1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
CAD detail catalogue
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Version number:01/2019
basement
SOv 01 standard basement
façade
Fv 01 ETICS (high acoustic req.)Fv 02 wooden façade
(high acoustic req.)Fv 03 wooden façade
(normal acoustic req.)Fv 04 wooden façade
(normal acoustic req. decoupled)Fv 05 brickwork supportFv 06 concrete support
balcony / terrace
Bv 01 balcony FF (RC wall)Bv 02 balcony UF (CLT façade)Bv 03 balcony suspensionBv 04 balcony support / pillarBv 05 balcony doorBv 06 balcony rainwater pipeBv 07 balcony vergeBv 08 balcony side wallTv 01 terrace parapetTv 02 terrace nodeTv 03 terrace door
staircase
STv 01 staircase CLT-plasterboardSTv 02 staircase RCSTv 03 staircase CLT-DVQ
attic / flat roof
Av 01 atticAv 02 drainage flat roofAv 03 attic window connectionAv 04 attic form elementAv 05 attic EW ventilated
window / door
FEv 01 window sillFEv 02 external blind elementFEh 01 side connectionTh 01 door connection STC
shaft
Sv 01 shaft cutSh 01 shaft allocation
Note:The detailed examples shown are intended as planning aids and must be adapted to the respective project conditions and requirements.The completeness of the information and a standard-compliant execution must be checked and supplemented by the responsible planner.
Further assistance on the KLH product and the general terms of use can be found at https://www.klh.at
Proj
ect:
CAD
-Det
ails
Date:09.2019
BW
base
men
t wat
erpr
oofin
gi.a
.w. Ö
NO
RM
B 3
692
air-t
ight
join
t sea
ling
FS
fast
enin
gsi.a
.w. Ö
NO
RM
B 1
995-
1-1,
app
endi
x K
FFL
drai
nage
Sw ≥ 300
Ah & Sp ≥ 300 prot
ectiv
e la
yer e
.g.
stud
ded
mem
bran
e
wat
erpr
oofin
g ag
ains
tas
cend
ing
hum
idity
mor
tar s
ill
join
t sea
ling
acco
rdin
gto
the
insu
latio
n sy
stem
≥2%
base
men
t ins
ulat
ion
pane
l i.a
.w.
man
ufac
ture
r´ssp
ecifi
catio
ns
EW2
edge
rubb
erst
ripe
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Plan content:Façade/basement compartment floor, CLT basement on reinforced concrete
SOv01
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
ETICS ex.external thermal insulationcomposite system with plaster
trickle protection
FS
EW1
air-tight adhesive tape
PE foam mat / acoustic foil
fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K
elast. hanger
edge rubber stripe
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Facade-dividing ceiling, CF with high soundproof requirements
Scale:1:5
Size:A3
DETAIL Fv 01
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
trickle protection
FS
EW2
air-tight adhesive tape
fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K
elast. hanger
PE foam mat / acoustic foil
closed wooden façade
edge rubber stripe
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Facade-dividing ceiling, CF with high soundproof requirements
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Version number:01/2019
Fv 02
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
trickle protection
gravel filling
concrete blocks
PE foam mat / acoustic foil
fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K
Note:In the case of a high number ofconnection (high node stiffness), thenode must be checked with regard tosound insulation.
air-tight adhesive tape
FS
EW2
edge rubber stripe
closed wooden façade
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Facade-dividing ceiling, CF with normal acoustic requirements
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Version number:01/2019
Fv 03
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
trickle protection
FS
PE foam mat / acoustic foil
concrete blocks
gravel filling
fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K
soundproofing support
Note:In the case of a high number ofconnection (high node stiffness), thenode must be checked with regard tosound insulation.
air-tight adhesive tape
closed wooden façade
EW2
edge rubber stripe
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Plan content:Facade-dividing ceiling, CF with normal soundproof requirements
Version number:01/2019
Fv 04
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
trickle protection
FS
EW
PE foam mat / acoustic foil
elast. hanger
fasteningsi.a.w. ÖNORM B 1995-1-1, appendix Kor static requirement
RC ring beam
elastic support
air-tight adhesive tape
e.g. glued-in threaded bar
ETICSi.a.w. manufacturer's data
EW1
edge rubber stripe
Note:In the case of a high number ofconnection (high node stiffness), thenode must be checked with regard tosound insulation.
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Plan content:Facade-dividing ceiling, brickwork support, CF with high soundproof req.
Version number:01/2019
Fv 05
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
trickle protection
FS
EW
PE foam mat / acoustic foil
Note:In the case of a high number ofconnection (high node stiffness), thenode must be checked with regard tosound insulation.
elast. hanger
RC ring beam
e.g. glued-in threaded bar
fasteningsi.a.w. ÖNORM B 1995-1-1, appendix Kor static requirement
elastic support
air-tight adhesive tape
ETICSi.a.w. manufacturer's data
edge rubber stripe
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Plan content:Facade-dividing ceiling, RC support, CF with high soundproof requirements
Version number:01/2019
Fv 06
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
drainage level terrace gutter
connection i.a.w. ETICS guidelines
FSB
vertical waterproofing,top edge min. 30 cm A.F.F.
hard wood decking
wooden support impregnated
terrace drainagechannel
formwork plate
air-tight foil with lowvapor permeability
air-tight foil with highvapour permeability
edge rubber stripe
wooden slope
substructure on bearing elastomeraccording to acoustic requirements
XPS HD insulation
sheet covering
FFL basement
functional material (e.g. PUR)
protective layere.g. studded membrane
perimeter insulationi.a.w. processing guideline ormanufacturer's specifications
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Connection balcony with balcony´s door at 1st storey
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Version number:01/2019
Bv 01
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
connectioni.a.w. ETICS guidelines
air-tight foil with low vapourpermeability
trickle protection
edge rubber stripe
FS
drainage level terrace gutter
hard wood decking
wooden support impregnated
terrace drainagechannel
air-tight foil with highvapour permeability
wooden slope
substructure on bearing elastomeraccording to acoustic requirements
XPS HD insulation
sheet covering
air-tight tape
PE foam mat/ acoustic foil
functional material (e.g. PUR)
fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K
elast. hanger
EW1
≥ 2%
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Connection balcony with balcony´s door at standard storey
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Version number:01/2019
Bv 02
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
sheet covering
connectioni.a.w. ETICS guidelines
clamping profile
XPSi.a.w. ÖNORM B3691
ETICSi.a.w. manufacturer´s specifications
connectioni.a.w. ETICS guidelines
drainage level
hard wood decking
wooden support impregnated
formwork panels trickle protection
FSemergency sealingi.a.w. ÖNORM B3691
EW1
wooden slope
air-tight tape
PE foam mat/ acoustic foil
fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K
elast. hanger
edge rubber stripe
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Connection balcony at standard storey
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Bv 03
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
elast. hanger
FS
air-tight tape
PE foam mat/ acoustic foil
balcony´ssuspension
fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K
edge rubber stripe
EW1
XPS 30cmabove cladding
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Balcony suspension
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Bv 04
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
sheet covering
connectioni.a.w. ETICS guidelines
clamping profile
XPSi.a.w. ÖNORM B369130 cm above cladding
ETICS i.a.w.manufacturer´s specifications
drainage level
hard wood decking
wooden support impregnated
formwork panels trickle protection
FSemergency sealingi.a.w. ÖNORM B3691
EW1
wooden slope
PE foam mat/ acoustic foil
fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K
elast. hanger
≥ 2%
edge rubber stripe
connecting profilei.a.w. ETICS guidelines
air-tight tape
spreading screwingi.a.w. static
bearing sound insulation orthermal separation
position securing
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Connection balcony - standard storey on balcony door
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Bv 05
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
mounting metalprofile
glass balustrade (2xVSG)
clamping profile
laminated sheet metal
steel angle
drainage level
hard wood decking
wooden support impregnated
terrace drainagechannel
formwork panels
steelsupport
wooden slope
stainless steel gutterdrain DN50
substructure on bearing elastomeraccording to acoustic requirements
drip edge
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Balcony eaves
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Bv 06
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
mounting metalprofile
clampingprofile
gutterdrain DN50
steel angle
laminated sheet metal
steelsupport
glass balustrade (2xVSG)
hard wood decking
wooden support impregnated
formwork panels
wooden slope
drip edge
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Balcony verge
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Bv 07
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
RW drain DN50
insects screen
insects screen
laminated sheet metal
mounting profile (ventilation)
façade platei.a.w. EN 438-6
hard wood decking
wooden support impregnatedlaminatedsheet metal
emergency sealingi.a.w. ÖNORM B3691
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Balcony sides
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Bv 08
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Date:09.2019
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdf
inse
cts
scre
en
inse
cts
scre
en
connecting profilei.a.w. ETICS guidelines
faça
de p
late
i.a.
w. E
N 4
38-6
mou
ntig
pro
file
(ven
tilat
ion) woo
d or
alu
min
ium
sub
stru
ctur
e
terra
ce d
ecki
ng
conc
rete
sla
b on
dra
inag
e el
emen
t
EW1
shee
t cov
erin
g
subs
truct
ure
on b
earin
g el
asto
mer
acco
rdin
g to
aco
ustic
requ
irem
ents
emer
genc
y se
alin
g i.a
.w. Ö
NO
RM
B36
91
air-t
ight
tape
vapo
ur b
arrie
r
fast
enin
gsi.a
.w. Ö
NO
RM
B 1
995-
1-1,
app
endi
x K
elas
t. ha
nger
≥ 3
°
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Terrace parapet
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Tv 01
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Date:09.2019
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdf
wooden spacer
IW1
trickle protection
edge rubber stripe
FS
emergency sealing i.a.w. ÖNORM B3691
clamping profile
protective plate
XPS 30cmabove cladding
ETICSi.a.w. manufacturer´sspecifications
PE foam mat/ acoustic foil
vapour barrier
fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K
elast. hanger
≥ 3°
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Connection terrace - wall
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Tv 02
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
bonded vapour-tight i.a.w. ÖNORM B5320
elastisc joint
trickle protectionedge rubber stripe
FS
substructure on bearing elastomeraccording to acoustic requirements
XPS HD insulation
steel angle
PE foam mat/ acoustic foil
vapour barrier
fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K
elast. hangerIW1
≥ 3°
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Connection terrace - balcony´s door
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Tv 03
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
WD
apartment staircase
Z-profile
compression band
doorsillbuck frame
permanent elastic seal
WTW
FS
entrance door
PE foam strip
apartment staircase
PE foam mat/ acoustic foil
elast. hanger
fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K
edge rubber stripe
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:STC (CLT with gypsum plasterboard) connection floor - door
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
STv 01
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
FS
apartment staircase
Z-profile
compression band
doorsillbuck frame
permanent elastic seal
WTS
FSS
entrance door
PE foam strip
apartment staircase
PE foam mat/ acoustic foil
elast. hanger
edge rubber stripe
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:STC (RC) connection floor - door
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
STv 02
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
WD
apartment staircase
Z-profile
compression band
doorsillbuck frame
permanent elastic seal
WTW
WD
entrance door
PE foam strip
apartment staircase
PE foam mat
elast. hanger
edge rubber stripe
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:STC (visual quality CLT) connection floor - door
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
STv 03
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
EW1
clamping profile
FD
metal sheet
connecting profilei.a.w. ETICSguidelines
air-tightadhesive tape
≥ 3°
fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K
sealing layerconsider emergency spillway
emergency sealing i.a.w. ÖNORM B3691
elast. hanger
vapour barrier / emergency roof / waterproofing construction period(connection air-tight level EW)
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Attic connection wall
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Av 01
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
clam
ping
pro
file
FD
met
al s
heet
stai
nles
s st
eel
edge
pro
tect
ion
exte
nsio
n pr
ofile
silic
on c
ompr
essi
on b
and
insu
latio
n zo
nesu
pppo
rting
blo
ck
exte
rnal
blin
del
emen
t
air-t
ight
foil
with
high
vap
our
perm
eabi
lity
drip
edg
e
≥ 3
°
fast
enin
gsi.a
.w. Ö
NO
RM
B 1
995-
1-1,
app
endi
x K
elas
t. ha
nger
vapo
ur b
arrie
r / e
mer
genc
y ro
of /
wat
erpr
oofin
g co
nstru
ctio
n pe
riod
(con
nect
ion
air-t
ight
leve
l EW
)
seal
ing
laye
rco
nsid
er e
mer
genc
y sp
illway
air-t
ight
adh
esiv
eta
peconn
ectin
g pr
ofile
i.a.w
. ETI
CS
guid
elin
es
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Attic connection window
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Av 02
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
EW1
clamping profile
FD
metal sheet
connecting profilei.a.w. ETICSguidelines
air-tight tape
≥ 3°
sealing layerconsider emergency spillway
emergency sealing i.a.w. ÖNORM B3691
emergency spillway
free outlet for eavy rain event
guard outlet vapour barrier (insulated)drain to wastewater network
vapour barrier / emergency roof / waterproofing construction period(connection air-tight level EW)
roof drain
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Attic drainage
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Av 03
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
clam
ping
pro
file
attic
ele
men
t
FD
met
al s
heet
stai
nles
s st
eel e
dge
prot
ectio
n
exte
nsio
n pr
ofile
silic
on c
ompr
essi
on b
and
insu
latio
n zo
nesu
pppo
rting
blo
ck
≥ 3
°
elas
t. ha
nger
vapo
ur b
arrie
r / e
mer
genc
y ro
of /
wat
erpr
oofin
g co
nstru
ctio
n pe
riod
(con
nect
ion
air-t
ight
leve
l EW
)
seal
ing
laye
rco
nsid
er e
mer
genc
y sp
illway
exte
rnal
blin
del
emen
t
air-t
ight
foil
with
high
vap
our
perm
eabi
lity
drip
edg
e
air-t
ight
adh
esiv
eta
peconn
ectin
g pr
ofile
i.a.w
. ETI
CS
guid
elin
es
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Attic alternative flat roof element - connection window
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Av 04
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
EW2
clamping profile
vapour barrier / emergency roof / waterproofing construction period(connection air-tight level EW)
FR
metal sheet
air-tight adhesivetape
≥ 3°
fasteningsi.a.w. ÖNORM B 1995-1-1, appendix K
sealing layerconsider emergency spillway
emergency sealing i.a.w. ÖNORM B3691
façade membrane/ windproofing(diffusion-open)
ventilation layer
insects screen
subconstructione.g. OSB
closed woodenfaçade
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Attic connection wall, EW ventilated
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Av 05
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
foil (2nd waterproof layer)
air-tight foil with low vapour permeability
air-tight foil with highvapour permeability
insulation wedge
insulation zone,supporting block
thin plastering
ETICSi.a.w. manufacturer´sspecifications
connectioni.a.w. ETICS guidelines
permanentelasticexpansion joint
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Window´s bottom connection
Scale:1:2,5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
FEv 01
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
stainless steeledge protection
extension profile
external blindelement silicon compression band
air-tight foil with highvapour permeability
air-tight foil with lowvapour permeability
drip edge
insulation zone,supporting block
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Window´s top connection
Scale:1:2,5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
FEv 02
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
EW 01
stainless steeledge protection
stainless steel edge protection
air-tight foil with highvapour permeability
air-tight foil with low vapourpermeability
insulation zone
silicon compression band
external blind´s rail
external blind
inside windowsill
outside windowsill
window´s connectionprofile
sealing tape
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Window´s side connection
Scale:1:2,5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
FEh 01
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
stainless steel edge protection
sealing tape
6 x 4
installation angle
hardwood strip + siliconcompression band
installation connectioni.a.w. manufacturer´sspecifications
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:STC connection wall - door
Scale:1:5
Size:A3
DETAIL
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Th 01
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
shaf
t sys
tem
Kna
uf W
635
REI
60or
equ
ival
ent
fire
prot
ectio
n co
llar
vent
ilatio
n
fire
caps
ule
(air-
tight
glu
ed)
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
Plan content:Shaft section
Scale:1:5
Size:A3
DETAIL Sv 01
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019
VIIIShaft system Knauf W635 REI60or equivalent
Sh 02
1.UF - 4.UF
5.UF
GF
BF
Bv 01
Fv 01Fv 02Fv 03Fv 04
SOv 01
Bv 06
Bv 02Bv 03Bv 04Bv 05
Tv 02Tv 03
Tv 01
Av 01Av 02Av 03Av 04Av 05
FEv 02
FEv 01
FEh 01
Bv 08
Bv 07
1 x sewage Ø1102 x sup. air 25/20 cm2 x exh. air 25/20 cm1 x cold water Ø502 x heating Ø50Shaft: 140/30 cm
VIII
Legende Farben:
AllgemeinHeizung:
VorlaufRücklaufÖlIsolierung
Kälte:AllgemeinVorlaufRücklaufIsolierung
Gase:GasAzetylenArgon
HeliumKohlendioxidSauerstoffStickstoff
AllgemeinSanitär:
KaltwasserKaltwasser WeichLöschwasserDesinfektionswasser
ZirkulationswasserRegenwasserSchmutzwasserSchmutzwasser Fett
Lüftung:AllgemeinAbluftZuluftAußenluftFortluftSaugluft
Warmwasser
Isolierung
Druckluft
BrandschutzAllgemein:
HT BauangabenET Bauangaben
Isolierung
AllgemeinSchraffuren:
FußbodenheizungHeizflächenEinrichtungsgegenständeAbluftZuluft
AußenluftFortluft
Legende Symbole:Leitung nach obenLeitung nach untenLeitung nach oben und untenKugelhahnAbsperrklappe
Eckventil
AbsperrschieberRegulierventilDifferenzdruckreglerMagnetventil
M DurchgangsventilDreiwegeventil
M Dreiwegeventil mit StellantriebRückschlagventilRückschlagklappe
SchrägsitzventilDruckminderventil
Sicherheitsventil
Thermometer
Manometer
Manometerhahn
EntlüftungsventilEntleerungPumpe
SchmutzfängerFilterLuftabscheider
Wärmemengenzähler
PassstückKompensator
Wasserzähler
Fühler
ReglerRaumthermostatZeitschaltuhr
Leitungen an der DeckeLeitungen im BodenLeitungen an/in der Wand
Schalldämpfer
Volumenstromregler
Jalousieklappe
MotorantriebM
Ventilator
Plan content:Shaft section
Scale:1:5
Size:A3
DETAIL Sh 01
KLH
Mas
sivh
olz
Gm
bHG
ewer
best
raße
4A
- 884
2 Te
ufen
bach
-Kat
sch
offic
e@kl
h.at
Version number:01/2019
Proj
ect:
CAD
-Det
ails
Legend: Note:The processing and manufacturing instructions must be observed! Sealing coumpounds must be selectedin accordance with the requirements and checked for compatibility with each other and with thecomponents concerned (warranty). Anchor spacings must be observed in accordance with thecertification. The dimensioning of the profiles, fastenings, anchors, dowels and glazing must bedetermined independently by the executing company, depending on the assembly concept, the staticcalculation and the applicable standards and approvals!
Plan coding:Abbrev.: Component:EW exterior wallIW interior wallWTW Double partition wallFL Floor levelFR Flat roofPR Pitched roof
General Terms of Use: https://www.klh.at/wp-content/uploads/2020/07/webpage-allgemeine-nutzungsbedingungen-en.pdfDate:09.2019