

    Step #1

    Engineering costs

    Cost of Path survey 800.00

    Cost of Link engneering 150.00

    #Links designed per year 300

    Step #2

    Network Description

    Network Urban

    Links to be designed 400 150 200 750

    green field 196 95 166

    existing networks 204 56 34

    % green field 49% 63% 83%

    % existing networks 51% 37% 17%

    1) Input Path Survey Cost

    2) Input Link Engineering Cost

    3) Input the number of links designed per year

    1) Fill the number of links to be designed (yellow cells)

    Very majorcities

    Nonurban

    This Business Case intends to guide you through the savings youMicrowave.

    The benefits are twofold :

    Lowered engineering costs (Spend less in surveys)

    Unrivaled computation engine along with Hi-Res geodata reduce the nuto find the right spot for your MW links. The first part of this Business Caimpact of using Ellipse with different resolutions of geodata.

    Improved efficiency (Time is Money)

    Administrative tasks and data exchange with suppliers or contractors adtedious. Therefore the less time you spend on this, the more efficient youbusiness case will show you how much time you save while using our DGeneration / One-Click Excel / ... features.

  • 8/14/2019 Bc Ellipse Mw

    2/20

    49 63 83

    Step #3

    Current Geodata Description

    Geodata Area (km) 1M 5M 20M+

    500

    Urban / average topo 5000

    Non Urban / simple topo 200000

    Note :

    No Clutter Data (No CD) means that only paper maps or GIS terrain is used

    Simple Topology is defined as small town, rural area, desert area,

    Average Topology is found in most cities around the world

    Difficult Topology is found in densely populated areas such as downtown Ma

    Step #4

    Geodata Description

    Geodata area Area (km) 1M 5M 20M+

    500

    Urban / average topo 5000

    Non Urban / simple topo 200000

    COST SAVINGS ARE COMPUTED IN REAL-TIME AND ARE DISPLAYED I

    Savings and Path surveys and Path engineering

    without ELLIPSE with ELLIPSE

    Cost of Path surveys 1,864,400.00 1,305,600.00

    Cost of Path Engineering 349,575.00 215,400.00

    Cost of Geodata - 13,750.00

    Total 2,213,975.00 1,534,750.00

    Cost Savings with ELLIPSE (in ) 679,225.00

    Part II - Improve you efficiency (Time is Money)

    Step #5

    1) Input the Area of your field of study according to the suggested segmenta

    2) Check the radio buttons to select the resolution of your current geodata

    Very major cities / difficultTopo

    1) Check the radio buttons to select the resolution of geodata you may want

    Very major cities / difficultTopo

    1) Input the estimated duration for each task (yellow cells)2) Check or uncheck the boxes of the task you want to include in the calcula

  • 8/14/2019 Bc Ellipse Mw

    3/20

    TIME SAVINGS ARE COMPUTED IN REAL-TIME AND ARE DISPLAYED IN

    Time Savings

    Unit

    FALSETime to setup a link during the design phas min / link 0

    Reports (duration / link)

    TRUE Frequency application min / link 1 1

    TRUE Link budget reportmin / link 1

    TRUE Physical description for deploymentmin / link 1

    TRUE Work ordermin / link 1 1

    TRUE Bill of Materials min / link 1

    TRUE Data exchange with LOS suppliers min / link 1

    FALSE Data exchange within company min / link 0 2

    TRUE Data exchange with outsourced suppliers min / link 1 3

    TRUE Access to documents within deployment min / link 1 1

    FALSE Data management hr / month 0 3Savings in ELLIPSE (Man days)

    Description of the tasks

    Time to setup a link during the design phase This time includes: sit

    interference analysisReports (duration / link)

    Frequency application This report is generall

    Link budget report Link budget report is

    Physical description for deployment Document given to th

    Work order Internal document iss

    Bill of Materials Exhaustive list of equ

    Data exchange with LOS suppliers Based on planning co

    Data exchange within company Exchange of informati

    Data exchange with outsourced suppliers Exchange of informati

    Access to documents within deployment Field engineering co

    Data management Retrieving, sorting, a

    DurationELLI

    This Business Case takes into account tangible earnings.deliver also true benefits difficult to model, such as:

    * Optimisation of frequency re-use leads to a better spectrumprice for spectrum, maintenance, spares,...* Significant reduction of interferences leads to higher Qualitythe loyalty of the customers* Detailed cost description of your transmission links (CapEx /accurate financial view of operating your network

    * The Network Audit Wizard can select the optimum leased lina cost effective manner while maintainin our oS

  • 8/14/2019 Bc Ellipse Mw

    4/20

  • 8/14/2019 Bc Ellipse Mw

    5/20

    g can save your company

    .

    ys)

    2) Adjust with thescroll bars theproportion betweenGreen Field andExisting Network

    an make using Ellipse

    ber of sites surveys to completee will show you the economic

    limited value and often areget. The second part of theta Management / Report

  • 8/14/2019 Bc Ellipse Mw

    6/20

    Current Geodata Description

    No CDGeodata area 1M 5M

    Very major cities / dif 0 0

    Urban / average topo 0 0

    Non Urban / symple t 0 0

    hattan, Rio de Janeiro, Hong Kong

    Geodata Description

    No CDGeodata area 1M 5M

    Very major cities / dif 0 1

    Urban / average topo 0 0

    Non Urban / symple t 0 0

    RED IN THE TABLE BELOW

    tion (yellow cells)

    to work with

    ion

  • 8/14/2019 Bc Ellipse Mw

    7/20

    RED IN THE TABLE BELOW

    -45

    0 1

    1

    1

    0 1

    1

    1

    5 1

    0 1

    0 5

    2 0106

    e positionning, LOS clearance, link budget, station positionning, equiment, antennae

    for the link and the network

    y handed to the Regulation Authority for compliance with the spectrum usage

    used internally to keep a track of the specs of the link. It can be the base document

    e deployment team. It compiles power data as well as equipment descriptions and s

    ued by the purchasing department based on planning recommendations

    ipment to power up the link

    mputations, site surveys must be done in the field and the results shall be logged int

    ion between planning and other departments within the company

    ion between the company and the contractors/suppliers,

    pares theoritical results with in the field measurements, and feed the database with

    chiving, editing ... files

    withoutPSE

    Duration withELLIPSE

    Some built-in features can

    fficiency, thus reducing the

    f Service (QoS), improving

    OpEx) provides you with an

    s to be replaced by MW in

  • 8/14/2019 Bc Ellipse Mw

    8/20

  • 8/14/2019 Bc Ellipse Mw

    9/20

  • 8/14/2019 Bc Ellipse Mw

    10/20

    20M CD

    0 1 4

    0 1 4

    0 1 4

    20M CD

    0 0 2

    1 0 3

    0 1 4

  • 8/14/2019 Bc Ellipse Mw

    11/20

    , frequency allocation,

    for a site survey

    etup paramaters for the link

    o the network database

    relevent comments

  • 8/14/2019 Bc Ellipse Mw

    12/20

  • 8/14/2019 Bc Ellipse Mw

    13/20

    New

    Cost of path survey 800.00

    Cost of Path engineering 150.00

    Geodata area 1m 5m 20m No CDVery major cities / difficult Topo 500 0 1 0 0

    Urban / average topo 5000 0 0 1 0

    Non Urban / symple topo 200000 0 0 0 1

    9 10 11 12

    5 6 7 8

    1 2 3 4

    Network Urban Non urban Network

    Links to be designed 400 150 200 Links to be d% green field 49% 63% 83%

    % existing networks 51% 37% 17% exist

    Path sur

    Path en

    Very majorcities

  • 8/14/2019 Bc Ellipse Mw

    14/20

    Green Field existing network

    path suvey link engineeringpath suvey link engineering

    2 1 2 2OK 2 2 2 2

    OK 3 3 1 1

    OK

    10

    7

    4

    Urban Non urban

    signed 400 150 200green field 196.00 94.50 166.00

    ng networks 204.00 55.50 34.00

    ey costs 1,305,600.00

    ineering 215,400.00

    1,521,000.00

    Very majorcities

  • 8/14/2019 Bc Ellipse Mw

    15/20

    Current

    Cost of path survey 800.00

    Cost of Path engineering 150.00

    Geodata area 1m 5m 20m No CD

    Very major cities / difficult Topo 500 0 0 0 1

    Urban / average topo 5000 0 0 0 1

    Non Urban / symple topo 200000 0 0 0 1

    9 10 11 12

    5 6 7 8

    1 2 3 4

    Network Urban Non urban Network

    Links to be designed 400 150 200 Links to be d

    % green field 49% 63% 83%

    % existing networks 51% 37% 17% exist

    Path sur

    Path en

    Very majorcities

  • 8/14/2019 Bc Ellipse Mw

    16/20

    Green Field existing network

    path suvey link engineeringpath suvey link engineering

    3 3 4 4

    OK 3 3 2 2

    OK 3 3 1 1

    OK

    12

    8

    4

    Very major cities Urban Non urban

    signed 0 0 0

    green field 196.00 94.50 166.00

    ng networks 204.00 55.50 34.00

    ey costs 1,864,400.00

    ineering 349,575.00

    2,213,975.00

  • 8/14/2019 Bc Ellipse Mw

    17/20

    Simple Topology Average Topology Difficult Topology

    1mR

    esolu

    tionCD

    5mR

    esolu

    tionCD

    20mR

    esolutionCD

    NoC

    D

    1mR

    esolu

    tionCD

    5mR

    esolu

    tionCD

    20mR

    esolutionCD

    NoC

    D

    1mR

    esolu

    tionCD

    5mR

    esolu

    tionCD

    20mR

    esolutionCD

    NoC

    D

    1 2 3 4 5 6 7 8 9 10 11 12

    1 1 1 1 1 1 1 1 1 1 1 1

    1 1 1 1 1 1 2 2 1 2 3 4

    1 1 1 1 1 1 2 2 1 2 3 4

    NOTES

    Microwave Hops are in a higher frequency bands and relatively short (1-6 km).

    Number of SiteSurveys per Hop(two sites per Hop)

    Number of PathSurveys per Hop

    Path Engineeringper Hop

    "No Clutter Data" means that only paper maps or GIS terrain data is used.

    Simple topology is defined as a small town or rural area, desert area, etc.

    Average topology is found in most cities around the world.

    Difficult topology is found in densly populated areas areas like downtown Manhattan, Rio De Janeiro, Ho

  • 8/14/2019 Bc Ellipse Mw

    18/20

    g-Kong, et.

  • 8/14/2019 Bc Ellipse Mw

    19/20

    Simple Topology Average Topology Difficult Top

    1mR

    esolu

    tionCD

    5mR

    esolu

    tionCD

    20mR

    esolutionCD

    NoC

    D

    1mR

    esolu

    tionCD

    5mR

    esolu

    tionCD

    20mR

    esolutionCD

    NoC

    D

    1mR

    esolu

    tionCD

    5mR

    esolu

    tionCD

    20mR

    esolutionCD

    1 2 3 4 5 6 7 8 9 10 11

    1 1 1 1 1 1 1 1 1 1 1

    1 1 2 3 1 1 2 3 1 2 2

    1 1 2 3 1 1 2 3 1 1 2

    NOTE: Although new cell-site may initially have up to 15 candidates, microwave path surveys are usu

    Number of SiteSurveys per Hop(two sites per Hop)

    Number of PathSurveys per Hop

    Path Engineering

    per Hop

  • 8/14/2019 Bc Ellipse Mw

    20/20

    logy

    NoC

    D

    12

    1

    3

    3

    ally limited to top three candidates.