    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 1 of 30

    DATE OF ISSUE:

    NUCLEAR POWER CORPORATION OF INDIA LIMITED(A Govt.of India Enterprise)

    TARAPUR ATOMIC POWER PROJECT-3&4

    Concurred BY

    Name & design.

    NPC Design Group

    PREPAREDBY

    CHECKED BY REVIEWEDBY

    APPROVEDBY

    ISSUED BY

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

  • 7/30/2019 Barring Gear

    2/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 2 of 30

    DATE OF ISSUE:

    -This page is intentionally left blank-

  • 7/30/2019 Barring Gear

    3/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 3 of 30

    DATE OF ISSUE:

    REVISION LOG

    Revision Details Preparation Details

    Issue No. Rev.No. Details DatePageNo.

    Prepared byChecked byReviewed by

    Concurred byApproved by

  • 7/30/2019 Barring Gear

    4/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 4 of 30

    DATE OF ISSUE:

    -This page is intentionally left blank-

  • 7/30/2019 Barring Gear

    5/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 5 of 30

    DATE OF ISSUE:

    CONTENTS

    SL

    NO.TITLE CLAUSE PAGE NO.

    Cover sheet 1

    Revision log3

    Contents5

    1.Purpose

    6

    2.

    Pre-requisites

    2.1 Status of other systems2.2 System Requirements2.3 Manpower requirements2.4 Requirement of special Equipments2.5 Requirement of outside agencies

    2.6 Hazards & precautions

    6

    3.General method

    8

    4.Design intents

    14

    5.Expected process parameters

    15

    6.Work plan

    16

    7.Test report format

    16

    8.Reference

    28

    9.Verification process

    28

    10. COMMISSIONING PROCEDURE ACCEPTANCE NOTE 30

  • 7/30/2019 Barring Gear

    6/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 6 of 30

    DATE OF ISSUE:

    1.0 Purpose:

    The purpose of this procedure is to provide guidelines forcommissioning of the barring gear system.

    2.0 Pre-requisites:

    2.1 Status of other systems:

    Normal LT supply to AOPs, JOPs, EOP, VEFs,

    DC supply to DCEOP and DCSOP

    Control room readiness with all recorders, indicators, for

    Turbovisory readings, bearing temperatures, expansions.

    Lab facility to test oil.

    Readiness of seal oil system

    Other systems as per following list:

    a All erection activities should be completed.

    b Oil flushing of the system should be completed.

    c System should be available with fresh oil.

    d Pipes should be normalized in all respects.

    e Temporary supports should be removed.

    f AOPs are available for running & no leakage is persisting in

    the system.

    g Oil Purification System should be in operation.

    h Service air should be available near filters for cleaning.

    i Cooling water at oil cooler should be available.

  • 7/30/2019 Barring Gear

    7/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 7 of 30

    DATE OF ISSUE:

    2.2 System Requirements

    The following equipments and Instruments shall be made available.

    a) Dial gauges with Magnetic Base 0-10 mm for measuring each

    journal lift.

    b) Different sizes of spanner set (double end)

    c) Ring spanner 3 mm to 27 mm one set.

    d) Allen Key one set 3 mm to 10 mm.

    e) Screwdriver small to big one set.

    2.3 Manpower requirements:

    Commissioning team of mechanical, electrical & C&I engineers &

    supporting manpower of BHEL & NPCIL.

    2.4 Requirement of special Equipments:

    Nil

    2.5 Requirement of outside agencies

    Nil

    2.6 Hazards& precautions

    While testing and adjusting the barring gear system no insulation

    work shall be allowed.

    Fire fighting equipments shall be made available.

    The operating personnel shall be aware of the procedure.

  • 7/30/2019 Barring Gear

    8/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 8 of 30

    DATE OF ISSUE:

    Debris in and around oil systems and MOT floor to be removed.

    Approach/Stair Case/Platform wherever required are made

    available.

    Sign boards to be displayed at strategic location to indicate that Oil

    System is charged and oil pumps are ON.

    3.0 General method

    Check the completion of erection as per the design flow sheets and

    drawings. Check the completion of equipments and supports in all oil pipe

    systems.

    Ensure that at least one oil Vapour exhauster fan is running and the

    butterfly valves in the bearing and MOT are adjusted for having

    negative pressure in the bearings (approx 10-40 mm WLC).

    Ensure that adjustment of Lub oil line throttles have been

    completed as mentioned in the commissioning procedure for oil

    system. for proper bearing oil flow as per the throttle

    characteristics. Record the throttle lift in each bearing and MOTroom injectors

    Start DC EOP and fill up the system.

    Ensure there is no leakage and the drain oil flow in each bearing is

    o.k.

  • 7/30/2019 Barring Gear

    9/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 9 of 30

    DATE OF ISSUE:

    Ensure that the Lub oil duplex filter elements are not in choked

    condition.

    Start AOP I and keep it running.

    Change over AOP I to AOP II and ensure there is no abnormality

    with the system.

    Ensure installation of the JOP line filters and pressure regulating

    valve

    Release the limiter spring.

    Closed inlet valves to all bearings.

    Start JOP I and adjust the JOP header pressure to 150 kg/cm2.

    Install the Dial gauges with Magnetic Base 0-10 mm for measuring

    each journal lift.

    Adjust the lift of rotor in each bearing (between 0.08 to 0.1 mm)

    with dial gauge.

    Carry out hand barring

    Ensure that the rotor is free with hand barring.

  • 7/30/2019 Barring Gear

    10/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 10 of 30

    DATE OF ISSUE:

    Record the lift and JOP pressure of each bearing.

    Run the other JOP and ensure its proper operation.

    Ensure that one seal oil vacuum pump and one generator bearing

    chamber exhauster fan is running.

    Ensure that there is vacuum in the seal oil tank.

    Ensure that seal oil filter elements are installed in the filters.

    Ensure that oil is taken in seal oil system and there is normal level

    in SOT and IOT.

    Run Seal Oil Pump I and ensure proper operation of CPR (Constant

    Pressure Regulator) and DPR-I (Differential Pressure Regulator).

    Ensure proper operation of the second DPR-II and ensure change

    over of CPR.

    Adjust the ring relief oil flow.

    Ensure that the SOT level is maintained by the SOT Float valve.

    Run other AC seal oil and DC seal oil pump one by one and adjust

    the CPR of the respective pump.

  • 7/30/2019 Barring Gear

    11/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 11 of 30

    DATE OF ISSUE:

    Ensure that the DPR is functioning o.k. with any one seal oil pump.

    Ensure that the calibration of Turbovisory work is completed

    and bearing metal temperature thermocouple are installed.

    Ensure that the Turbovisory readings and bearing metal

    temperature indicators are commissioned and reading in control

    room

    Ensure that following oil drives are operable from control

    room.

    AOP I/II

    DC EOP

    JOP I/II

    OVE I/II

    SOP I/II

    DC SOP

    SEAL OIL VAC PUMP I/II

    GEN BEARING CHAMBER EXHAUSTE I/II

    BARRING GEAR VALVE WITH INTRLOCK OF LUB OIL

    HEADER PRESSURE

    OIL TEMPERATURE CONTROL VALVE

    Ensure that fire-fighting system is commissioned and floor lighting

    is completed.

  • 7/30/2019 Barring Gear

    12/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 12 of 30

    DATE OF ISSUE:

    Ensure the completion of all oil line pressure switches and

    transmitters with HEAD CORRECTION. (INSTRUMENT LIST,

    DRG.NO. 4 13300 98 001, REV02 NPC DOC. TAPP-

    3/64110/5516/SCH/RO)

    Ensure the field checks of SGC OIL are completed.

    Ensure that readings are available in control room as per format.

    Ensure the following interlocks of oil pump before putting the

    machine on barring gear:

    LUB OIL PUMPS

    AOP I ON with SLC OFF and AOP II OFF with SLC ON

    Stop AOP I, AOP II should pick up on Auto.

    Repeat the same with AOP II running and AOP I in auto.

    AOP I /AOP II On with SLC OFF DC EOP OFF with SLC ON

    Stop running AOP DC EOP will pick up on auto.

    JOP

    JOP I ON with SLC OFF JOP II OFF with SLC ON

  • 7/30/2019 Barring Gear

    13/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 13 of 30

    DATE OF ISSUE:

    Stop JOP I JOP II will pick up on auto

    Repeat the same in vice versa

    SEAL OIL PUMPS

    SOP I ON with Auto OFF SOP II OFF with Auto ON

    DC EOP OFF with Auto OFF

    Stop running SOP II will pick up on Auto

    Repeat the same in vice versa with SOP II and DC SOP running.

    PUTTING THE MACHINE ON BARRING GEAR

    Ensure the all oil pumps are ready mechanically and module are ON

    from switch gear with SLC s in OFF condition

    Ensure the seal oil system is in operation with all interlocks and

    protection

    Ensure that safety clearance has been signed by all concerned

    Agencies for Barring Gear operation.

    Ensure that oil purifier is in operation.

    Ensure that ACW system is in operation.

    Switch ON SGC OIL programme from control room and ensure that

    programme follows as per design steps.

  • 7/30/2019 Barring Gear

    14/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 14 of 30

    DATE OF ISSUE:

    Attend to the problems if programme is held at any step and ensure

    that machine comes to barring gear on auto.

    Ensure there is no rubbing sound from seals of turbines when

    machine comes to barring.

    Allow the machine to come to a steady speed and take a set of

    readings as per the format.

    4.0 Design intents:

    On hand barring, rotor shaft system should be free.

    Speed at barring gear (without vacuum ) is expected to be

    around 60-70 mw,which shall increase with vacuum in

    condenser.

    During speeding up barring gear valve will close at about 240

    rpm.

    JOP will cut-off at 540 rpm.

    During coast down JOP will cut-in at 540 rpm.

    Barring gear valve will open at 210 rpm.

  • 7/30/2019 Barring Gear

    15/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 15 of 30

    DATE OF ISSUE:

    5.0 Expected process parameters

    BEARING OIL FLOWS

    Bearing Oil flow (cu.dm)

    Bearing 1 8.0

    Bearing 2 2.7

    Bearing 3 11.8

    Bearing 4 12.9

    Bearing 5 6.35

    Bearing 6 6.35

    Bearing 7 1.37

    JACKING OIL PRESSURE AND ROTOR LIFT

    Brg

    no.

    JOP pressure

    (Kg/Cm2)

    Rotor lift

    (mm)-

    approx.

    1 0.07

    2 0.07

    3 0.07

    4 0.07

    5 0.07

    6 0.07

    7 0.07

    6.0 Work plan:

    a Commissioning of Lube oil system

    b Commissioning of JOP system

  • 7/30/2019 Barring Gear

    16/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 16 of 30

    DATE OF ISSUE:

    c Commissioning of Seal Oil System.

    d Putting the set on Barring Gear.

    7.0 Test report formats:

    LUB OIL FLOW ADJUSTMENT (MACHINE AT STAND STILL)

    Brgno.

    Throttleliftadjusted

    l.o.

    Press.Bef.throttle

    l.o.

    Press.Aft.Throttle

    DP acrossthrottle

    Lub oilflow

    Remarks

    1

    2

    3

    4

    5

    6

    7

    Motinj.

    LUB OIL FLOW ADJUSTMENT (MACHINE ON BARRING GEAR)

    Brgno.

    Throttleliftadjusted

    l.o.Press.Bef.

    throttle

    l.o.Press.Aft.

    Throttle

    DP acrossthrottle

    Lub oilflow

    Remarks

    1

    2

    3

    4

    5

    6

    7

    Motinj.

  • 7/30/2019 Barring Gear

    17/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 17 of 30

    DATE OF ISSUE:

    JACKING OIL PRESSURE AND ROTOR LIFT

    Brgno.

    JOP pressure(Kg/Cm2)

    Rotor lift(mm)

    1

    2

    3

    45

    6

    7

    CONTROL ROOM READINGS FOR EVALUATING PERFORMANCE AT BG

    SLNO

    PARAMETERSSTANDSTILL

    BARRINGGEAR

    REMARKS

    1. Speed

    2. AOP dish pr

    3. L.o. header pr.

    4. J.O. header pr.

    5.L.o.temp befcooler

    6.L.o.temp aft

    cooler7. MOT level

    8. Shaft I vib

    9. Shaft 2 vib

    10. Shaft 3 vib

    11. Shaft 4 vib

  • 7/30/2019 Barring Gear

    18/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 18 of 30

    DATE OF ISSUE:

    12. Shaft 7 vib

    13. Brg 1 vib

    14. Brg 2 vib

    15. Brg 3 vib

    16. Brg 4 vib

    17. Brg 5 vib

    18. Brg 6 vib

    19. Brg 7 vib

    20. Brg 1 temp.

    21. Brg 2 temp.

    22. Brg 3 temp.

    23. Brg 4 temp.

    24. Brg 5 temp.

    25. Brg 6 temp.

    26. Brg 7 temp.

    27. Th. Brg temp.

    28. A.S.

    29. Diff. Exp

    30. SOP (TE)

    31. SOP (EE)

    32. SO temp

  • 7/30/2019 Barring Gear

    19/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 19 of 30

    DATE OF ISSUE:

  • 7/30/2019 Barring Gear

    20/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 20 of 30

    DATE OF ISSUE:

    System: ATRS Logic- Oil Supply

    The following systems were checked under ATRS Logic for Oil Supply

    1. SGC Oil supply operation

    2. SGC Oil supply shutdown

    3. SLC Aux Oil Pump 1

    4. SLC Aux Oil Pump 2

    5. SLC Emergency Oil Pump DC

    6. SLC Jacking Oil Pump 1

    7. SLC Jacking Oil Pump 2

    8. Drive logic for AOP 1, AOP 2, EOP DC, JOP 1, JOP 2, Oil Temperature

    Control Valve, Turning Gear Valve, Oil Vapour Extractor 1 and Oil

    Vapour Extractor 2.

    9. Associated alarms.Live checks were carried out for all the above systems and checks were

    found satisfactory in all respect.

    For ensuring readiness of complete oil system (including control oil

    system) instruments as per next sheets were checked for their

    healthiness:

  • 7/30/2019 Barring Gear

    21/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 21 of 30

    DATE OF ISSUE:

    OIL SYSTEM-INSTRUMENT CHECKS

    TAG DESCRIPTION OK/NOT OKMAD11CT021AMAD11CT021BMAD11CT021CMAD11CT022AMAD11CT022BMAD11CT022CMAD11CT023AMAD11CT023BMAD11CT023CMAD11CT024AMAD11CT024BMAD11CT024CMAD11CT031AMAD11CT031BMAD11CT031CMAD11CT032A

    MAD11CT032BMAD11CT032CMAD11CT033AMAD11CT033BMAD11CT033CMAD11CT034AMAD11CT034BMAD11CT034CMAD11CY011MAD11CY012MAD11CY013

    MAD11CY021MAD11CY041MAD11FY901

    MAD12CT014AMAD12CT014BMAD12CT014CMAD12CT018AMAD12CT018BMAD12CT018CMAD12CY021

    MAD12CY041MAD12FY901

    RAD BRG HP F TOP LHRAD BRG HP F TOP LHRAD BRG HP F TOP LHRAD BRG HP F TOP RHRAD BRG HP F TOP RHRAD BRG HP F TOP RHRAD BRG HP F BOT LHRAD BRG HP F BOT LHRAD BRG HP F BOT LHRAD BRG HP F BOT HRRAD BRG HP F BOT HRRAD BRG HP F BOT HRAXL BRG FRONT LHAXL BRG FRONT LHAXL BRG FRONT LHAXL BRG FRONT RH

    AXL BRG FRONT RHAXL BRG FRONT RHAXL BRG REAR LHAXL BRG REAR LHAXL BRG REAR LHAXL BRG REAR RHAXL BRG REAR RHAXL BRG REAR RHAXIAL SHIFTAXIAL SHIFTAXIAL SHIFT

    BRG VIBR HP FRNTPEDREL SHAFT VIBR HP FABS SHAFT VIBR HP F(MAD11CY021&041)RAD BRG HP R BOT RHRAD BRG HP R BOT RHRAD BRG HP R BOT RHRAD BRG HP R BOT RHRAD BRG HP R BOT RHRAD BRG HP R BOT RHBRG VIBR HP R-PED

    REL SHAFT VIB HP RABS SHAFT VIBR HP R

  • 7/30/2019 Barring Gear

    22/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 22 of 30

    DATE OF ISSUE:

    MAD13CT014AMAD13CT014BMAD13CT014CMAD13CT018AMAD13CT018BMAD13CT018CMAD13CY021MAD13CY041

    MAD13FY901

    MAD14CT014AMAD14CT014BMAD14CT014CMAD14CT018AMAD14CT018BMAD14CT018CMAD14CY005MAD14CY021MAD14CY041

    MAD14FY901

    (MAD12CY021&041)RAD BRG LP1 R BOTRHRAD BRG LP1 R BOTRHRAD BRG LP1 R BOTRHRAD BRG LP1 R BOTRHRAD BRG LP1 R BOTRHRAD BRG LP1 R BOTRHBRG VIBR LP 1 R -PEDREL SHAFT VIB LP1 RABS SHAFT VIBR LP1 R

    (MAD13CY021&CY041)RAD BRG LP2 R BOTRHRAD BRG LP2 R BOTRHRAD BRG LP2 R BOTRHRAD BRG LP2 R BOTRHRAD BRG LP2 R BOTRHRAD BRG LP2 R BOTRHABS EXP LP2 CASE RBRG VIBR LP2 R-PEDREL SHAFT VIB LP2 RABS SHAFT VIBR LP2 R(MAD14CY021&041)

    MAV10CL001MAV10CL002MAV10CL006MAV10CL007MAV10CL008MAV10CL521MAV21CP001MAV21CP010

    MAV21CP011MAV21CP012MAV21CP521MAV22CP501MAV23CP501MAV24CP501MAV31CP501MAV32CP501MAV35CP001MAV35CP011MAV35CP016

    MAV41CP501MAV41CP521

    LEVEL IN MAIN OIL TANKLEVEL IN MAIN OIL TANKLEVEL IN MAIN OIL TANKLEVEL IN MAIN OIL TANKLEVEL IN MAIN OIL TANKLEVEL IN MAIN OIL TANKHYD OIL HEADERHYD OIL HEADER

    HYD OIL HEADERHYD OIL HEADERSUC LINE MOPHYD OIL AUX OIL PMP1HYD OIL AUX OIL PMP2LUB OIL EMERG OIL PUMPJACK OIL AFT PUMP1JACK OIL AFT PUMP2JACK OIL PRESSUREJACK OIL PRESSUREDP FILTR JACK OIL

    LUBE OIL BEF COOLERLUBE OIL BEH COOLER

  • 7/30/2019 Barring Gear

    23/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 23 of 30

    DATE OF ISSUE:

    MAV41CT001AMAV41CT001BMAV41CT501MAV42CP001MAV42CP011MAV42CP012MAV42CP013MAV42CP014MAV42CP015MAV42CP016

    MAV42CP017MAV42CP018MAV42CP412MAV42CP413MAV42CP414MAV42CP417MAV42CP418MAV42CP421MAV42CP422MAV42CT001AMAV42CT001BMAV42CT501MAV44CP411MAV44CP412MAV44CP413MAV44CP414MAV44CP415MAV44CP416MAV51CP501MAV66CP501MAV66CP503

    MAV66CP507MAV66CP508MAV66CP511MAV66CP512MAV67CP501MAV67CP503MAV67CP506MAV71CT501MAV71CT502MAV71CT504MAV71CT506

    MAV71CT511MAV72CT501

    LUBE OIL BEF COOLERLUBE OIL BEF COOLERLUBE OIL BEF COOLERLUBE OIL PRESSURELUBE OIL PRESSURELUBE OIL PRESSUREDP FILTER 1 LUBE OILLUBE OIL PRESSUREDP FILTER 2 LUBE OILLUBE OIL PRESSURE

    LUBE OIL PRESSURELUBE OIL PRESSUREHP F BRG OIL BEH ORFHP R BRG OIL BEF ORFHP R BRG OIL BEH ORFLP1 R BRGOIL BEF ORFLP1 R BRGOIL BEH ORFLP2 R BRGOIL BEF ORFLP2 R BRGOIL BEH ORFLUBE OIL BEH COOLERLUBE OIL BEH COOLERLUBE OIL BEH COOLERGEN F BRGOIL BEF ORFGEN F BRGOIL BEH ORFGEN R BRGOIL BEF ORFGEN R BRGOIL BEH ORFEXR BRG OIL BEF ORFEXR BRG OIL BEH ORFBEH TURNING GATE VJACK OIL BRG1.CAS FJACK OIL BRG1.CAS R

    JACK OIL BRG1.CAS RJACK OIL BRG2.CAS RJACK OIL 1BRG3.CAS RJACK OIL2 BRG3.CAS RJACK OIL GEN BRG TSJACK OIL GEN BRGJACK OIL EXR BRGHP F BRG DRAIN OILHP R BRG DRAIN OILLP1 R BRG DRAIN OILLP2 R BRG DRAIN OIL

    EXR BRG DRAIN OILGEN F BRG DRAIN OIL

  • 7/30/2019 Barring Gear

    24/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 24 of 30

    DATE OF ISSUE:

    MAV72CT502MAV91CF516MAV91CL001MAV91CL012MAV91CL521MAV91CL522MAV91CL523MAV91CP011MAV91CP501MAV91CP502

    GEN R BRG DRAINFLOW BEH OIL-PURIFOIL-PURIFIEROIL-PURIFIEROIL-PURIFIEROIL-PURIFIEROIL-PURIFIERDP FLTR OIL-PURIFIERBEH PUMP OIL-PURIFBEH FILTER OIL-PURIF

    MAX16CP011MAX16CP021MAX16CP501MAX16CP502MAX18CP501MAX18CP502MAX31CP001MAX31CP511MAX31CP512MAX31CP516

    MAX31CP517MAX31CP541MAX31CP542MAX31CP543MAX31CP544MAX31CP545MAX31CP546MAX31CP547MAX31CP548MAX32CP011MAX32CP081MAX32CP511MAX32CP513MAX32CP514MAX41CP001MAX41CP501MAX41CP521MAX41CP522MAX42CP011MAX42CP012MAX42CP013

    MAX42CP014MAX42CP501

    HP CNT FLD BEH PMP1HP CNT FLD BEH PMP2HP CNT FLD BEHHP CNT FLD BEHLP CNT FLD BEH PMP1LP CNT FLD BEH PMP1HP CONTROL FLUIDACCUM1 HP-ESVACCUM2 HP-ESVACCUM3 HP-ESV

    ACCUM4 HP-ESVACCUM1 BEH HP FLDPMPACCUM2 BEH HP FLDPMPACCUM3 BEH HP FLDPMPACCUM4 BEH HP FLDPMPACCUM5 BEH HP FLDPMPACCUM6 BEH HP FLDPMPACCUM7 BEH HP FLDPMPACCUM8 BEH HP FLDPMPDP FILTR HP-ESVDP FILTR BYP VALVESBEH FILTR HP-ESVFILTER 1 HP-ESVFILTER 1 HP-ESVLP CONTROL FLUIDLP CONTROL FLUIDACCUM BYP CNT CUB1ACCUM BYP CNT CUB2CNT FLD INTLK BYPCNT FLD INTLK BYPCNT FLD INTLK BYP

    CNT FLD INTLK BYPLP CONTROL FLUID

  • 7/30/2019 Barring Gear

    25/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 25 of 30

    DATE OF ISSUE:

    MAX42CP502MAX42CP503MAX42CP504MAX42CP511MAX42CP512MAX42CP513MAX42CP514MAX42CP517MAX42CP518MAX42CP519

    MAX42CP520MAX42CP531MAX42CP532MAX42CP541MAX42CP542MAX42CP543MAX42CP544MAX44CP501MAX45CG001AMAX45CG001KMAX45CG001TMAX45CG002AMAX45CG002KMAX45CG002TMAX45CP001MAX45CP006MAX45CP041MAX45CP042MAX45CP043MAX45CP501MAX46CG001A

    MAX46CG001BMAX46CP001MAX46CP002MAX46CP501MAX46CP502MAX47CG001AMAX47CG001BMAX47CG001CMAX47CG001DMAX47CG001FMAX47CP001

    MAX47CP501MAX48CP201

    LP CONTROL FLUIDLP CONTROL FLUIDLP CONTROL FLUIDCNT FLD INJ WTR V 1CNT FLD INJ WTR V 2CNT FLD INJ WTR V 3CNT FLD INJ WTR V 4CNT FLD INJ WTR V 5CNT FLD INJ WTR V 6CNT FLD INJ WTR V 7

    CNT FLD INJ WTR V 8ACCUM 1 CNT CUBACCUM 2 CNT CUBACCUM1 BYP CNT CUB 1ACCUM2 BYP CNT CUB 1ACCUM1 BYP CNT CUB 2ACCUM2 BYP CNT CUB 2PRIMARY FLUIDEHYD CONV 1 TURB GOVEHYD CONV 1 TURB GOVEHYD CONV 1 TURB GOVEHYD CONV 2 TURB GOVEHYD CONV 2 TURB GOVEHYD CONV 2 TURB GOVSEC FLD HP-GOVVALVESEC FLD HP-GOVVALVESEC FLD HP-GOVVALVESEC FLD HP-GOVVALVESEC FLD HP-GOVVALVESEC FLD HP-GOVVALVESPEED CHANGER

    SPEED CHANGERSEC AUX FLUID 1SEC AUX FLUID 2SEC AUX FLUID 1SEC AUX FLUID 2STARTING DEVICESTARTING DEVICESTARTING DEVICESTARTING DEVICESTARTING DEVICESTART-UP FLUID

    START-UP FLUIDSTART-UP AUX FLUID

  • 7/30/2019 Barring Gear

    26/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 26 of 30

    DATE OF ISSUE:

    MAX48CP202MAX48CP501MAX51CG005CMAX51CG005EMAX51CG006CMAX51CG006EMAX51CG205CMAX51CG205EMAX51CG206CMAX51CG206E

    MAX51CG211BMAX51CG211CMAX51CP001MAX51CP013MAX51CP016MAX51CP017MAX51CP018MAX51CP021MAX51CP022MAX51CP023MAX51CP209MAX51CP210MAX51CP211MAX51CP212MAX51CP221MAX51CP222MAX51CP223MAX51CP226MAX51CP227MAX51CP228MAX51CP501

    MAX51CP522MAX51CP523MAX51CP527MAX51CP528MAX52CG005CMAX52CG005EMAX52CP211MAX52CP212MAX52CP213MAX52CP214MAX52CP501

    MAX53CG001AMAX53CG001T

    START-UP AUX FLUIDSTART-UP AUX FLUIDEMERG TRP DEVICE1 NBEMERG TRP DEVICE1 NBEMERG TRP DEVICE2 NBEMERG TRP DEVICE2 NBEMERG TPP DEVICE1 WPEMERG TRP DEVICE1 WPEMERG TRP DEVICE2 WPEMERG TRP DEVICE2 WP

    CHANGEOVER VLVCHANGEOVER VLVTRIP FLUIDTRIP FLUIDTRIP FLUIDTRIP FLUIDTRIP FLUIDTRIP FLUIDTRIP FLUIDTRIP FLUIDBEF TRIP DEVICE DOBEF TRIP DEVICE DOBEF TRIP DEVICE DTBEF TRIP DEVICE DTBEF TEST V HP-ESV 1UP PISTON HP-ESV 1BEL PISTON HP-ESV 1BEF TEST V HP-ESV 2UP PISTON HP-ESV 2BEL PISTON HP-ESV 2TRIP FLUID

    UP PISTON HP-ESV 1UP PISTON HP-ESV 2UP PISTON HP-ESV 2BEL PISTON HP-ESV 2MANUAL TRIPMANUAL TRIPAUXILIARY TRIP FLUIDAUXILIARY TRIP FLUIDAUX TRIP FLUID WPAUX TRIP FLUID WPAUXILIARY TRIP FLUID

    EHYD CONV BYP CNT 1EHYD CONV BYP CNT 1

  • 7/30/2019 Barring Gear

    27/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 27 of 30

    DATE OF ISSUE:

    MAX53CG002AMAX53CG002TMAX53CG003AMAX53CG003TMAX53CG004AMAX53CG004TMAX53CP031MAX53CP032MAX53CP033MAX53CP034

    MAX53CP035MAX53CP036MAX53CP037MAX53CP038MAX53CP501MAX53CP502MAX53CP503MAX53CP504MAX61CP215MAX62CG001BMAX62CG001CMAX62CP211MAX62CP212MAX62CP213MAX62CP501MAX89CL001MAX89CL015MAX89CL521MAY01EP001AMAY01EP001BMAY01EP001C

    MAY01EP001DMAY01EP001EMAY01EP001FMAY10CG001MAY10CG001CMAY10CG001EMAY10CG002MAY10CG002CMAY10CG002EMKA02FE001AMKA02FE001A

    MKA02FE001BMKA02FE001C

    EHYD CONV BYP CNT 2EHYD CONV BYP CNTEHYD CONV BYP CNTEHYD CONV BYP CNTEHYD CONV BYP CNTEHYD CONV BYP CNTCNT FLD CSDV 1CNT FLD CSDV 1CNT FLD CSDV 2CNT FLD CSDV 2

    CNT FLD CSDV 3CNT FLD CSDV 3CNT FLD CSDV 4CNT FLD CSDV 4CNT FLD CSDV 1CNT FLD CSDV 2CNT FLD CSDV 3CNT FLD CSDV 4LATCH TRIP DEVICE DTTEST DEVICETEST DEVICETEST OSPD TRIP DEVTEST OSPD TRIP DEVTEST OSPD TRIP DEVTESTFLD OSPD TRP DEWASTE OIL TANKWASTE OIL TANKWASTE OIL TANKESV UP MARGINESV LOWER MARGINHP SHAFT 50%

    HP SHAFT UPPER MARGINHP SHAFT LOWER MARGINACTUAL SPEED/LOADOVERSPEED TRIP DEV 1 INDICATOR LAMPOVERSPEED TRIP DEV 1OVERSPEED TRIP DEV 1OVERSPEED TRIP DEV 2 INDICATOR LAMPOVERSPEED TRIP DEV 2OVERSPEED TRIP DEV 2ACTUAL POWER GENERATEDACTUAL POWER

    ACTUAL POWER GENERATEDCURRENT TRANSDUCER GENERATED

  • 7/30/2019 Barring Gear

    28/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 28 of 30

    DATE OF ISSUE:

    MYA01CS011MYA01CS012MYA01CS013MYA01CS014MYA01DS001AMYA01DS001BMYA01FS001AMYA01FS001BMYA01FS001CMYA01FS002

    MYA01GS005PGB20CT001APGB20CT001BPGB21CT501PGB21CT502PGB22CT501PGB22CT502PGB23CT001APGB23CT001B

    TURBINE SPEEDTURBINE SPEEDTURBINE SPEEDTURBINE SPEEDTURBINE SPEEDTURBINE SPEEDTURBINE SPEEDTURBINE SPEEDTURBINE SPEEDLAMP TEST

    PUSH BUTTON SWCLG WTR BEF OIL CLRCLG WTR BEF OIL CLRCLG WTR BEF OIL CLR1CLG WTR BEH OILCLR1CLG WTR BEF OIL CLR2CLG WTR BEH OIL CLR2CLGWTR BEH OILCLRCLGWTR BEH OILCLR

    8.0 Reference

    1. Volume of EAST Package2. O&M manual

    9.0 Verification process

    Verification points are included in 4.0 general methods

    Verification requirements- all functional requirements have been listed ingeneral method.

  • 7/30/2019 Barring Gear

    29/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 29 of 30

    DATE OF ISSUE:

    APPENDIX

    VERIFICATION TABLE

    COMMISSIONING PROCEDURE FOR BARRING GEAR SYSTEM

    COMMISSIONING PROCEDURE NO._________________________________

    SL.NO

    ACTIVITYVERIFIED

    ACCEPTANCECRITERIA

    VERIFYINGAGENCY

    CERTIFICATION BY VERIFYING AGENCY

    PROCEDUREVERIFICATION

    INSPECTIONWITNESS

    FUNCTION-AL TEST

    RESULTVERIFICA-TION

    GENERALREMARKS

    1 Pl refer4.0

    Pl refer 4.0

  • 7/30/2019 Barring Gear

    30/30

    TAPP-3&4 COMMISSIONINGPROCEDURE

    PROCEDURE NO: 3&4-

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    ISSUENO:01

    REV NO:0

    Page 30 of 30

    DATE OF ISSUE:

    ANNEXURE

    NUCLEAR POWER CORPORATION OF INDIA LIMITED(A Govt. of India Enterprise)

    TARAPUR ATOMIC POWER PROJECT3&4

    COMMISSIONING PROCEDURE ACCEPTANCE NOTE

    Contractor commissioning procedure number ___________________________ forthe commissioning of BARRING GEAR SYSTEM submitted by BHEL under thecontract number ______________ is received and found conforming to therequirement of NPCIL specifications & Norms & hence accepted.

    Commissioning procedure number:

    Commissioning procedure title:

    _____________________________________

    COMMISSIONING PROCEDURE FORBARRING GEAR SYSTEM

    NAME & DESIGNATION SIGNATURE

    Reviewed by:Concerned Commg. Engs./Sr.Commg. Engs/SMEs

    Concurredby:

    ConcernedENCs/Suptds.

    NPC DesignGroup

    Approved by: